Bridge merging section splicing construction equipment
By laying tracks and using load-bearing trolleys at the bridge merging points, the limitations of beam transport vehicle width and guardrails were solved, enabling stable transportation and precise splicing of precast beams, avoiding traffic disruption, and improving construction efficiency and safety.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- GUIZHOU ROAD & BRIDGE GRP
- Filing Date
- 2026-05-28
- Publication Date
- 2026-06-30
AI Technical Summary
During the construction of precast beams at the bridge merging section, the width of the beam transport vehicle and the pre-embedded steel bars in the guardrails on the beams limit the stability of beam transport. In addition, the bridge erecting machine occupies the emergency lane or slow lane, affecting traffic safety and efficiency.
The design incorporates bridge merging section splicing construction equipment, employing tracks laid transversely along the bridge and movable load-bearing trolleys, combined with jacks and temporary support components, to achieve stable transportation and precise splicing of precast beams, avoiding obstruction of existing lanes.
This solved the spatial constraints of transporting precast beams on the bridge deck, reduced traffic disruption, lowered the risk of construction accidents, and improved construction efficiency and safety.
Smart Images

Figure CN122304283A_ABST