Urban rail non-planned train automatic adjustment method

By developing dedicated operation plans for unplanned trains and using onboard ATO systems for control, the problem of unplanned train operation times being difficult to control has been solved, improving the urban rail transit system's ability to respond to emergencies and ensuring safe, stable, and efficient operation.

CN121201167APending Publication Date: 2025-12-26NANJING NRIET IND CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202511505331.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-10-21
Publication Date
2025-12-26

AI Technical Summary

Technical Problem

In existing technologies, unplanned trains lack clear operational planning benchmarks, making it difficult to control their operating times, affecting efficiency, and potentially causing line congestion and safety risks.

Method used

Through automatic train classification, unplanned train plan creation, deviation calculation, and automatic adjustment, the ATS system builds specialized operation plans for unplanned trains, provides clear operating benchmarks, and controls train operation through the onboard ATO system.

Benefits of technology

It effectively solves the problems encountered during unplanned train operations, enhances the ability of urban rail transit systems to respond to emergencies, and ensures safe, stable, and efficient operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121201167A_ABST
    Figure CN121201167A_ABST
Patent Text Reader

Abstract

The invention discloses an automatic adjustment method for urban rail non-planned trains. The method comprises the following steps: automatically classifying the trains; automatically creating an unplanned train plan; calculating unplanned train deviation; and the adjusted interval operation time and the adjusted station dwell time are sent to a vehicle-mounted ATO system, the ATO system controls the train to operate according to the station dwell time and the interval operation time, and the non-planned train gradually operates according to the plan. According to the method, a special dynamic operation plan is constructed for the non-planed train, a clear and definite operation reference is provided, the train is dynamically adjusted based on the operation reference of the non-planed train, and deviation adjustment of the non-planed train is ensured, so that many problems in the operation process of the non-planed train are effectively solved, and the operation efficiency of the non-planed train is improved. The ability of the urban rail transit system to deal with emergencies is improved, and it is guaranteed that the system can still operate safely, stably and efficiently under complex conditions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention patent relates to automatic train monitoring systems, and more particularly to a method for automatic adjustment of unplanned urban rail trains. Background Technology

[0002] In modern urban rail transit systems, the signaling system plays a crucial role, acting as the "brain" of the urban rail transit system to ensure the safe, efficient, and orderly operation of trains. Among them, the Automatic Train Control (ATS), as one of the core subsystems of the signaling system, undertakes the important task of real-time monitoring and dispatching of train operations.

[0003] Under normal circumstances, the ATS (Automatic Train Protection System) can make precise and effective adjustments to planned trains based on a pre-defined timetable. Through algorithms and strategies such as deviation adjustment, offset adjustment, and equal interval adjustment, the ATS can monitor the position, speed, and other operating parameters of planned trains in real time, and optimize train dwell times and intervals according to actual conditions. This ensures that planned trains operate efficiently and strictly according to the established timetable, maximizing the satisfaction of passenger travel needs and maintaining the normal operational order of the urban rail transit system.

[0004] However, when various emergencies occur on the line, such as vehicle malfunctions, temporary line construction, or special operational needs, trains may be added to the line temporarily. These trains often lack a corresponding schedule in the already loaded timetable, and the ATS system typically does not automatically adjust for them. Therefore, in certain special scenarios such as malfunctions, unplanned trains cannot operate according to the default schedule using the ATS's automatic adjustment function, unlike planned trains, which can easily lead to a series of problems.

[0005] Because unplanned trains lack corresponding pre-established operating plans, a clear adjustment baseline is missing during actual operation. On one hand, the timing of unplanned trains is difficult to control precisely, potentially leading to arrivals at stations too early or too late. This not only affects their own operational efficiency but may also cause cascading disruptions to the normal operation of subsequent trains. On the other hand, the operating intervals between unplanned and scheduled trains are difficult to coordinate reasonably, easily causing line congestion and reducing the overall capacity of the urban rail transit network. More seriously, in some extreme cases, the disorderly operation of unplanned trains may threaten the safety of train operations. Summary of the Invention

[0006] To address the problems existing in the prior art, this invention provides an automatic adjustment method for unplanned urban rail trains. This method aims to construct a dedicated operation plan for unplanned trains and provide a clear and specific operation benchmark, thereby effectively solving many problems faced by unplanned trains during operation, improving the ability of urban rail transit systems to cope with emergencies, and ensuring that the system can still operate safely, stably, and efficiently under complex conditions.

