Cooperative scheduling method and system for composite robot and automated guided vehicle

By acquiring and processing data from the target area, robots, and vehicles, a collaborative scheduling scheme is generated and adjusted, solving the problem of inaccurate collaborative scheduling between composite robots and automated guided vehicles, and improving collaborative efficiency and production efficiency.

CN122064049APending Publication Date: 2026-05-19SHENZHEN TIANJIAN ENG INSPECTION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202610216654.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-02-14
Publication Date
2026-05-19

AI Technical Summary

Technical Problem

The coordination and scheduling accuracy of the composite robot and the automated guided vehicle is poor, and the timing is prone to inconsistencies.

Method used

By acquiring model data of the target area, abstract data of the composite robot and the automated guided vehicle, and target task data, task allocation and binding are performed to generate an initial collaborative scheduling scheme. The scheme is then adjusted and optimized based on real-time monitoring data.

Benefits of technology

This improved the coordination and scheduling accuracy of the composite robot and the automated guided vehicle, reduced task completion time, and increased production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122064049A_ABST
    Figure CN122064049A_ABST
Patent Text Reader

Abstract

The invention provides a cooperative scheduling method and system for a composite robot and an automated guided vehicle. The method comprises the following steps: acquiring model data of a target area, abstract data of a composite robot and an automated guided vehicle, and target task data; performing allocation processing on the target task data to obtain task allocation data; performing task binding according to the task allocation data and the abstract data to obtain collaborative unit data; generating an initial collaborative scheduling scheme according to the collaborative unit data and the model data; and adjusting the initial collaborative scheduling data according to real-time monitoring data to obtain a target collaborative scheduling scheme. The precision of cooperative scheduling of the composite robot and the automated guided vehicle can be improved, the task completion time can be shortened, and the production efficiency can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of data processing technology, and also to a method for fabricating printable curved perovskite solar cells. Background Technology

[0002] Composite robots are a new type of intelligent equipment that integrates a mobile chassis, a collaborative robotic arm, a vision module, and an end effector. Automated Guided Vehicles (AGVs) are industrial vehicles that load goods automatically or manually, automatically travel along a set route or tow a cargo trolley to a designated location, and then load and unload goods automatically or manually. In intelligent manufacturing and flexible logistics scenarios, composite robots (mobile chassis + robotic arm + vision) are responsible for precision operations such as loading and unloading, assembly, and sorting, while automated guided vehicles are responsible for long-distance, high-load material transfer. Together, they form the core unit of automated production lines / warehousing.

[0003] Because the composite robot and the automated guided vehicle belong to two separate control systems, their task timing is not consistent, which can easily lead to problems such as "the automated guided vehicle has arrived but the robot has not arrived, or the robot has arrived but the automated guided vehicle has not been in place." As a result, the coordination and scheduling accuracy of the composite robot and the automated guided vehicle is poor. Summary of the Invention

[0004] The technical problem to be solved by the present invention is to provide a method and system for the coordinated scheduling of composite robots and automated guided vehicles, so as to improve the accuracy of the coordinated scheduling of composite robots and automated guided vehicles.

[0005] To solve the above-mentioned technical problems, the technical solution of the present invention is as follows: A first aspect of the present invention provides a method for the coordinated scheduling of a composite robot and an automated guided vehicle, comprising: Acquire model data of the target area, abstract data of the composite robot and automated guided vehicle, and target task data; The target task data is allocated to obtain task allocation data; Tasks are bound together based on the task allocation data and the abstract data to obtain collaborative unit data; An initial collaborative scheduling scheme is generated based on the collaborative unit data and the model data; The initial collaborative scheduling data is adjusted based on real-time monitoring data to obtain the target collaborative scheduling scheme.

[0006] Optionally, acquire model data of the target area, abstract data of the composite robot and automated guided vehicle, and target task data, including: Acquire drawing data and point cloud data for the target area; Based on the drawing data and the point cloud data, the model data of the target area is obtained; Based on the attribute data of the composite robot and the automated guided vehicle, abstract data of the composite robot and the automated guided vehicle are obtained. Obtain target task data; the target task data includes material identifier, start point, end point, process, priority, and deadline.

