Task processing method and device, computer equipment and computer readable storage medium

By having the old and new systems execute tasks in parallel during the transition between them, and by utilizing progress tracking and alarm mechanisms, the problem of low task processing efficiency during user data migration was solved, achieving synchronous and continuous task execution and improving the system's processing capacity.

CN121833185APending Publication Date: 2026-04-10SHANGHAI PUDONG DEVELOPMENT BANK
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-12-26
Publication Date
2026-04-10

AI Technical Summary

Technical Problem

During the transition between old and new systems, existing technologies cannot execute tasks simultaneously while user data is being migrated, resulting in low task processing efficiency. This poses a risk of task execution interruption, especially in systems with high user service requirements or large data volumes.

Method used

By decoupling user data migration from task execution, the new system executes tasks in parallel based on migrated user data while the old system executes tasks based on unmigrated user data. Progress is acquired after task completion to ensure synchronization. A time interval mechanism is used to track progress and output alarm information when necessary.

Benefits of technology

This enables synchronous task execution during user data migration, avoiding redundant processing, ensuring the synchronicity and continuity of task execution, preventing task interruptions due to user data migration failures, and improving task processing efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121833185A_ABST
    Figure CN121833185A_ABST
Patent Text Reader

Abstract

The invention relates to a task processing method and device, computer equipment and a computer readable storage medium. The method comprises the following steps: acquiring at least two to-be-processed tasks in a process of migrating user data in an old system integrated at a second equipment end to a new system; for each to-be-processed task, in the process that the old system executes the to-be-processed task based on the non-migrated user data, the new system executes the to-be-processed task based on the migrated user data; after the to-be-processed task is executed, obtaining a first execution progress of the old system on the to-be-processed task; and under the condition that the first execution progress represents that the old system has executed the to-be-processed task, executing the next to-be-processed task in parallel through the new system and the old system. By adopting the method, the new system and the old system can execute the same to-be-processed task in parallel while the user data is migrated from the old system to the new system, so that interruption of the to-be-processed task caused by failure of user data migration is avoided.
Need to check novelty before this filing date? Find Prior Art