Gas injection well explosion-proof system and using method thereof
Through the combination of air seals, corrosion-resistant oil pipes and temperature and pressure measuring couples of the gas injection well explosion-proof system, the bottom hole temperature and pressure are monitored in real time, which solves the problems of gas injection well explosion and hydrogen sulfide leakage, realizes the safe monitoring and response of gas injection wells, and improves the recovery rate of oil reservoirs.
Patent Information
- Application Number
- CN202410366796.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-28
- Publication Date
- 2025-09-30
AI Technical Summary
Gas injection wells are prone to accidents such as explosions and hydrogen sulfide leaks during the gas injection process. Existing technologies make it difficult to effectively monitor and respond to the risks caused by oil and gas backflow.
The gas injection well explosion-proof system, which consists of air seals, anti-corrosion oil pipes, safety valves, and temperature and pressure measuring couples, can promptly identify and respond to explosion risks by remotely controlling the safety valves and real-time monitoring of bottom hole temperature and pressure.
Effectively ensure the air tightness in the well pipe, prevent leakage, timely isolate the bottom of the well from the outside world, reduce the risk of explosion, ensure the safe completion of gas injection operations, and improve oil reservoir recovery rate.
Smart Images

Figure CN120719942A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of oil reservoir development, and in particular to a gas injection well explosion-proof system and a use method thereof. Background Art
[0002] Many oil reservoirs in the existing technology have entered the late stage of waterflooding development, resulting in low oil production and poor economic benefits. At this time, air injection oil recovery technology has attracted widespread attention due to its low cost, lack of gas source restrictions, and thermal energy assistance. After a large number of theoretical and field tests, it was found that the resulting heat-assisted miscible flooding can stabilize oil reservoir production and effectively improve oil recovery. Specifically, during the steam flooding process of air injection development of oil reservoirs, oxygen oxidation heat can reduce crude oil viscosity and change crude oil composition, thereby promoting the miscibility of flue gas and formation crude oil, thereby completing the air injection thermal miscible flooding process, forming a miscible flooding in the oil reservoir to improve oil recovery.
[0003] However, gas injection wells have high process requirements and require a large number of gas injection equipment. There are also many risk points in the production process, making it prone to accidents such as gas injection well explosions and hydrogen sulfide leaks. Therefore, risk analysis of the air injection fire drive oil recovery process, as well as the timely and rapid identification of hazard sources and risk assessment, are of great significance to reservoir development. Generally speaking, the main cause of gas injection well hazards is oil and gas backflow, which can be caused by gas injection cessation, equipment failure, pipeline leakage, etc. Therefore, how to timely monitor, identify, and respond to risks in gas injection wells at the gas injection site is an urgent problem that researchers in this field need to solve. Summary of the Invention
[0004] The object of the present invention is to provide a gas injection well explosion prevention system and a method of using the same, so as to timely monitor, identify and respond to risks of gas injection wells at the gas injection site.
[0005] To achieve this object, the present invention adopts the following technical solutions:
[0006] Gas injection well explosion protection system, including:
[0007] An airtight seal, which is used to seal the wellhead, which is located above the ground;
[0008] An air injection pipe and an anti-corrosion oil pipe are both arranged in the well pipe, and the anti-corrosion oil pipe is connected to the wellhead and the air injection pipe. The air injection pipe is located at the air injection layer at the bottom of the well and is used for perforation air injection;
[0009] A safety valve is provided in the anti-corrosion oil pipe to control the on-off of the inside thereof, the safety valve is located below the ground and can be remotely controlled to open and close;
[0010] A temperature and pressure measuring couple is provided through the wellhead and is located in the anti-corrosion oil pipe. The output end of the temperature and pressure measuring couple is located in the gas injection pipe and is used to monitor the temperature and pressure at the bottom of the well.
[0011] Optionally, it also includes a first pipeline and a compressor, the first pipeline is connected to the wellhead, and the compressor is arranged at the input end of the first pipeline for injecting gas into the first pipeline.
[0012] Optionally, a spare compressor is also included, which is used to replace the compressor.
[0013] Optionally, a first one-way valve and a monitor are further provided on the first pipeline. The monitor is provided between the first one-way valve and the compressor for monitoring the gas injection process, and the first one-way valve is unidirectional.
