Dual-energy storage collaborative control method and system
By employing hardware synchronization triggering and active transfer strategies, the synchronization delay problem in hybrid energy storage systems combining lithium-ion batteries and supercapacitors was solved, achieving efficient energy dispatch and extended lifespan, and improving the system's response speed and the lifespan of lithium batteries.
Patent Information
- Application Number
- CN202610305460.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-03-13
- Publication Date
- 2026-06-05
Smart Images

Figure CN122159414A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of new energy and energy storage control technology, and in particular to a dual energy storage collaborative control method and system. Background Technology
[0002] In the current new energy and energy storage industry, the hybrid energy storage architecture of lithium-ion batteries and supercapacitors has become an important technological direction for breaking through the physical limits of single energy storage media. Lithium batteries have extremely high energy density, but are highly susceptible to polarization degradation due to high current and deep charge-discharge cycles; while supercapacitors have low energy density, they have extremely high power density and extremely long cycle life. How to efficiently coordinate these two heterogeneous media is a problem that the industry urgently needs to solve.
[0003] Existing technologies typically employ two completely independent microcontroller units to manage the lithium battery and supercapacitor separately. This traditional dual-controller architecture relies on a communication bus for data exchange, inevitably introducing communication queuing and interrupt handling time at the software level, resulting in a significant synchronization delay (typically greater than 100 milliseconds) in data acquisition and coordinated control between the two. This asynchrony of the underlying data causes the system to lag in response to sudden transient power demands, making precise energy scheduling impossible.
[0004] Furthermore, existing power allocation logic is mostly a passive peak power assist strategy, meaning it only intervenes passively when the external power demand exceeds a set threshold. This simple control method lacks deep collaborative logic based on the battery's electrochemical degradation mechanism, and cannot proactively intervene and actively transfer load when lithium batteries face specific operating conditions that accelerate lifespan degradation (such as high current, deep charging and deep discharging). Therefore, it cannot fundamentally optimize and extend the full lifespan of lithium batteries. Summary of the Invention
[0005] To overcome the aforementioned shortcomings in existing technologies, the present invention aims to provide a dual energy storage collaborative control method and system. By employing absolute synchronization triggering at the hardware level and an active transfer strategy based on the lifespan decay mechanism, it addresses the latency issues of heterogeneous energy storage systems and significantly extends the service life of lithium batteries across the entire temperature range.
[0006] To achieve the above objectives, the first aspect of the present invention provides a dual energy storage cooperative control method, applied to the main control unit of a dual energy storage cooperative control system, comprising:
[0007] Hardware synchronization trigger signals are sent to the trigger pins of the first and second sampling units, which are respectively connected by a hardware interface, so that the first and second sampling units lock data within the same clock cycle, thereby synchronously collecting the operating status data of the first and second energy storage units.
[0008] Receive the operating status data and extract at least one status parameter from it, including the current load current of the first energy storage unit, the depth of discharge, or the ambient temperature of the environment in which it is located.
[0009] Based on preset lifetime loss assessment rules, determine whether the at least one state parameter meets the preset high loss condition;
[0010] In response to the determination result satisfying the high loss condition, an active transfer command for adjusting the power transmission state is generated;
[0011] The active transfer command is sent to the bidirectional power conversion unit connected between the first energy storage unit and the second energy storage unit to adjust the switching action of the bidirectional power conversion unit, thereby controlling the second energy storage unit to share the load power of the first energy storage unit, or controlling the second energy storage unit to take over all power supply circuits of the first energy storage unit.
[0012] In one possible implementation, the lifetime loss assessment rule is established based on the heterogeneous physicochemical loss characteristics of the first energy storage unit and the second energy storage unit:
[0013] The lifespan loss of the first energy storage unit is characterized as being nonlinearly positively correlated with the charge / discharge rate and the depth of discharge, and the correlation increases at an accelerating rate with the increase of the charge / discharge rate and the depth of discharge.
[0014] The lifespan degradation of the second energy storage unit is positively correlated with the increase in operating peak voltage and ambient temperature.
[0015] In one possible implementation, determining whether the at least one state parameter satisfies a preset high-loss condition includes at least one of the following determination logics:
[0016] When the load current is detected to be greater than or equal to the first multiplier threshold, it is determined that the high current and high loss operating condition is met.
[0017] When the current discharge depth of the first energy storage unit is detected to be lower than the first energy threshold or higher than the second energy threshold, it is determined that the deep charge and discharge high loss condition is met.
[0018] When the ambient temperature is detected to be lower than the first temperature threshold, it is determined that the low-temperature polarization high-loss condition is met.
[0019] In one possible implementation, sending the active transfer command to the bidirectional power conversion unit includes:
[0020] When the high current and high loss operating condition is determined to be met, the power transmission direction and operating parameters of the bidirectional power conversion unit are adjusted so that the second energy storage unit shares the load current, thereby limiting the actual discharge current of the first energy storage unit to within the first rate threshold.
[0021] When it is determined that the deep charge-discharge high loss condition is met and the remaining power is lower than the first power threshold, the discharge power route of the first energy storage unit is cut off, and the second energy storage unit takes over the power supply of all loads through the bidirectional power conversion unit.
[0022] In one possible implementation, the method further includes:
[0023] When the ambient temperature is lower than the second temperature threshold, the maximum discharge rate of the first energy storage unit is limited so that it can only maintain a preset static current output mode, and the second energy storage unit is controlled to respond to the external system start command to release the start-up peak current.
[0024] The thermal management unit configured within the control system conducts the heat generated by the second energy storage unit during the release of the startup peak current to the first energy storage unit for waste heat preheating until the ambient temperature rises above the first temperature threshold and the restriction is lifted.
[0025] A second aspect of the present invention provides a dual energy storage cooperative control system, comprising:
[0026] Main control unit;
[0027] A first sampling unit and a second sampling unit are respectively communicatively connected to the main control unit. The first sampling unit is configured to monitor the first energy storage unit, and the second sampling unit is configured to monitor the second energy storage unit.
[0028] A bidirectional power conversion unit is connected between the first energy storage unit and the second energy storage unit, and the control terminal of the bidirectional power conversion unit is controlled by the main control unit;
[0029] The main control unit is configured to send hardware synchronization trigger signals to the trigger pins of the first sampling unit and the second sampling unit via a hardware serial peripheral interface, so that the first sampling unit and the second sampling unit lock data within the same clock cycle.
[0030] The main control unit is configured to execute a lifetime coordination algorithm based on operating status data, and when it is determined that a preset high loss condition is met, it outputs a hardware drive signal to the bidirectional power conversion unit to adjust its power transmission state and perform active load transfer to the first energy storage unit.
[0031] In one possible implementation, the main control unit utilizes a built-in memory protection unit to construct at least one mutually logically isolated energy storage management domain and a cooperative control domain to prevent control crosstalk during multitasking.
