Tunnel state evaluation method based on defective lining model test

By constructing a tunnel lining model test device and machine learning algorithms, the train load and disease development were simulated, which solved the problem of inaccurate assessment of tunnel lining deterioration and enabled scientific evaluation of tunnel structure life and maintenance decisions.

CN121164062APending Publication Date: 2025-12-19CHINA STATE RAILWAY GRP CO LTD +2
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202511504407.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-10-21
Publication Date
2025-12-19

AI Technical Summary

Technical Problem

Existing methods for assessing the deterioration of tunnel linings fail to fully consider a variety of influencing factors, resulting in inaccurate assessments. Furthermore, a single corrosion resistance property cannot fully reflect the service life of the tunnel structure.

Method used

A test device for a defective lining model was constructed. Train loads were simulated by servo hydraulic loading and vibration devices to record the development of defects. A defect development model was established using a data acquisition system and machine learning algorithms, and a tunnel condition evaluation method was derived.

Benefits of technology

It enables quantitative assessment of tunnel defects, provides scientific tunnel maintenance decisions, reflects the actual impact of the coupling effects of multiple defects, and improves the accuracy of tunnel structure life prediction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121164062A_ABST
    Figure CN121164062A_ABST
Patent Text Reader

Abstract

The invention relates to a tunnel state evaluation method based on a defective lining model test. The method comprises the following steps: constructing a test device, manufacturing a lining model and a surrounding rock model, starting a servo hydraulic loading device to simulate a surrounding rock load, simulating a train load by using an excitation device, and recording development conditions of diseases at different moments. And analyzing the collected sample data, constructing an analysis model based on a result obtained through analysis, judging the danger degree of lining diseases through the analysis model, speculating the residual life of the lining, and evaluating the state of the tunnel by adopting the residual life / reference life. The model test is closer to a complex disease scene of a real tunnel, the influence of different disease coupling effects on the lining life can be revealed, and a new method is provided for tunnel life prediction and state evaluation.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the technical field of railway tunnel state evaluation, and particularly relates to a tunnel state evaluation method based on a model test of a lining containing defects. BACKGROUND

[0002] The existing grade division of tunnel lining degradation grade evaluation or soundness evaluation is mostly based on the influence on structure function and driving safety. Since there are many influencing factors of tunnel lining structure degradation, the mechanism is not completely clear. In order to facilitate implementation, the evaluation method mostly takes the degree of variation as the basis to grade the degradation degree, but the similar degree of tunnel variation, the position of variation occurrence is different, the geological conditions are different, and the influence on tunnel structure function and driving safety is also different.

[0003] In addition, for the prediction of the remaining life of the building structure, most of the existing researches focus on the failure time of reinforced concrete structures in corrosive environments (such as chloride ion penetration and concrete carbonization). For example, the chloride ion penetration model usually needs to consider factors such as the chloride ion diffusion coefficient of concrete, the thickness of the concrete protective layer, and the critical corrosion threshold of the steel bar. When the chloride ion penetrates the concrete protective layer and corrodes the steel bar, it is considered to reach the service life. However, the corrosion resistance life is only one aspect of the service life of the tunnel lining structure. The train vibration load leads to surrounding rock relaxation, surrounding rock bias creep, landslide, groundwater damage and other factors, which will restrict the service life of the tunnel lining structure. Therefore, the single corrosion resistance performance is not completely suitable as the basis for judging the remaining life of the tunnel lining structure. SUMMARY

[0004] The technical problem to be solved by the present application is to provide a tunnel state evaluation method based on a model test of a lining containing defects, which provides a new method for deducing the logical relationship between the influencing factors of various tunnel variations.