[0014] Optionally, it also includes a second pipeline and a pump truck. The second pipeline is connected to the wellhead and is located between the first pipeline and the ground. The pump truck is connected to the input end of the second pipeline for well pressure.
[0015] Optionally, the device further includes a first host electrically connected to the safety valve for remotely controlling the opening and closing of the safety valve.
[0016] Optionally, a second host is also included, which is electrically connected to the temperature and pressure measuring couple and is used to monitor and record the temperature and pressure of the bottom of the well.
[0017] Optionally, it also includes a ring seal assembly, which includes a packer and a sealing bridge plug, both of which are arranged on the outside of the anti-corrosion oil pipe and abut against the inner wall of the well pipe.
[0018] On the other hand, a method for using a gas injection well explosion prevention system includes the following steps:
[0019] After the air tightness test of the well pipe is carried out, the first stage is carried out, which is the high-efficiency oxygen consumption stage of the air injection reservoir;
[0020] Air and catalyst are injected through the compressor in the gas injection well explosion-proof system, and the bottom hole temperature and pressure are monitored in real time through the second host and temperature and pressure measuring couples in the gas injection well explosion-proof system to determine whether there is an explosion risk;
[0021] The second stage, i.e., the conventional air injection stage, is carried out, wherein the air injection amount is reduced, and at the same time, the bottom hole temperature and pressure are monitored in real time by the second host and the temperature and pressure measuring couple (80) to determine whether there is an explosion risk;
[0022] Stop air injection and take the casing gas components for testing every 6 hours to determine whether there is an explosion risk until the gas injection operation is safely completed.
[0023] Optionally, it also includes:
[0024] When the bottom hole temperature and pressure are monitored by the second host and the temperature and pressure measuring couples and it is determined that there is an explosion risk, the injection parameters, compressor, compressor pipeline, and the status of the injected air are checked in turn for adjustment;
[0025] When it is found through the detection of casing gas components that the content of organic hydrocarbons in the gas is close to half of the explosion limit and there is a risk of explosion, the pump truck in the gas injection well explosion-proof system is used to perform foam hydraulic well until the content of organic hydrocarbons in the casing gas components is reduced. When the content of organic hydrocarbons in the casing gas components increases after the pump truck performs foam hydraulic well, all valves at the wellhead are closed, and the safety valve is closed by remote control of the first host.
[0026] Beneficial effects of the present invention:
[0027] The use of air seals and anti-corrosion oil pipes in the present invention can effectively ensure the airtightness of the well pipe, avoid leakage during the gas injection process, and with the cooperation of the anti-corrosion oil pipe and the gas injection pipe, a complete path for perforation oil production can be achieved. Furthermore, the safety valve provided in the present invention can control the on-off of the anti-corrosion oil pipe, and the safety valve is located below the ground and can be remotely controlled to open and close, thereby isolating the bottom of the well from the outside world in time when an explosion occurs to prevent the explosion. The temperature and pressure measuring couples provided in the present invention monitor the temperature and pressure of the bottom of the well, so that the operating personnel can predict the explosion risk in advance and make relevant adjustments in time. On the other hand, the use method of the gas injection well explosion-proof system can effectively monitor the first and second stage gas injection and ensure the safe completion of the gas injection operation, so as to improve the safe recovery rate of the oil reservoir. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a structural schematic diagram of the gas injection well explosion-proof system according to an embodiment of the present invention.
[0029] In the picture:
[0030] 100-ground; 200-gas injection layer; 300-pump truck; 400-compressor; 401-backup compressor; 10-gas seal; 101-first check valve; 11-first pipeline; 102-monitor; 12-second pipeline; 20-gas injection pipe; 30-corrosion-resistant oil pipe; 40-ring seal assembly; 41-packer; 42-sealing bridge plug; 50-safety valve; 501-first main engine; 60-second check valve; 70-perforating string; 80-temperature and pressure measuring couple; 801-second main engine. DETAILED DESCRIPTION
[0031] The following describes embodiments of the present invention in detail. Examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar components or components having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to explain the present invention, but are not to be construed as limiting the present invention.
[0032] In the description of the present invention, unless otherwise expressly specified or limited, the terms "connected," "connected," and "fixed" should be understood in a broad sense. For example, they may refer to fixed or detachable connections, mechanical or electrical connections, direct or indirect connections through an intermediate medium, and internal communication between two elements or interaction between two elements. Those skilled in the art will understand the specific meanings of the above terms in the present invention based on specific circumstances.