[0007] The objective of this invention is achieved through the following technical solution:

[0008] An automatic adjustment method for unplanned urban rail trains includes step S1: automatic train classification. When manually creating a train or automatically creating a train based on train status information, the train number, current location, and train operation plan are matched. If the train is not in the train operation plan, it is automatically identified as an unplanned train.

[0009] Step S2: Automatic creation of unplanned train schedules. When the system determines that a train is unplanned, it automatically creates a planned running line for the current unplanned train based on the train's current location, the default interval running time in the timetable, and the default stop time.

[0010] Step S3: Unplanned train deviation calculation. When a train arrives or departs from the station, the system compares the arrival and departure times with the planned route of the unplanned train to obtain the train's deviation time.

[0011] Step S4: Automatic adjustment of unplanned trains: Based on the train's deviation time and the timetable adjustment range, the train's stop time and section travel time are adjusted.

[0012] Step S5: Based on step S4, the adjusted interval running time and station dwell time are sent to the onboard ATO system. The ATO controls the train operation according to the station dwell time and interval running time, and gradually unplanned trains operate according to the plan.

[0013] The aforementioned automatic train classification refers to the following: when trains are created manually or automatically based on train status information, the ATS system classifies trains running on the line into planned trains and unplanned trains according to the timetable currently loaded by the system. Specifically, if the train's current train number, train position, current station, and platform are in the timetable, the system will set the train as a planned train; otherwise, it will set the train as an unplanned train.

[0014] The aforementioned automatic creation of unplanned train schedules refers to the ATS system automatically creating an operation plan for a train based on the current time, the default stop time of the loaded timetable, the section running time, the train number, and the current location information. This plan serves as a baseline for controlling train operation. Regardless of whether the train runs early or late, the system automatically adjusts to ensure that the train runs according to this plan as much as possible.

[0015] Step S2 specifically includes:

[0016] When creating an unplanned train operation plan, the first step is to obtain the set of stations St(n) along the train's route and the time set Tst(dt, rt, n) for each station. Based on the obtained station set and the time set for each station, the time T(n) for the train to pass through each station is calculated, thereby generating the unplanned train operation plan. The specific process is as follows:

[0017] Step S21: Obtain the set of all stations St(n) = {St1, St2, ..., Stn} that the train passes through based on the train's current location, the train's destination code, and the basic line data, where St1 is the current train's starting station and Stn is the train's destination station.

[0018] Step S22: Based on the set of stations the train passes through, obtain the default stopping time and default interval travel time for each station in the station set St(n) by loading the timetable through the system, Tst(dt, rt, n) = {(dt1, dt1), (dt2, dt2) ... (dtn, dtn)}, where dt represents the stopping time and rt represents the interval travel time;

[0019] Step S23: Based on the station set and time set of each station obtained above, and using the current system time as the base time, calculate the planned arrival time Tarrive(n) and departure time Tdepart(n) of the train at each station. ;

[0020] Step S24: Obtain the set of arrival and departure times of the train at each station T(n) = {( Tarrive (1), Tdepart (1)), ( Tarrive (2), Tdepart (2)) ... ( Tarrive (n), Tdepart (n))}, thereby obtaining the set of operation plans T(n) for this unplanned train.

[0021] When unplanned trains are created manually or automatically, the ATS system automatically creates a running plan for the unplanned trains. When the ATS system receives train arrival and departure events, it judges the deviation of the current train's actual operation. When the actual operation deviation is within the allowable range, no adjustment is made. When the actual operation deviation is early or late, the system adjusts the interval travel time and stop time according to the timetable adjustment range, and sends the adjusted interval travel time and stop time to the onboard ATO system. The ATO system automatically controls the train's operation, gradually realizing that unplanned trains execute according to the running plan.

