Intelligent optimization and early warning method and platform for multi-dimensional factor collaborative large-scale material matching

By constructing an event-driven material influence function queue and mapping table, dynamic response and closed-loop control of a large-scale material management system are realized, solving the problems of response lag and insufficient control accuracy in existing material management technologies, and improving production adaptability and storage cost control.

CN121903512APending Publication Date: 2026-04-21CHINA COMPUTER DIGITAL (BEIJING) INFORMATION TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
CHINA COMPUTER DIGITAL (BEIJING) INFORMATION TECHNOLOGY CO LTD
Filing Date
2025-12-26
Publication Date
2026-04-21

Smart Images

  • Figure CN121903512A_ABST
    Figure CN121903512A_ABST
Patent Text Reader

Abstract

The invention discloses an intelligent optimization and early warning method and platform for multi-dimensional factor collaborative large-scale material registration. The method comprises the following steps: 1) constructing a control queue; 2) adding, deleting or changing nodes in the control queue; 3) loading a table item k in the mapping table and a material set contained in the predefined table item k, establishing mapping association between the table item k of the mapping table and a node nq of the control queue, and establishing an association pointer from materials in the material table to the table item k in the mapping table; 4) obtaining a complete set model function F and a control model function fj (t); 5) checking a safety boundary; and (6) adjusting is completed, the material quantity safety risk is solved, and the process is ended. According to the invention, aiming at a scene with a huge material type scale, various events influencing the materials are taken as driving, and the various events are processed according to a unified standard, so that efficient and accurate material neat set early warning, overstock early warning and management control are realized, the effectiveness of enterprise material management is improved, and the risk and the cost are reduced.
Need to check novelty before this filing date? Find Prior Art