Screen detection device

By introducing the collaborative work of a turntable and a robotic arm into the screen inspection device, efficient screen inspection is achieved, solving the problem of long screen inspection time and improving inspection efficiency.

CN122276434APending Publication Date: 2026-06-26ZHEJIANG DONGZHICHUANGXIN IND INTELLIGENT EQUIPMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202610667891.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-05-14
Publication Date
2026-06-26

Smart Images

  • Figure CN122276434A_ABST
    Figure CN122276434A_ABST
Patent Text Reader

Abstract

This application provides a screen inspection device, comprising: an inspection module, the inspection module including a rotatable turntable, a plurality of carrier groups arranged sequentially along the rotation direction of the turntable on the turntable, an AOI inspection device and a Pre-gama inspection device arranged sequentially and spaced apart along the circumference of the turntable on the outer side of the turntable; and a loading and unloading module, the loading and unloading module including a base, a loading bin, a first robot arm and a second robot arm, a loading platform disposed beside the turntable, and a transfer mechanism for transferring the screen to be inspected on the loading platform to the carrier group at a preset position; the first robot arm and the second robot arm are movably disposed on the base; the first robot arm is used to transfer the screen to be inspected in the loading bin to the loading platform; the second robot arm is used to transfer the inspected screen on the carrier group at the preset position to the unloading station.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of screen detection, and more particularly to a screen detection device. Background Technology

[0002] Screen inspection includes loading, inspection, and unloading processes. Due to the numerous inspection items, the inspection time is relatively long. How to effectively reduce inspection time and improve inspection efficiency has become a pressing technical problem to be solved in this field. Summary of the Invention

[0003] This application provides a screen detection device aimed at improving the efficiency of screen detection.

[0004] This application provides a screen detection device, including: The detection module includes a rotatable turntable, multiple carrier groups arranged sequentially on the turntable along the rotation direction of the turntable, and AOI detection equipment and Pre-gama detection equipment arranged at intervals along the circumference of the turntable on its outer side; and The loading and unloading module includes a base, a loading bin, a first robotic arm and a second robotic arm, a loading platform disposed alongside the turntable, and a transfer mechanism for transferring the screen to be tested on the loading platform to a carrier group at a preset position. The first robotic arm and the second robotic arm are movably disposed on the base. The first robotic arm is used to transfer the screen to be tested in the loading bin to the loading platform. The second robotic arm is used to transfer the tested screen on the carrier group at the preset position to the unloading station.

[0005] Optionally, the detection module further includes a first image acquisition device and a first adjustment mechanism. The first image acquisition device is set corresponding to the preset position and is used to capture a first image at the preset position. The adjustment mechanism is configured to adjust the position state of the screen to be detected at the preset position according to the first image.

[0006] Optionally, the vehicle group includes at least two vehicles.

[0007] Optionally, the number of the second robotic arms is the same as the number of vehicles on each vehicle group, and the second robotic arms can adjust the suction cup components on them in the height direction so that the suction cup components of multiple second robotic arms can be misaligned in the height direction.

[0008] Optionally, the AOI inspection device has at least two devices, and the at least two AOI inspection devices are arranged at circumferential intervals along the turntable.

[0009] Optionally, the unloading station includes a transfer platform and an unloading bin; the unloading module also includes a third robotic arm, which is configured to transfer the inspected screen on the transfer platform to the unloading bin.

[0010] Optionally, the unloading bin includes a normal screen unloading bin and an NG screen unloading bin; the third robotic arm is configured to transfer the detected screen to the normal screen unloading bin or the NG screen unloading bin according to the detection result signal.

[0011] Optionally, the NG screen unloading bin includes at least two; and / or The feeding bin, the normal screen unloading bin, and the NG screen unloading bin are arranged in sequence; or the feeding bin, the NG screen unloading bin, and the normal screen unloading bin are arranged in sequence.

[0012] Optionally, the third robotic arm is configured to be movable in the height direction, the first direction, and the second direction; wherein any two of the height direction, the first direction, and the second direction are perpendicular. The third robotic arm has at least two parts and is arranged at intervals along a first direction; wherein, the second direction is the interval direction between the transfer platform and the unloading bin.

