Method for finely measuring and calculating developable capacity of wind power installation technology in specified area

By combining terrain classification and wake avoidance rules, the exploitable amount of wind power installation technology can be quickly assessed, solving the problems of insufficient accuracy or excessive calculation time in traditional methods. This enables refined calculation over a large area and is suitable for large-scale resource surveys.

CN122088360APending Publication Date: 2026-05-26SHANGHAI ELECTRIC POWER DESIGN INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202610045481.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-01-14
Publication Date
2026-05-26

AI Technical Summary

Technical Problem

Existing technologies struggle to achieve rapid, large-scale, and detailed calculations of wind power development volume while taking into account topography and wake distribution rules. Traditional methods are either insufficiently accurate or take too long to calculate, failing to meet the needs of rapid surveys at large scales such as provinces and cities.

Method used

By combining data acquisition and preprocessing, terrain segmentation, construction of a rule base for turbine type and spacing, turbine layout in mountainous and flat terrain scenarios, and capacity calculation, and by combining terrain features and wake avoidance rules, the exploitable amount of wind power installation technology can be quickly assessed.

Benefits of technology

It enables rapid and precise calculation of the exploitable capacity of wind power installations over a wide area, balancing accuracy and efficiency. It is suitable for large-scale resource surveys, and the results are more reliable. It also takes into account the differences in turbine models under different wind resource conditions, thus improving the accuracy of the calculation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122088360A_ABST
    Figure CN122088360A_ABST
Patent Text Reader

Abstract

The invention discloses a method for finely measuring and calculating the developable capacity of a wind power installation technology in a specified area, and the method comprises the following steps: S1, obtaining the geographic information and wind resource data of a target area, and superposing a restrictive factor layer to obtain available land resources; s2, dividing available land into a mountain land type and a flat land type based on topographic features; s3, preferentially extracting a ridge line corridor of a mountain type, and performing mountain unit arrangement in combination with a main wind direction and a fan wake flow model; s4, updating the available boundary of the flat ground type based on the wake flow influence area of the mountain unit, and performing boundary recursive unit arrangement in the flat ground type; s5, matching a corresponding model according to the wind speed data of the arranged point positions; and S6, accumulatively calculating the total installed capacity. According to the method, on the premise that the terrain and wake flow arrangement rule is met, the technology developable quantity of wind power installation can be rapidly and automatically measured and calculated in a large range.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of artificial intelligence evaluation technology in wind power generation, and in particular to a method for refined calculation of the technically exploitable amount of wind power installed capacity in a specified area. Background Technology

[0002] As the global energy transition progresses, countries around the world have formulated medium- and long-term renewable energy development plans.

[0003] Therefore, accurately grasping the exploitable wind power capacity within a specific administrative or geographical region is a prerequisite for scientifically setting targets during the planning stage.

[0004] There are two main types of traditional methods for calculating wind power development potential:

[0005] Macro-level indicator method: This method simply uses "available area × installed capacity per unit area (e.g., 5MW / km^2)" for estimation. This method ignores terrain fragmentation, wake loss caused by prevailing wind direction, and the adaptability of different turbine models to different wind speed zones, resulting in calculation results that are often too large and difficult to implement.

[0006] Micro-site selection method: This method involves refined CFD fluid simulation and machine-by-machine optimization for specific plots of land. While highly accurate, it is computationally time-consuming and requires significant computing power, making it unsuitable for rapid surveys across large-scale areas such as provinces and cities.

[0007] Therefore, how to take into account both topography and wake distribution rules, and how to quickly calculate the exploitable amount of wind power installed capacity in a large-scale specific administrative or geographical area during the early evaluation of wind power generation, has become a technical problem that urgently needs to be solved by those skilled in the art. Summary of the Invention

[0008] In view of the above-mentioned deficiencies of the prior art, the present invention provides a method for finely calculating the technically exploitable amount of wind power installed capacity in a specified area. The purpose is to achieve rapid and large-scale automatic calculation of the technically exploitable amount of wind power installed capacity under the premise of satisfying the topography and wake distribution rules.

[0009] To achieve the above objectives, this invention discloses a method for refined calculation of the technically exploitable amount of wind power installed capacity in a designated area, comprising the following steps:

[0010] Step S1, data acquisition and preprocessing, specifically involves acquiring geographic information data, limiting factor data, and wind energy resource maps of the target measurement area;

[0011] Step S2, Delineation of Available Space and Terrain, specifically: removing the area covered by the limiting factor data from the target measurement area to obtain the theoretical available range;

[0012] Based on the elevation and slope data, the theoretically usable area is divided into several mountainous plots and several flat plots, and each of the mountainous plots and each of the flat plots is defractionated.