[0032] The collaborative control domain independently runs the lifetime collaborative algorithm and outputs corresponding instructions.
[0033] In one possible implementation, taking into account the heterogeneous electrical characteristics of the first energy storage unit and the second energy storage unit, the first sampling unit and the second sampling unit have non-isomorphic internal analog front-end acquisition circuits:
[0034] The first sampling unit is equipped with a first analog-to-digital converter for collecting the individual voltage and temperature parameters of the first energy storage unit.
[0035] The second sampling unit is internally configured with a second analog-to-digital converter with a range greater than that of the first analog-to-digital converter and an AC impedance injection analysis circuit, in order to acquire the wide voltage fluctuation and dynamic internal resistance status of the second energy storage unit.
[0036] In one possible implementation, the hardware serial peripheral interface is an SPI interface with a physical clock line and a chip select line.
[0037] The main control unit is configured to simultaneously select the acquisition and hold circuits of the first sampling unit and the second sampling unit in parallel physical hard-wired manner through the hardware edge signal of the chip select line of the serial peripheral interface, so that the sampling timing deviation between the two is limited to a preset microsecond threshold range.
[0038] In one possible implementation, the bidirectional power conversion unit employs a synchronous rectification chopper topology circuit;
[0039] The synchronous rectification chopper topology circuit includes a main control switch matrix and a power inductor; the main control unit directly drives the gate of the main control switch matrix according to the high-frequency pulse width modulation signal output by the lifetime coordination algorithm, so that the system can switch between the buck mode in which the first energy storage unit steps down to supplement the second energy storage unit and the boost mode in which the second energy storage unit steps up to supplement the system bus, and the bus voltage fluctuation during the switching process is less than the preset voltage fluctuation threshold.
[0040] The above-described one or more technical solutions in the embodiments of this application have at least one or more of the following technical effects:
[0041] This invention provides a dual-energy storage collaborative control method and system that, through the combination of underlying hardware and upper-level logic, solves the defects of communication delay and passive power allocation in existing technologies. First, the main control unit sends a hardware synchronization trigger signal to the sampling unit via a hardware interface, locking the data of the two energy storage units within the same clock cycle. This mechanism eliminates the queuing and interruption time of traditional communication buses, improves data acquisition synchronization, and ensures the accuracy of transient power response and scheduling. Second, this method introduces a preset lifetime loss assessment rule, replacing the passive intervention mode that relies solely on external power demand. The system extracts parameters such as load current, depth of discharge, or ambient temperature to actively determine high-loss conditions; when the conditions are met, the main control unit issues a command to adjust the bidirectional power conversion unit, with the second energy storage unit sharing or taking over power supply. This proactive transfer mechanism preemptively removes high-loss conditions, alleviates the polarization attenuation of the first energy storage unit, and effectively extends the overall lifespan of the system.
[0042] The above description is merely an overview of the technical solution of the present invention. In order to better understand the technical means of the present invention and to implement it in accordance with the contents of the specification, and in order to make the above and other objects, features and advantages of the present invention more apparent and understandable, specific embodiments of the present invention are described below. Attached Figure Description
[0043] Figure 1 This is a schematic diagram of a dual energy storage collaborative control method according to an exemplary embodiment;
[0044] Figure 2 This is a schematic diagram of a dual energy storage collaborative control system according to an exemplary embodiment.
[0045] Explanation of reference numerals in the attached figures: 100, main control unit; 200, first sampling unit; 300, second sampling unit; 400, first energy storage unit; 500, second energy storage unit; 600, bidirectional power conversion unit. Detailed Implementation
[0046] To make the objectives, technical solutions, and advantages of the present invention clearer, the embodiments of the present invention will be described in further detail below with reference to the accompanying drawings.
[0047] Exemplary embodiments will now be described in detail, examples of which are illustrated in the accompanying drawings. When the following description relates to the drawings, unless otherwise indicated, the same numbers in different drawings denote the same or similar elements. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the present invention. Rather, they are merely examples of systems and methods consistent with some aspects of the invention as detailed in the appended claims.
[0048] Figure 1This is a flowchart of a dual energy storage coordinated control method according to an exemplary embodiment, such as... Figure 1 As shown, the method includes the following steps:
[0049] In step S100, a hardware synchronization trigger signal is sent to the trigger pins of the first and second sampling units, which are respectively connected via a hardware interface, so that the first and second sampling units lock data within the same clock cycle, thereby synchronously acquiring the operating status data of the first and second energy storage units. Specifically, to overcome the latency problem introduced by the traditional dual microcontroller unit (MCU) architecture relying on the communication bus for data interaction, the main control unit of this invention directly initiates control from the underlying hardware level. Preferably, the main control unit adopts a single domain control unit, such as an automotive-grade MCU conforming to the ISO 26262 ASIL-D safety level, such as the NXP S32K396. The main control unit generates a synchronization trigger signal through its internal hardware interfaces such as the hardware serial peripheral interface (SPI), which directly acts on the physical trigger pins.
[0050] It should be noted that, for ease of description and understanding, the following descriptions of exemplary embodiments will use the example of the first energy storage unit being a lithium battery pack and the second energy storage unit being a supercapacitor module for detailed explanation. This specific designation will not be redundantly marked thereafter; it should be understood that this specific designation is merely a preferred embodiment of the present invention and does not constitute a limitation on the scope of protection of the present invention. Furthermore, considering the differences in electrical characteristics between the first and second energy storage units, the first sampling unit and the second sampling unit preferably employ two sets of differentiated analog front-end (AFE) sampling chips. When the two AFEs receive a hardware synchronization trigger signal, their internal circuits operate instantaneously within the same clock cycle, achieving synchronous sampling, with the sampling timing deviation strictly controlled within 1 microsecond. This hardware-level synchronization mechanism based on absolute physical time eliminates uncontrollable delays at the software communication level, ensuring that the acquired heterogeneous energy storage operating status data has extremely high alignment accuracy on the time scale.
[0051] In step S200, the operating status data is received, and at least one status parameter from it is extracted: the current load current, depth of discharge, or ambient temperature of the first energy storage unit. Specifically, after completing the data synchronization lock of the underlying hardware, the main control unit receives and reads the aforementioned operating status data in real time. The system is no longer limited to passively monitoring the total external power demand, but rather deeply extracts key parameters characterizing the internal physical and chemical state of the first energy storage unit. Preferably, the main control unit extracts the load current, the depth of discharge calculated in combination with the state of charge (SOC), and the ambient temperature measured by a thermistor, etc., where the load current reflects the charge / discharge rate, the depth of discharge reflects the degree of consumption of available capacity and the deep charge / discharge state, and the ambient temperature reflects the activity and polarization characteristics of the internal electrochemical reaction. The extraction of these status parameters provides the most basic data support for accurately assessing the health status and lifespan degradation trend of the first energy storage unit.