[0013] Optionally, the detection module further includes a second image acquisition device and a second adjustment mechanism. The second image acquisition device is set corresponding to the loading platform and is used to capture a second image at the loading platform. The second adjustment mechanism is configured to adjust the position of the standby side screen on the loading platform according to the second image.

[0014] In the technical solution of this application embodiment, the screen inspection device is divided into two main modules: an inspection module and a loading / unloading module. The inspection module is equipped with a rotatable turntable, and multiple carrier groups arranged sequentially along the rotation direction of the turntable, and AOI inspection equipment and Pre-gama inspection equipment arranged at intervals along the circumference of the turntable on its outer side. By rotating the turntable, the screens on the carrier groups can pass through the Pre-gama and AOI inspection equipment; and by setting multiple carrier groups, screens on different carrier groups are inspected by the Pre-gama and AOI inspection equipment respectively during inspection, improving inspection efficiency. The loading and unloading module uses a first robotic arm and a second robotic arm to load and unload materials respectively. A transfer mechanism is set up to transfer the screen to be inspected from the loading bin to the loading platform by the first robotic arm to a preset position. At the preset position, the second robotic arm transfers the screen that has been inspected to the unloading station. This allows the loading to the inspection module and the unloading of the screen that has been inspected to the preset position to be completed in the same preset position. This not only saves the space of the turntable arrangement, but also helps to save time and improve inspection efficiency. Attached Figure Description

[0015] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on the structures shown in these drawings without creative effort.

[0016] Figure 1 A schematic diagram of the screen detection device provided in the embodiments of this application; Figure 2 A schematic diagram of the detection module of the screen detection device provided in the embodiments of this application; Figure 3 This is a schematic diagram of the detection process of the screen detection device provided in the embodiments of this application; Figure 4 A schematic diagram of the loading and unloading module of the screen detection device provided in the embodiments of this application; Figure 5 A schematic diagram of the loading, unloading, and testing process of the screen testing device provided in this application embodiment; Figure 6 This is a schematic diagram of the suction cup assembly in the screen detection device provided in an embodiment of this application.

[0017] List of reference numerals 10. Screen detection device; 100, Loading / unloading module; 110, Base; 120, Material bin; 121, Loading bin; 122, Normal screen unloading bin; 123, NG screen unloading bin; 130, First robotic arm; 140, Second robotic arm; 150, Third robotic arm; 161, Third image acquisition device; 162, Fourth image acquisition device; 163, Fifth image acquisition device; 170, Transfer platform; 180, Transfer mechanism; 191, First suction cup group; 192, Second suction cup group; 193, Third suction cup group; 200, Inspection module; 210, Loading platform; 220, Carrier assembly; 230, Turntable; 240, Pre-gama inspection equipment; 250, AOI inspection equipment; 260, Cleaning mechanism; 300, control equipment. Detailed Implementation

[0018] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of this application, and not all of the embodiments. Based on the embodiments of this application, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of this application.

[0019] It should be noted that all directional indicators (such as up, down, left, right, front, back, etc.) in the embodiments of this application are only used to explain the relative positional relationship and movement of each component in a certain specific posture (as shown in the figure). If the specific posture changes, the directional indicator will also change accordingly.

[0020] In this application, unless otherwise expressly specified and limited, the terms "connection," "fixed," etc., should be interpreted broadly. For example, "fixed" can mean a fixed connection, a detachable connection, or an integral part; it can mean a mechanical connection or an electrical connection; it can mean a direct connection or an indirect connection through an intermediate medium; it can mean the internal communication of two components or the interaction between two components, unless otherwise expressly limited. Those skilled in the art can understand the specific meaning of the above terms in this application according to the specific circumstances.

[0021] Furthermore, if the embodiments of this application involve descriptions such as "first" or "second," these descriptions are for descriptive purposes only and should not be construed as indicating or implying their relative importance or implicitly specifying the number of technical features indicated. Therefore, a feature defined with "first" or "second" may explicitly or implicitly include at least one of those features. Additionally, the meaning of "and / or" throughout the text includes three parallel solutions; for example, "A and / or B" includes solution A, solution B, or a solution where both A and B are satisfied simultaneously. Furthermore, the technical solutions of the various embodiments can be combined with each other, but this must be based on the ability of those skilled in the art to implement them. When the combination of technical solutions is contradictory or impossible to implement, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection claimed in this application.