[0013] Step S3, Model and Spacing Rule Library Construction, specifically: establish a mapping relationship library between wind speed classification and wind turbine model, and set wake avoidance rules for turbine layout;

[0014] In the relational database, each type of machine corresponds to a specific single-machine capacity and impeller diameter D;

[0015] The wake avoidance rules for the unit layout include longitudinal spacing thresholds along the prevailing wind direction and lateral spacing thresholds perpendicular to the prevailing wind direction.

[0016] Step S4, Mountain Scene Unit Arrangement, specifically: Identify and extract the corresponding ridgeline corridor in each of the mountain plots;

[0017] Along the direction of each ridgeline corridor, the mountain turbine locations are iteratively arranged in combination with the prevailing wind direction and the wake avoidance rules of the turbine layout, until all the ridgeline corridors can no longer accommodate new turbine locations.

[0018] Step S5, flat terrain scene unit arrangement, specifically: based on all the mountain drone locations, calculate the impact area of ​​the mountain drone wake generated on each flat terrain plot, and remove all the mountain drone wake impact areas as new restricted areas from all the flat terrain plots;

[0019] Then, within the updated flat land plot, the flat land turbine locations are iteratively arranged from the boundary inwards, taking into account the prevailing wind direction and the wake avoidance rules of the turbine layout.

[0020] Step S6, capacity calculation, specifically: count all valid mountain turbine sites and all valid flat-ground turbine sites from steps S4 and S5, match the turbine type and single unit capacity according to the wind speed of each mountain turbine site and each flat-ground turbine site, and sum them up to obtain the technically exploitable wind power installed capacity of the target measurement area.

[0021] Preferably, in step S2, the specific steps for defraction processing of each of the mountainous plots and each of the flat plots are as follows:

[0022] Step S2.1: Calculate the area of ​​each of the mountainous plots and each of the flat plots;

[0023] Step S2.2: Set the minimum usable area threshold;

[0024] Step S2.3: Mark each mountain plot and each flat plot with an area smaller than the minimum usable area threshold as an unusable area and remove them.

[0025] Preferably, in step S3, the longitudinal spacing threshold along the prevailing wind direction is N×D;

[0026] The threshold for the lateral spacing perpendicular to the prevailing wind direction is M×D.

[0027] Wherein, D is the impeller diameter of the matching machine model at the current location; N is the main wind direction spacing coefficient ranging from 5 to 9; M is the vertical main wind direction spacing coefficient ranging from 2 to 5; and the preset width of the ridgeline corridor is 30 meters to 80 meters.

[0028] More preferably, step S4 is as follows:

[0029] Step S4.1: Use terrain analysis algorithm to extract the ridgeline in each mountainous area, and extend the ridgeline to both sides with a preset width to form the corresponding ridgeline corridor;

[0030] Step S4.2: Determine the prevailing wind direction of the target measurement area;

[0031] Step S4.3: Arrange the first wind turbine at one end of the corresponding ridgeline corridor. The location of the first wind turbine is the first mountain turbine location of the corresponding ridgeline corridor.

[0032] Step S4.4: Starting from the first fan, execute the following steps in a loop until the corridor is full;

[0033] Step S4.4.1: Taking each deployed wind turbine as the center, according to the corresponding main wind direction, form a rectangular or elliptical restricted area at a distance of N×D upstream and downstream along the main wind direction and at a distance of M×D on both sides perpendicular to the wind direction.

[0034] Step S4.4.2: In the remaining available area of ​​the same ridgeline corridor, find the nearest valid point of the corresponding deployed wind turbine that is outside the rectangular or elliptical restricted area and deploy the next wind turbine;

[0035] Step S4.4: Traverse all the ridgeline corridors to complete the arrangement of all the mountain machine sites.

[0036] More preferably, step S4 is as follows:

[0037] Step S5.1: Project all the rectangular or elliptical restricted areas onto all the flat land plots, and remove overlapping parts;

[0038] Step S5.2: Select a starting point on the boundary line of each of the flat land plots and place the first flat land fan.

[0039] Step S5.3: Combining the prevailing wind direction and the wake avoidance rules of the unit arrangement, arrange all subsequent flatland wind turbines in the remaining flatland space of all the flatland plots in a row and column scanning or boundary recursion manner to ensure that each newly added flatland wind turbine is located outside the existing restricted area.