[0007] Optionally, the target task data is processed for allocation to obtain task allocation data, including: The target task data is classified according to the preset task type to obtain collaborative task data; The collaborative task data is allocated and processed according to preset allocation conditions to obtain task allocation data.

[0008] Optionally, task binding is performed based on the task allocation data and the abstract data to obtain collaborative unit data, including: Candidate set data is obtained by using the task allocation data, the abstract data, and the preset cost function; The matching degree of the collaborative unit is obtained based on the preset matching function and the candidate set data; The candidate set data is filtered based on the matching degree of the collaborative unit to obtain the collaborative unit data.

[0009] Optionally, candidate set data is obtained through the task allocation data, the abstract data, and the preset cost function, including: pass Obtain the total cost of single-device task allocation; The abstract data is filtered based on the total cost of single-device task allocation and preset filtering conditions to obtain a candidate set of data; in, Allocate total cost for a single device task. , , , All are weights, D is the distance cost in the task allocation data, T is the time cost in the task allocation data, Bat is the remaining battery power of the device in the abstract data, and Err is the historical error cost in the abstract data.

[0010] Optionally, the matching degree of the collaborative unit is obtained based on a preset matching function and the candidate set data, including: pass Obtain the matching degree of the collaborative unit; For the matching degree of the collaborative unit, Weighted by waiting time The waiting time is defined as follows: i represents the Automated Guided Vehicle (AGV) number in the candidate set data, and j represents the composite robot number in the candidate set data. Weights are matched to ensure docking accuracy. To ensure the accuracy and matching degree of the docking.

[0011] Optionally, based on the collaborative unit data and the model data, an initial collaborative scheduling scheme is generated, including: Path planning data is obtained by performing path planning based on the collaborative unit data and the model data; Based on preset constraints, the task allocation data, and the collaborative unit data, collaborative task chain data is generated. An initial collaborative scheduling scheme is generated based on the path planning data and the collaborative task chain data.

[0012] A second aspect of the present invention provides a collaborative scheduling system for a composite robot and an automated guided vehicle, comprising: The acquisition module is used to acquire model data of the target area, abstract data of the composite robot and the automated guided vehicle, and target task data. The processing module is used to allocate and process the target task data to obtain task allocation data; bind tasks according to the task allocation data and the abstract data to obtain collaborative unit data; generate an initial collaborative scheduling scheme according to the collaborative unit data and the model data; and adjust the initial collaborative scheduling data according to real-time monitoring data to obtain a target collaborative scheduling scheme.

[0013] A third aspect of the present invention provides a computing device, comprising: a processor and a memory storing a computer program, wherein the computer program, when executed by the processor, performs the method described in the first aspect.

[0014] A fourth aspect of the present invention provides a computer-readable storage medium storing instructions that, when executed on a computer, cause the computer to perform the method as described in the first aspect.

[0015] The above-described solution of the present invention has at least the following beneficial effects: The above-described solution of the present invention acquires model data of the target area, abstract data of the composite robot and the automated guided vehicle, and target task data. Then, it performs allocation processing on the target task data to obtain task allocation data. Based on the task allocation data and the abstract data, it binds tasks to obtain collaborative unit data. Then, based on the collaborative unit data and the model data, it generates an initial collaborative scheduling scheme. Finally, it adjusts the initial collaborative scheduling data based on real-time monitoring data to obtain the target collaborative scheduling scheme. This can improve the accuracy of collaborative scheduling of the composite robot and the automated guided vehicle, and is beneficial to reducing task completion time and improving production efficiency. Attached Figure Description

[0016] Figure 1 This is a flowchart illustrating the collaborative scheduling method of the composite robot and the automated guided vehicle in an embodiment of the present invention. Figure 2 This is a schematic diagram of the structure of the collaborative scheduling system of the composite robot and the automated guided vehicle in an embodiment of the present invention. Detailed Implementation

[0017] Exemplary embodiments of the invention will now be described in more detail with reference to the accompanying drawings. While exemplary embodiments of the invention are shown in the drawings, it should be understood that the invention may be implemented in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this invention will be thorough and complete, and will fully convey the scope of the invention to those skilled in the art.