[0052] In step S300, based on a preset lifetime loss assessment rule, it is determined whether the at least one state parameter meets a preset high loss condition. Specifically, considering the physical limitation that the first energy storage unit is susceptible to polarization decay due to specific operating conditions, this system incorporates a lifetime loss assessment rule based on an electrochemical mechanism, thereby upgrading the control logic from passive assistance to active transfer. Preferably, this assessment rule is constructed based on a quantified lifetime loss model; for example, the lifetime loss formula for the first energy storage unit can be expressed as:
[0053]
[0054] In this lifespan loss assessment formula, This represents the change in the health status of the first energy storage unit, used to quantitatively assess the degree of lifespan degradation. This represents the current load current of the first energy storage unit, and its squared term reflects the impact of Joule heat loss and polarization on the lifespan. This indicates the depth of discharge of the first energy storage unit, reflecting the mechanical stress damage generated during the cycling of active materials; This indicates the absolute temperature of the environment where the first energy storage unit is located; Indicates the number of loops that have been completed; For activation energy, Since it is an ideal gas constant, both temperature and temperature together determine the effect of temperature on the electrochemical reaction rate. , , , All of these are preset weighting coefficients, determined experimentally based on the specific electrochemical system of the first energy storage unit (such as lithium iron phosphate or ternary lithium).
[0055] According to this mechanism model, the lifespan loss of the first energy storage unit is positively correlated with the square of the charge / discharge rate and the square of the discharge depth. Furthermore, the chemical reaction rate is suppressed by the exponential term at low temperatures, easily leading to lithium plating. Therefore, when the main control unit detects any of the following conditions, it determines that the preset high-loss condition is met: the current load current is greater than or equal to the preset first rate threshold (e.g., ≥0.5C); the current discharge depth enters the deep charge / discharge high-risk zone (e.g., SOC < 20% or SOC > 80%); or the current ambient temperature is lower than the set ultra-low temperature safety threshold (e.g., ≤ -10℃ or ≤ -30℃).
[0056] In step S400, in response to the determination result satisfying the high-loss condition, an active transfer command for adjusting the power transmission state is generated. Specifically, once the main control unit identifies, according to the aforementioned quantitative evaluation rules, a specific high-loss condition that the first energy storage unit is facing or is about to face, leading to accelerated lifespan degradation, a protection response mechanism is immediately triggered. The generation process of the active transfer command involves a replanning of the overall energy flow of the system. This command aims to utilize the physical characteristics of the second energy storage unit, which possesses extremely high power density, is insensitive to high-current charging and discharging, and has an extremely long cycle life (e.g., cycle life ≥ 500,000 cycles), to actively transfer the damaging load that would originally be applied to the first energy storage unit to the second energy storage unit, thereby achieving pre-emptive stripping of high-loss conditions at the logic control level.
[0057] In step S500, the active transfer command is sent to the bidirectional power conversion unit connected between the first energy storage unit and the second energy storage unit to adjust the switching action of the bidirectional power conversion unit, thereby controlling the second energy storage unit to share the load power of the first energy storage unit, or controlling the second energy storage unit to take over the entire power supply circuit of the first energy storage unit. Specifically, the main control unit outputs the generated active transfer command to the bidirectional power conversion unit. To avoid voltage difference impact and passive distribution problems caused by direct parallel connection of the first and second energy storage units, the bidirectional power conversion unit is preferably a bidirectional synchronous Buck-Boost converter, including a main control switching device such as an automotive-grade MOSFET, to achieve precise power decoupling and bidirectional energy flow. Furthermore, the bidirectional power conversion unit dynamically adjusts its switching action in response to this command: On the one hand, when the first energy storage unit faces transient high current or high loss conditions in a specific low temperature range (such as -30℃ < T ≤ -10℃), the control system enters Boost mode, and the second energy storage unit quickly outputs a large current (such as a peak current of up to 150A) to share the peak power exceeding the safe rate of the first energy storage unit, limiting the discharge rate of the first energy storage unit (such as limiting it to ≤0.5C or ≤0.2C) to achieve precise peak shaving; on the other hand, when the first energy storage unit faces extremely deep discharge (such as SOC < 20%) or is in an extremely low temperature environment (such as T ≤ -30℃), the second energy storage unit is forcibly controlled to take over all load power supply circuits, so that the first energy storage unit can be completely isolated from the high-pressure network and avoid irreversible damage such as lithium plating.
[0058] By combining underlying hardware with upper-level logic, this invention addresses the shortcomings of communication delays and passive power allocation in existing technologies. First, the main control unit sends a hardware synchronization trigger signal to the sampling unit via a hardware interface, locking the data from both energy storage units within the same clock cycle. This mechanism eliminates queuing and interruption time in traditional communication buses, improves data acquisition synchronization, and ensures the accuracy of transient power response and scheduling. Second, this method introduces preset lifetime loss assessment rules, replacing the passive intervention mode that relies solely on external power demand. The system extracts parameters such as load current, depth of discharge, or ambient temperature to actively determine high-loss conditions. When these conditions are met, the main control unit issues instructions to adjust the bidirectional power conversion unit, allowing the second energy storage unit to share or take over power supply. This proactive transfer mechanism preemptively removes high-loss conditions, alleviates polarization attenuation in the first energy storage unit, and effectively extends the overall lifespan of the system.
[0059] To make the objectives, technical solutions, and advantages of the embodiments of this application clearer, the technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.
[0060] In an exemplary embodiment, the lifetime loss assessment rule is established based on the heterogeneous physicochemical loss characteristics of the first energy storage unit and the second energy storage unit:
[0061] The lifespan loss of the first energy storage unit is characterized as being nonlinearly positively correlated with the charge / discharge rate and the depth of discharge, and the correlation increases at an accelerating rate with the increase of the charge / discharge rate and the depth of discharge.
[0062] The lifespan degradation of the second energy storage unit is positively correlated with the increase in operating peak voltage and ambient temperature.
[0063] Specifically, the first energy storage unit and the second energy storage unit have fundamental differences in energy conversion and storage mechanisms, resulting in drastically different sensitivities to the environment and operating conditions.
[0064] For the first energy storage unit, its lifetime loss mainly stems from the internal structural damage during the electrochemical reaction process. Preferably, its lifetime loss is characterized as a non-linear positive correlation with the charge / discharge rate and the depth of discharge (DOD).