[0040] The existing restricted areas include restricted areas belonging to the mountainous areas and restricted areas belonging to the flat areas.

[0041] More preferably, in step S6, the method for matching the machine type and single-unit capacity according to the wind speed of each of the mountain machine sites and each of the grader sites is as follows:

[0042] First, extract the annual average wind speed of a specific turbine location from the wind energy resource map. ;

[0043] like Matching low-wind-speed model A, with a capacity of The impeller diameter is ;

[0044] like Matching medium wind speed model B, with a capacity of The impeller diameter is ;

[0045] like Matching high-speed fan model C, with a capacity of The impeller diameter is .

[0046] The beneficial effects of this invention are:

[0047] This invention is closer to actual engineering practice. Unlike the simple power density method, this invention simulates the layout logic in actual engineering, such as ridge priority and wake avoidance, making the calculation results more reliable.

[0048] This invention balances accuracy and efficiency, avoids the high time consumption of full-field CFD simulation, and utilizes geometric rules for rapid iteration, making it suitable for large-area resource surveys.

[0049] This invention features dynamic matching, taking into account the differences in machine models under different wind resource conditions, so that the impeller diameter D and single-unit capacity change with wind speed, thereby improving the accuracy of the calculation.

[0050] The following will further explain the concept, specific structure, and technical effects of the present invention in conjunction with the accompanying drawings, so as to fully understand the purpose, features, and effects of the present invention. Attached Figure Description

[0051] Figure 1 The following is a flowchart illustrating the execution of an embodiment of the present invention.

[0052] Figure 2 This diagram illustrates the layout logic of mountainous and flat land parcels and wake avoidance in one embodiment of the present invention.

[0053] Figure 3 The diagram illustrates the logic of wind speed classification and aircraft model matching in one embodiment of the present invention. Detailed Implementation

[0054] Example 1: As Figure 1 and Figure 2 As shown, a method for refined calculation of the technically exploitable amount of wind power capacity in a specified area includes the following steps:

[0055] Step S1, data acquisition and preprocessing, specifically involves acquiring geographic information data, limiting factor data, and wind energy resource maps of the target measurement area;

[0056] In this step, by inputting the area of ​​interest and the limiting factors within that area (such as ecological red lines, basic farmland, residential areas, etc.), spatial analysis is used to eliminate the limiting areas and obtain the usable area.

[0057] Step S2, Delineation of Available Space and Terrain: Specifically, the area covered by limiting factor data is removed from the target measurement area to obtain the theoretical available range;

[0058] Based on the elevation and slope data, the theoretically usable area is divided into several mountainous plots and several flat plots, and each mountainous plot and each flat plot is defractionated.

[0059] In this step, the available areas are divided into two categories: flat land and mountainous land, based on slope and elevation characteristics. A connectivity analysis is then performed on the available areas to remove overly scattered small patches.

[0060] Step S3, Model and Spacing Rule Library Construction, specifically: establish a mapping relationship library between wind speed classification and wind turbine model, and set wake avoidance rules for turbine layout;

[0061] In the relational database, each type of machine corresponds to a specific single-machine capacity and impeller diameter D;

[0062] The wake avoidance rules for unit layout include longitudinal spacing thresholds along the prevailing wind direction and lateral spacing thresholds perpendicular to the prevailing wind direction.

[0063] In this step, the prevailing wind direction of the area is determined; different recommended models are set according to different wind speed classifications (corresponding to different single unit capacities and impeller diameters D); and wake avoidance geometry parameters based on the D value are set (e.g., prevailing wind direction 7D, vertical wind direction 3D).

[0064] Step S4, Mountain Scene Unit Arrangement, specifically: Identify and extract the corresponding ridgeline corridor in each mountain plot;

[0065] Along the direction of each ridgeline corridor, the mountain turbine locations are iteratively arranged in combination with the prevailing wind direction and the wake avoidance rules of the turbine layout, until all ridgeline corridors can no longer accommodate new turbine locations.

[0066] In this step, identify the ridgeline (e.g., 50m wide). Along the ridgeline, start by placing wind turbines from one end. Delineate restricted areas based on the current turbine model's D-value, and then proceed sequentially along the remaining ridgeline until all turbines are utilized.

[0067] Step S5, Flatland Scene Unit Arrangement: Based on all mountain drone locations, calculate the impact area of ​​the mountain drone wake generated on each flatland plot, and remove all mountain drone wake impact areas as new restricted areas from all flatland plots.