[0018] like Figure 1 As shown, an embodiment of the present invention proposes a collaborative scheduling method for a composite robot and an automated guided vehicle, comprising the following steps: Step 101: Obtain model data of the target area, abstract data of the composite robot and the automated guided vehicle, and target task data; Step 102: Perform allocation processing on the target task data to obtain task allocation data; Step 103: Bind tasks according to the task allocation data and the abstract data to obtain collaborative unit data; Step 104: Generate an initial collaborative scheduling scheme based on the collaborative unit data and the model data; Step 105: Adjust the initial collaborative scheduling data based on real-time monitoring data to obtain the target collaborative scheduling scheme.

[0019] The collaborative scheduling method for composite robots and automated guided vehicles (AGVs) of this invention acquires model data of the target area, abstract data of the composite robot and AGV, and target task data. Then, it allocates the target task data to obtain task allocation data. Based on the task allocation data and the abstract data, tasks are bound to obtain collaborative unit data. Next, based on the collaborative unit data and the model data, an initial collaborative scheduling scheme is generated. Finally, the initial collaborative scheduling data is adjusted based on real-time monitoring data to obtain the target collaborative scheduling scheme. This method can improve the accuracy of collaborative scheduling between composite robots and AGVs, and is beneficial for reducing task completion time and improving production efficiency.

[0020] In an optional embodiment of the present invention, step 101, obtaining model data of the target area, abstract data of the composite robot and the automated guided vehicle, and target task data, may include: Step 1011: Obtain the drawing data and point cloud data of the target area; Specifically, the target area can be determined according to user needs. It can be a factory area or a workshop. The drawing data of the target area can be CAD (computer-aided design) drawings; the point cloud data can be obtained by traversing the target area using LiDAR.

[0021] Step 1012: Obtain model data of the target area based on the drawing data and the point cloud data; Specifically, the drawing data undergoes the following preprocessing: Obstacle layers (including walls, columns, and equipment), passable layers (including passageways and ground), and functional area layers (including workstations, docking points, and charging areas) are retained; annotations, text, dimension lines, and redundant layers are deleted; CAD coordinates are converted to world coordinates (meters, m), with the bottom left corner of the target area set as (0,0) as the origin, and 1 CAD unit = 1 meter; rotation correction is used to make the passageway parallel to the X / Y axes. Then, the preprocessed drawing data is rasterized: preset raster parameters are obtained, including a resolution of 0.1m × 0.1m, and raster values ​​defined as: 0 - free and passable, 1 - obstacle (walls, machines), 2 - workstation / work area, 3 - AGV docking area, 4 - narrow passageway / intersection; the preprocessed drawing data is rasterized according to the preset raster parameters to obtain a two-dimensional raster map. Here, through... We obtain a two-dimensional raster map, where, It is a two-dimensional raster map. y , Here, res represents the world coordinates and the resolution.

[0022] After filtering and denoising the point cloud data, the point cloud data and the 2D raster map are fused to obtain a fused raster map, which is the model data of the target area. Here, fusion needs to be performed according to preset fusion conditions. In one specific embodiment, the preset fusion conditions include: if the 2D raster map marks an obstacle and the point cloud also shows an obstacle, then the obstacle is retained; if the 2D raster map is passable and the point cloud shows an obstacle, then the point cloud data is used as the standard and the obstacle is set; if the 2D raster map shows an obstacle but the point cloud does not, then the obstacle is retained; functional areas (workstations / passages) are based on the 2D raster map. The purpose of fusing the point cloud data and the 2D raster map is to make the map more accurate. Additionally, the time axis needs to be set to a time granularity of 0.1 seconds, with a time range of 0 to 3600 seconds for cyclical refresh; the spatiotemporal raster needs to be set to... In this system, 0 represents spacetime idle, 1 represents spacetime occupied, 2 represents pre-occupancy, and 3 represents locked. The three-dimensional structure is... W is the map width (number of raster columns), H is the map height (number of raster rows), and T is the time axis length.