[0005] To solve the above problems, the technical scheme adopted by the present application is: A tunnel state evaluation method based on a model test of a lining containing defects, comprising the following steps: S1, constructing a test device, the test device comprising a base, a model structure arranged on the base, and a pressing plate mechanism for pressing the model structure, the model structure comprising a ring-shaped sleeve and a plurality of servo hydraulic loading devices, the plurality of servo hydraulic loading devices being arranged around the ring-shaped sleeve, the base being provided with a train load excitation device for simulating train load excitation, and a data acquisition system; S2. Based on the principle of similar model test, prepare the lining model and surrounding rock simulation material. Place the lining model on the base and set it concentrically with the annular sleeve. Fill the gap between the lining model and the annular sleeve with surrounding rock simulation material to form a surrounding rock model. When preparing the lining model and surrounding rock model, simulate various defects and diseases such as cracks, back voids, insufficient strength, and insufficient thickness, and clarify the key factors to be considered for each disease, such as the length, depth, and location of cracks, the size and location of back voids, the length, strength, and location of insufficient strength, and the thickness, length, and location of insufficient thickness. S3, start the servo hydraulic loading device to apply load to the surrounding rock model through the ring sleeve to simulate the surrounding rock pressure, start the excitation device, and cyclically load to simulate the train load; S4 records the development of defects at different times. When the lining model shows signs of chipping, it is considered that the service life of the lining has been reached; when the lining model collapses, it is considered that the durability life of the lining has been reached. S5. Collect the disease development status and lining service life and durability life collected in S4 as sample data, analyze the sample data and build an analysis model based on the analysis results, and use the analysis model to judge the degree of lining disease risk and predict the remaining service life of the lining. S6, Tunnel condition evaluation: The lifespan measured by the intact lining model is used as the benchmark value of the lining lifespan. Based on the remaining lining lifespan obtained in step S5, the integrity of the tunnel is evaluated, where the integrity is the remaining lifespan / benchmark lifespan.

[0006] As one embodiment of the present invention, the data acquisition system includes a pressure sensor, a strain gauge sensor, and a DIC measurement system.

[0007] In one embodiment of the present invention, in step S2, the geometric similarity ratio of the lining model is determined according to the actual structural condition of the tunnel lining and the characteristics of tunnel lining defects. The dominant similarity criterion is determined, the key parameter ratio is derived, the materials of the lining model are prepared, the steel mesh is made and installed, and the lining model is cast in a mold to complete the preparation of the lining model.

[0008] In one embodiment of the present invention, a gypsum slurry containing 30% mica powder is sprayed onto the outer surface of the lining model to form a rough layer with a thickness of 0.3 mm and a friction coefficient μ of 0.6-0.7.

[0009] As one embodiment of the present invention, based on the third law of similarity, the similarity relationship in the model test is determined, similar materials of surrounding rock under different surrounding rock grades are configured, and the in-situ stress field is applied by a servo hydraulic loading device.

[0010] In one embodiment of the present invention, a plurality of pressure sensors and strain gauge sensors are distributed on the contact surface of the lining model and the surrounding rock model, and the pressure sensors and strain gauge sensors are distributed at the arch crown, arch waist, and arch foot positions of the lining model; the DIC measurement system includes a binocular industrial camera, a light source, a computer, and an image acquisition card; the binocular industrial camera is located inside the lining model, and the optical axis of the binocular industrial camera is perpendicular to the surface of the lining model; the light source is a ring-shaped LED light source, located between the binocular industrial camera and the lining model, and the center of the light source is collinear with the optical axis of the binocular industrial camera, and the illumination direction of the light source is perpendicular to the surface of the lining model; the computer is connected to the binocular industrial camera through the image acquisition card and is used to receive and process the image data acquired by the binocular industrial camera.

[0011] As one embodiment of the present invention, the method for constructing the analysis model in step S5 includes: classifying the sample data according to the type of defect into crack propagation data, rockfall data, and collapse data; performing time history analysis on each type of defect data to extract the development rate, cycle number threshold, and mutation point characteristic parameters of defects at different spatial locations under different surrounding rock grades; establishing a multi-parameter correlation model, wherein the input parameters of the model include initial defect characteristics, cyclic load amplitude, and confining pressure, and the output parameters include defect development prediction curve, service life probability distribution function, and durability life safety factor; and training and optimizing the multi-parameter correlation model using machine learning algorithms, wherein the machine learning algorithms include, but are not limited to, support vector machines, random forests, or neural networks.