[0068] Then, within the updated flat land plot, the placement of the flat land turbine sites is iteratively arranged from the boundary inwards, taking into account the prevailing wind direction and the wake avoidance rules of the turbine layout.

[0069] In this step, the wake exclusion zones created by the existing wind turbines in the mountainous area are first eliminated within the flat terrain. In the remaining usable flat area, wind turbines are arranged according to the boundary priority principle, and the remaining space is filled sequentially according to the prevailing wind direction and spacing rules.

[0070] Step S6, capacity calculation, specifically: count all valid mountain turbine sites and all valid flat-ground turbine sites from steps S4 and S5, match the turbine type and single unit capacity according to the wind speed of each mountain turbine site and each flat-ground turbine site, and sum them up to obtain the technically exploitable wind power installed capacity of the target measurement area.

[0071] In this step, the number of each type of wind turbine in the final layout is counted, and the total installed capacity is calculated.

[0072] This invention comprehensively considers topography, wind turbine wake effect, and the matching of turbine type with wind resources. By introducing terrain classification, geometric constraint layout algorithm, and dynamic matching mechanism for wind turbine type, it can quickly and accurately assess the regional wind power development potential. It solves the problems of low accuracy of preliminary calculations in traditional macro planning and low efficiency of traditional micro site selection calculations. It can quickly and accurately assess the regional wind power technology development potential and provide a scientific basis for energy planning.

[0073] In some embodiments, the step of defraction processing for each mountain plot and each flat plot in step S2 is as follows:

[0074] Step S2.1: Calculate the area of ​​each mountain plot and each flat plot;

[0075] Step S2.2: Set the minimum usable area threshold;

[0076] Step S2.3: Mark each mountain plot and each flat plot with an area smaller than the minimum usable area threshold as an unusable area and remove them.

[0077] In some embodiments, in step S3, the longitudinal spacing threshold along the prevailing wind direction is N×D;

[0078] The threshold for lateral spacing perpendicular to the prevailing wind direction is M×D.

[0079] Where D is the impeller diameter of the matching machine model at the current location; N is the main wind direction spacing coefficient, with a value range of 5 to 9; M is the vertical main wind direction spacing coefficient, with a value range of 2 to 5; and the preset width of the ridgeline corridor is 30 meters to 80 meters.

[0080] In some embodiments, step S4 is specifically as follows:

[0081] Step S4.1: Use terrain analysis algorithms to extract the ridgeline in each mountainous area, and extend the ridgeline to both sides with a preset width to form a corresponding ridgeline corridor.

[0082] Step S4.2: Determine the prevailing wind direction in the target measurement area;

[0083] Step S4.3: Deploy the first wind turbine at one end of the corresponding ridgeline corridor. The location of the first wind turbine is the first mountain turbine site of the corresponding ridgeline corridor.

[0084] Step S4.4: Starting from the first fan, execute the following steps in a loop until the corridor is full;

[0085] Step S4.4.1: Taking each deployed wind turbine as the center, according to the corresponding prevailing wind direction, form a rectangular or elliptical restricted area at a distance of N×D upstream and downstream along the prevailing wind direction and at a distance of M×D on both sides perpendicular to the wind direction.

[0086] Step S4.4.2: In the remaining available area of ​​the same ridgeline corridor, find the nearest valid point of the corresponding wind turbine that is outside the rectangular or elliptical restricted area and place the next wind turbine thereafter.

[0087] Step S4.4: Traverse all ridgeline corridors to complete the layout of all mountain machine sites.

[0088] In some embodiments, step S4 is specifically as follows:

[0089] Step S5.1: Project all rectangular or elliptical restricted areas onto all flat land plots and remove overlapping parts;

[0090] Step S5.2: Select a starting point on the boundary line of each flat land plot and place the first flat land fan.

[0091] Step S5.3: Combining the prevailing wind direction and the wake avoidance rules of the unit layout, arrange all subsequent flatland wind turbines in the remaining flatland space of all flatland plots in the manner of row and column scanning or boundary recursion, to ensure that each newly added flatland wind turbine is located outside the existing restricted area.

[0092] Existing restricted areas include restricted areas belonging to mountainous areas and restricted areas belonging to flat areas.

[0093] like Figure 3 As shown, in some embodiments, in step S6, the method for matching the machine type and single-unit capacity according to the wind speed at each mountain machine location and each flat machine location is as follows:

[0094] First, extract the annual average wind speed of a specific turbine location from the wind energy resource map. ;

[0095] like Matching low-wind-speed model A, with a capacity of The impeller diameter is ;

[0096] like Matching medium wind speed model B, with a capacity of The impeller diameter is ;

[0097] like Matching high-speed fan model C, with a capacity of The impeller diameter is .

