Scientific and technological research and development project cost management and control system

By using the technology research and development project cost control system, the problem of being unable to assess the labor ratio of personnel involved in multiple overlapping projects was solved, the optimal adjustment plan was generated, costs were reduced, and the efficiency of project management was improved.

CN121810356APending Publication Date: 2026-04-07赢客百投(重庆)科技有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-17
Publication Date
2026-04-07

AI Technical Summary

Technical Problem

In existing technologies, when multiple projects involve overlapping personnel, it is impossible to accurately assess the proportion of labor, resulting in high costs and an inability to allocate the optimal adjustment plan.

Method used

A technology research and development project cost control system is adopted, including a login module, a database module, a retrieval module, a personnel information module, a project information module, a screening module, a cost statistics module, a storage module, a communication module, and a display module. By using these modules in combination, the system analyzes and calculates the labor ratio of overlapping personnel in multiple projects, screens out overlapping consumables, makes adjustments according to preset conditions, and generates the optimal adjustment plan to save costs.

Benefits of technology

It enables the analysis of the labor ratio of overlapping personnel in multiple projects, which can screen out the optimal adjustment plan, reduce costs, and improve the efficiency and accuracy of project cost management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121810356A_ABST
    Figure CN121810356A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of research and development cost management, in particular to a science and technology research and development project cost management and control system. The project information module is used for sorting project information; the personnel information module is used for sorting project personnel information; the database module is used for tracing information of projects and project personnel; the retrieval module is used for acquiring information of projects and personnel; the cost statistics module is used for adjusting data of personnel project cost, the storage module is used for uploading flow data of each item of cost to the database module and is traceable, the communication module is used for providing a communication network for the storage module, and the display module is used for displaying a display image processed by the cost statistics module. According to the method, data of the overlapping personnel of the multiple projects can be screened out, the labor proportions of the overlapping personnel of the multiple projects in different projects are analyzed and calculated, the optimal adjustment scheme can be obtained through distribution and evaluation, and the cost is saved.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the technical field of research and development cost management, and particularly relates to a scientific and technological research and development project cost management system. BACKGROUND

[0002] Research and development, research and development, research and development, refers to various research institutions, enterprises or individuals to obtain scientific and technological (excluding humanistic and social sciences) new knowledge, creative use of scientific and technological new knowledge, or substantial improvement of technology, products and services, and continuous system activities with clear goals, including system and equipment testing, installation, maintenance, maintenance and a series of system activities, in the process of managing the research and development project, the cost needs to be controlled.

[0003] However, the existing technology may have multiple overlapping personnel, the labor proportion of the multiple overlapping personnel in different projects is unclear, the optimal adjustment scheme cannot be allocated and evaluated, and the cost is high. SUMMARY

[0004] The present application aims to provide a scientific and technological research and development project cost management system, which solves the problem that the existing technology may have multiple overlapping personnel, the labor proportion of the multiple overlapping personnel in different projects is unclear, the optimal adjustment scheme cannot be allocated and evaluated, and the cost is high.

[0005] To achieve the above-mentioned purpose, a scientific and technological research and development project cost management system is adopted, which comprises a login module, a database module, a retrieval module, a personnel information module, a project information module, a screening module, a cost statistics module, a storage module, a communication module and a display module, the login module is connected with the database module, the retrieval module is connected with the database module, the personnel information module is connected with the retrieval module and the screening module respectively, the project information module is connected with the retrieval module and the screening module respectively, the cost statistics module is connected with the screening module, the storage module is connected with the cost statistics module, the display module is connected with the cost statistics module, the communication module is connected with the storage module, and the database module is connected with the communication module;

[0006] The login module is used for verifying the identity of the inquirer;

[0007] The project information module is used for collating each project information;

[0008] The personnel information module is used for collating each project personnel information;

[0009] The database module is used for tracing the information of each project and each project personnel;

[0010] The retrieval module is used for obtaining the information of the project and the personnel;

[0011] The screening module is used for screening the project overlapping personnel data;

[0012] The cost statistics module is used for analyzing and calculating the labor proportion of the project overlapping personnel in different projects, performing weight calculation, obtaining part of the personnel project cost data, screening the overlapping consumables in multiple projects, customizing the use plan according to the preset condition, arranging various cost data, and distributing and evaluating to obtain the optimal adjustment scheme and save the cost;

[0013] The storage module is used for uploading the flow data of each cost to the database module, which can be traced back;

[0014] The communication module is used for providing a communication network for the storage module, realizing the addition, deletion and modification of the project information and budget data in the database module;

[0015] The display module is used for displaying the display image processed by the cost statistics module.