[0022] Step S41: When the system receives a train arrival event, the system compares the received arrival time with the corresponding Train(n) in the unplanned train schedule T(n) to obtain the train's deviation time, and adopts a specific adjustment strategy based on the current deviation time. If the current deviation time is within the allowable deviation range, the system does not make any adjustments. When the train is early, the system increases the train's interval travel time. If the interval travel time cannot be fully adjusted within the adjustment range, the system adopts the maximum interval travel time and increases the platform dwell time. If the dwell time adjustment still cannot fully adjust the time, the system adopts the maximum platform dwell time. When the train is late, the system reduces the train's interval travel time. If the interval travel time cannot be fully adjusted within the adjustment range, the system reduces the platform dwell time. If the dwell time adjustment still cannot fully adjust the time, the system adopts the minimum platform dwell time.

[0023] Step S42: When the system receives a departure event, the system compares the received departure time with the corresponding Tdepart(n) in the unplanned train plan T(n) to obtain the train's deviation time, and adopts a specific adjustment strategy based on the current deviation time; if the current deviation time is within the allowable deviation range, the system does not make any adjustment; when the train is early, the system increases the train's interval travel time. If the interval travel time cannot be fully adjusted within the adjustment range, the system adopts the maximum interval travel time; when the train is late, the system decreases the train's interval travel time. If the interval travel time cannot be fully adjusted within the adjustment range, the system adopts the minimum interval travel time.

[0024] The issuance of operation control commands refers to the ATS system dynamically adjusting unplanned trains and then sending the train's stopping time and section travel time to the onboard ATO system. The ATO system controls the train's stopping at the platform according to the adjusted stopping time, and closes the doors and prompts the driver to depart before the stopping time ends. The ATO system generates the train's section travel curve based on the adjusted section travel time, and controls the train's traction, cruise, inertia, and braking switching according to the travel curve, so that the train can run to the next platform according to the operation plan.

[0025] Compared with the prior art, the advantages of this invention are:

[0026] This invention provides a dedicated dynamic operation plan for unplanned trains, offering a clear and specific operating benchmark. Based on this benchmark, the train is dynamically adjusted to ensure deviation correction, thereby effectively solving many problems faced by unplanned trains during operation, enhancing the ability of urban rail transit systems to cope with emergencies, and ensuring the system can still operate safely, stably, and efficiently under complex conditions. Attached Figure Description

[0027] Figure 1 Flowchart for adjusting unplanned train schedules.

[0028] Figure 2 Create a flowchart for unplanned train schedules.

[0029] Figure 3 This is a flowchart for the automatic adjustment of unplanned trains. Detailed Implementation

[0030] When unplanned trains are created manually or automatically, the ATS system automatically creates a running plan for them. When the ATS system receives train arrival and departure events, it assesses the deviation of the current train's actual operation. If the actual deviation is within the allowable range, no adjustment is made. If the actual deviation is early or late, the system automatically adjusts the interval travel time and stop time according to the timetable adjustment range, and sends the adjusted interval travel time and stop time to the onboard ATO system. The ATO system then automatically controls the train's operation, gradually achieving the goal of unplanned trains executing according to the running plan. Figure 1 Adjustment procedures for unplanned trains.

[0031] When creating trains manually or automatically based on train status information, the ATS system classifies trains running on the line into planned trains and unplanned trains based on the timetable currently loaded by the system, the train number of the currently created train, and the current position of the train. If the current train number, train position, current station, and platform are in the timetable, the system will set the train as a planned train; otherwise, it will set the train as an unplanned train.

[0032] When creating an unplanned train operation plan, first obtain the set of stations St(n) along the train's route and the time set Tst for each station. (dt、rt、n) Furthermore, based on the acquired set of stations and the time T(n) for the train to pass through each station, an unplanned train operation plan is generated. The specific process is as follows:

[0033] (1) Obtain the set of all stations St(n) = {St1, St2, ..., Stn} that the train passes through based on the train's current location, the train's destination code, and the basic route data. Where St1 is the current train's starting station and Stn is the train's destination station.

[0034] (2) Based on the set of stations the train passes through, obtain the default stopping time and default interval travel time of each station in the station set St(n) by loading the timetable through the system, Tst (dt、rt、n) ={(dt1, dt1), (dt2, dt2)...(dtn, dtn)}, where dt represents the stop time and rt represents the interval travel time.