[0098] Example 2: A process for calculating the development volume of wind power planning in a certain county, as detailed below:

[0099] Step S1: Data Preparation

[0100] Input the vector boundary of the county as the area of ​​interest. Import the ecological red line, permanent basic farmland, and urban development boundary as the "prohibited area". Subtract the prohibited area from the area of ​​interest to obtain the "theoretical usable area".

[0101] Step S2: Terrain Classification and Fragmentation

[0102] The slope is calculated using the DEM (Digital Elevation Model).

[0103] Areas with a slope greater than 15 degrees or located in the ridgeline buffer zone are defined as "mountainous areas".

[0104] The remaining areas are defined as "flat land".

[0105] The generated patches are filtered out, removing those with areas smaller than [the specified area]. Isolated plots are used to avoid the situation where the plots are too scattered to support towers.

[0106] Step S3: Establish layout parameters

[0107] Based on the regional wind resource map (WRG), the following turbine model library is established:

[0108] Class A models (low wind speed): annual average wind speed 5.0-6.0 m / s, single unit capacity 5MW, impeller diameter .

[0109] Class B models (medium-high wind speed): annual average wind speed > 6.0 m / s, single unit capacity 6.25 MW, impeller diameter .

[0110] The prevailing wind direction is set at 30 degrees north of west.

[0111] Set avoidance distance: spacing along the prevailing wind direction Vertical spacing of the prevailing wind direction .

[0112] Step S4: Mountainous terrain layout (prioritize execution)

[0113] Extract the ridgeline to generate a 50m wide strip area.

[0114] The program automatically searches for the ridge point with the highest wind speed as the starting point, determines the wind speed at that point (e.g., 6.5 m / s), and selects a Class B air conditioner. ).

[0115] Centered on this point, extend upstream and downstream along a direction of 30 degrees north of west (prevailing wind direction). Extending vertically This forms a rectangular restricted area.

[0116] Find the next available point outside the restricted area along the ridgeline, and repeat the above process until the ridgeline is full.

[0117] Step S5: Arrange on flat ground (to be performed next)

[0118] Project all the rectangular restricted areas generated by the mountain wind turbines in step 4 onto the flat land plots, and deduct these areas that are severely affected by the wake.

[0119] Deploy the aircraft at the boundary of the remaining flat land. Assuming a wind speed of 5.5 m / s at a certain point, select a Class A aircraft ( ).

[0120] form (Vertical) and (Horizontal) restricted area.

[0121] In the remaining space, the fans are filled in sequentially according to the row and column scanning method, ensuring that each new fan is not in the restricted area of ​​the existing fans.

[0122] Step S6: Output of Results

[0123] The final statistical results are as follows:

[0124] Category A (5MW): A total of 120 units.

[0125] Category B (6.25MW): A total of 50 units will be deployed.

[0126] Technological potential = .

[0127] The preferred embodiments of the present invention have been described in detail above. It should be understood that those skilled in the art can make numerous modifications and variations based on the concept of the present invention without creative effort. Therefore, all technical solutions that can be obtained by those skilled in the art based on the concept of the present invention through logical analysis, reasoning, or limited experimentation on the basis of existing technology should be within the scope of protection defined by the claims.

Claims

1. A method for refined calculation of the technically exploitable amount of wind power installed capacity in a specified area; characterized in that, Includes the following steps: Step S1, data acquisition and preprocessing, specifically involves acquiring geographic information data, limiting factor data, and wind energy resource maps of the target measurement area; Step S2, Delineation of Available Space and Terrain, specifically: removing the area covered by the limiting factor data from the target measurement area to obtain the theoretical available range; Based on the elevation and slope data, the theoretically usable area is divided into several mountainous plots and several flat plots, and each of the mountainous plots and each of the flat plots is defractionated. Step S3, Model and Spacing Rule Library Construction, specifically: establish a mapping relationship library between wind speed classification and wind turbine model, and set wake avoidance rules for turbine layout; In the relational database, each type of machine corresponds to a specific single-machine capacity and impeller diameter D; The wake avoidance rules for the unit layout include longitudinal spacing thresholds along the prevailing wind direction and lateral spacing thresholds perpendicular to the prevailing wind direction. Step S4, Mountain Scene Unit Arrangement, specifically: Identify and extract the corresponding ridgeline corridor in each of the mountain plots; Along the direction of each ridgeline corridor, the mountain turbine locations are iteratively arranged in combination with the prevailing wind direction and the wake avoidance rules of the turbine layout, until all the ridgeline corridors can no longer accommodate new turbine locations. Step S5, flat terrain scene unit arrangement, specifically: based on all the mountain drone locations, calculate the impact area of ​​the mountain drone wake generated on each flat terrain plot, and remove all the mountain drone wake impact areas as new restricted areas from all the flat terrain plots; Then, within the updated flat land plot, the flat land turbine locations are iteratively arranged from the boundary inwards, taking into account the prevailing wind direction and the wake avoidance rules of the turbine layout. Step S6, capacity calculation, specifically: count all valid mountain turbine sites and all valid flat-ground turbine sites from steps S4 and S5, match the turbine type and single unit capacity according to the wind speed of each mountain turbine site and each flat-ground turbine site, and sum them up to obtain the technically exploitable wind power installed capacity of the target measurement area.