[0033] In the description of the present invention, unless otherwise expressly specified or limited, a first feature being "above" or "below" a second feature may include the first feature being in direct contact with the second feature, or may include the first feature being in contact with the second feature through another feature between them instead of being in direct contact. Moreover, a first feature being "above," "above," and "above" a second feature may include the first feature being directly above or obliquely above the second feature, or may simply mean that the first feature is higher in level than the second feature. A first feature being "below," "below," and "below" a second feature may include the first feature being directly below or obliquely below the second feature, or may simply mean that the first feature is lower in level than the second feature.
[0034] Many oil reservoirs in the existing technology have entered the late stage of waterflooding development, resulting in low oil production and poor economic benefits. At this time, air injection oil recovery technology has attracted widespread attention due to its low cost, lack of gas source restrictions, and thermal energy assistance. After a large number of theoretical and field tests, it was found that the resulting heat-assisted miscible flooding can stabilize oil reservoir production and effectively improve oil recovery. Specifically, during the steam flooding process of air injection development of oil reservoirs, oxygen oxidation heat can reduce crude oil viscosity and change crude oil composition, thereby promoting the miscibility of flue gas and formation crude oil, thereby completing the air injection thermal miscible flooding process, forming a miscible flooding in the oil reservoir to improve oil recovery.
[0035] However, gas injection wells have high process requirements and require a large number of gas injection equipment. There are also many risk points in the production process, making it prone to accidents such as gas injection well explosions and hydrogen sulfide leaks. Therefore, risk analysis of the air injection fire drive oil recovery process, as well as the timely and rapid identification of hazard sources and risk assessment, are of great significance to reservoir development. Generally speaking, the main cause of gas injection well hazards is oil and gas backflow, which can be caused by gas injection cessation, equipment failure, pipeline leakage, etc. Therefore, how to timely monitor, identify, and respond to risks in gas injection wells at the gas injection site is an urgent problem that researchers in this field need to solve.
[0036] The technical solution of this embodiment will be further described below with reference to the accompanying drawings and through specific implementation methods.
[0037] like Figure 1 As shown, this embodiment provides a gas injection well explosion-proof system and its use method. The gas injection well explosion-proof system includes an air seal 10, an air injection pipe 20, an anti-corrosion oil pipe 30, a safety valve 50, and a temperature and pressure measuring couple 80. The air seal 10 is used to seal the wellhead, which is located above the ground 100. Both are arranged in the well pipe, and the anti-corrosion oil pipe 30 connects the wellhead and the air injection pipe 20. The air injection pipe 20 is located in the air injection layer 200 at the bottom of the well and is used for perforation gas injection. The safety valve 50 is arranged in the anti-corrosion oil pipe 30 to control the internal on-off of the safety valve 50. The safety valve 50 is located below the ground 100 and can be remotely controlled to open and close. The temperature and pressure measuring couple 80 is set through the wellhead and is located in the anti-corrosion oil pipe 30. The output end of the temperature and pressure measuring couple 80 is located in the air injection pipe 20 for monitoring the temperature and pressure at the bottom of the well.
[0038] On the other hand, a method for using the gas injection well explosion prevention system is characterized by comprising the following steps:
[0039] After the air tightness test of the well pipe is carried out, the first stage is carried out, which is the high-efficiency oxygen consumption stage of the air injection reservoir;
[0040] Air and catalyst are injected through the compressor 400 in the gas injection well explosion-proof system, and the bottom hole temperature and pressure are monitored in real time through the second host 801 and the temperature and pressure measuring couple 80 in the gas injection well explosion-proof system to determine whether there is an explosion risk;
[0041] The second stage, i.e., the conventional air injection stage, is carried out, in which the air injection rate is reduced. At the same time, the bottom hole temperature and pressure are monitored in real time by the second host 801 and the temperature and pressure measuring couple 80 to determine whether there is an explosion risk.
[0042] Stop air injection and take the casing gas components for testing every 6 hours to determine whether there is an explosion risk until the gas injection operation is safely completed.
