A foundation pit support drainage control system and control method
The automated control and real-time monitoring of the foundation pit support dewatering and regulation system have solved the problems of manual dependence and accuracy in foundation pit dewatering and regulation, realizing closed-loop management of water level, accurate measurement and safety assurance, and optimizing construction costs and schedule.
Patent Information
- Application Number
- CN202611064133.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-07-17
- Publication Date
- 2026-11-17
AI Technical Summary
The construction of foundation pit dewatering and drainage has many problems, including high dependence on manual control, poor accuracy of water level control, inability to measure the amount of water pumped out, low pumping and drainage efficiency, high operation and maintenance costs, and high construction safety risks.
The foundation pit support dewatering and control system includes a pump, float valve, water level gauge and electronic water meter in the deep well dewatering well. It realizes automatic control and real-time monitoring through the distribution box, automatically starts and stops the pump, measures the amount of water pumped in real time, and integrates early warning function.
It achieves automatic closed-loop control of water level, reduces manual operation and maintenance costs, improves equipment operation reliability and construction safety, accurately measures drainage volume, optimizes construction costs and schedule, and adapts to the needs of multi-condition construction.
Smart Images

Figure CN123109188A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of foundation pit construction technology, and more specifically, to a foundation pit support drainage control system and control method. Background Technology
[0002] During the excavation of the foundation pit, groundwater directly affects the stability of the pit slope and the construction conditions of the foundation. Conventional foundation pit support and dewatering systems generally adopt a combination of three-axis deep mixing pile water-stop curtain, deep well dewatering wells installed inside the pit, and supporting recharge wells outside the pit. At the same time, intercepting ditches are set up at the top of the pit and drainage ditches are set up at the bottom of the pit. The dewatering well pumping, water level measurement and recharge operations are completed by manual operation to control the groundwater level in the site and meet the basic requirements for dry construction of the foundation pit.
[0003] Traditional dewatering construction suffers from drawbacks such as complex procedures and high reliance on manual labor. The entire construction process involves soil reinforcement, support pile construction, cutoff curtain pouring, and the completion of dewatering and recharge wells. In the subsequent operation and maintenance phase, it is necessary to arrange for dedicated personnel to carry measuring tapes and measuring tapes to measure the water level of each well and manually start and stop the water pumps. If the project has a large number of dewatering wells, water level inspection and water pump operation will consume a lot of manpower and time. Moreover, without supporting metering equipment, it is impossible to quantify the total daily groundwater discharge and to intuitively grasp the groundwater infiltration situation in the site.
[0004] Traditional manual management methods also have multiple construction control defects. Manual scheduling of pumping equipment is prone to uneven pumping and drainage rates and the inability to uniformly control the pumping status of individual wells. Insufficient dewatering efficiency will raise the groundwater level, causing the foundation pit to be flooded and the bearing capacity of the foundation to be damaged. At the same time, excessive pumping can easily induce settlement and cracking of the surrounding ground and buildings. Overall, the labor costs for construction and operation and maintenance are high, the accuracy of water level control is poor, and the control of construction quality, schedule and cost is difficult. Summary of the Invention
[0005] The present invention aims to provide a foundation pit support dewatering and control system and method to solve the problems of high dependence on manual control of foundation pit dewatering and control, poor water level control accuracy, inability to measure drainage volume, low drainage efficiency, high operation and maintenance costs, prominent safety risks in foundation pit construction and great management difficulty in the prior art.
[0006] This invention is implemented as follows: This invention provides a foundation pit support dewatering and control system, including a deep well dewatering well installed in the foundation pit, a water pump installed in the dewatering well, a dedicated power distribution box for each dewatering well, a float valve installed in the dewatering well, the float valve being electrically connected to the power distribution box, and the power distribution box being electrically connected to the water pump. The float valve is used to control the automatic start and stop of the water pump through the power distribution box according to the water level in the well. A water level gauge is installed at the wellhead of the aforementioned dewatering well. The measuring line of the water level gauge extends to the bottom of the aforementioned dewatering well. The water level gauge is electrically connected to the aforementioned distribution box via a signal line. An electronic water meter is installed on the outlet pipe of the aforementioned water pump.