[0022] Combination Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 As shown, this application embodiment provides a screen detection device 10, including: Detection module 200, comprising a rotatable turntable 230, a plurality of carrier groups 220 arranged sequentially on the turntable 230 along the rotation direction of the turntable 230, and AOI detection equipment and Pre-gama detection equipment arranged at intervals along the circumference of the turntable 230 on its outer side; and The loading / unloading module 100 includes a base 110, a loading bin 121, a first robotic arm 130 and a second robotic arm 140, a loading platform 210 disposed alongside the turntable 230, and a transfer mechanism 180 for transferring the screen to be tested on the loading platform 210 to a carrier group 220 at a preset position. The first robotic arm 130 and the second robotic arm 140 are movably disposed on the base 110. The first robotic arm 130 is used to transfer the screen to be tested in the loading bin 121 to the loading platform 210. The second robotic arm 140 is used to transfer the tested screen on the carrier group 220 at the preset position to the unloading station.

[0023] In the technical solution of this application embodiment, the screen detection device 10 is divided into two main modules: a detection module 200 and a loading / unloading module 100. The detection module 200 is equipped with a rotatable turntable 230, and multiple carrier groups 220 arranged sequentially along the rotation direction of the turntable 230, and AOI detection equipment and Pre-gama detection equipment arranged sequentially and spaced apart along the circumference of the turntable 230 on its outer side. The screen detection device is activated by the rotation of the turntable 230. Figure 3(Diagram of curved arrow) This allows the screens on the carrier group 220 to pass through the Pre-gama inspection equipment and the AOI inspection equipment; and multiple carrier groups 220 are set up so that during inspection, the screens on different carrier groups 220 are inspected by the Pre-gama inspection equipment and the AOI inspection equipment respectively, improving inspection efficiency. The loading and unloading module 100 uses the first robot arm 130 and the second robot arm 140 to load and unload respectively, and the transfer mechanism 180 is set up to transfer the screens to be inspected from the loading bin 121 to the loading platform 210 by the first robot arm 130 to a preset position ( Figure 3 (Illustrated by dotted line 1), and at the preset position, the second robotic arm 140 transfers the screen that has been inspected to the unloading station. Figure 3 (Dash line in the middle (2) indicates that the material is loaded into the detection module 200 at the preset position and unloaded from the preset position to complete the detection of the screen; the loading and unloading are completed in the same preset position, which not only saves the arrangement space of the turntable 230 but also helps to save time and improve detection efficiency.

[0024] In some embodiments, the loading platform 210 is mounted on the transfer mechanism 180, which is used to transfer the loading platform 210 to a position corresponding to a preset position. The transfer mechanism 180 also includes a transfer robot, which transfers the screen on the loading platform 210 to the carrier assembly 220 at the preset position. In this embodiment, In some embodiments, the transfer mechanism 180 may include a transfer robot for transferring a screen on the loading platform 210 to a carrier group 220 at a preset position.

[0025] In this embodiment, the turntable 230 is driven by a rotatable drive mechanism, such as a direct drive by a motor or a motor and a transmission mechanism. The motor can be a stepper motor.

[0026] In some embodiments, there are multiple carrier groups 220, so that during inspection, carrier groups 220 are present at both the Pre-gama inspection equipment and the AOI inspection equipment. For example, in one embodiment, there are five carrier groups 220; during the inspection cycle, three carrier groups 220 are located at the Pre-gama inspection equipment, the first AOI inspection equipment, and the second AOI inspection equipment, respectively, one group is located at a preset position, and the remaining group is located at the cleaning station. When the turntable 230 rotates once, each carrier group 220 sequentially passes through the preset position, the Pre-gama inspection equipment, the first AOI inspection equipment, the second AOI inspection equipment, and the cleaning station. In one embodiment, the cleaning station is equipped with a cleaning mechanism 260 for cleaning the screen after inspection; after cleaning, the carrier group 220 is moved to the preset position for unloading and loading the next batch of materials.