[0023] Step 1013: Obtain abstract data of the composite robot and the automated guided vehicle based on the attribute data of the composite robot and the automated guided vehicle; Specifically, the attribute data of the composite robot (mobile chassis + robotic arm + vision) and the automated guided vehicle (AGV) are divided into general attributes and specific attributes, forming a unified "mobile work body" data model. The composite robot and the AGV are uniformly abstracted as a mobile work body, with their states—position, attitude, battery level, task segment, accuracy threshold, etc.—as abstract data. Additionally, the abstract data may also include the composite robot's number or identifier, and the AGV's number or identifier. The abstract data can include the composite robot's state (including its position, attitude, battery level, task segment, and accuracy threshold) and its number (or identifier), and the AGV's state (including its position, attitude, battery level, task segment, and accuracy threshold) and its number (or identifier).

[0024] Step 1014: Obtain target task data; the target task data includes material identifier, start point, end point, process, priority, and deadline.

[0025] Specifically, target task data can be obtained from the Manufacturing Execution System (MES). This data includes material identifier, start point, end point, process, priority, and deadline. In one specific embodiment, the material identifier is MAT-2026001, the start point is loading station A (coordinates: X=5.0m, Y=3.0m), the end point is finished product unloading station C (coordinates: X=20.0m, Y=10.0m), the process is precision assembly + vision positioning and grasping, the priority is 3 (levels 1-5, with 5 being the highest), and the deadline is 20xx-xx-xx 14:30:00 (timestamp: 1740645000). Among them, material identification is used for unified identification of materials by the composite robot and the automated guided vehicle; the starting point is used to determine the starting position during path planning and to calculate the total cost of single-device task allocation; the ending point is used to determine the ending position during path planning and to allow the automated guided vehicle to return to the ending point after completing its operation, as well as to calculate the total task distance, total time, and power consumption; the process is used to determine whether the composite robot and the automated guided vehicle need to cooperate and to determine the task chain; the priority is used to indicate the urgency of the task, with high-priority equipment occupying the spacetime grid; and the deadline is the latest time that the task must be completed, used to calculate whether the task has exceeded the time limit and whether it is urgent, ensuring that the composite robot and the automated guided vehicle complete all actions before the deadline.

[0026] In an optional embodiment of the present invention, step 102, which involves allocating the target task data to obtain task allocation data, may include: Step 1021: Classify the target task data according to the preset task type to obtain collaborative task data; Specifically, preset task types can include: transfer and operation coordination, transfer, operation, emergency tasks, normal tasks, standby, charging, or return-to-base tasks, etc. Target task data is categorized according to preset task types, forming multiple corresponding task groups. Simultaneously, transfer and operation coordination tasks are included as coordination task data. Coordination task data includes task type, material identifier, start point, end point, process, priority, and deadline. The purpose of categorizing target task data is to determine the types of tasks requiring transfer and operation coordination, providing a basis for subsequent task allocation.

[0027] Step 1022: The collaborative task data is allocated according to preset allocation conditions to obtain task allocation data.

[0028] Specifically, the preset allocation conditions include: distance matching, load matching, power matching, and accuracy matching. Equipment data (composite robots and automated guided vehicles) can be extracted from the abstract data of the composite robot and the automated guided vehicle (AGV), including the equipment's current position, rated load, remaining power, and accuracy data. Based on the equipment data and the collaborative task data, the distance matching degree, load matching degree, power matching degree, and accuracy matching degree are obtained. Equipment whose current position and the path length from the task start point meet a preset length threshold, whose rated load is not less than the weight of the task material, whose remaining power is not less than the power required to complete the task, and whose accuracy is not less than the required accuracy of the task are selected as candidate equipment. Candidate equipment includes candidate composite robots and candidate AGVs. The task allocation data includes the collaborative task data and its corresponding candidate composite robots and candidate AGVs.

[0029] In an optional embodiment of the present invention, step 103, which involves binding tasks based on the task allocation data and the abstract data to obtain collaborative unit data, may include: Step 1031: Obtain candidate set data through the task allocation data, the abstract data, and the preset cost function; In an optional embodiment of the present invention, step 1031 includes: Step 10311, through Obtain the total cost of single-device task allocation; Step 10312: Filter the abstract data according to the total cost of single-device task allocation and preset filtering conditions to obtain candidate set data; in, Allocate total cost for a single device task. , , , All are weights, D is the distance cost in the task allocation data, T is the time cost in the task allocation data, Bat is the remaining battery power of the device in the abstract data, and Err is the historical error cost in the abstract data.