[0007] Preferably, the float valve is an electric float valve, and its liquid level trigger contact is connected in series in the water pump control circuit of the distribution box; when the water level in the well rises to a preset high water level threshold, the float valve triggers the distribution box to start the water pump; when the water level in the well drops to a preset low water level threshold, the float valve triggers the distribution box to stop the water pump.
[0008] Preferably, the water level gauge is a deep water dewatering well water level gauge, the main body of which is fixed at the wellhead, the measuring line extends vertically along the well wall to the bottom of the well, and the signal output terminal of the water level gauge is electrically connected to the control unit in the distribution box.
[0009] Preferably, the aforementioned distribution box is equipped with an early warning unit, which is signal-connected to the control unit and configured to output an early warning signal when the rate of change of the water level in the well exceeds a preset threshold.
[0010] Preferably, the aforementioned electronic water meter is an electronic cumulative water meter, which is connected in series and installed in the wellhead outlet section of the aforementioned water pump outlet pipe.
[0011] Preferably, the above-mentioned dewatering well includes a well wall pipe, the lower part of the well wall pipe has multiple water permeable holes, the outside of the water permeable holes is wrapped with a filter screen, and the bottom of the dewatering well is filled with a gravel filter layer.
[0012] Preferably, the upper part of the well wall pipe is a watertight solid pipe section, and the outer wall of the solid pipe section and the inner wall of the well hole are filled with a clay sealing layer; the wellhead cover of the dewatering well is equipped with a steel mesh cover plate.
[0013] Preferably, the float valve is fixedly installed in the well wall at a position corresponding to the preset water level in the dewatering well, with its float sensing end suspended in the water inside the well.
[0014] Preferably, the main body of the water level gauge is fixed to the inner wall of the wellhead of the dewatering well or to the steel mesh cover plate.
[0015] In one embodiment of this invention, a method for regulating drainage and dewatering in foundation pit support is also provided, comprising the following steps: Step 1: Install several deep dewatering wells in the foundation pit, install a water pump and float valve in each dewatering well, install a water level gauge at the wellhead, connect an electronic water meter in series on the water outlet pipe of the water pump, and configure a dedicated power distribution box for each dewatering well, and electrically connect the float valve, water level gauge and water pump to the corresponding power distribution box respectively. Step 2: The water level in the dewatering well is sensed by the float valve, and the water pump is automatically started and stopped via the distribution box: when the water level in the well rises to the preset high value, the water pump is automatically started to perform the pumping operation; when the water level in the well drops to the preset low value, the water pump is automatically stopped. Step 3: Collect water level data in the dewatering well in real time through a water level gauge and transmit it to the power distribution box for real-time monitoring. When the rate of change of water level exceeds the preset threshold, an early warning is triggered. Step 4: Use electronic water meters to measure the pumping volume of each dewatering well in real time, and record and calculate the daily pumping volume of a single well and the total dewatering volume of the entire foundation pit.
[0016] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are: 1. Enables automatic closed-loop control of water level, significantly reducing manual operation and maintenance costs and improving equipment reliability.
[0017] Each dewatering well is equipped with a dedicated electrical control box and float valve, which automatically controls the start and stop of the pumps based on the water level in the well. The pumps automatically start when the water level rises to a preset high water level threshold and automatically stop when the water level drops to a preset low water level threshold. This completely eliminates the traditional, labor-intensive method of manually measuring water levels well by well and manually starting and stopping the pumps. Stable dewatering can be maintained without on-site personnel, significantly reducing the manual input for water level inspections and pump management. Simultaneously, this automatic start-stop mechanism effectively prevents the pumps from running dry for extended periods, reducing the probability of pump motor burnout, extending equipment lifespan, and reducing equipment maintenance and replacement costs.
[0018] 2. Achieve continuous dynamic monitoring and precise control of water level to fully ensure the safety of foundation pit construction.