[0016] The technology research and development project cost control system further comprises a login record module, which is connected with the login module;

[0017] The login record module is used for recording the login traces of the inquirers.

[0018] The login record module comprises a face recognition unit and a fingerprint recognition unit, the face recognition unit is connected with the database module, and the fingerprint recognition unit is connected with the database module;

[0019] The face recognition unit is used for identifying and verifying the user's face according to the inquirer's identity card information;

[0020] The fingerprint recognition unit is used for fingerprint recognition of the inquirer's identity.

[0021] The cost statistics module comprises an evaluation unit and an adjustment unit, the evaluation unit is connected with the screening module, and the adjustment unit is connected with the evaluation unit;

[0022] The evaluation unit is used for arranging various cost data, distributing and evaluating to obtain the optimal adjustment scheme and save the cost;

[0023] The adjustment unit is used for adjusting the data of the personnel project cost according to the preset condition.

[0024] The technology research and development project cost control system further comprises a data arrangement module, which is connected with the storage module;

[0025] The data arrangement module is used for arranging the personnel project cost data after evaluation and adjustment.

[0026] The data arrangement module comprises a report generation module and a report printing module, the report generation module is connected with the storage module, and the report printing module is connected with the report generation module.

[0027] The report generation module is used for arranging and generating the personnel project cost data after evaluation and adjustment.

[0028] The report printing module is used for printing the result of the personnel project cost data arrangement and generation.

[0029] The scientific research project cost management system comprises a login module, a project information module, a personnel information module, a database module, a search module, a screening module, a cost statistics module, a storage module and a communication module. BRIEF DESCRIPTION OF DRAWINGS

[0030] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the prior art, the drawings needed to be used in the embodiments or the prior art description will be briefly introduced. Obviously, the drawings in the following description are only some embodiments of the present application, and other drawings can be obtained by those skilled in the art without creative labor.

[0031] Figure 1 is the principle schematic diagram of the first embodiment of the present application.

[0032] Figure 2 is the principle schematic diagram of the second embodiment of the present application.

[0033] Figure 3 is a principle schematic diagram of the third embodiment of the present application.

[0034] 101-database module, 102-retrieval module, 103-personnel information module, 104-project information module, 105-screening module, 106-storage module, 107-communication module, 108-display module, 109-login record module, 110-face recognition unit, 111-fingerprint recognition unit, 112-evaluation unit, 113-adjustment unit, 201-report generation module, 202-report printing module, 301-brightness adjustment module, 302-direction adjustment unit, 303-playback unit. DETAILED DESCRIPTION

[0035] The first embodiment is:

[0036] Please refer to Figure 1 , wherein Figure 1 is a principle schematic diagram of the first embodiment. The present application provides a scientific and technological research and development project cost control system, which comprises a login module, a database module 101, a retrieval module 102, a personnel information module 103, a project information module 104, a screening module 105, a cost statistics module, a storage module 106, a communication module 107, a display module 108, and a login record module 109, the login record module 109 comprises a face recognition unit 110 and a fingerprint recognition unit 111, and the cost statistics module comprises an evaluation unit 112 and an adjustment unit 113;

[0037] For this specific embodiment, the login module is connected with the database module 101, the retrieval module 102 is connected with the database module 101, the personnel information module 103 is connected with the retrieval module 102 and the screening module 105 respectively, the project information module 104 is connected with the retrieval module 102 and the screening module 105 respectively, the cost statistics module is connected with the screening module 105, the storage module 106 is connected with the cost statistics module, the display module 108 is connected with the cost statistics module, the communication module 107 is connected with the storage module 106, and the database module 101 is connected with the communication module 107;

[0038] The login module is used for verifying the identity of the inquirer;

[0039] The project information module 104 is used for collating various project information;

[0040] The personnel information module 103 is used for collating various project personnel information;

[0041] The database module 101 is used for tracing the information of various projects and various project personnel;

[0042] The retrieval module 102 is configured to obtain information of projects and personnel;

[0043] The screening module 105 is configured to screen the project overlapping personnel data.