[0035] (3) Based on the station set and time set of each station obtained above, and using the current system time as the base time, calculate the planned arrival time Tarrive(n) and departure time Tdepart(n) of the train at each station. ,

[0036] Further, obtain the set of arrival and departure times of the train at each station, T(n) = {(Tarrive(1), Tdepart(1)), (Tarrive(2), Tdepart(2))...(Tarrive(n), Tdepart(n))}, thus obtaining the set of operation plans T(n) for this unplanned train. Figure 2 Unplanned train schedule creation process.

[0037] When making unplanned train operation adjustments, the system provides two time options: arrival adjustment and departure adjustment.

[0038] (1) When the system receives a train arrival event, the system compares the received arrival time with the corresponding Train(n) in the unplanned train schedule T(n) to obtain the train's deviation time, and adopts a specific adjustment strategy based on the current deviation time, such as... Figure 3 Automatic adjustment procedure for unplanned trains:

[0039] 1) The system will not make adjustments when the current deviation time is within the allowable deviation range.

[0040] 2) When a train is early, the system increases the train's interval travel time. If the interval travel time cannot be fully adjusted within the adjustment range, the system adopts the maximum interval travel time and increases the platform dwell time. If the dwell time adjustment still cannot be fully adjusted, the system adopts the maximum platform dwell time.

[0041] 3) When a train is delayed, the system reduces the train's travel time between sections. If the travel time between sections cannot be fully adjusted within the adjustment range, the system reduces the platform dwell time. If the dwell time adjustment still cannot fully adjust the time, the system adopts the minimum platform dwell time.

[0042] (2) When the system receives a departure event, the system compares the received departure time with the corresponding Tdepart(n) in the unplanned train plan T(n) to obtain the train's deviation time, and adopts a specific adjustment strategy based on the current deviation time:

[0043] 1) The system will not make adjustments when the current deviation time is within the allowable deviation range.

[0044] 2) When a train is early, the system increases the train's interval travel time. If the interval travel time cannot be fully adjusted within the adjustment range, the system adopts the maximum interval travel time.

[0045] 3) When a train is delayed, the system reduces the train's travel time between sections. If the travel time between sections cannot be fully adjusted within the adjustment range, the system adopts the minimum travel time between sections.

[0046] The ATS system dynamically adjusts unplanned train schedules and then sends the adjusted stop times and interval travel times to the onboard ATO system.

[0047] (1) The ATO system controls the train's stopping at the platform according to the adjusted stopping time. Before the stopping time ends, the doors are closed and the driver is notified that the train can depart.

[0048] (2) The ATO system generates the train's interval operation curve based on the adjusted interval operation time. The ATO controls the train's traction, cruise, inertia and braking switching based on the operation curve, so that the train can run to the next station according to the operation plan.

[0049] This invention provides a dedicated operation plan for unplanned trains, offering clear and specific operational benchmarks. This effectively solves many problems faced by unplanned trains during operation, enhances the ability of urban rail transit systems to cope with emergencies, and ensures that the system can still operate safely, stably, and efficiently under complex conditions.

Claims

1. A method for automatic adjustment of unscheduled trains in urban rail, characterized in that, The method comprises the following steps: Step S1: automatic train classification, when manually creating a train or automatically creating a train according to train state information, the train is matched according to the train number, the current position and the train operation plan, and if it is not the train in the train operation plan, the train is automatically judged as a non-planned train; Step S2: non-planned train plan automatic creation, when the system judges that the train is a non-planned train, the current non-planned train plan operation line is automatically created according to the train current position, the default interval running time in the timetable and the default stop time; Step S3: non-planned train deviation calculation, when the train arrives at or departs from a station, the system compares the arrival and departure times with the non-planned train plan operation line to obtain the deviation time of the train; Step S4: non-planned train automatic adjustment, according to the deviation time of the train, the stop time and the interval running time of the train are adjusted according to the timetable adjustment range; Step S5: on the basis of step S4, the adjusted interval running time and stop time are sent to the on-board ATO system, and the ATO controls the train operation according to the stop time and the interval running time, so that the non-planned train gradually operates according to the plan.

2. The method according to claim 1, wherein, The automatic train classification specifically includes manually creating a train or automatically creating a train according to train state information, and the ATS system divides the trains running on the line into planned trains and non-planned trains according to the currently loaded timetable, wherein the train number, the train position, the current station and the platform of the train are in the timetable, the system sets the train as a planned train; otherwise, the train is set as a non-planned train.