[0027] As an optional implementation of the above embodiments, the detection module 200 further includes a first image acquisition device and a first adjustment mechanism. The first image acquisition device is set corresponding to the preset position and is used to capture a first image at the preset position. The adjustment mechanism is configured to adjust the position of the standby screen at the preset position according to the first image, so that the screen to be detected accurately reaches the carrier, facilitating subsequent detection. The first image acquisition device is used to capture an image of the screen for the control device 300 to determine whether the screen overlaps with the edge and the specific position of the screen. If there is an overlap, the screen needs to be finely adjusted by the second adjustment mechanism so that the screen does not overlap. The second adjustment mechanism may include a pusher, which is used to apply a pushing force to the screen that is about to overlap so that the screen does not overlap. The control device 300 also determines whether the screen reaches the designated carrier based on the position of the screen or determines whether there is a screen on the carrier based on the image.

[0028] As an optional implementation of the above embodiments, the carrier group 220 includes at least two carriers. In this embodiment, to improve detection efficiency, each carrier group 220 may include at least two carriers, enabling at least two screens to simultaneously detect the same item.

[0029] As an optional implementation of the above embodiments, the number of second robotic arms 140 is the same as the number of carriers on each carrier group 220, and the suction cup components of the second robotic arms 140 can be adjusted in the height direction so that the suction cup components of multiple second robotic arms 140 can be staggered in the height direction. In this embodiment, since multiple screens are simultaneously unloaded at a preset position, multiple second robotic arms 140 are provided to transfer the carriers at the preset position at one time, so as to load the screens to be tested and improve efficiency.

[0030] For example, in some embodiments, to improve detection efficiency, it is necessary to load two or more screens at once. Therefore, to adapt to the detection efficiency, in some embodiments of this application, the second robotic arm 140 has at least two sets, with the at least two sets of second robotic arms 140 spaced apart in a first direction; the second robotic arm 140 picks up the detected screen from the carrier at the detection completion position and transfers it to the transfer platform 170 along a second direction; the second robotic arm 140 includes a transfer suction cup assembly, which is configured to move in the height direction, so that the suction cup assemblies of the at least two sets of second robotic arms 140 can be misaligned in the height direction; wherein the first direction, the second direction, and the height direction are perpendicular to each other. In this embodiment, there are multiple sets of second robotic arms 140, which are arranged at intervals along a first direction and configured to pick up the screens that have been inspected from the carrier at the inspection completion position to the transfer platform 170 along a second direction; and the transfer suction cup assembly on the second robotic arm 140 moves in the height direction so that at least two sets of suction cup assemblies of the second robotic arm 140 can be misaligned in the height direction, so that the second robotic arms 140 do not interfere with each other during the screen transfer process, and can transfer the screens continuously and without interruption, thereby improving the unloading efficiency.

[0031] In some embodiments, the first direction is the left-right direction, and the second direction is the front-back direction; two second robotic arms 140 are arranged at intervals in the left-right direction. The transfer suction cup assemblies on the two robotic arms are movable in the height direction to be staggered in height and to grasp the screen located on the lower side. In addition, in some embodiments, the transfer suction cup assemblies can also be configured to move in the left-right direction.

[0032] As an optional implementation of the above embodiments, Figure 2 and Figure 3 As shown, the AOI inspection device has at least two units, which are arranged at circumferential intervals along the turntable 230. In the technical solution of this application embodiment, there are many AOI inspection items, resulting in a long inspection time; while the Pre-gama inspection time is short. Therefore, having at least two AOI inspection devices allows AOI inspection items to be distributed to AOI inspection devices at different locations, thereby improving inspection efficiency, reducing the idle time rate of Pre-gama inspection, and increasing the inspection cycle time.

[0033] In this embodiment, after the screen to be inspected is loaded at a preset position, it then enters the Pre-gama for inspection, and then sequentially enters the first AOI inspection device and the second AOI inspection device. The first part of the inspection items is completed in the first AOI inspection device, and the second part of the inspection items is completed in the second AOI inspection device, so as to complete the entire AOI inspection item and speed up the inspection cycle.