[0065] Specifically, when the charge / discharge rate exceeds the rated threshold (e.g., ≥0.5C) or the depth of discharge enters an extreme range (e.g., SOC < 20%), the polarization phenomenon inside the battery intensifies, active material particles are prone to mechanical stress cracks, and the thickness of the solid electrolyte interface film increases rapidly. This loss does not increase linearly, but rather shows an accelerating increasing trend with the increase of charge / discharge rate and depth of discharge. Therefore, this invention, through active transfer commands, utilizes the power assistance characteristics of the second energy storage unit to limit the charge / discharge rate of the first energy storage unit within a safe threshold (e.g., ≤0.5C) and maintain its daily operating range within a preferred range (e.g., 20%-80% SOC), thereby exponentially reducing its cycle life loss by utilizing the flattening section of the nonlinear curve.
[0066] As for the second energy storage unit, as a power-type energy storage medium, it has extremely high tolerance to high current surges, but its lifespan decay is positively correlated with the increase of operating peak voltage and ambient temperature.
[0067] Specifically, the lifespan of a supercapacitor is mainly affected by electrolyte evaporation and electrochemical decomposition, while higher terminal voltage and ambient temperature can significantly accelerate this failure process.
[0068] Preferably, the lifespan degradation law of the second energy storage unit can be characterized by a quantified overcapacity lifespan loss formula as follows:
[0069]
[0070] In this formula, This indicates the change in the health status of the second energy storage unit; This is the highest operating voltage; The ambient temperature; This represents the number of loop iterations. , , This is the preset loss coefficient for the second energy storage unit.
[0071] According to the core conclusion of this formula, the lifespan of the second energy storage unit is not sensitive to the number of cycles or high-current charge / discharge electrodes. Its cycle life is typically more than 200 times that of the first energy storage unit, and is only strongly correlated with the maximum operating voltage and temperature. Based on this characteristic, this system incorporates real-time monitoring of the voltage and temperature at the second energy storage unit's terminals in its evaluation rules. In the high-loss condition judgment logic, if the second energy storage unit is in a high-voltage saturation state or a high-temperature environment, the main control unit will dynamically adjust its power sharing ratio to prevent the second energy storage unit from operating under extreme voltage conditions for extended periods. This protects the energy lifespan of the first energy storage unit while also considering the power lifespan of the second energy storage unit itself.
[0072] Through this multi-dimensional evaluation based on heterogeneous loss characteristics, the system can accurately identify operating conditions that pose a high risk to the first energy storage unit but are within the tolerance range of the second energy storage unit, such as high-current transient impacts, and issue active transfer commands in real time.
[0073] For example, when the health status of the first energy storage unit drops to a preset threshold (e.g., SOH < 80%), the system will automatically increase the power sharing ratio of the second energy storage unit based on the above heterogeneous loss law (e.g., from 30% to 60%), and achieve maximum balance of the entire energy storage PACK service life by dynamically adjusting the load pressure of the two.
[0074] In an exemplary embodiment, determining whether the at least one state parameter satisfies a preset high-loss condition includes at least one of the following determination logics:
[0075] When the load current is detected to be greater than or equal to the first multiplier threshold, it is determined that the high current and high loss operating condition is met.
[0076] When the current discharge depth of the first energy storage unit is detected to be lower than the first energy threshold or higher than the second energy threshold, it is determined that the deep charge and discharge high loss condition is met.
[0077] When the ambient temperature is detected to be lower than the first temperature threshold, it is determined that the low-temperature polarization high-loss condition is met.
[0078] Specifically, in order to shift the control strategy from passive peak assistance to proactive transfer of life loss throughout the entire life cycle, the main control unit accurately identifies high-risk operating conditions by comparing the underlying state parameters with the preset safety boundaries in real time.
[0079] To determine the high-current, high-loss operating condition, the main control unit monitors the load current of the first energy storage unit in real time. Preferably, the first rate threshold is set to the rated rate of the first energy storage unit. For example, when the detected load current is greater than or equal to 0.5C (i.e., the first rate threshold), the system determines that the current condition meets the high-current, high-loss requirement. At this time, without intervention, the continuous high current can easily cause polarization degradation in the first energy storage unit. Through this determination, the system can proactively trigger the transfer of the high-loss operating condition.
[0080] To determine the high-loss condition of deep charge and discharge, the main control unit calculates the state of charge (SOC) of the first energy storage unit in real time to assess its discharge depth, thereby avoiding deep charge and discharge. Specifically, the system aims to limit the daily operating discharge depth of the first energy storage unit to the range of 20%-80%. Preferably, the first energy threshold is set to 20% SOC, and the second energy threshold is set to 80% SOC. When the remaining energy of the first energy storage unit is detected to be less than 20%, the system determines that the deep discharge high-loss condition is met, indicating a risk of deep discharge; when the remaining energy is detected to be greater than 80%, the system determines that the overcharge high-loss condition is met, indicating a risk of overcharging during braking or generator regenerative braking.
[0081] To address the issue of high-loss polarization at low temperatures, the main control unit monitors the ambient temperature in real time to mitigate low-temperature degradation. High-current charging and discharging at low temperatures is the primary cause of lithium plating within the first energy storage unit. Preferably, the first temperature threshold is set to -10°C. When the ambient temperature is detected to be below or equal to -10°C, the system determines that the high-loss polarization at low temperatures condition is met. This determination logic provides crucial logical support for subsequently prohibiting high-current discharge from the first energy storage unit and preventing low-temperature lithium plating.
[0082] Through the above-mentioned hierarchical and multi-dimensional judgment logic, the present invention completely avoids the conventional means of single threshold control in traditional technology, ensuring that the first energy storage unit always operates within the safe boundary of its physicochemical properties.
[0083] In an exemplary embodiment, sending the active transfer command to the bidirectional power conversion unit includes:
[0084] When the high current and high loss operating condition is determined to be met, the power transmission direction and operating parameters of the bidirectional power conversion unit are adjusted so that the second energy storage unit shares the load current, thereby limiting the actual discharge current of the first energy storage unit to within the first rate threshold.
[0085] When it is determined that the deep charge-discharge high loss condition is met and the remaining power is lower than the first power threshold, the discharge power route of the first energy storage unit is cut off, and the second energy storage unit takes over the power supply of all loads through the bidirectional power conversion unit.
[0086] Specifically, when the judgment parameters meet specific high-loss conditions, the main control unit sends an active transfer command to the bidirectional power conversion unit to achieve precise decoupling and intervention of the power output of the heterogeneous energy storage medium at the physical level, thereby protecting the first energy storage unit in a targeted manner.
[0087] For execution mechanisms under high-current, high-loss conditions, when the external load current demand is detected to reach or exceed the first rate threshold of the first energy storage unit, the main control unit dynamically adjusts the power transmission direction and operating parameters of the bidirectional power conversion unit through active transfer commands. Preferably, the main control unit dynamically adjusts the operating mode and output current of the bidirectional power conversion unit (such as a Buck-Boost circuit) according to the real-time status. For example, when the load current is greater than or equal to the first rate threshold (such as 0.5C, i.e., the rated rate of the lithium battery), the main control unit controls the bidirectional power conversion circuit so that the second energy storage unit bears all peak currents exceeding 0.5C. Through this power transmission parameter adjustment and sharing mechanism, the system can forcibly limit the maximum discharge rate of the first energy storage unit to within 0.5C, thereby effectively avoiding lithium polarization degradation caused by high current.