[0043] Specifically, the use of an air seal 10 and an anti-corrosion oil pipe 30 in this embodiment can effectively ensure the airtightness of the well pipe, avoiding leakage during the gas injection process, and with the cooperation of the anti-corrosion oil pipe 30 and the gas injection pipe 20, a complete path for perforation oil production can be achieved. Furthermore, in this embodiment, a safety valve 50 is provided to control the on-off of the anti-corrosion oil pipe 30, and the safety valve 50 is located below the ground 100 and can be remotely controlled to open and close, thereby allowing timely handling when an explosion occurs, isolating the bottom of the well from the outside world in a timely manner to prevent explosions. In this embodiment, a temperature and pressure measuring couple 80 is provided to monitor the temperature and pressure of the bottom of the well, making it easier for operators to predict the risk of explosion in advance and make relevant adjustments in a timely manner. On the other hand, the use of the gas injection well explosion-proof system can effectively monitor the first and second stages of gas injection and ensure the safe completion of the gas injection operation, thereby improving the safe recovery rate of the oil reservoir.
[0044] The specific structure of the gas injection well explosion-proof system in this embodiment is described below.
[0045] like Figure 1 As shown, the gas injection well explosion-proof system in this embodiment is used for gas injection in air hot miscible phase drive gas injection wells and for pre-emptive prevention, identification and emergency response to explosions during the gas injection process. Specifically, the gas injection well explosion-proof system in this embodiment is respectively arranged at the wellhead, the ground 100, the well pipe, the bottom of the well and the gas injection layer 200. Through the process equipment in multiple positions, it can effectively prevent the danger of explosion caused by oil and gas backflow and deal with it in time when the danger occurs. Optionally, the gas injection well explosion-proof system includes an air seal 10 arranged at the wellhead, as well as a gas injection pipe 20, an anti-corrosion oil pipe 30, a ring seal assembly 40, a safety valve 50 and a temperature and pressure measuring couple 80, and is provided with a pump truck 300, a compressor 400 and a spare compressor 401.
[0046] Specifically, the wellhead is located above the ground 100, and an air seal 10 is provided at the wellhead for sealing at the wellhead to ensure that air does not leak out during the gas injection process. Furthermore, a first pipeline 11 is provided near the wellhead, and the output end of the first pipeline 11 is connected to the wellhead, and a compressor 400 is provided at its input end, so that gas can be injected into the first pipeline 11 through the compressor 400, and under the action of the first pipeline 11, the gas is transmitted to the wellhead and transmitted to the well pipe. Furthermore, a spare compressor 401 is also provided in this embodiment, so that when the compressor 400 fails or has a problem and needs to be repaired, the compressor 400 can be replaced in time to achieve the continuity of gas injection and ensure production needs.
[0047] Optionally, the first pipeline 11 is also equipped with a first check valve 101 and a monitor 102. In this embodiment, the monitor 102 is located between the first check valve 101 and the compressor 400 to monitor gas injection, allowing operators to observe and control the gas injection process in real time. The first check valve 101 is unidirectional, effectively reducing the rate of oil and gas backflow into the compressor 400, thereby reducing the risk of explosion. Furthermore, the gas injection well explosion-proof system also includes a second pipeline 12 and a pump truck 300 at the wellhead. Specifically, the second pipeline 12 connects to the wellhead and is located between the first pipeline 11 and the surface 100. The pump truck 300 is connected to the input end of the second pipeline 12 for well killing. Specifically, the pump truck 300 can deliver foam fluid for well killing operations, effectively controlling oil and gas backflow and reducing the oil and gas content in mixtures nearing the explosion limit, thereby significantly reducing the risk of explosion. It also isolates the wellbore from the first pipeline 11, protecting the first pipeline 11 from the effects of explosions. Therefore, the pump truck 300 and the second pipeline 12 are used in conjunction with each other to perform the well killing operation, making the air injection process safe and controllable.
[0048] Optionally, in this embodiment, both the air injection pipe 20 and the anti-corrosion oil pipe 30 are disposed within the wellbore, and the anti-corrosion oil pipe 30 is connected to the wellhead and the air injection pipe 20, that is, the air injection pipe 20 forms a passage with the wellhead through the anti-corrosion oil pipe 30, which is conducive to air injection and subsequent oil production. Furthermore, the air injection pipe 20 is located at the air injection layer 200 at the bottom of the well, and is used for perforating and injecting air to achieve oil production. For example, in this embodiment, an anti-corrosion coating is provided on the outside of the anti-corrosion oil pipe 30, which can effectively prevent the anti-corrosion oil pipe 30 from being damaged and leaking, thereby improving its air tightness and ensuring a stable air injection volume. For example, the air injection pipe 20 can release a perforating column 70 to perform perforation operations on the air injection layer 200 to ensure the stability of oil production.