[0030] Specifically, the total cost of single-device task allocation measures the overall cost of a single device (composite robot or automated guided vehicle) performing a task; the lower the value, the higher the priority for allocation. Therefore, a preset screening criterion could be the minimum total cost of single-device task allocation. After calculating the total cost of single-device task allocation using the above formula, the device with the minimum total cost of single-device task allocation is selected as the candidate set data. The candidate set data may include the device's number or identifier.

[0031] Step 1032: Obtain the matching degree of the collaborative unit based on the preset matching function and the candidate set data; In an optional embodiment of the present invention, step 1032 includes: pass Obtain the matching degree of the collaborative unit; For the matching degree of the collaborative unit, Weighted by waiting time The waiting time is defined as follows: i represents the Automated Guided Vehicle (AGV) number in the candidate set data, and j represents the composite robot number in the candidate set data. Weights are matched to ensure docking accuracy. To ensure the accuracy and matching degree of the docking.

[0032] Specifically, selecting the devices with the highest matching degree of collaborative units from the candidate set data as a group to jointly execute tasks can improve task execution efficiency. Collaborative unit data includes composite robots and automated guided vehicles as a group, and may also include corresponding task data.

[0033] In an optional embodiment of the present invention, step 104, generating an initial cooperative scheduling scheme based on the cooperative unit data and the model data, may include: Step 1041: Perform path planning based on the collaborative unit data and the model data to obtain path planning data; Specifically, motion constraints are established for the automated guided vehicle and the composite robot in the collaborative unit data: maximum speed, maximum acceleration, minimum turning radius, and safe contour radius (for expanding the grid). The grid map in the model data is safely expanded: the obstacle grid is expanded outward by a safe contour radius distance to avoid collisions with the equipment. The path cost function value of each candidate point in the raster map is calculated using the path cost function F(x,y,t)=G(x,y,t)+H(x,y,t). Here, F(x,y,t) is the path cost function value of the candidate point (x,y,t), G(x,y,t) is the spatiotemporal cost already incurred by the candidate point (x,y,t), i.e., the actual cost incurred at time t to travel from the starting point to the current raster (x,y), and H(x,y,t) is the estimated remaining spatiotemporal cost of the candidate point (x,y,t), i.e., the minimum estimated cost to travel from the current point (x,y,t) to the target point. The candidate point with the smallest path cost function value is selected as the next point until the target point is reached. Connecting all the next points from the starting point to the destination with a line yields the path planning data.

[0034] Step 1042: Generate collaborative task chain data based on preset constraints, the task allocation data, and the collaborative unit data; Specifically, the preset constraints include: each subsequent step must depend on the "completion signal" of the preceding step: Automated Guided Vehicle (AGV) driving trigger condition = AGV retrieval completed (sensor sends "retrieval OK"); Composite Robot movement trigger condition = AGV alignment and docking completed (AGV sends "stopped OK"); Robotic Arm operation trigger condition = vision calibration completed (vision system sends "calibration coordinates OK"); AGV return trigger condition = robotic arm operation completed (composite robot sends "operation OK"), etc.; Parallel / serial constraints: all steps are serial (no parallelism) to avoid resource conflicts. By parsing the tasks in the task allocation data, multiple sub-steps are obtained. Sub-processes are generated according to the generation criteria corresponding to each sub-step, and then collaborative task chain data is generated according to the time sequence. In a specific embodiment, the tasks in the task allocation data include retrieval from the starting point to the destination, which are parsed into sub-steps such as retrieval and delivery. The generation basis for picking includes: the core task objective is for materials to move from the starting point to the workstation, with the automated guided vehicle (AGV) serving as the material transfer carrier; production line rules require materials to be picked up / loaded by the AGV from the storage / loading area; equipment constraints require the AGV to have a picking mechanism (such as lifting or clamping); therefore, the determined sub-processes include AGV picking, AGV driving, AGV positioning and docking, composite robot movement, and AGV return. The collaborative task chain data includes sub-processes arranged chronologically.

[0035] Step 1043: Generate an initial collaborative scheduling scheme based on the path planning data and the collaborative task chain data.

[0036] Specifically, the initial collaborative scheduling scheme includes path planning data and collaborative task chain data.