[0012] As one embodiment of the present invention, the method for tunnel condition evaluation in step S6 includes classifying tunnel condition levels based on the soundness evaluation results: When the integrity level is ≥0.8, the tunnel is considered to be in excellent condition, and routine inspections are recommended. When 0.6 ≤ integrity < 0.8, the tunnel condition is considered good, and it is recommended to strengthen monitoring. When 0.4 ≤ health status < 0.6, the tunnel condition is judged as warning level, and moderate maintenance is recommended; When the integrity level is less than 0.4, the tunnel is deemed to be in a dangerous condition, and immediate reinforcement is recommended. A tunnel maintenance decision matrix is ​​constructed, with the integrity level as the horizontal axis and the defect type as the vertical axis, outputting maintenance priorities and technical solutions; uncertainty correction is applied to the integrity evaluation results, and on-site detection data is introduced as prior probability.

[0013] The beneficial effects of adopting the above technical solution are as follows: This invention simultaneously simulates various defects such as cracks, back voids, insufficient strength, and insufficient thickness, and clarifies the key factors to consider for each defect (such as length, depth, location, and strength value). This makes the model test more closely resemble the complex defect scenarios of real tunnels, revealing the impact of the coupling effects of different defects on the lining life. This invention uses a dual-threshold method—the number of rockfall cycles as the service life and the number of collapse cycles as the durability life—which better reflects the actual failure process of tunnel structures under repeated train loading. Using a vibration device to simulate cyclic loading of train loads, compared to static loading tests, it better reflects the expansion law of defects under dynamic loading (such as fatigue propagation of cracks and progressive failure caused by stress concentration around voids).

[0014] By training machine learning algorithms on disease development data, a mapping relationship between input (disease parameters) and output (risk level, remaining life) is established, breaking through the limitations of traditional empirical formulas and enabling quantitative assessment of complex disease combinations. The proposed index of "integrity = remaining life / baseline life" directly transforms experimental results into quantifiable evaluation standards for engineering, providing a scientific basis for tunnel maintenance decisions.

[0015] This invention forms a complete technology chain from model preparation, loading test, data acquisition, analysis and modeling, to condition evaluation. The proposed maintenance decision matrix directly links the integrity evaluation results with maintenance measures, providing an operable technical solution for tunnel management departments. Attached Figure Description

[0016] Figure 1 This is a flowchart of the present invention.

[0017] Figure 2 This is a schematic diagram of the main structure of the experimental setup.

[0018] Figure 3 This is a schematic diagram of the base and the structure above the model of the experimental device.

[0019] Figure 4 This is a schematic diagram of the structure of the test device after the filling block and servo hydraulic loading device are inserted into the slot.

[0020] Figure 5 This is a schematic diagram of the structure of the test device after the filling block and servo hydraulic loading device are removed from the slot.

[0021] Figure 6 This is a top view of the lining test model device after the surrounding rock model has been filled into the model structure.

[0022] The components are as follows: 100 Base; 101 Through-hole; 102 First slot; 103 Second slot; 200 Model structure; 300 Pressure plate mechanism; 301 Upper plate; 302 Pressure plate drive component; 303 Pressure plate; 1 Lining model; 2 Ring sleeve; 3 Servo hydraulic loading device; 31 Support base; 32 Vertical plate; 33 Grip part; 34 Servo cylinder; 4 Filling block; 41 Handle part; 5 Vibration assembly; 51 Base; 52 Base connecting seat; 53 Contact rod; 54 Vibration motor; 6 Filling gap; 7 Surrounding rock model; 8 Pressure sensor; 9 Strain gauge sensor; 10 Binocular industrial camera; 11 Light source; 12 Computer. Detailed Implementation

[0023] To make the objectives, technical solutions, and advantages of the present invention clearer, the invention will be described clearly and completely below in conjunction with specific embodiments.

[0024] like Figure 1 As shown, a tunnel condition evaluation method based on a model test of a defective lining includes the following steps: S1. Construct a test device, which includes a base 100, a model structure 200 mounted on the base 100, and a pressure plate mechanism 300 for pressing the model structure 200. The model structure 200 includes an annular sleeve 2 and several servo hydraulic loading devices 3, which are arranged around the annular sleeve 2. The base 100 is equipped with a vibration excitation device 5 for simulating train loads and a data acquisition system.