[0034] In this embodiment, the number of AOI detection devices can be set according to the required cycle time, and the number is not limited to two.

[0035] As an optional implementation of the above embodiments, the detection module 200 further includes a second image acquisition device and a second adjustment mechanism. The second image acquisition device is configured to capture a second image at the loading platform 210, corresponding to the loading platform 210. The second adjustment mechanism is configured to adjust the position of the standby screen on the loading platform 210 according to the second image. The second image acquisition device is used to capture images of the screen to allow the control device 300 to determine whether the screen overlaps with the edge and the specific position of the screen. If there is overlap, the screen needs to be finely adjusted by the second adjustment mechanism to eliminate the overlap. The second adjustment mechanism may include a pusher, which is used to apply a pushing force to the screen that is about to overlap, so that the screen does not overlap. The control device 300 also outputs instructions to the corresponding robot arm according to the position of the screen, so that the corresponding robot arm moves to the position of the screen to grasp the screen.

[0036] In one embodiment, Figure 4 As shown, the loading / unloading module 100 provided in this embodiment includes: Base 110; The material hopper 120 includes an upper material hopper 121, an NG screen lower material hopper 123, and a normal screen lower material hopper 122; the material hopper 120 is disposed next to the base 110; The first robotic arm 130 is movably mounted on the base 110 and is used to pick up the screen to be inspected from the loading bin 121 and onto the loading platform 210. The second robotic arm 140 is movably mounted on the base 110 and is used to pick up the screen that has been inspected from the carrier at the inspection completion position to the transfer platform 170. The third robotic arm 150 is movably mounted on the base 110 and is used to grab the screens on the transfer platform 170 and place them into the NG screen unloading bin 123 or the normal screen unloading bin 122.

[0037] Figure 5As shown, in some technical solutions of this application embodiment, the screen hoppers are all located beside the base 110, so that the hoppers are concentrated around the base 110, saving the transfer path of the robot arm and improving the loading and unloading efficiency; the robot arm includes a first robot arm 130, a second robot arm 140 and a third robot arm 150; the first robot arm 130 is movably disposed on the base 110 and is used to pick up the screen after inspection from the carrier at the inspection completion position to the carrier at the inspection waiting position; the second robot arm 140 is movably disposed on the base 110 and picks up the screen after inspection from the carrier at the inspection completion position to the transfer platform 170, while the third robot arm 150 moves the screen from the transfer platform 170 to the transfer platform 170. The screens that have been inspected on the 0th are picked up and placed into the NG screen unloading bin 123 or the normal screen unloading bin 122. During the unloading process, the screens need to be sorted and unloaded, so the unloading path is uncertain. Therefore, in the technical solution of this application embodiment, the second robot 140 can transfer the screens on the carrier of the inspection position to the transfer platform 170, pick up the inspected screens from the carrier of the inspection completion position, and then use the suction robot to sort the screens on the transfer platform 170 into the NG screen unloading bin 123 and the normal screen unloading bin 122, speeding up the sorting and unloading rhythm, improving the unloading efficiency, and enabling the inspected screens on the inspection device to be quickly unloaded to adapt to the inspection rhythm of the inspection device.

[0038] In some embodiments, the unloading station includes a transfer platform 170 and an unloading bin; the unloading module 100 also includes a third robot arm 150, which is configured to transfer the detected screen on the transfer platform 170 to the unloading bin.

[0039] In the technical solutions of this application embodiment, the robotic arm can be one of a hydraulic robotic arm, a pneumatic robotic arm, an electric robotic arm, or a mechanical robotic arm. The movement of the robotic arm includes linear motion, rotational motion, etc. In some embodiments, the movement of the robotic arm includes linear motion in different directions to accelerate the screen transfer speed.