[0037] In an optional embodiment of the present invention, in step 105, the initial collaborative scheduling data is adjusted based on real-time monitoring data to obtain a target collaborative scheduling scheme. Specifically, the real-time monitoring data includes congestion, delay, faults, and temporary tasks. When the triggering conditions are met, the paths in the initial collaborative scheduling data are locally replanned, faulty equipment is removed, and tasks are assigned to backup units. Only affected sub-paths are replanned, avoiding global oscillations and improving the stability of the method.

[0038] In one specific embodiment, although the locations of obstacles (which can be suspended obstacles 0.1m to 1.5m above the ground, such as cantilever beams and pipes; or ultra-low obstacles 0 to 0.1m above the ground, such as anchor bolts and cable trays) are marked on the map, and these obstacles are avoided in the path planning, if the composite robot or automated guided vehicle still encounters suspended or ultra-low obstacles during actual operation, the 0 to 0.1m obstacles can be detected using the bottom-filling laser of the equipment, and measures such as immediate deceleration, stopping, and detouring can be taken; when the 0.1 to 1.5m suspended obstacles are detected by the top-of-the-line sensor of the equipment, it is determined whether the height interferes, and if it does, the movement is prohibited; if a new obstacle appears on the spatiotemporal grid-planned path, local replanning is triggered to bypass the obstacle without disrupting the global collaborative timing, thereby improving processing efficiency.

[0039] A specific embodiment of the collaborative scheduling method for composite robots and automated guided vehicles according to the present invention includes: Step 111: Obtain model data of the target area, abstract data of the composite robot and the automated guided vehicle, and target task data; Based on the drawing data and point cloud data of the target area, generate model data of the target area, i.e., a raster map.

[0040] Step 112: Perform allocation processing on the target task data to obtain task allocation data; Identify tasks that require collaborative execution by the composite robot and the automated guided vehicle from the target task data, and bind the tasks and equipment based on the matching degree of distance, load, power, and accuracy.

[0041] Step 113: Bind tasks according to the task allocation data and the abstract data to obtain collaborative unit data; By calculating the total cost of single-device task allocation and the matching degree of collaborative units, the most suitable composite robot and automated guided vehicle are selected to form a team to jointly execute the task.

[0042] Step 114: Generate an initial collaborative scheduling scheme based on the collaborative unit data and the model data; An initial collaborative scheduling scheme is determined by path planning and the task chain required to complete the task.

[0043] Step 115: Adjust the initial collaborative scheduling data based on real-time monitoring data to obtain the target collaborative scheduling scheme.

[0044] The initial collaborative scheduling data is adjusted based on real-time monitoring data to adapt to unexpected situations and improve task execution efficiency.

[0045] The collaborative scheduling method for composite robots and automated guided vehicles (AGVs) in this invention significantly improves collaborative efficiency by using a target collaborative scheduling scheme to schedule the composite robots and AGVs. This reduces task completion time by 30% to 50%, equipment waiting time by 80%, and production line cycle time by more smoothly. Path conflict rate is reduced by over 95%, deadlock is eliminated, and channel utilization is improved, all of which contribute to increased production efficiency.

[0046] like Figure 2 As shown, an embodiment of the present invention proposes a collaborative scheduling system 200 for a composite robot and an automated guided vehicle, comprising: The acquisition module 201 is used to acquire model data of the target area, abstract data of the composite robot and the automated guided vehicle, and target task data. The processing module 202 is used to allocate and process the target task data to obtain task allocation data; bind tasks according to the task allocation data and the abstract data to obtain collaborative unit data; generate an initial collaborative scheduling scheme according to the collaborative unit data and the model data; and adjust the initial collaborative scheduling data according to real-time monitoring data to obtain a target collaborative scheduling scheme.

[0047] Optionally, acquire model data of the target area, abstract data of the composite robot and automated guided vehicle, and target task data, including: Acquire drawing data and point cloud data for the target area; Based on the drawing data and the point cloud data, the model data of the target area is obtained; Based on the attribute data of the composite robot and the automated guided vehicle, abstract data of the composite robot and the automated guided vehicle are obtained. Obtain target task data; the target task data includes material identifier, start point, end point, process, priority, and deadline.

[0048] Optionally, the target task data is processed for allocation to obtain task allocation data, including: The target task data is classified according to the preset task type to obtain collaborative task data; The collaborative task data is allocated and processed according to preset allocation conditions to obtain task allocation data.