[0044] The cost statistics module is configured to analyze and calculate the labor proportion of the project overlapping personnel in different projects, perform weight calculation, obtain part of the personnel project cost data, screen the overlapping consumables in the multiple projects, customize the use plan according to the preset condition, arrange various cost data, and obtain the optimal adjustment scheme through distribution evaluation to save cost.

[0045] The storage module 106 is configured to upload the flow data of each cost to the database module 101, which can be traced.

[0046] The communication module 107 is configured to provide a communication network for the storage module 106, so as to realize addition, deletion and modification of the project information and the budget data in the database module 101.

[0047] The display module 108 is configured to display the display image processed by the cost statistics module.

[0048] The login record module 109 is connected with the login module.

[0049] The login record module 109 is configured to record the login traces of the inquirer.

[0050] Secondly, the face recognition unit 110 is connected with the database module 101, and the fingerprint recognition unit 111 is connected with the database module 101.

[0051] The face recognition unit 110 is configured to identify and verify the user's face according to the inquirer's ID information.

[0052] The fingerprint recognition unit 111 is configured to perform fingerprint recognition on the inquirer's identity.

[0053] In addition, the evaluation unit 112 is connected with the screening module 105, and the adjustment unit 113 is connected with the evaluation unit 112.

[0054] The evaluation unit 112 is configured to arrange various cost data, perform distribution evaluation, obtain the optimal adjustment scheme, and save cost.

[0055] The face recognition unit 110 recognizes the user's face according to the identity information of the inquirer, the fingerprint recognition unit 111 performs fingerprint recognition on the identity of the inquirer, the login record module 109 records the login traces of the inquirer, the project information module 104 sorts the information of each project, the personnel information module 103 sorts the information of personnel of each project, the database module 101 traces the information of each project and personnel of each project, the search module 102 obtains the information of the project and personnel, the screening module 105 screens the overlapping personnel data of multiple projects, the evaluation unit 112 analyzes and calculates the labor proportion of the overlapping personnel in different projects, performs weight calculation, obtains the project cost data of part of the personnel, screens the overlapping consumables in multiple projects, the adjustment unit 113 adjusts the data of the personnel project cost according to the preset condition, arranges various cost data, and saves the optimal adjustment scheme through distribution and evaluation, saves the cost, the storage module 106 uploads the flow data of each cost to the database module 101, which can be traced, the communication module 107 provides a communication network for the storage module 106, realizes the addition, deletion and modification of the project information and budget data in the database module 101, the display module 108 displays the display image of the personnel project cost data, realizes the screening of the overlapping personnel data of multiple projects, through the analysis and calculation of the labor proportion of the overlapping personnel in different projects, the optimal adjustment scheme can be obtained through distribution and evaluation, and the cost is saved.

[0056] The second embodiment is:

[0057] Based on the first embodiment, please refer to Figure 2 , wherein Figure 2 is the principle schematic diagram of the second embodiment. The present application provides a scientific and technological research and development project cost control system further comprising a data sorting module, the data sorting module comprising a report generation module 201 and a report printing module 202;

[0058] For this specific embodiment, the data sorting module is connected with the storage module 106;

[0059] The data sorting module is used for sorting the personnel project cost data after evaluation and adjustment.

[0060] Among them, the report generation module 201 is connected with the storage module 106, and the report printing module 202 is connected with the report generation module 201;

[0061] The report generation module 201 is used for sorting and generating the personnel project cost data after evaluation and adjustment.

[0062] The report generation module 201 generates the personnel project cost data after evaluation and adjustment, and the report printing module 202 prints the result of the personnel project cost data generated.

[0063] The third embodiment is:

[0064] Based on the second embodiment, please refer to Figure 3 , wherein Figure 3 is a schematic diagram of the third embodiment. The present application provides a scientific and technological research and development project cost management system further comprising an adjusting module, the adjusting module comprising a brightness adjusting module 301, a direction adjusting unit 302 and a playing unit 303.

