A multi-battery cluster management method and system
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- SHANGHAI ROBESTEC ENERGY CO LTD
- Filing Date
- 2026-02-25
- Publication Date
- 2026-06-26
AI Technical Summary
Existing multi-cell cluster systems suffer from low automation, insufficient safety, weak fault handling capabilities, and lack of dynamic balancing, which leads to circulating currents and electrical shocks when cell clusters are connected in parallel, affecting system availability and battery life.
The system is initialized and self-tested using a power control unit (PCU). Based on the self-test results and the status of the energy storage converter (PCS), the battery cluster is automatically controlled. Power is supplied through a voltage pre-synchronization mechanism, and an isolation process of first reducing power and then disconnecting is adopted when the status is abnormal. Dynamic voltage balancing is achieved by combining intelligent power distribution strategies.
It achieves full lifecycle automated control of the electrochemical energy storage system, improves system availability and safety, avoids electrical shocks, extends battery life, and reduces circulating current and thermal stress through dynamic balancing.
Smart Images

Figure CN122292602A_ABST