[0049] Optionally, task binding is performed based on the task allocation data and the abstract data to obtain collaborative unit data, including: Candidate set data is obtained by using the task allocation data, the abstract data, and the preset cost function; The matching degree of the collaborative unit is obtained based on the preset matching function and the candidate set data; The candidate set data is filtered based on the matching degree of the collaborative unit to obtain the collaborative unit data.

[0050] Optionally, candidate set data is obtained through the task allocation data, the abstract data, and the preset cost function, including: pass Obtain the total cost of single-device task allocation; The abstract data is filtered based on the total cost of single-device task allocation and preset filtering conditions to obtain a candidate set of data; in, Allocate total cost for a single device task. , , , All are weights, D is the distance cost in the task allocation data, T is the time cost in the task allocation data, Bat is the remaining battery power of the device in the abstract data, and Err is the historical error cost in the abstract data.

[0051] Optionally, the matching degree of the collaborative unit is obtained based on a preset matching function and the candidate set data, including: pass Obtain the matching degree of the collaborative unit; For the matching degree of the collaborative unit, Weighted by waiting time The waiting time is defined as follows: i represents the Automated Guided Vehicle (AGV) number in the candidate set data, and j represents the composite robot number in the candidate set data. Weights are matched to ensure docking accuracy. To ensure the accuracy and matching degree of the docking.

[0052] Optionally, based on the collaborative unit data and the model data, an initial collaborative scheduling scheme is generated, including: Path planning data is obtained by performing path planning based on the collaborative unit data and the model data; Based on preset constraints, the task allocation data, and the collaborative unit data, collaborative task chain data is generated. An initial collaborative scheduling scheme is generated based on the path planning data and the collaborative task chain data.

[0053] The collaborative scheduling device for composite robots and automated guided vehicles in this invention acquires model data of the target area, abstract data of the composite robot and the automated guided vehicle, and target task data. Then, it performs allocation processing on the target task data to obtain task allocation data. Based on the task allocation data and the abstract data, it binds tasks to obtain collaborative unit data. Next, based on the collaborative unit data and the model data, it generates an initial collaborative scheduling scheme. Finally, it adjusts the initial collaborative scheduling data based on real-time monitoring data to obtain the target collaborative scheduling scheme. This improves the accuracy of collaborative scheduling between composite robots and automated guided vehicles, and helps reduce task completion time and increase production efficiency.

[0054] It should be noted that this device corresponds to the method described above, and all implementations in the method embodiments described above are applicable to the embodiments of this device and can achieve the same technical effect. Further details will not be provided in this embodiment.

[0055] This invention also provides a computing device, including: a processor and a memory storing a computer program, wherein the computer program, when executed by the processor, performs the method as described in any of the above embodiments. All implementations in the above method embodiments are applicable to the embodiments of this device and can achieve the same technical effects. Further details are omitted in this embodiment.

[0056] This invention also provides a computer-readable storage medium storing instructions that, when executed on a computer, cause the computer to perform the method as described in any of the above embodiments. All implementations in the above method embodiments are applicable to the embodiments of this device and can achieve the same technical effects. Further details are omitted in this embodiment.

[0057] It should be noted that in the apparatus and method of the present invention, the components or steps can obviously be decomposed and / or recombined. These decompositions and / or recombinations should be considered equivalent solutions of the present invention. Furthermore, the steps for performing the above series of processes can naturally be performed in the order described and in chronological order, but are not necessarily required to be performed in chronological order. Some steps can be performed in parallel, overlapping, or independently of each other.

[0058] It should be noted that in the above embodiments, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes that element. Furthermore, it should be noted that the scope of the methods and apparatuses in the embodiments described above is not limited to performing functions in the order shown or discussed, but may also include performing functions substantially simultaneously or in the reverse order, depending on the functions involved. For example, the described methods may be performed in a different order than described, and various steps may be added, omitted, or combined. Additionally, features described with reference to certain examples may be combined in other examples.

[0059] The above description represents the preferred embodiments of the present invention. It should be noted that those skilled in the art can make various improvements and modifications without departing from the principles of the present invention, and these improvements and modifications should also be considered within the scope of protection of the present invention.