2. The method for refined calculation of the technically exploitable amount of wind power installed capacity in a designated area according to claim 1, characterized in that, In step S2, the specific steps for defraction processing of each of the mountainous plots and each of the flat plots are as follows: Step S2.1: Calculate the area of ​​each of the mountainous plots and each of the flat plots; Step S2.2: Set the minimum usable area threshold; Step S2.3: Mark each mountain plot and each flat plot with an area smaller than the minimum usable area threshold as an unusable area and remove them.

3. The method for refined calculation of the technically exploitable amount of wind power installed capacity in a designated area according to claim 1, characterized in that, In step S3, the longitudinal spacing threshold along the prevailing wind direction is N×D; The threshold for the lateral spacing perpendicular to the prevailing wind direction is M×D; Wherein, D is the impeller diameter of the matching machine model at the current location; N is the main wind direction spacing coefficient ranging from 5 to 9; M is the vertical main wind direction spacing coefficient ranging from 2 to 5; and the preset width of the ridgeline corridor is 30 meters to 80 meters.

4. The method for refined calculation of the technically exploitable amount of wind power installed capacity in a designated area according to claim 3, characterized in that, Step S4 is as follows: Step S4.1: Use terrain analysis algorithm to extract the ridgeline in each mountainous area, and extend the ridgeline to both sides with a preset width to form the corresponding ridgeline corridor; Step S4.2: Determine the prevailing wind direction of the target measurement area; Step S4.3: Arrange the first wind turbine at one end of the corresponding ridgeline corridor. The location of the first wind turbine is the first mountain turbine location of the corresponding ridgeline corridor. Step S4.4: Starting from the first fan, execute the following steps in a loop until the corridor is full; Step S4.4.1: Taking each deployed wind turbine as the center, according to the corresponding main wind direction, form a rectangular or elliptical restricted area at a distance of N×D upstream and downstream along the main wind direction and at a distance of M×D on both sides perpendicular to the wind direction. Step S4.4.2: In the remaining available area of ​​the same ridgeline corridor, find the nearest valid point of the corresponding already deployed wind turbine that is outside the rectangular or elliptical restricted area and deploy the next wind turbine; Step S4.4: Traverse all the ridgeline corridors to complete the arrangement of all the mountain machine sites.

5. The method for refined calculation of the technically exploitable amount of wind power installed capacity in a designated area according to claim 4, characterized in that, Step S4 is as follows: Step S5.1: Project all the rectangular or elliptical restricted areas onto all the flat land plots, and remove overlapping parts; Step S5.2: Select a starting point on the boundary line of each of the flat land plots and place the first flat land fan. Step S5.3: Combining the prevailing wind direction and the wake avoidance rules of the unit arrangement, arrange all subsequent flatland wind turbines in the remaining flatland space of all the flatland plots in a row and column scanning or boundary recursion manner to ensure that each newly added flatland wind turbine is located outside the existing restricted area. The existing restricted areas include restricted areas belonging to the mountainous areas and restricted areas belonging to the flat areas.

6. The method for refined calculation of the technically exploitable wind power capacity in a designated area according to claim 1, characterized in that, In step S6, the method for matching the machine type and single-unit capacity according to the wind speed of each of the mountain machine sites and each of the grader sites is as follows: First, extract the annual average wind speed of a specific turbine location from the wind energy resource map. ; like Matching low-wind-speed model A, with a capacity of The impeller diameter is ; like Matching medium wind speed model B, with a capacity of The impeller diameter is ; like Matching high-speed fan model C, with a capacity of The impeller diameter is .