[0049] Optionally, the gas injection well explosion-proof system also includes a ring seal assembly 40, and the ring seal assembly 40 includes a packer 41 and a sealing bridge plug 42, both of which are arranged on the outside of the anti-corrosion oil pipe 30 and abut against the inner wall of the well pipe to seal the annular channel between the anti-corrosion oil pipe 30 and the well pipe, ensuring that the pressure inside and outside the anti-corrosion oil pipe 30 and the gas injection pipe 30 is balanced and not pressurized, further improving the sealing performance and preventing air leakage. Optionally, a second check valve 60 is also provided between the ring seal assembly 40 and the gas injection pipe 20, and the second check valve 60 is also configured for one-way flow and is located in the anti-corrosion oil pipe 30 to prevent oil and gas from flowing back into the gas injection layer 200.
[0050] Furthermore, in this embodiment, a safety valve 50 and a first host 501 electrically connected to the safety valve 50 are provided. Optionally, the safety valve 50 is provided in the anti-corrosion oil pipe 30 to control the internal flow of the oil pipe. The safety valve 50 is located below the ground 100 and can be opened and closed by the first host 501 to open and close the internal channel of the anti-corrosion oil pipe 30. Furthermore, when there is an explosion risk during the air injection process, the safety valve 50 can be remotely controlled to open and close, thereby achieving timely isolation between the bottom of the well and the external environment and reducing the impact of the explosion. In this embodiment, the safety valve 50 is the last line of defense in the explosion-proof system of the gas injection well. Remote control can effectively ensure the safety of operators while promptly sealing the bottom of the well to prevent explosions.
[0051] Optionally, a temperature and pressure measuring couple 80 is also provided in this embodiment, and the temperature and pressure measuring couple 80 is installed through the wellhead and located in the anti-corrosion oil pipe 30. The output end of the temperature and pressure measuring couple 30 is located in the gas injection pipe 20, thereby monitoring the temperature and pressure at the bottom of the well. Similarly, a second host 801 is provided in this embodiment, and the second host 801 is electrically connected to the temperature and pressure measuring couple 80, which is used to monitor and record the temperature and pressure at the bottom of the well in real time, and then reflect the state of the gas injection layer 200 through the fluctuation of its temperature and pressure, so that the operating personnel can pre-determine whether there is an explosion risk, and conduct timely and targeted inspections to reduce the explosion risk and avoid causing excessive damage.
[0052] The following describes the method for using the gas injection well explosion-proof system in this embodiment.
[0053] The method for using the gas injection well explosion-proof system includes the following steps:
[0054] After the air tightness test of the well pipe is carried out, the first stage is carried out, which is the high-efficiency oxygen consumption stage of the air injection reservoir;
[0055] Air and catalyst are injected through the compressor 400 in the gas injection well explosion-proof system, and the bottom hole temperature and pressure are monitored in real time through the second host 801 and the temperature and pressure measuring couple 80 in the gas injection well explosion-proof system to determine whether there is an explosion risk;
[0056] The second stage, i.e., the conventional air injection stage, is carried out, in which the air injection rate is reduced. At the same time, the bottom hole temperature and pressure are monitored in real time by the second host 801 and the temperature and pressure measuring couple 80 to determine whether there is an explosion risk.
[0057] Stop air injection and take the casing gas components for testing every 6 hours to determine whether there is an explosion risk until the gas injection operation is safely completed.
[0058] Furthermore, it also includes:
[0059] When the second host 801 and the temperature and pressure measuring couple 80 monitor the bottom hole temperature and pressure and determine that there is an explosion risk, the injection parameters, the compressor 400, the compressor pipeline, and the status of the injected air are checked in turn for adjustment;
[0060] When it is found through the detection of casing gas components that the content of organic hydrocarbons in the gas is close to half of the explosion limit and there is a risk of explosion, the pump truck 300 in the gas injection well explosion-proof system is used to perform foam hydraulic well until the content of organic hydrocarbons in the casing gas components is reduced. When the content of organic hydrocarbons in the casing gas components increases after the pump truck 300 performs foam hydraulic well, all valves at the wellhead are closed, and the safety valve 50 is remotely controlled to be closed through the first host 501.