[0065] For this specific embodiment, the adjusting module is connected with the display module 108.

[0066] Therefore, the adjusting module is used for adjusting the display module 108, facilitating the user to use.

[0067] Among them, the brightness adjusting module 301 is connected with the display module 108, and the direction adjusting unit 302 is connected with the display module 108.

[0068] The brightness adjusting module 301 is used for adjusting the use brightness of the display module 108.

[0069] The direction adjusting unit 302 is used for adjusting the use direction of the display module 108.

[0070] Secondly, the playing unit 303 is connected with the display module 108.

[0071] The playing unit 303 is used for playing the display content of the display module 108 at this time, facilitating the middle-aged and old people to understand.

[0072] The brightness adjusting module 301 adjusts the use brightness of the display module 108, the direction adjusting unit 302 adjusts the use direction of the display module 108, and the playing unit 303 plays the display content of the display module 108 at this time, facilitating the middle-aged and old people to understand, and realizing that the user can use conveniently.

[0073] The above disclosure is only a preferred embodiment of the present application, and of course cannot limit the scope of the present application, and those skilled in the art can understand that all or part of the above-mentioned embodiments can be implemented, and equivalent changes made according to the claims of the present application still belong to the scope covered by the present application.

Claims

1. A technology research and development project cost control system, characterized in that, It includes a login module, a database module, a retrieval module, a personnel information module, a project information module, a screening module, a cost statistics module, a storage module, a communication module, and a display module. The login module is connected to the database module, the retrieval module is connected to the database module, the personnel information module is connected to both the retrieval module and the screening module, the project information module is connected to both the retrieval module and the screening module, the cost statistics module is connected to the screening module, the storage module is connected to the cost statistics module, the display module is connected to the cost statistics module, the communication module is connected to the storage module, and the database module is connected to the communication module. The login module is used to verify the identity of the inquirer; The project information module is used to organize information for each project. The personnel information module is used to organize personnel information for each project. The database module is used to trace information about each project and its personnel. The retrieval module is used to obtain information about projects and personnel; The screening module is used to filter out overlapping personnel data from multiple projects; The cost statistics module is used to analyze and calculate the labor proportion of personnel overlapping in multiple projects, perform weight calculations, obtain partial personnel project cost data, screen overlapping consumables in multiple projects, customize usage plans for them according to preset conditions, arrange various cost data, allocate and evaluate to obtain the optimal adjustment plan, and save costs. The storage module is used to upload the flow data of various fees to the database module, which is traceable; The communication module provides a communication network for the storage module, enabling the addition, deletion, and modification of project information and budget data within the database module; The display module is used to display the image processed by the cost statistics module.

2. The technology research and development project cost control system as described in claim 1, characterized in that, The technology research and development project cost control system also includes a login record module, which is connected to the login module. The login record module is used to record the login history of the user.

3. The technology research and development project cost control system as described in claim 2, characterized in that, The login record module includes a face recognition unit and a fingerprint recognition unit. The face recognition unit is connected to the database module, and the fingerprint recognition unit is also connected to the database module. The face recognition unit is used to identify and verify the user's face based on the inquirer's ID card information; The fingerprint recognition unit is used to identify the identity of the person making the query using fingerprint recognition.

4. The technology research and development project cost control system as described in claim 3, characterized in that, The cost statistics module includes an evaluation unit and an adjustment unit. The evaluation unit is connected to the screening module, and the adjustment unit is connected to the evaluation unit. The evaluation unit is used to sort various cost data, allocate evaluations to obtain the optimal adjustment plan, and save costs; The adjustment unit is used to adjust the data of personnel project expenses according to preset conditions.

5. The technology research and development project cost control system as described in claim 4, characterized in that, The technology research and development project cost control system also includes a data processing module, which is connected to the storage module. The data processing module is used to process the assessed and adjusted personnel project cost data.

6. The technology research and development project cost control system as described in claim 5, characterized in that, The data processing module includes a report generation module and a report printing module. The report generation module is connected to the storage module, and the report printing module is connected to the report generation module. The report generation module is used to organize and generate the assessed and adjusted personnel project cost data; The report printing module is used to print the results generated from the processing of personnel and project cost data.