Claims

1. A method for the coordinated scheduling of a composite robot and an automated guided vehicle, characterized in that, include: Acquire model data of the target area, abstract data of the composite robot and automated guided vehicle, and target task data; The target task data is allocated to obtain task allocation data; Tasks are bound together based on the task allocation data and the abstract data to obtain collaborative unit data; An initial collaborative scheduling scheme is generated based on the collaborative unit data and the model data; The initial collaborative scheduling data is adjusted based on real-time monitoring data to obtain the target collaborative scheduling scheme.

2. The collaborative scheduling method for the composite robot and the automated guided vehicle according to claim 1, characterized in that, Acquire model data of the target area, abstract data of the composite robot and automated guided vehicle, and target task data, including: Acquire drawing data and point cloud data for the target area; Based on the drawing data and the point cloud data, the model data of the target area is obtained; Based on the attribute data of the composite robot and the automated guided vehicle, abstract data of the composite robot and the automated guided vehicle are obtained. Obtain target task data; the target task data includes material identifier, start point, end point, process, priority, and deadline.

3. The collaborative scheduling method for the composite robot and the automated guided vehicle according to claim 1, characterized in that, The target task data is allocated to obtain task allocation data, including: The target task data is classified according to the preset task type to obtain collaborative task data; The collaborative task data is allocated and processed according to preset allocation conditions to obtain task allocation data.

4. The collaborative scheduling method for the composite robot and the automated guided vehicle according to claim 1, characterized in that, Tasks are bound together based on the task allocation data and the abstract data to obtain collaborative unit data, including: Candidate set data is obtained by using the task allocation data, the abstract data, and the preset cost function; The matching degree of the collaborative unit is obtained based on the preset matching function and the candidate set data; The candidate set data is filtered based on the matching degree of the collaborative unit to obtain the collaborative unit data.

5. The collaborative scheduling method for the composite robot and the automated guided vehicle according to claim 4, characterized in that, The candidate set data is obtained by using the task allocation data, the abstract data, and the preset cost function, including: pass Obtain the total cost of single-device task allocation; The abstract data is filtered based on the total cost of single-device task allocation and preset filtering conditions to obtain a candidate set of data; in, Allocate total cost for a single device task. , , , All are weights, D is the distance cost in the task allocation data, T is the time cost in the task allocation data, Bat is the remaining battery power of the device in the abstract data, and Err is the historical error cost in the abstract data.

6. The collaborative scheduling method for the composite robot and the automated guided vehicle according to claim 4, characterized in that, Based on the preset matching function and the candidate set data, the matching degree of the collaborative unit is obtained, including: pass Obtain the matching degree of the collaborative unit; For the degree of matching of collaborative units, Weighted by waiting time The waiting time is defined as follows: i represents the Automated Guided Vehicle (AGV) number in the candidate set data, and j represents the composite robot number in the candidate set data. Weights are matched to ensure docking accuracy. To ensure the accuracy and matching degree of the docking.

7. The collaborative scheduling method for the composite robot and the automated guided vehicle according to claim 1, characterized in that, Based on the collaborative unit data and the model data, an initial collaborative scheduling scheme is generated, including: Path planning data is obtained by performing path planning based on the collaborative unit data and the model data; Based on preset constraints, the task allocation data, and the collaborative unit data, collaborative task chain data is generated. An initial collaborative scheduling scheme is generated based on the path planning data and the collaborative task chain data.

8. A collaborative scheduling system for a composite robot and an automated guided vehicle, characterized in that, include: The acquisition module is used to acquire model data of the target area, abstract data of the composite robot and the automated guided vehicle, and target task data. The processing module is used to allocate and process the target task data to obtain task allocation data; bind tasks according to the task allocation data and the abstract data to obtain collaborative unit data; generate an initial collaborative scheduling scheme according to the collaborative unit data and the model data; and adjust the initial collaborative scheduling data according to real-time monitoring data to obtain a target collaborative scheduling scheme.

9. A computing device, characterized in that, include: A processor, a memory storing a computer program, wherein the computer program, when executed by the processor, performs the method as described in any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that, The system stores instructions that, when executed on a computer, cause the computer to perform the method as described in any one of claims 1 to 7.