[0019] By using a water level gauge installed at the wellhead and a measuring line extending to the bottom of the well, liquid level data can be continuously and accurately collected across the entire well depth, allowing for real-time and intuitive monitoring of groundwater level changes. After the water level data is transmitted to the distribution box via a signal line, it can be used to adjust the start and stop water level thresholds of the float valve, forming a dual control system of "coarse mechanical control by the float valve + fine control by water level gauge data." This system can prevent excessive precipitation from causing ground subsidence, cracking of buildings and pipelines, and also avoid insufficient precipitation leading to waterlogging of the foundation pit, decreased foundation bearing capacity, and slope seepage and collapse. Furthermore, based on real-time water level data, abnormal conditions such as sudden rises and falls in water level can be quickly identified, providing early warnings of potential hazards such as sudden increases in groundwater and pipeline damage, allowing for timely intervention and significantly reducing the probability of safety accidents such as foundation pit water inrush and instability.
[0020] 3. Achieve accurate measurement of pumping and drainage volume, supporting refined cost control and engineering scheme optimization.
[0021] By installing electronic water meters on the outlet pipes of the pumps, the pumping volume of a single well can be accumulated in real time, accurately calculating the daily pumping volume of a single well and the total dewatering volume of the entire foundation pit. This replaces the traditional, extensive management model that relies on experience-based estimations without metering. The accurate water volume data can be directly used as the basis for settling drainage disposal fees, external recharge water fees, and pumping electricity fees. Simultaneously, through matching analysis of water volume and energy consumption, ineffective pumping problems such as pump idling and pipeline leaks can be quickly identified, achieving energy savings and cost reduction. Long-term accumulated water level and drainage volume data can also be used to infer the groundwater recharge rate and stratum permeability characteristics of the site, providing reliable hydrological data support for the dynamic optimization of this dewatering plan and the dewatering design of subsequent similar projects.
[0022] 4. Improve the overall operation and maintenance efficiency of the system and adapt to the construction needs of multiple working conditions.
[0023] The complete dewatering and drainage control system integrates automatic water control, real-time monitoring, and precise metering. It provides backup water control during extreme conditions such as power outages through the automatic control mechanism of the float valve, and achieves routine, digital, and precise management through water level gauges and electronic water meters. It can reliably adapt to various construction conditions, including rainy seasons, dry seasons, and sudden water inrushes. For large-scale foundation pit projects with multi-well dewatering, the independent control configuration for each well supports zoned, differentiated dewatering, matching the geological and hydrological conditions of different areas of the foundation pit. This comprehensively improves the construction quality, control efficiency, and safety level of foundation pit dewatering and drainage, effectively shortening the dewatering construction period and controlling the overall project cost. Attached Figure Description
[0024] To more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings used in the embodiments will be briefly introduced below. It should be understood that the following drawings only show some embodiments of the present invention and should not be regarded as a limitation on the scope. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.
[0025] Figure 1 This is a schematic diagram of a foundation pit support and drainage control system according to an embodiment of the present invention.
[0026] Icons: 1-Drainage well, 2-Water pump, 3-Distribution box, 4-Float valve, 5-Water level gauge, 6-Measuring line, 7-Electronic water meter, 8-Well wall pipe, 9-Water permeable hole, 10-Filter screen, 11-Gravel filter layer, 12-Solid pipe section, 13-Clay sealing layer, 14-Reinforcing mesh cover plate. Detailed Implementation
[0027] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. The components of the embodiments of the present invention described and shown in the accompanying drawings can generally be arranged and designed in various different configurations.
[0028] Therefore, the following detailed description of the embodiments of the invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely to illustrate selected embodiments of the invention. All other embodiments obtained by those skilled in the art based on the embodiments of the invention without inventive effort are within the scope of protection of the invention.
[0029] Example See Figure 1 This embodiment proposes a foundation pit support dewatering and control system, including a deep well dewatering well 1 set in the foundation pit, a water pump 2 set in the dewatering well 1, a dedicated power distribution box 3 for each dewatering well 1, a float valve 4 set in the dewatering well 1, the float valve 4 being electrically connected to the power distribution box 3, the power distribution box 3 being electrically connected to the water pump 2, and the float valve 4 being used to control the automatic start and stop of the water pump 2 through the power distribution box 3 according to the water level in the well. A water level gauge 5 is installed at the wellhead of the dewatering well 1. The measuring line 6 of the water level gauge 5 extends to the bottom of the dewatering well 1. The water level gauge 5 is electrically connected to the distribution box 3 via a signal line. An electronic water meter 7 is installed on the outlet pipe of the water pump 2. The electronic water meter 7 is used to measure the pumping volume of the corresponding dewatering well 1.