[0040] As an optional implementation of the above embodiments, the screen detection loading and unloading module 100 is further provided with a third image acquisition device 161, a fourth image acquisition device 162, and a fifth image acquisition device 163. In this embodiment, the image acquisition device may include a CCD device. The third image acquisition device 161 is located in the loading bin 121, the fourth image acquisition device 162 is located in the NG screen unloading bin 123, and the fifth image acquisition device 163 is located in the normal screen unloading bin 122. The third image acquisition device 161, the fourth image acquisition device 162, and the fifth image acquisition device 163 are respectively used to capture images of the screen for the control device 300 to determine whether the screen overlaps and the specific position of the screen; if there is an overlap, the screen needs to be finely adjusted by an adjustment mechanism so that the screen does not overlap. The adjustment mechanism may include a pusher, which is used to apply a pushing force to the screen that is about to overlap so that the screen does not overlap. The control device 300 also outputs instructions to the corresponding robot arm according to the position of the screen so that the corresponding robot arm moves to the position of the screen to grasp the screen. In this embodiment, when the control device 300 determines that the screen overlaps with the edge, it can also issue an alarm.

[0041] As an optional implementation of the above embodiments, the NG screen unloading bin 123 and the normal screen unloading bin 122 are arranged at a distance from each other on the same side of the base 110 in a first direction; the transfer platform 170 is arranged at a distance from the NG screen unloading bin 123 and the normal screen unloading bin 122 in a second direction; the third robot arm 150 is configured to grab the screens on the transfer platform 170 and place them into the NG screen unloading bin 123 or the normal screen unloading bin 122 along the first and second directions. In some technical solutions of the embodiments of this application, when the third robot arm 150 is unloading, it needs to classify and unload the screens according to the instructions of the control device 300. Therefore, the third robot arm 150 needs to be able to move in both the first and second directions so that it can grab the screens on the transfer platform 170 and place them into the NG screen unloading bin 123 or the normal screen unloading bin 122.

[0042] In this embodiment, the unloading suction cup assembly on the third robot 150 can move in the height direction to grab the screen to be unloaded on the transfer platform 170 located on the lower side; after grabbing the screen, the third robot 150 moves along the first direction and the second direction according to the movement path given by the control device 300 to place the screen into the corresponding unloading bin.

[0043] As an optional implementation of the above embodiments, the third robotic arm 150 has at least two sets, and the at least two sets of the third robotic arms 150 are spaced apart in the first direction; the third robotic arm 150 includes a feeding suction cup assembly, which is configured to move in the height direction; wherein, the first direction, the second direction, and the height direction are perpendicular to each other. In some embodiments, the detection device will simultaneously unload multiple or more screens that have been detected. Therefore, in the technical solution of this application embodiment, the third robotic arm 150 is configured in two or more sets and is spaced apart in the first direction (adapting to the spacing direction of the feeding bin, which helps to save the feeding path), so that the third robotic arms 150 can cooperate and unload without interfering with each other, and transfer the screens on the transfer platform 170 in a timely manner.

[0044] As an optional implementation of the above embodiments, Figure 6 As shown, the first robotic arm 130, the second robotic arm 140, and the third robotic arm 150 all include suction cup assemblies. Each suction cup assembly includes a first suction cup group 191 and a second suction cup group 192, with the second suction cup group 192 surrounding the outer side of the first suction cup group 191. In this embodiment, by having the second suction cup group 192 surround the outer side of the first suction cup group 191, the suction cup assembly can adhere to screens of different sizes, improving the compatibility of the loading / unloading module 100. For example, the first suction cup group 191 includes multiple first suction cups, which are connected sequentially along a circular array to form a first enclosed area; the first suction cup group 191 also includes multiple second suction cups, which are connected sequentially along a circular array to form a second enclosed area. The first enclosed area is located within the second enclosed area, meaning the second enclosed area is larger and can adsorb larger screens; the first enclosed area is smaller and can adsorb smaller screens. In addition, when the second suction cup group 192 adsorbs the screen, the first suction cup group 191 can also assist in adsorbing the screen, improving the stability of large screens during the transfer process.

[0045] In some embodiments, the suction cup assembly may further include a third suction cup group 193 disposed around the outside of the second suction cup group 192 to further improve the screen compatibility of the device.