[0061] Specifically, before air injection, it is necessary to conduct an air tightness test on the well pipe to ensure that the air injection volume is stable during the subsequent air injection, avoid energy waste, and effectively improve production efficiency. Optionally, the entire process of air injection is roughly divided into two stages, one is the first stage, the high-efficiency oxygen consumption stage of air-injected oil reservoirs, and the other is the second stage, the conventional air injection stage. The two stages have different air injection volumes. The air injection volume in the first stage is greater than the air injection volume in the second stage, and the air and catalyst need to be injected simultaneously in the first stage. Specifically, the injected air must be dry and meet the requirements of the water dew point detection of the compressor 400 to ensure the air injection volume during the air injection process and prevent the occurrence of oil and gas backflow from the source.
[0062] Optionally, when the bottom hole temperature and pressure are monitored by the second host 801 and the temperature and pressure measuring couple 80 and it is determined that there is an explosion risk, first check whether the injection parameters are set reasonably and whether the injected air meets the demand, and then check the compressor 400 and the compressor pipeline to verify whether the compressor 400 has failed. If there is a failure and repair is required, replace it with the spare compressor 401 to reduce the impact. At the same time, check whether the pipeline has problems such as punctures or corrosion, and clean and replace it in time. Specifically, the operating temperature of the compressor 400 can be strictly controlled, and when its temperature is too high and it automatically shuts down, it will be immediately deactivated and replaced with the spare compressor 401. Similarly, the compressor 400 and pipelines are regularly maintained according to the instructions to reduce the frequency of maintenance.
[0063] For example, the casing gas contains organic hydrocarbons. Generally, the lower explosion limit of methane at 25°C is 5%, while that of ethane, propane, and butane is 3.0%, 2.1%, and 1.8%, respectively. The lower explosion limit of pentane is 1.4%. As the initial temperature and initial pressure of the combustible gas increase, the explosion limit range widens, the critical oxygen content decreases, and the explosion risk increases. Therefore, the gas injection well explosion prevention system in this embodiment requires close monitoring of hazardous gases, such as H2S, based on the characteristics of different reservoirs. By testing the casing gas composition every six hours, real-time monitoring of these hazardous gases can be achieved, enabling the regulation of relevant parameters. Specifically, if the casing gas composition testing indicates that the organic hydrocarbon content in the gas is approaching half the explosion limit, posing an explosion risk, the pump truck 300 in the gas injection well explosion prevention system performs foam hydraulic well pumping until the casing gas organic hydrocarbon content decreases, indicating that the well killing has taken effect and oil-gas backflow has ceased. After further testing, air injection operations can be resumed to ensure safe operation. However, if the organic hydrocarbon content of the casing gas components still increases after the pump truck 300 performs foam hydraulic well drilling, all valves at the wellhead need to be closed, and the safety valve 50 needs to be closed remotely controlled by the first host 501 to isolate the bottom of the well from the outside world, eliminate the possibility of explosion, and ensure safe gas injection.
[0064] Therefore, the gas injection well explosion prevention system and its use method provided in this embodiment predict and judge the gas injection well from three aspects to avoid explosion. First, the anti-corrosion oil pipe 30 and the air seal 10 at the wellhead are set up, and the air seal detection is performed before air injection. This can effectively prevent the pressure drop caused by pipeline leakage and directly avoid the occurrence of explosion from the process direction; then, through the monitor 102 and the temperature and pressure measuring couple 80, the real-time monitoring of the gas injection volume and the bottom hole temperature and pressure can be used to predict the risk of explosion in advance, so as to facilitate timely adjustment to avoid explosion; finally, the pump truck 300 and the safety valve 50 are set up to timely suppress the well when an explosion occurs, and to perform closed control below the ground 100 to avoid explosion. This ensures that oil and gas backflow does not occur in the gas injection well, ensures the safe injection of the air injection hot miscible phase drive gas injection well, and ensures the final safe recovery rate of the oil reservoir.
[0065] Obviously, the above embodiments of the present invention are merely examples for the purpose of clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. Those skilled in the art will appreciate that other variations or modifications can be made based on the above description. It is not necessary and impossible to enumerate all embodiments here. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention shall be included within the scope of protection of the claims of the present invention.