[0030] During operation, the deep well dewatering well 1 set in the foundation pit works with the water pump 2 to carry out dewatering operations. The float valve 4 controls the automatic start and stop of the water pump 2 through the distribution box 3 according to the water level in the dewatering well 1. The water level gauge 5 installed at the wellhead of the dewatering well 1 senses the water level through the measuring line 6 extending to the bottom of the well and is electrically connected to the distribution box 3 through the signal line. The electronic water meter 7 on the water outlet pipe of the water pump 2 measures the amount of water pumped out of the corresponding dewatering well 1.
[0031] The foundation pit support dewatering and control system disclosed in this implementation plan uses a float valve 4 to control the automatic start and stop of the water pump 2 through the distribution box 3. In conjunction with the water level gauge 5 installed at the wellhead of the dewatering well 1 and the measuring line 6 to monitor the water level in the well, and the electronic water meter 7 installed in the outlet water pipe to measure the amount of water pumped out, the system can automatically control the water level in the dewatering well 1, realize water level monitoring and water volume measurement simultaneously, reduce the intensity of manual control, and improve the stability and control accuracy of dewatering and control operation.
[0032] See Figure 1In this embodiment, the float valve 4 is an electric float valve 4, and its liquid level trigger contact is connected in series in the control circuit of the water pump 2 of the distribution box 3. When the water level in the well rises to the preset high water level threshold, the float valve 4 triggers the distribution box 3 to start the water pump 2. When the water level in the well drops to the preset low water level threshold, the float valve 4 triggers the distribution box 3 to stop the water pump 2.
[0033] Specifically, an electric float valve 4 is used, and its liquid level trigger contact is connected in series in the control circuit of the water pump 2. The water pump 2 can be automatically triggered to start and stop according to the rise and fall of the water level in the well. No manual on-site operation is required. It can not only keep the water level in the well stable within the preset threshold range, avoiding the problems of excessive or insufficient watering, but also effectively prevent the water pump from burning out due to dry running. This reduces the cost of manual management and the risk of equipment failure, and improves the automated operation efficiency and reliability of the dewatering system.
[0034] See Figure 1 In this embodiment, the water level gauge 5 is a water level gauge 5 for a deep water dewatering well 1. Its instrument body is fixed at the wellhead, and the measuring line 6 extends vertically along the well wall to the bottom of the well. The signal output terminal of the water level gauge 5 is electrically connected to the control unit (not shown in the figure) in the power distribution box 3 to continuously and dynamically collect the liquid level data in the well, and correct the start and stop water level threshold of the float valve 4 based on the collected water level data.
[0035] Specifically, the water level gauge 5 of the deep water dewatering well 1 with the above-mentioned structure, through the installation method of fixing the instrument body to the wellhead and extending the measuring line 6 vertically to the bottom of the well, can ensure the depth coverage and measurement stability of water level monitoring, and continuously and dynamically collect the liquid level data in the well. The water level data is transmitted to the control unit in the distribution box 3 through the signal output terminal, which can correct the start and stop water level threshold of the float valve 4, realize the coordinated cooperation between mechanical float coarse control and data-driven fine control, effectively improve the accuracy of water level control, ensure the dewatering effect of the foundation pit, and at the same time facilitate the timely identification of abnormal water level conditions, reducing the hydrological risks of foundation pit construction.
[0036] See Figure 1 In this embodiment, a warning unit (not shown in the figure) is provided in the power distribution box 3. The warning unit is connected to the control unit and is configured to output a warning signal when the rate of change of water level in the well exceeds a preset threshold.
[0037] Specifically, an early warning unit connected to the control unit is installed in the distribution box 3. It can monitor the rate of water level change based on real-time collected water level data. When the water level rises or falls suddenly and exceeds the preset threshold, an early warning signal is output in a timely manner. This makes it easier for operation and maintenance personnel to quickly identify abnormal conditions such as sudden increase in groundwater and pipeline damage and deal with them in advance. This effectively reduces construction risks such as water inrush in the foundation pit and slope instability, and improves the safety and emergency response efficiency of the dewatering system.