[0088] To address the high-loss operation under deep charge and discharge conditions, when the state of charge of the first energy storage unit indicates that its remaining charge is below a set first charge threshold, the main control unit will trigger a higher level of physical isolation protection to prevent irreversible structural damage. Preferably, to mitigate the risks of deep charge and discharge, the system limits the daily operating discharge depth of the first energy storage unit to the range of 20%-80%. When the remaining charge of the first energy storage unit is detected to be less than the first charge threshold (e.g., 20%), the main control unit cuts off the discharge power route of the first energy storage unit via an active transfer command, and the second energy storage unit takes over the power supply to the entire load through a bidirectional power conversion unit. This control logic, which completely cuts off the discharge route and allows the second energy storage unit to take over the entire power supply, ensures that the first energy storage unit is not subjected to any load pressure when its charge is low, fundamentally avoiding the lifespan loss caused by deep discharge.
[0089] In an exemplary embodiment, the method further includes:
[0090] When the ambient temperature is lower than the second temperature threshold, the maximum discharge rate of the first energy storage unit is limited so that it can only maintain a preset static current output mode, and the second energy storage unit is controlled to respond to the external system start command to release the start-up peak current.
[0091] The thermal management unit configured within the control system conducts the heat generated by the second energy storage unit during the release of the startup peak current to the first energy storage unit for waste heat preheating until the ambient temperature rises above the first temperature threshold and the restriction is lifted.
[0092] Specifically, this embodiment addresses the challenges of cold start and lithium plating risks in extremely low-temperature environments by designing a full-temperature-range adaptive collaborative control strategy that combines power distribution and heat transfer. In traditional technologies, a single primary energy storage unit often experiences a sharp increase in internal resistance at extremely low temperatures, failing to provide sufficient transient start-up power, and forced discharge easily triggers irreversible lithium plating degradation. This invention utilizes the complementary characteristics of heterogeneous energy storage, achieving safe start-up and active self-heating in low-temperature environments through the linkage of control logic and underlying thermal management hardware.
[0093] Preferably, the main control unit monitors the ambient temperature in real time via a temperature sensor. When the ambient temperature is below a second temperature threshold (e.g., set to an extremely low temperature range of T≤-30℃), the system strictly prohibits the first energy storage unit from discharging with a large current. At this time, the main control unit limits the maximum discharge rate of the first energy storage unit, causing it to enter and only maintain a preset static current output mode (e.g., limiting the discharge rate to ≤0.1C). This small current is only used to maintain the static operating power consumption of the underlying control circuits such as the main control MCU. Meanwhile, when an external system startup command is received, the main control unit controls the bidirectional power conversion unit, with the second energy storage unit fully responsible for handling startup requirements and peak load power supply. Because the second energy storage unit still has excellent transient power release capability at extremely low temperatures, it can instantly release extremely high startup peak current, such as a peak current of up to 150A, to powerfully drive the external starter motor, thereby ensuring a high startup success rate in environments such as -40℃.
[0094] Furthermore, during the process of the second energy storage unit responding to commands by releasing a large current to start up or intermittently outputting peak power, it inevitably generates Joule heat and other heat dissipation. The system uses a shared thermal management unit, such as an internal thermal management component within the PACK containing a thermally conductive medium or a circulating liquid cooling circuit, to collect the waste heat generated by the discharge of the second energy storage unit and actively conduct it to the surface or interior of the first energy storage unit for insulation and preheating. This waste heat preheating mechanism cleverly recovers the high-power dissipation energy of the second energy storage unit, converting it into a heat source to raise the core temperature of the first energy storage unit. This waste heat conduction process continues until the temperature of the first energy storage unit rises above a set first temperature threshold (e.g., above -10°C). Once this safe temperature limit is crossed, the risk of lithium plating is significantly reduced, and the main control unit releases the restriction on forcibly maintaining a static current in the first energy storage unit, switching it back to a collaborative power supply mode. Through this active control logic that couples power transfer and heat utilization, the present invention balances the reliability of ultra-low temperature startup with the safety of the energy storage unit itself.
[0095] In an exemplary embodiment, the present invention also provides a dual energy storage cooperative control system, comprising:
[0096] Main control unit 100;
[0097] A first sampling unit 200 and a second sampling unit 300 are respectively communicatively connected to the main control unit 100. The first sampling unit 200 is configured to monitor the first energy storage unit 400, and the second sampling unit 300 is configured to monitor the second energy storage unit 500.
[0098] A bidirectional power conversion unit 600 is connected between the first energy storage unit 400 and the second energy storage unit 500, and the control terminal of the bidirectional power conversion unit 600 is controlled by the main control unit 100.
[0099] The main control unit 100 is configured to send a hardware synchronization trigger signal to the trigger pins of the first sampling unit 200 and the second sampling unit 300 via a hardware serial peripheral interface, so that the first sampling unit 200 and the second sampling unit 300 lock data in the same clock cycle.
[0100] The main control unit 100 is configured to execute a lifetime coordination algorithm based on operating status data, and when it is determined that a preset high loss condition is met, it outputs a hardware drive signal to the bidirectional power conversion unit 600 to adjust its power transmission state and perform active load transfer to the first energy storage unit 400.
[0101] Specifically, to achieve efficient collaboration between dual energy storage media and overcome the drawbacks of existing dual microcontroller architectures, such as large size, high cost, and synchronization delay, this invention provides a hardware core architecture integrated with the PACK, while maintaining the existing PACK installation interface and external electrical specifications. This system architecture completely avoids the traditional dual MCU plus dual BMS solution, achieving deep integration and collaboration of energy storage media through underlying hardware innovation.
[0102] For the main control unit 100, preferably, this system adopts a single MCU domain control main control unit 100. To meet the real-time control and high safety requirements of the dual energy storage system, the main control unit 100 can be an automotive-grade MCU conforming to ISO 26262 ASIL-D safety level, such as the NXP S32K396 chip, which features a high clock frequency of 240MHz, a built-in double-precision FPU, and abundant ADC interfaces. Furthermore, to address the stability issues of single-MCU multi-tasking and avoid control crosstalk, the main control unit 100 is internally divided into multiple independent control domains through a memory protection unit (MPU). Specifically, these include: a lithium battery management domain responsible for calculating the state of charge and health status and performing protection and equalization control; an overcapacity management domain responsible for self-discharge monitoring and low-temperature power calibration; a collaborative control domain executing lifetime coordination algorithms and full-temperature power allocation; and a safety function domain responsible for high-voltage interlocking and fault classification processing.