[0025] S2. Based on the principle of similar model testing, a lining model 1 and surrounding rock simulation material are prepared. The lining model 1 is placed on the base 100 and concentrically arranged with the annular sleeve 2. The surrounding rock simulation material is filled into the filling gap 6 formed between the lining model 1 and the annular sleeve 2 to form a surrounding rock model 7. During the preparation of the lining model and the surrounding rock model, various defects and problems such as cracks, back voids, insufficient strength, and insufficient thickness are simulated. Key factors to consider for each defect are identified, such as the length, depth, and location of cracks; the size and location of back voids; the length, strength, and location of insufficient strength; and the thickness, length, and location of insufficient thickness.

[0026] S3, start the servo hydraulic loading device 3 to apply load to the surrounding rock model 7 through the annular sleeve 2 to simulate the surrounding rock pressure, start the excitation device 5, and cyclically load the simulated train load.

[0027] S4 records the development of defects at different times. When lining model 1 shows signs of chipping, it is considered that the lining has reached its service life; when lining model 1 collapses, it is considered that the lining has reached its durability life. Service life refers to the period during which the tunnel can be used normally; durability life refers to the period during which the tunnel is damaged and cannot be used normally, at which point the tunnel requires major repairs.

[0028] S5. Collect the disease development status, service life and durability of the lining collected in S4 as sample data, analyze the sample data and construct an analysis model based on the analysis results, and use the analysis model to judge the degree of lining disease risk and predict the remaining service life of the lining.

[0029] S6, Tunnel Condition Evaluation: The lifespan measured by the intact lining model is used as the baseline value for the lining lifespan. Based on the remaining lining lifespan obtained in step S5, the integrity of the tunnel is evaluated, where integrity is the remaining lifespan / baseline lifespan. The remaining lifespan refers to the baseline lifespan (design lifespan) minus the lifespan already used.

[0030] In step S2, the method for preparing the lining model 1 is as follows: based on the actual structural condition of the tunnel lining and the characteristics of tunnel lining defects, the geometric similarity ratio (e.g., C) of the lining model 1 is determined. L =1 / 30), determine the dominant similarity criterion (such as elastic stress similarity C). σ =C L *C γ C γ =1), deriving the key parameter ratio (elastic modulus ratio C) E =1 / 30; Strength ratio C f =1 / 30; Displacement ratio C δ =1 / 30; Bulk density ratio C γ =1). An example of material preparation for lining model 1 is as follows: Reinforcing mesh installation: Galvanized iron wire was welded into a mesh, and the protective layer was fixed by a positioning frame to simulate the effect of concrete enveloping the reinforcing steel in the prototype. Layered pouring was performed in the mold: three layers were poured circumferentially, each layer with a pouring height ≤60mm. Vibration was performed for 20 seconds using a micro-vibrating table (frequency 80Hz, amplitude 0.5mm). Curing was carried out for 48 hours at a temperature of 23±1℃ and a humidity of 95%. A gypsum slurry containing 30% mica powder was sprayed onto the outer surface of the lining to form a 0.3mm rough layer with a friction coefficient μ of 0.6-0.7.

[0031] In step S2, the preparation method of the surrounding rock model 7 is as follows: based on the third law of similarity, the similarity relationship in the model test is determined (e.g., the surrounding rock grade is determined according to the geological survey, the geometric similarity ratio and the bulk density similarity ratio are determined, and the similarity ratio of the linear modulus, the strength similarity ratio and the in-situ stress similarity ratio are derived), surrounding rock similar materials under different surrounding rock grades are configured, and the in-situ stress field is applied using a servo hydraulic loading device.

[0032] The step S5 of parsing the sample data includes: extracting characteristic parameters of disease development in different spatial locations under different surrounding rock grades. These characteristic parameters include the crack length growth rate, crack depth propagation rate, cavity size change, and the correlation between the area of ​​rockfall and the number of cycles. The construction process of the analysis model is as follows: using the characteristic parameters and their corresponding service life and durability as input variables, a machine learning algorithm is used for training. The machine learning algorithm includes multiple linear regression, neural networks, or support vector machines. Through training, a mapping relationship model between the input variables and the degree of disease risk and remaining life is obtained.