Claims
1. Gas injection well explosion-proof system, characterized by: include: An air seal (10), the air seal (10) being used for sealing at a wellhead, the wellhead being located above the ground (100); An air injection pipe (20) and an anti-corrosion oil pipe (30), both of which are arranged in the well pipe, and the anti-corrosion oil pipe (30) is connected to the wellhead and the air injection pipe (20), and the air injection pipe (20) is located at the air injection layer (200) at the bottom of the well and is used for perforation air injection; a safety valve (50), the safety valve (50) being arranged in the anti-corrosion oil pipe (30) to control the opening and closing of the interior thereof, the safety valve (50) being located below the ground (100) and capable of being remotely controlled to open and close; A temperature and pressure measuring couple (80) is provided through the wellhead and is located in the anti-corrosion oil pipe (30); an output end of the temperature and pressure measuring couple (80) is located in the gas injection pipe (20) and is used to monitor the bottom hole temperature and pressure.
2. The gas injection well explosion-proof system according to claim 1, characterized in that: It also includes a first pipeline (11) and a compressor (400), wherein the first pipeline (11) is connected to the wellhead, and the compressor (400) is arranged at the input end of the first pipeline (11) and is used to inject gas into the first pipeline (11).
3. The gas injection well explosion-proof system according to claim 2, characterized in that: The utility model further comprises a spare compressor (401), wherein the spare compressor (401) is used to replace the compressor (400).
4. The gas injection well explosion-proof system according to claim 2, characterized in that: A first one-way valve (101) and a monitor (102) are also provided on the first pipeline (11). The monitor (102) is provided between the first one-way valve (101) and the compressor (400) for monitoring the gas injection process. The first one-way valve (101) is unidirectionally conductive.
5. The gas injection well explosion-proof system according to claim 2, characterized in that: It also includes a second pipeline (12) and a pump truck (300), wherein the second pipeline (12) is connected to the wellhead and is located between the first pipeline (11) and the ground (100), and the pump truck (300) is connected to the input end of the second pipeline (12) for well pressure.
6. The gas injection well explosion-proof system according to claim 1, characterized in that: The invention also includes a first host (501), wherein the first host (501) is electrically connected to the safety valve (50) and is used for remotely controlling the opening and closing of the safety valve (50).
7. The gas injection well explosion-proof system according to claim 1, characterized in that: It also includes a second host (801), which is electrically connected to the temperature and pressure measuring couple (80) and is used to monitor and record the temperature and pressure of the bottom of the well.
8. The gas injection well explosion-proof system according to claim 1, characterized in that: The invention also comprises an annular seal assembly (40), wherein the annular seal assembly (40) comprises a packer (41) and a sealing bridge plug (42), both of which are arranged outside the anti-corrosion oil pipe (30) and abut against the inner wall of the well pipe.
9. The method for using the explosion-proof system for gas injection wells is characterized in that: The following steps are involved: After the air tightness test of the well pipe is carried out, the first stage is carried out, which is the high-efficiency oxygen consumption stage of the air injection reservoir; Air and catalyst are injected by a compressor (400) in the gas injection well explosion-proof system according to any one of claims 1 to 8, and bottom hole temperature and pressure are monitored in real time by a second host (801) and a temperature and pressure measuring couple (80) in the gas injection well explosion-proof system to determine whether there is an explosion risk; The second stage, i.e., the conventional air injection stage, is carried out, wherein the air injection rate is reduced, and at the same time, the bottom hole temperature and pressure are monitored in real time by the second host (801) and the temperature and pressure measuring couple (80) to determine whether there is an explosion risk; Stop air injection and take the casing gas components for testing every 6 hours to determine whether there is an explosion risk until the gas injection operation is safely completed.
10. The method for using the gas injection well explosion-proof system according to claim 9, characterized in that: Also includes: When the bottom hole temperature and pressure are monitored by the second host (801) and the temperature and pressure measuring couple (80) and it is determined that there is an explosion risk, the injection parameters, the compressor (400), the compressor pipeline, and the state of the injected air are sequentially checked and adjusted; When it is found through detection of casing gas components that the gas organic hydrocarbon content is close to half of the explosion limit and there is a risk of explosion, a pump truck (300) in the gas injection well explosion-proof system is used to perform foam hydraulic well until the casing gas component organic hydrocarbon content is reduced. When the casing gas component organic hydrocarbon content increases after the pump truck (300) performs foam hydraulic well, all valves at the wellhead are closed, and the safety valve (50) is remotely controlled to be closed through the first host (501).