[0103] To avoid simplistic reusing of analog front-ends of the same model, this system employs dual AFE differentiated sampling units for the first sampling unit 200 and the second sampling unit 300. Specifically, considering the significant differences in electrical characteristics between the first energy storage unit 400 and the second energy storage unit 500, the system has customized two completely different AFE sampling hardware schemes, thereby ensuring the accuracy and real-time response capability of heterogeneous data acquisition at the underlying physical circuit level.
[0104] For the hardware-level synchronization triggering mechanism, the main control unit 100 is configured to synchronously send trigger signals to two differentiated AFE sampling units through its internal hardware serial peripheral interface. When the trigger pins of the first sampling unit 200 and the second sampling unit 300 capture the hardware synchronization trigger signal, their internal circuits instantly lock the current data sampling value within the same clock cycle. Through this strict synchronization at the physical link level, the system ensures that the timing deviation of the dual energy storage medium data sampling is controlled within an extremely high precision range of less than 1 microsecond, thereby completely solving the core pain point of poor synchronization in traditional dual MCU architectures and providing zero-latency data support for subsequent transient power allocation.
[0105] To address the voltage difference surges and passive distribution issues caused by direct parallel connection of heterogeneous energy storage media in the bidirectional power conversion unit 600 and its collaborative control logic, a bidirectional power decoupling unit is connected in series between the first energy storage unit 400 and the second energy storage unit 500. Preferably, this unit adopts a bidirectional synchronous Buck-Boost converter topology, and its main control switch can be an automotive-grade MOSFET, such as the Infineon BSC0904NS, which can achieve a conversion efficiency of ≥95% at switching frequencies up to 200kHz. During system operation, the collaborative control domain of the main control unit 100 executes a full-lifecycle active transfer strategy for lifetime losses in real time, i.e., a lifetime collaborative algorithm. When the system's operating status data is determined to meet preset high-loss conditions such as high current, extremely low temperature, or deep charge / discharge, the main control unit 100 outputs a precise hardware drive signal, such as a PWM control signal, to the bidirectional power conversion unit 600. Upon receiving this signal, the bidirectional power conversion unit 600 dynamically adjusts its Buck or Boost operating mode and output current parameters. For example, in Boost mode, a peak current of up to 150A can be output to power the load from the second energy storage unit 500; in Buck mode, the first energy storage unit 400 is controlled to slowly replenish the second energy storage unit 500 with an adjustable current of 0.1-10A. Through this precise power decoupling and bidirectional energy flow control, the system achieves active load transfer to the first energy storage unit 400, fundamentally optimizing and extending the service life of the energy storage system throughout its entire lifecycle.
[0106] In an exemplary embodiment, the main control unit 100 utilizes a built-in memory protection unit to construct at least one mutually logically isolated energy storage management domain and a cooperative control domain to prevent control crosstalk during multitasking.
[0107] The collaborative control domain independently runs the lifetime collaborative algorithm and outputs corresponding instructions.
[0108] Specifically, in traditional dual energy storage systems, to avoid interference between management programs of different energy storage media, two completely independent microcontroller architectures are typically used. This inevitably increases system cost, size, and communication latency. To achieve highly reliable integrated management of dual energy storage systems within a single master control unit 100 (such as an automotive-grade single MCU) architecture, this invention introduces a domain control function partitioning design based on a memory protection unit.
[0109] Preferably, the main control unit 100 utilizes its hardware-level memory protection unit to forcibly divide a single physical memory space into multiple logically isolated control domains. In practical applications, the at least one energy storage management domain can be further divided into a first energy storage management domain (e.g., a lithium battery management domain) for the first energy storage unit 400 and a second energy storage management domain (e.g., a supercapacitor management domain) for the second energy storage unit 500. Specifically, the lithium battery management domain focuses on basic management tasks such as calculating the state of charge and health of the lithium battery, overvoltage / overcurrent / overtemperature protection, and active balancing control; while the supercapacitor management domain independently handles tasks such as parameter calculation, self-discharge monitoring, and low-temperature power output calibration of the supercapacitor. Through the strict memory access permission boundary division of the MPU, each of the above-mentioned underlying management domains operates within its own independent memory space, without crossing boundaries, thereby completely avoiding control crosstalk and system crash risks that may occur during multi-task concurrent processing from the underlying hardware mechanism.
[0110] Furthermore, to achieve overall coordination of upper-level strategies, the main control unit 100 also delineates an independent collaborative control domain with advanced control authority. This collaborative control domain is specifically configured to independently run the aforementioned lifetime collaborative algorithm based on heterogeneous physicochemical characteristics, and to coordinate the execution of full-temperature power allocation, thermal collaborative management, and hibernation self-discharge compensation strategies. By physically separating the complex lifetime optimization and overall allocation algorithms from the underlying battery / capacitor basic management tasks, the collaborative control domain can make accurate judgments based on precise state data reported by the underlying energy storage management domain, within a protected and safe operating environment. When the judgment meets the high-loss conditions, it stably outputs active transfer commands to the lower layers (such as the bidirectional power conversion unit 600).
[0111] This single MCU + MPU domain control isolation system software architecture design not only significantly improves the system's stability in multi-task parallel operation under complex working conditions and ensures the reliable execution of the active transfer strategy for lifespan loss, but also successfully achieves efficient decoupling and deep collaboration of dual energy storage systems on a low-cost, small-volume hardware basis.
[0112] In an exemplary embodiment, considering the heterogeneous electrical characteristics of the first energy storage unit 400 and the second energy storage unit 500, the first sampling unit 200 and the second sampling unit 300 have non-isomorphic internal analog front-end acquisition circuits:
[0113] The first sampling unit 200 is internally equipped with a first analog-to-digital converter for acquiring the individual voltage and temperature parameters of the first energy storage unit 400;
[0114] The second sampling unit 300 is internally configured with a second analog-to-digital converter with a range greater than that of the first analog-to-digital converter and an AC impedance injection analysis circuit, for acquiring the wide voltage fluctuation and dynamic internal resistance state of the second energy storage unit 500.
[0115] Specifically, in order to completely solve the technical defects of low sampling accuracy and poor real-time performance caused by the simple reuse of the same model analog front-end in traditional dual energy storage systems, this invention has customized two completely different AFE sampling schemes for the first energy storage unit 400 and the second energy storage unit 500, which are different from the electrical characteristics of the two units, instead of simply reusing the same model AFE. This ensures sampling accuracy and real-time performance from the hardware level and is a key design to circumvent existing patents.