[0033] The method for tunnel condition evaluation in step S6 includes: Tunnel condition levels are classified based on the soundness evaluation results: When the integrity level is ≥0.8, the tunnel is considered to be in excellent condition, and routine inspections are recommended. When 0.6 ≤ integrity < 0.8, the tunnel condition is considered good, and it is recommended to strengthen monitoring. When 0.4 ≤ health status < 0.6, the tunnel condition is judged as warning level, and moderate maintenance is recommended; When the integrity level is less than 0.4, the tunnel is deemed to be in a dangerous condition, and immediate reinforcement is recommended. A tunnel maintenance decision matrix is ​​constructed, with the integrity level as the horizontal axis and the defect type as the vertical axis, outputting maintenance priorities and technical solutions; uncertainty correction is applied to the integrity evaluation results, and on-site detection data is introduced as prior probability.

[0034] like Figures 2 to 6The diagram illustrates a specific embodiment of the experimental apparatus, comprising a base 100, a model structure 200, and a pressure plate mechanism 300. The base 100 has multiple concentric slot rings, each including several slots spaced annularly. The model structure 200 includes a lining model 1 mounted on the base 100, an annular sleeve 2 fitted over the lining model 1, and several servo hydraulic loading devices 3. A filling gap 6 is formed between the lining model 1 and the annular sleeve 2, filled with the surrounding rock model 7. The slot rings correspond to the contour of the lining model 1. The servo hydraulic loading devices 3 are insertable / removable within the slots to apply force to the annular sleeve 2, which is then transmitted to the lining model 1 via the surrounding rock model 7. The pressure plate mechanism 300 includes a liftable pressure plate 303, which is used to press the lining model 1.

[0035] The base 100 of this embodiment is provided with a through-hole 101. The wiring harnesses of the pressure sensor 8, strain gauge sensor 9 and DIC measurement system used for test simulation can be connected to the computer 12 through the through-hole 101. At the same time, the wiring harness of the excitation assembly 5 is also connected to the computer 12 through the through-hole 101.

[0036] See Figure 3 and Figure 4 In this embodiment, the slot includes a first slot ring and a second slot ring arranged concentrically. The first slot ring includes a plurality of first slots 102, and the second slot ring includes a plurality of second slots 103. Similarly, more slot rings concentric with the first slot ring can be provided.

[0037] See Figures 3 to 5 The servo hydraulic loading device 3 includes a support base 31, a vertical plate 32 disposed on the top of the support base 31, and a servo cylinder 34 fixed to one side of the vertical plate 32. The output end of the servo cylinder 34 abuts against the annular sleeve 2. When the servo cylinder 34 is working, it transmits the pressure load to the surrounding rock model 7 and the lining model 1 through the annular sleeve 2. The annular sleeve 2 is made of copper or rubber and is cylindrical in shape.

[0038] See Figure 3 and Figure 6 When the servo cylinder 34 is in its retracted state, it abuts against the annular sleeve 2. The shape formed by the servo cylinder 34 is adapted to the overall shape of the annular sleeve 2, allowing the annular sleeve 2 to be quickly installed into the shape formed by the servo cylinder 34. Both the support base 31 and the slot have rectangular cross-sections. The support base 31 has a recessed gripping part 33 in the middle. After the support base 31 is inserted into the slot, the gripping part 33 protrudes from the upper end surface of the base 100, facilitating the insertion and removal of the servo hydraulic loading device 3.

[0039] See Figure 3 and Figure 6 As shown, a vibration assembly 5 is provided on the base 100 inside the lining model 1. The vibration assembly 5 includes a base 51, two base connecting seats 52 symmetrically arranged on both sides of the base 51, two contact rods 53 symmetrically arranged on one side of the base 51, and two sets of vibration motors 54 symmetrically arranged on the base 51. The base 51 is fixed on the base 100 through the base connecting seats 52. The contact rods 53 abut against the inner wall of the lining model 1. The vibration motors 54 work to make the contact rods 53 vibrate, thereby simulating the load of the railway track inside the tunnel lining when it is in operation.

