Method for the production of a tower segment
By combining automated welding with manual labor, along with auxiliary welding blocks and tool finishing, the problem of poor flux recovery when welding large-diameter towers was solved, achieving high-quality welds and a highly efficient welding process.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- JINGMEN TIANSHUN WIND POWER EQUIP CO LTD
- Filing Date
- 2026-03-27
- Publication Date
- 2026-06-09
AI Technical Summary
Existing technologies for welding large-diameter towers suffer from poor automatic flux recovery, resulting in non-straight welds or inconsistent V-shaped weld openings, leading to unsatisfactory welding outcomes.
The welding process combines automated welding with manual follow-up. The welding flux is recovered by manually operating the recovery pipe, and the submerged arc welding machine is adjusted according to the welding situation. Auxiliary welding blocks and tools are used to repair the weld seam to ensure the welding effect.
The weld is smooth and flat with a smooth transition. The weld quality meets the requirements, the first-time welding success rate is greater than 98%, the defect positioning accuracy is ≤1mm, and the weld tensile strength is increased by 4.5%.