[0116] For the first energy storage unit 400, its individual operating voltage typically fluctuates within a relatively stable and gradual range, and its polarization and attenuation are extremely sensitive to temperature changes. Preferably, the first sampling unit 200 is internally configured with a first analog-to-digital converter (ADC) designed specifically for this characteristic. This first ADC focuses on acquiring the individual voltage and temperature parameters of the first energy storage unit 400 in real time and at high frequency, thereby providing accurate basic measurement data for the main control unit 100 to perform overvoltage, undervoltage, overcurrent, and overtemperature protection of the lithium battery.
[0117] In contrast, the second energy storage unit 500 exhibits a wide and rapid fluctuation in its terminal voltage during charging and discharging, driven by the volume of charge. Its equivalent series resistance (ESR) is a key parameter for assessing its underlying health status. Preferably, the second sampling unit 300 employs an internal analog front-end acquisition circuit that is not isomorphic to the first sampling unit 200. Specifically, this circuit incorporates a second analog-to-digital converter with a significantly larger range than the first analog-to-digital converter, perfectly adapting to the wide voltage fluctuations generated by the second energy storage unit 500 within a very short time. Furthermore, to deeply monitor its aging process, the second sampling unit 300 also integrates an AC impedance injection analysis circuit. This special circuit actively injects a small excitation signal of a specific frequency into the second energy storage unit 500 and analyzes its response to acquire the dynamic internal resistance status in real time, thereby achieving accurate calculation of the supercapacitor's ESR and SOH and self-discharge monitoring.
[0118] This non-homogeneous dual AFE sampling architecture, tailored based on heterogeneous electrical characteristics, not only significantly improves the independent acquisition accuracy of the underlying data, but also perfectly adapts to the hardware synchronization triggering mechanism of the main control unit 100, ensuring the data reliability of the entire dual energy storage system when facing sudden power demands from a physical perspective.
[0119] In an exemplary embodiment, the hardware serial peripheral interface is an SPI interface with a physical clock line and a chip select line;
[0120] The main control unit 100 is configured to simultaneously select the acquisition and hold circuits of the first sampling unit 200 and the second sampling unit 300 in a parallel physical hard-wired manner through the hardware edge signal of the chip select line of the serial peripheral interface, so that the sampling timing deviation between the two is limited to a preset microsecond threshold range.
[0121] Specifically, in order to completely solve the software queuing and interrupt response delay problems that are inevitable in the traditional dual-microcontroller architecture when interacting through the communication bus, this system directly establishes the underlying communication between the main control unit 100 and the two heterogeneous sampling units at the physical circuit design level.
[0122] Preferably, the master control unit 100 utilizes its internally integrated hardware serial peripheral interface as the core medium for synchronous control. This SPI interface has a dedicated physical clock line and chip select line. Unlike the sequential addressing or software polling mechanism of slave devices in conventional serial buses, this invention uses parallel physical hard-wired connections during hardware routing to directly and simultaneously connect the chip select line of the SPI interface of the master control unit 100 to the physical trigger pins or acquisition and hold circuit selection terminals of the first sampling unit 200 (such as a customized lithium battery AFE) and the second sampling unit 300 (such as a customized supercapacitor AFE).
[0123] During system operation, the main control unit 100 initiates an SPI communication, causing the chip select line to generate a steep hardware edge signal, such as a momentary voltage level jump. This hardware edge signal arrives simultaneously at the two sampling units via parallel physical hardwires. At this moment, the analog front-end acquisition and hold circuits inside the first sampling unit 200 and the second sampling unit 300, after capturing the edge pulse, will activate instantaneously within the same physical clock cycle, thereby synchronously locking the current operating status data of the first energy storage unit 400 and the second energy storage unit 500 at this extremely brief instant.
[0124] By combining the aforementioned parallel physical hardwired connections with hardware edge signals, not only is the parsing and queuing time-consuming process at the software communication level completely avoided, but the data acquisition actions of both achieve extremely high alignment accuracy on the time axis. Preferably, the main control unit 100 synchronously triggers dual AFE sampling through a hardware SPI interface, strictly limiting the sampling timing deviation between the two to a preset microsecond threshold range; specifically, this sampling timing deviation is less than 1 microsecond. This underlying physical mechanism directly solves the core pain point of poor synchronization in traditional dual MCU architectures, thereby providing the main control unit 100 with extremely fast power decoupling and allocation when facing transient peak loads, and providing an absolutely accurate data benchmark for the real-time performance of fault protection.
[0125] In an exemplary embodiment, the bidirectional power conversion unit 600 employs a synchronous rectification chopper topology circuit;
[0126] The synchronous rectification chopper topology circuit includes a main control switch matrix and a power inductor; the main control unit 100 directly drives the gate of the main control switch matrix according to the high-frequency pulse width modulation signal output by the lifetime coordination algorithm, so that the system can switch between the buck mode in which the first energy storage unit 400 steps down to supplement the second energy storage unit 500, and the boost mode in which the second energy storage unit 500 steps up to supplement the system bus, and the bus voltage fluctuation during the switching process is less than a preset voltage fluctuation threshold.
[0127] Specifically, to achieve precise decoupling and distribution of power between the first energy storage unit 400 and the second energy storage unit 500, the bidirectional power decoupling unit of this invention preferably adopts a synchronous rectification Buck-Boost topology design. In this synchronous rectification chopper topology circuit, the core main control switching transistor matrix preferably uses automotive-grade MOSFETs (such as Infineon BSC0904NS) to withstand large current surges, and works in conjunction with a power inductor to achieve smooth energy transfer. Through this physical architecture, the system can establish a controlled bidirectional energy flow channel between the first energy storage unit 400 and the second energy storage unit 500.
[0128] During system operation, the collaborative control logic within the main control unit 100 dynamically adjusts the converter's operating mode based on real-time data collected from the battery and overcapacitor's SOC, SOH, and temperature. The main control unit 100 directly drives the gate of the aforementioned automotive-grade MOSFET by outputting a high-frequency pulse-width modulation (PWM) signal with a switching frequency up to 200kHz, thereby controlling seamless switching between different modes. Preferably, in buck mode, the first energy storage unit 400 is controlled to provide step-down charging to the second energy storage unit 500. In this mode, the charging current can be maintained within an adjustable range of 0.1-10A, avoiding damage to the plates from large pulse currents. In boost mode, the second energy storage unit 500 (overcapacitor) is controlled to provide boost auxiliary power to the system bus to respond to transient loads. In this mode, extremely high currents can be output, such as a peak current of 150A to meet the requirements of low-temperature startup. The chopper circuit achieves a conversion efficiency of ≥95% and remains stable within a continuous output range of 0-50A.
[0129] Furthermore, through the high-frequency chopping and synchronous rectification actions uniformly controlled by the main control MCU, the system can actively and dynamically match the voltage difference between heterogeneous energy storage media. This soft-switching closed-loop regulation not only completely avoids the destructive inrush current that may be caused by direct parallel connection, but also ensures that the bus voltage fluctuation is strictly limited to a very small preset voltage fluctuation threshold at the moment of switching between step-down power supply and step-up power supply, thus guaranteeing the stability of the external output electrical specifications.