[0040] See Figure 4 and Figure 5 The base 100 is provided with a plurality of filling blocks 4. The filling blocks 4 are used to seal the slots where the servo hydraulic loading device 3 is not installed. The top of the filling block 4 is provided with a recessed handle 41 for picking up and putting in the filling block 4. The recessed handle 41 is lower than the upper end surface of the base 100, which can ensure that the filling block 4 will not enter the surrounding rock model 7 and affect the simulation results.

[0041] In this embodiment, the pressure plate mechanism 300 further includes an upper plate 301 mounted above the model structure 200 via a column assembly, and a pressure plate driving component 302 mounted on the upper plate 301. The output end of the pressure plate driving component 302 can be vertically raised and lowered and passes through the upper plate 301. The pressure plate 303 is mounted on the output end of the pressure plate driving component 302. The pressure plate driving component 302 is a hydraulic cylinder or an electric cylinder.

[0042] like Figure 6 As shown, the data acquisition system includes multiple pressure sensors 8, multiple strain gauge sensors 9, and a DIC measurement system. The pressure sensors 8 and strain gauge sensors 9 are distributed on the contact surfaces of the lining model 1 and the surrounding rock model 7, and are located at the arch crown, arch waist, and arch foot of the lining model 1. The pressure sensors 8 are miniature earth pressure cells (range 0-50 kPa, accuracy 0.5% FS). The sensing surface of the pressure cell is flush with the surface of the surrounding rock model, and a 0.2 mm thick epoxy resin-barite powder hybrid layer is used for stiffness matching.

[0043] like Figure 6As shown, the DIC measurement system includes a binocular industrial camera 10, a light source 11, a computer 12, and an image acquisition card. The binocular industrial camera 10 is disposed inside the lining model 1, and the optical axis of the binocular industrial camera is perpendicular to the surface of the lining model 1. The light source is a ring-shaped LED light source, which is disposed between the binocular industrial camera and the lining model 1, and the center of the light source is collinear with the optical axis of the binocular industrial camera. The illumination direction of the light source is perpendicular to the surface of the lining model 1. The computer is connected to the binocular industrial camera through the image acquisition card and is used to receive and process the image data acquired by the binocular industrial camera.

[0044] Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for evaluating the condition of a tunnel based on a model test of a lining with defects, characterized in that, Includes the following steps: S1, construct a test device, the test device including a base (100), a model structure (200) set on the base (100) and a pressure plate mechanism (300) for pressing the model structure (200), the model structure (200) including an annular sleeve (2) and a plurality of servo hydraulic loading devices (3), the plurality of servo hydraulic loading devices (3) are arranged around the annular sleeve (2), the base (100) is provided with a vibration excitation device (5) for simulating train load, and a data acquisition system; S2, based on the principle of similar model test, prepare the lining model (1) and surrounding rock simulation material, place the lining model (1) on the base (100) and set concentrically with the annular sleeve (2), fill the gap (6) between the lining model (1) and the annular sleeve (2) and fill it with surrounding rock simulation material to form the surrounding rock model (7); when preparing the lining model and the surrounding rock model, simulate various defects and diseases such as cracks, back voids, insufficient strength, and insufficient thickness; S3, start the servo hydraulic loading device (3) to apply load to the surrounding rock model (7) through the ring sleeve (2) to simulate the surrounding rock pressure, start the excitation device (5) to cyclically load the simulated train load; S4 records the development of the disease at different times. When the lining model (1) shows signs of falling off, it is considered that the service life of the lining has been reached. When the lining model (1) collapses, it is considered that the durability life of the lining has been reached. S5. Collect the disease development status and lining service life and durability life collected in S4 as sample data, analyze the sample data and build an analysis model based on the analysis results, and use the analysis model to judge the degree of lining disease risk and predict the remaining service life of the lining. S6, Tunnel condition evaluation: The lifespan measured by the intact lining model is used as the benchmark value of the lining lifespan. Based on the remaining lining lifespan obtained in step S5, the integrity of the tunnel is evaluated, where the integrity is the remaining lifespan / benchmark lifespan.

