A three-way bolted steel box girder lug mounting precision control method
CN122169437APending Publication Date: 2026-06-09CHINA RAILWAY BAOJI BRIDGE YANGZHOU CO LTD +1
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- CHINA RAILWAY BAOJI BRIDGE YANGZHOU CO LTD
- Filing Date
- 2026-04-17
- Publication Date
- 2026-06-09
Smart Images

Figure FT_1 
Figure FT_2 
Figure FT_3
Abstract
The application discloses a three-way bolted steel box girder lug mounting precision control method, which comprises the following steps: 1) height direction control; 2) transverse control; 3) longitudinal control; 4) structure avoidance; 5) hole group processing optimization; and 6) progressive screwing process and the like. The application constructs a height-transverse-longitudinal three-dimensional integrated precision control system, realizes three-way bolted connection of the angle type stiffener, realizes installation deviation of less than or equal to 1 mm, and solves problems such as poor adhesion, hole group misplacement and screwing interference and the like.
Need to check novelty before this filing date? Find Prior Art