[0130] Any aspects of this invention not described in detail are well-known to those skilled in the art.
[0131] It will be apparent to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the invention can be implemented in other specific forms without departing from its spirit or essential characteristics. Therefore, the embodiments should be considered in all respects as exemplary and non-limiting, and the scope of the invention is defined by the appended claims rather than the foregoing description. Thus, all variations falling within the meaning and scope of equivalents of the claims are intended to be included within the present invention. No reference numerals in the claims should be construed as limiting the scope of the claims.
Claims
1. A dual energy storage collaborative control method, applied to a master control unit, characterized in that, include: Hardware synchronization trigger signals are sent to the trigger pins of the first and second sampling units, which are respectively connected by a hardware interface, so that the first and second sampling units lock data within the same clock cycle, thereby synchronously collecting the operating status data of the first and second energy storage units. Receive the operating status data and extract at least one status parameter from it, including the current load current of the first energy storage unit, the depth of discharge, or the ambient temperature of the environment in which it is located. Based on preset lifetime loss assessment rules, determine whether the at least one state parameter meets the preset high loss condition; In response to the determination result satisfying the high loss condition, an active transfer command for adjusting the power transmission state is generated; The active transfer command is sent to the bidirectional power conversion unit connected between the first energy storage unit and the second energy storage unit to adjust the switching action of the bidirectional power conversion unit, thereby controlling the second energy storage unit to share the load power of the first energy storage unit, or controlling the second energy storage unit to take over all power supply circuits of the first energy storage unit.
2. The dual energy storage coordinated control method according to claim 1, characterized in that, The lifetime loss assessment rule is established based on the heterogeneous physicochemical loss characteristics of the first energy storage unit and the second energy storage unit: The lifespan loss of the first energy storage unit is characterized as being nonlinearly positively correlated with the charge / discharge rate and the depth of discharge, and the correlation increases at an accelerating rate with the increase of the charge / discharge rate and the depth of discharge. The lifespan degradation of the second energy storage unit is positively correlated with the increase in operating peak voltage and ambient temperature.
3. The dual energy storage coordinated control method according to claim 2, characterized in that, Determining whether the at least one state parameter satisfies a preset high-loss condition includes at least one of the following determination logics: When the load current is detected to be greater than or equal to the first multiplier threshold, it is determined that the high current and high loss operating condition is met. When the current discharge depth of the first energy storage unit is detected to be lower than the first energy threshold or higher than the second energy threshold, it is determined that the deep charge and discharge high loss condition is met. When the ambient temperature is detected to be lower than the first temperature threshold, it is determined that the low-temperature polarization high-loss condition is met.
4. The dual energy storage coordinated control method according to claim 3, characterized in that, Sending the active transfer command to the bidirectional power conversion unit includes: When the high current and high loss operating condition is determined to be met, the power transmission direction and operating parameters of the bidirectional power conversion unit are adjusted so that the second energy storage unit shares the load current, thereby limiting the actual discharge current of the first energy storage unit to within the first rate threshold. When it is determined that the deep charge-discharge high loss condition is met and the remaining power is lower than the first power threshold, the discharge power route of the first energy storage unit is cut off, and the second energy storage unit takes over the power supply of all loads through the bidirectional power conversion unit.
5. The dual energy storage coordinated control method according to claim 3, characterized in that, The method further includes: When the ambient temperature is lower than the second temperature threshold, the maximum discharge rate of the first energy storage unit is limited so that it can only maintain a preset static current output mode, and the second energy storage unit is controlled to respond to the external system start command to release the start-up peak current. The thermal management unit configured within the control system conducts the heat generated by the second energy storage unit during the release of the startup peak current to the first energy storage unit for waste heat preheating until the ambient temperature rises above the first temperature threshold and the restriction is lifted.
6. A dual energy storage collaborative control system, characterized in that, include: Main control unit; A first sampling unit and a second sampling unit are respectively communicatively connected to the main control unit. The first sampling unit is configured to monitor the first energy storage unit, and the second sampling unit is configured to monitor the second energy storage unit. A bidirectional power conversion unit is connected between the first energy storage unit and the second energy storage unit, and the control terminal of the bidirectional power conversion unit is controlled by the main control unit; The main control unit is configured to send hardware synchronization trigger signals to the trigger pins of the first sampling unit and the second sampling unit via a hardware serial peripheral interface, so that the first sampling unit and the second sampling unit lock data within the same clock cycle. The main control unit is configured to execute a lifetime coordination algorithm based on operating status data, and when it is determined that a preset high loss condition is met, it outputs a hardware drive signal to the bidirectional power conversion unit to adjust its power transmission state and perform active load transfer to the first energy storage unit.
7. The dual energy storage coordinated control system according to claim 6, characterized in that, The main control unit utilizes a built-in memory protection unit to construct at least one logically isolated energy storage management domain and a cooperative control domain to prevent control crosstalk during multi-task processing. The collaborative control domain independently runs the lifetime collaborative algorithm and outputs corresponding instructions.
8. The dual energy storage coordinated control system according to claim 6, characterized in that, To address the heterogeneous electrical characteristics of the first energy storage unit and the second energy storage unit, the first sampling unit and the second sampling unit have non-isomorphic internal analog front-end acquisition circuits: The first sampling unit is equipped with a first analog-to-digital converter for collecting the individual voltage and temperature parameters of the first energy storage unit. The second sampling unit is internally configured with a second analog-to-digital converter with a range greater than that of the first analog-to-digital converter and an AC impedance injection analysis circuit, in order to acquire the wide voltage fluctuation and dynamic internal resistance status of the second energy storage unit.
9. The dual energy storage coordinated control system according to claim 6, characterized in that, The hardware serial peripheral interface is an SPI interface with a physical clock line and a chip select line. The main control unit is configured to simultaneously select the acquisition and hold circuits of the first sampling unit and the second sampling unit in parallel physical hard-wired manner through the hardware edge signal of the chip select line of the serial peripheral interface, so that the sampling timing deviation between the two is limited to a preset microsecond threshold range.
10. The dual energy storage cooperative control system according to claim 6, characterized in that, The bidirectional power conversion unit adopts a synchronous rectification chopper topology circuit. The synchronous rectification chopper topology circuit includes a main control switch matrix and a power inductor; the main control unit directly drives the gate of the main control switch matrix according to the high-frequency pulse width modulation signal output by the lifetime coordination algorithm, so that the system can switch between the buck mode in which the first energy storage unit steps down to supplement the second energy storage unit and the boost mode in which the second energy storage unit steps up to supplement the system bus, and the bus voltage fluctuation during the switching process is less than the preset voltage fluctuation threshold.