2. The tunnel condition evaluation method based on a model test with defective lining as described in claim 1, characterized in that, The data acquisition system includes a pressure sensor (8), a strain gauge sensor (9), and a DIC measurement system.

3. The tunnel condition evaluation method based on a model test with defective lining as described in claim 1, characterized in that, In step S2, based on the actual structural condition of the tunnel lining and the characteristics of tunnel lining defects, the geometric similarity ratio of the lining model (1) is determined, the dominant similarity criterion is determined, the key parameter ratio is derived, the materials of the lining model are prepared, the steel mesh is made and installed, and the lining model (1) is cast in the mold to complete the preparation of the lining model (1).

4. The tunnel condition evaluation method based on a model test with defective lining as described in claim 3, characterized in that, A gypsum slurry containing 30% mica powder was sprayed onto the outer surface of the lining model (1) to form a rough layer with a thickness of 0.3 mm and a friction coefficient μ of 0.6-0.

7.

5. The tunnel condition evaluation method based on a model test with defective lining as described in claim 3, characterized in that, Based on the third law of similarity, the similarity relationship in the model test is determined, and similar materials of surrounding rock under different surrounding rock grades are configured. The in-situ stress field is applied by using a servo hydraulic loading device.

6. The tunnel condition evaluation method based on a model test with defective lining as described in claim 2, characterized in that, Multiple pressure sensors (8) and strain gauge sensors (9) are distributed on the contact surfaces of the lining model (1) and the surrounding rock model (7). The pressure sensors and strain gauge sensors are distributed at the arch top, arch waist, and arch foot of the lining model. The DIC measurement system includes a binocular industrial camera, a light source, a computer, and an image acquisition card. The binocular industrial camera is located inside the lining model (1), and the optical axis of the binocular industrial camera is perpendicular to the surface of the lining model (1). The light source is a ring-shaped LED light source, located between the binocular industrial camera and the lining model (1), and the center of the light source is collinear with the optical axis of the binocular industrial camera. The illumination direction of the light source is perpendicular to the surface of the lining model (1). The computer is connected to the binocular industrial camera through the image acquisition card and is used to receive and process the image data acquired by the binocular industrial camera.

7. The tunnel condition evaluation method based on a model test with defective lining as described in claim 1, characterized in that, The step S5 of parsing the sample data includes: extracting characteristic parameters of disease development in different spatial locations under different surrounding rock grades. These characteristic parameters include the crack length growth rate, crack depth propagation rate, cavity size change, and the correlation between the area of ​​rockfall and the number of cycles. The construction process of the analysis model is as follows: using the characteristic parameters and their corresponding service life and durability as input variables, a machine learning algorithm is used for training. The machine learning algorithm includes multiple linear regression, neural networks, or support vector machines. Through training, a mapping relationship model between the input variables and the degree of disease risk and remaining life is obtained.

8. The tunnel condition evaluation method based on a model test with defective lining as described in claim 1, characterized in that, The method for tunnel condition evaluation in step S6 includes: Tunnel condition levels are classified based on the soundness evaluation results: When the integrity level is ≥0.8, the tunnel is considered to be in excellent condition, and routine inspections are recommended. When 0.6 ≤ integrity < 0.8, the tunnel condition is considered good, and it is recommended to strengthen monitoring. When 0.4 ≤ health status < 0.6, the tunnel condition is judged as warning level, and moderate maintenance is recommended; When the integrity level is less than 0.4, the tunnel is deemed to be in a dangerous condition, and immediate reinforcement is recommended. A tunnel maintenance decision matrix is ​​constructed, with the integrity level as the horizontal axis and the defect type as the vertical axis, outputting maintenance priorities and technical solutions; uncertainty correction is applied to the integrity evaluation results, and on-site detection data is introduced as prior probability.

Citation Information

Cited By

  • Reconfigurable tunnel engineering pilot-scale simulation system and method based on fabricated components

    CN122016365A