[0046] As an optional implementation of the above embodiments, Figure 4As shown, the loading bin 121, the NG screen unloading bin 123, and the normal screen unloading bin 122 are arranged at intervals along a first direction on the same side of the base 110; or the loading bin 121, the normal screen unloading bin 122, and the NG screen unloading bin 123 are arranged at intervals along a first direction on the same side. In the technical solution of this application embodiment, the loading bin 121 and the unloading bin are arranged at intervals along a first direction on the same side, so that loading and unloading are located on the same side of the base 110, thereby reasonably arranging the first robot arm 130, the third robot arm 150, and the second robot arm 140 to load from the same side and unload from the same side, improving space utilization and helping to rationally plan the transfer paths of the first robot arm 130, the third robot arm 150, and the second robot arm 140. In addition, along the first direction, the sequence is loading, unloading of NG screens, and unloading of normal screens (or loading, unloading of NG screens, and suction of normal screens), so that the transfer path of the third robot 150 does not overlap with the transfer path of the first robot 130, thereby improving the screen transfer efficiency.

[0047] As an optional implementation of the above embodiments, the NG screen unloading bin 123 includes at least two bins, which are used to place screens with different defect types. In the technical solution of this application embodiment, NG screens have different defect types, therefore at least two NG screen unloading bins 123 are set up to classify and store NG screens. For example, screens with dot defects are placed in one NG screen unloading bin 123, and screens with line and image defects are placed in another NG screen unloading bin 123.

[0048] In this embodiment, the third robotic arm 150 transfers the screens on the transfer platform 170 to different NG screen unloading bins 123 according to the instructions of the control device 300.

[0049] As an optional implementation of the above embodiments, the loading / unloading module 100 further includes a gripping robot, which is movably disposed in the hopper and used to grip empty pallets. In the technical solution of this application embodiment, each hopper contains empty pallets, which are used to support screens. In some cases, when the utilization rate of empty pallets in a certain hopper is high, while the idle rate of empty pallets in other hoppers is high, the gripping robot can be used to grip the idle empty pallets and move them to the hopper with the higher utilization rate.

[0050] In this embodiment, each hopper has a transfer device for moving pallets. The transfer device may include a roller assembly. Empty pallets are placed on the transfer device. When the utilization rate of empty pallets in a certain hopper is high, empty pallets from transfer devices in other hoppers can be transferred to that hopper using a gripping robot to increase the number of empty pallets on the transfer devices in that hopper.

[0051] In some embodiments of this application, the transfer device has two layers in the height direction. A designated position is provided on the first layer (upper layer).

[0052] For the loading hopper 121, at a designated location, the first robotic arm 130 is used to grab the screens on the pallets located on the higher upper layer. An external transport vehicle transports the stacked screens (each screen carried by a pallet) to the second layer (lower layer), and then through the roller assembly mechanism of the lower layer to the corresponding position of the lifting mechanism, which lifts the pallets one by one to the designated position; subsequently, the empty pallets are transported from the first layer to the loading hopper 121.

[0053] For the unloading hopper, the screens that have been inspected are transferred to an empty pallet located at a designated position on a higher upper layer. The empty pallet is transported to the designated position from the outside by the roller assembly mechanism on the first layer; after the inspected screens are placed on the empty pallet, they are transferred to the second layer by a lifting mechanism for stacking, and then transported out of the unloading hopper by the roller assembly mechanism on the lower layer.

[0054] In one embodiment, the lifting mechanism is equipped with a gripper for gripping the tray.

[0055] In the screen inspection device 10 of this application embodiment, when performing screen inspection, the first robot arm 130 transfers the screen to be inspected from the loading bin 121 to the loading platform 210, and then the transfer mechanism 180 transfers it to the carrier group 220 at the preset position of the turntable 230. The turntable 230 rotates, so that the screen passes through the pre-gama inspection equipment and the AOI inspection equipment in sequence. After the turntable 230 completes one revolution, the screen inspection is completed and it returns to the preset position. At this time, the second robot arm 140 transfers the inspected screen to the transfer platform 170. Subsequently, the carrier group 220 at the preset position is empty, and the transfer mechanism 180 transfers the screens on the loading platform 210 to the carrier group 220 at the preset position of the turntable 230 to continue the next batch of carrier inspection. The screens transferred to the transfer platform are then transferred to the corresponding unloading bin by the third robot arm 150 according to the inspection results, thus completing the screen inspection. During the inspection process, the CCD device is used to determine the position of the screen and whether it overlaps with the edge. The screen is adjusted in a timely manner through the adjustment mechanism, and the position of the screen is communicated to the robotic arm.