[0038] See Figure 1In this embodiment, the electronic water meter 7 is an electronic cumulative water meter, which is connected in series to the wellhead outlet pipe section of the water outlet pipe of the water pump 2. The electronic water meter 7 is used to accumulate the pumping volume of a single well in real time, so as to count the daily pumping volume of a single well and the total precipitation of the entire foundation pit.
[0039] Specifically, an electronic cumulative water meter is installed in series with the outlet pipe section of the water pump 2 well. This allows for real-time and accurate accumulation of the pumping volume of a single well, facilitating the calculation of the daily pumping volume of a single well and the total dewatering volume of the entire foundation pit. This replaces the traditional extensive management model that relies on estimation without metering. It can provide data for the refined accounting of drainage disposal costs and energy consumption costs, and can also provide data support for optimizing dewatering plans and construction management by inverting long-term water volume data to understand the groundwater recharge and stratum permeability characteristics of the site.
[0040] See Figure 1 In this embodiment, the dewatering well 1 includes a well wall pipe 8, the lower part of the well wall pipe 8 is provided with a plurality of water permeable holes 9, the outside of the water permeable holes 9 is wrapped with a water filter screen 10, and the bottom of the dewatering well 1 is filled with a gravel filter layer 11.
[0041] Specifically, the dewatering well 1 uses a well wall pipe 8 with permeable holes 9 in the lower part of the pipe wall. Together with the filter screen 10 on the outside of the permeable holes 9 and the gravel filter layer 11 at the bottom of the well, it can effectively filter the mud and fine particles in the stratum while ensuring that the groundwater flows smoothly into the well. This avoids the permeable holes 9 from being blocked and the mud and sand from entering the pump 2 and causing wear on the components, thereby improving the water intake efficiency and operational reliability of the dewatering well 1, extending the service life of the equipment, and ensuring a continuous and stable dewatering effect.
[0042] See Figure 1 In this embodiment, the upper part of the well wall pipe 8 is an impermeable solid pipe section 12, and the outer wall of the solid pipe section 12 and the inner wall of the well hole are filled with a clay sealing layer 13; the wellhead cover of the dewatering well 1 is equipped with a steel mesh cover plate 14.
[0043] Specifically, an impermeable solid pipe section 12 is installed on the upper part of the well wall pipe 8, and a clay sealing layer 13 is filled between its outer wall and the inner wall of the well hole. This can effectively prevent surface water and water accumulation around the foundation pit from seeping into the well through the gaps in the well wall, thus avoiding interference from the upper water body with the accuracy of the well water level monitoring. At the same time, it can improve the sealing and structural stability of the upper part of the well body. A steel mesh cover plate 14 is installed at the wellhead, which can not only prevent surface debris from falling into the well and causing blockage and damage to the water pump and pipeline, but also play a safety protection role at the wellhead, ensuring the long-term stable operation of the dewatering well 1 and the safety of on-site construction.
[0044] See Figure 1 In this embodiment, the float valve 4 is fixedly installed in the well wall of the dewatering well 1 at a position corresponding to the preset dewatering water level, and its float sensing end is suspended in the water body inside the well.
[0045] Specifically, the float valve 4 is fixedly installed in the well wall of the dewatering well 1 at the position corresponding to the preset dewatering water level elevation, and the sensing end of the float valve 4 is vertically placed in the water body in the well. This allows the liquid level triggering node of the float valve 4 to accurately match the designed dewatering elevation, ensuring the setting accuracy of the start and stop water level threshold. At the same time, it ensures that the float valve 4 is sensitive and reliable in sensing changes in water level rise and fall, and can stably and accurately trigger the start and stop of the water pump 2. This effectively avoids the problem of water level control inaccuracy caused by installation position deviation, and ensures that the dewatering water level in the foundation pit is stably maintained within the design requirement range.