3. The method according to claim 1, wherein, The automatic creation of the non-planned train plan means that the ATS system automatically creates a running plan for the train according to the current time, the default stop time and the interval running time of the loaded timetable, as well as the train number and the current position information.

4. The method according to claim 3, wherein, Step S2 specifically comprises: When creating the non-planned train operation plan, first, the train running path station set St(n) and the time set Tst(dt, rt, n) of each station are obtained, the train time T(n) passing through each station is calculated according to the obtained station set and each station set, and thus the non-planned train operation plan is produced, and the specific process is as follows: Step S21: according to the train current position, the train destination code and the line basic data, the train operation path passes through all station sets St(n)={St1, St2…Stn}, wherein St1 is the starting station of the current train, and Stn is the terminal station of the train operation; Step S22: according to the train passing through the station set, the default stop time and the default interval running time of each station in the station set St(n) are obtained through the system loaded timetable, Tst(dt, rt, n)={ (dt1, dt1), (dt2, dt2)…(dtn, dtn)}, wherein dt represents the stop time, and rt represents the interval running time. Step S23: According to the acquired station set and the time set of each station, the planned arrival time Tarrive(n) and the planned departure time Tdepart(n) of the train passing through each station are calculated based on the current system time as the reference time, wherein, , ; Step S24: obtaining a set of arrival and departure times T(n)={(Tarrive(1),Tdepart(1)),(Tarrive(2),Tdepart(2))…(Tarrive(n),Tdepart(n))} of the train passing through each station, so as to obtain the operation plan set T(n) of the non-scheduled train.

5. The method of claim 1, wherein the method comprises: When the non-scheduled train is created manually or automatically, the ATS system automatically creates an operation plan for the non-scheduled train, and the ATS system judges the deviation of the actual operation of the current train when receiving the train arrival and departure events; when the actual operation deviation is within the allowed range, no adjustment is made; when the actual operation deviation is early or late, the system automatically adjusts the interval running time and the station stopping time according to the timetable adjustment range, and sends the adjusted interval running time and station stopping time to the on-board ATO system, and the ATO system automatically controls the operation of the train, so as to gradually realize that the non-scheduled train executes according to the operation plan.

6. The method according to claim 5, wherein, The automatic adjustment of the non-scheduled train specifically includes: Step S41: when the system receives a train arrival event, the system compares the received arrival time with the corresponding Tarrive(n) in the non-scheduled train plan T(n), obtains the deviation time of the train, and adopts a specific adjustment strategy according to the current deviation time; when the current deviation time is within the allowed deviation range, the system does not adjust; when the train is early, the system increases the interval running time of the train, and if the interval running time cannot be completely adjusted within the adjustment range, the system uses the maximum interval running time and increases the station stopping time, and if the station stopping time adjustment still cannot be completely adjusted, the system uses the maximum station stopping time; when the train is late, the system reduces the interval running time of the train, and if the interval running time cannot be completely adjusted within the adjustment range, the system reduces the station stopping time, and if the station stopping time adjustment still cannot be completely adjusted, the system uses the minimum station stopping time; Step S42: when the system receives a departure event, the system compares the received departure time with the corresponding Tdepart(n) in the non-scheduled train plan T(n), obtains the deviation time of the train, and adopts a specific adjustment strategy according to the current deviation time; when the current deviation time is within the allowed deviation range, the system does not adjust; when the train is early, the system increases the interval running time of the train, and if the interval running time cannot be completely adjusted within the adjustment range, the system uses the maximum interval running time; when the train is late, the system reduces the interval running time of the train, and if the interval running time cannot be completely adjusted within the adjustment range, the system uses the minimum interval running time.

7. The method of claim 1, wherein the method comprises: The running control instruction issued by the ATS system is used to dynamically adjust the non-planned train, and then the stop time and the interval running time of the train are issued to the on-board ATO system; the ATO system controls the train to stop at the platform according to the adjusted stop time, and the train door is closed and the driver is prompted to start the train before the stop time ends; the ATO system produces the interval running curve of the train according to the adjusted interval running time, and controls the traction, cruise, inertia and braking switching of the train according to the running curve, so that the train runs to the next platform according to the running plan.