[0056] AOI stands for Automated Optical Inspection. Pre-gamma correction refers to gamma correction processing performed before the image signal enters the final driving circuit of the display panel. Its core function is to pre-adjust the grayscale / brightness mapping relationship of the image signal to match the non-linear brightness perception characteristics of the human eye and the electro-optical response curve of the display panel, ultimately achieving more accurate color reproduction, smoother grayscale transitions, and a display effect more consistent with human vision. The above descriptions are merely optional embodiments of this application and do not limit the patent scope of this application. Any equivalent structural transformations made based on the concept of this application and the content of this specification and drawings, or direct / indirect applications in other related technical fields, are included within the patent protection scope of this application.

Claims

1. A screen detection device, characterized in that, include: The detection module includes a rotatable turntable, a plurality of carrier groups arranged sequentially on the turntable along the rotation direction of the turntable, and AOI detection equipment and Pre-gama detection equipment arranged at intervals along the circumference of the turntable on the outer side of the turntable. as well as The loading and unloading module includes a base, a loading bin, a first robotic arm and a second robotic arm, a loading platform disposed alongside the turntable, and a transfer mechanism for transferring the screen to be tested on the loading platform to a carrier group at a preset position. The first robotic arm and the second robotic arm are movably disposed on the base. The first robotic arm is used to transfer the screen to be tested in the loading bin to the loading platform. The second robotic arm is used to transfer the tested screen on the carrier group at the preset position to the unloading station.

2. The screen detection device as described in claim 1, characterized in that, The detection module further includes a first image acquisition device and a first adjustment mechanism. The first image acquisition device is set corresponding to the preset position and is used to capture a first image at the preset position. The adjustment mechanism is configured to adjust the position state of the screen to be detected at the preset position according to the first image.

3. The screen detection device as described in claim 1, characterized in that, The vehicle group comprises at least two vehicles.

4. The screen detection device as described in claim 3, characterized in that, The number of the second robotic arms is the same as the number of vehicles on each vehicle group, and the second robotic arms can adjust the suction cup components on them in the height direction so that the suction cup components of multiple second robotic arms can be misaligned in the height direction.

5. The screen detection device as described in claim 1, characterized in that, The AOI inspection equipment has at least two devices, and the at least two AOI inspection devices are arranged at circumferential intervals along the turntable.

6. The screen detection device as described in claim 1, characterized in that, The unloading station includes a transfer platform and an unloading bin; the unloading module also includes a third robotic arm, which is configured to transfer the inspected screen on the transfer platform to the unloading bin.

7. The screen detection device as described in claim 6, characterized in that, The unloading bin includes a normal screen unloading bin and an NG screen unloading bin; the third robotic arm is configured to transfer the detected screen to the normal screen unloading bin or the NG screen unloading bin according to the detection result signal.

8. The screen detection device as described in claim 7, characterized in that, The NG screen unloading bin includes at least two; and / or The feeding bin, the normal screen unloading bin, and the NG screen unloading bin are arranged in sequence; or the feeding bin, the NG screen unloading bin, and the normal screen unloading bin are arranged in sequence.

9. The screen detection device as described in any one of claims 6-8, characterized in that, The third robotic arm is configured to move in the height direction, the first direction, and the second direction; wherein any two of the height direction, the first direction, and the second direction are perpendicular. The third robotic arm has at least two parts and is arranged at intervals along a first direction; wherein, the second direction is the interval direction between the transfer platform and the unloading bin.

10. The screen detection device as claimed in claim 1, characterized in that, The detection module further includes a second image acquisition device and a second adjustment mechanism. The second image acquisition device is set to correspond to the loading platform and is used to capture a second image at the loading platform. The second adjustment mechanism is configured to adjust the position of the standby side screen on the loading platform according to the second image.