[0046] See Figure 1 In this embodiment, the main body of the water level gauge 5 is fixed to the inner wall of the wellhead of the dewatering well 1 or to the steel mesh cover plate 14, and its measuring line 6 extends vertically along the well wall to the bottom of the dewatering well 1.
[0047] Specifically, the main body of the water level gauge 5 is fixed to the inner wall of the wellhead of the dewatering well 1 or to the steel mesh cover plate 14, which facilitates on-site installation and subsequent maintenance without requiring deep work inside the well. At the same time, the measuring line 6 extends vertically along the well wall to the bottom of the well, which can prevent the measuring line 6 from shaking or getting tangled in the components inside the well, ensuring the stability of the liquid level collection, realizing continuous and accurate monitoring of the water level throughout the entire well depth, and providing reliable data support for the refined control of foundation pit dewatering.
[0048] See Figure 1 In this embodiment, the dedicated power distribution box 3 integrates a water pump power supply circuit (not shown in the figure), a float valve 4 control circuit (not shown in the figure), and a water level gauge 5 signal acquisition circuit (not shown in the figure); the float valve 4 control circuit is connected in series in the water pump power supply circuit, and the circuit is turned on and off by the liquid level signal of the float valve 4.
[0049] See Figure 1 In this embodiment, the control unit (not shown in the figure) adopts an industrial-grade programmable logic controller (PLC) or an embedded single-chip microcomputer control module, which is fixedly installed inside the dedicated power distribution box 3 via an electrical mounting rail. Its power supply terminal is connected to the low-voltage power supply circuit of the power distribution box 3 and is powered by the power distribution box 3. The control unit is equipped with analog / digital input interfaces and switch output interfaces: the input interface is electrically connected to the signal output terminal of the water level gauge 5 via a signal line, and is used to receive the real-time analog liquid level signal collected by the water level gauge 5 and convert it into readable digital water level data; the input interface is also electrically connected to the liquid level trigger contact of the float valve 4, and is used to collect the real-time on / off status of the float valve 4; the switch output interface of the control unit is connected in series in the contactor control circuit of the water pump 2, and can output on / off commands to the contactor to assist in adjusting the start and stop logic of the water pump 2; The control unit has preset parameters for the precipitation level elevation, upper and lower limit thresholds, and rate of change threshold. It can continuously compare and calculate the real-time collected water level data with the preset thresholds. When the actual water level in the well deviates from the designed precipitation elevation for a long period of time, the control unit can output a water level deviation prompt signal to assist maintenance personnel in correcting the installation height and start / stop trigger threshold of the float valve 4, thereby achieving fine water level control based on mechanical coarse control.
[0050] See Figure 1 In this embodiment, the early warning unit (not shown in the figure) includes an audible and visual alarm module and a signal input terminal. The warning light and buzzer of the audible and visual alarm module are embedded in the outer surface panel of the dedicated power distribution box 3, which is convenient for on-site personnel to identify intuitively. The signal input terminal of the early warning unit is electrically connected to the early warning output interface of the control unit. During operation, the control unit calculates the rate of change of the water level in the well at preset time intervals (e.g., once every 5 minutes). When the rate of rise of the water level per unit time exceeds the preset threshold for sudden rise (corresponding to conditions such as sudden water in the foundation pit, leakage in the surrounding pipeline network, and sudden increase in groundwater recharge), or when the rate of drop of the water level exceeds the preset threshold for sudden drop (corresponding to conditions such as damage to the pumping pipeline and abnormal leakage in the stratum), the control unit outputs a trigger signal to the early warning unit, driving the audible and visual alarm module to emit flashing lights and buzzer warnings, reminding on-site maintenance personnel to promptly investigate abnormal conditions and avoid construction risks caused by uncontrolled water levels in the foundation pit.
[0051] The early warning unit can also be equipped with a conventional 4G IoT communication module to remotely transmit early warning signals to the mobile phones or monitoring terminals of maintenance personnel, enabling remote anomaly alarms in unattended scenarios.
[0052] See Figure 1 In one embodiment of this invention, a method for regulating drainage and dewatering in foundation pit support is also provided, comprising the following steps: Step 1: Install several deep well dewatering wells 1 in the foundation pit, install a water pump 2 and a float valve 4 in each dewatering well 1, install a water level gauge 5 at the wellhead of the dewatering well 1, connect an electronic water meter 7 in series on the water outlet pipe of the water pump 2, and configure a dedicated power distribution box 3 for each dewatering well 1, and electrically connect the float valve 4, water level gauge 5 and water pump 2 to the corresponding power distribution box 3 respectively. Step 2: The water level in the dewatering well 1 is sensed by the float valve 4, and the water pump 2 is automatically started and stopped via the distribution box 3: when the water level in the well rises to the preset high value, the water pump 2 is automatically started to perform the pumping operation; when the water level in the well drops to the preset low value, the water pump 2 is automatically stopped. Step 3: The water level data in the dewatering well 1 is collected in real time by the water level gauge 5 and transmitted to the power distribution box 3 for real-time monitoring. When the rate of change of water level exceeds the preset threshold, an early warning is triggered. Step 4: The pumping volume of each dewatering well 1 is measured in real time using the electronic water meter 7, and the daily pumping volume of a single well and the total dewatering volume of the entire foundation pit are recorded and statistically analyzed.
[0053] See Figure 1 The specific control principle of the foundation pit support dewatering and regulation system and method in this embodiment is as follows: 1. The level trigger contact of the float valve 4 is connected in series to the control circuit of the water pump 2 in the distribution box 3. When the water level in the well rises to the high water level threshold, the float rises to close the contact, and the water pump 2 starts pumping water; when the water level drops to the low water level threshold, the float falls to open the contact, and the water pump 2 stops running. This control relies on the physical change of water level to trigger, without the need for manual intervention. It can still maintain the basic water level limit under power failure conditions, and has high operational reliability.
[0054] 2. The water level gauge 5 continuously collects the liquid level data in the well and transmits it to the control unit in the distribution box 3. The control unit compares the real-time water level with the designed dewatering elevation and verifies the mechanical start-stop threshold of the float valve 4. When the mechanical threshold deviates, the control unit can assist in adjusting the pump start-stop logic to form a two-level control mode of "mechanical coarse control + data fine control" to improve the water level control accuracy and avoid problems of excessive or insufficient dewatering.
[0055] 3. The control unit calculates the rate of change of water level in the well at preset intervals. When the rate of sudden rise or fall of water level exceeds the preset threshold, it determines that there is an abnormal working condition such as a sudden increase in groundwater or pipeline damage. It then outputs a trigger signal to the early warning unit to drive the audible and visual alarm, reminding maintenance personnel to deal with it in time and reduce the risk of hydrological safety accidents in the foundation pit.
[0056] 4. The electronic water meter is connected in series with the outlet pipeline of pump 2 to accumulate the pumping volume of a single well in real time and synchronize it to the control unit. It can count the total amount of dewatering of a single well and the entire foundation pit on a periodic basis. The linkage analysis of water volume and water level data can support the refined cost accounting of drainage treatment and energy consumption, identify ineffective pumping losses, and also retrieve the hydrological parameters of the site to provide data basis for the optimization of dewatering plan.
[0057] The above description is merely a preferred embodiment of the present invention and is not intended to limit the invention. Various modifications and variations can be made to the present invention by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.
Claims
1. A foundation pit support dewatering and control system, comprising a deep well dewatering well (1) installed in the foundation pit, wherein a water pump (2) is installed in the dewatering well (1), characterized in that: Each of the aforementioned dewatering wells (1) is equipped with a dedicated power distribution box (3). A float valve (4) is installed inside the dewatering well (1). The float valve (4) is electrically connected to the power distribution box (3). The power distribution box (3) is electrically connected to the water pump (2). A water level gauge (5) is installed at the wellhead of the dewatering well (1). The measuring line (6) of the water level gauge (5) extends to the bottom of the dewatering well (1). The water level gauge (5) is electrically connected to the distribution box (3) via a signal line. An electronic water meter (7) is installed on the outlet pipe of the water pump (2).
2. The foundation pit support dewatering and control system according to claim 1, characterized in that: The float valve (4) is an electric float valve (4), and its liquid level trigger contact is connected in series in the control circuit of the water pump (2) of the distribution box (3); When the water level in the well rises to the preset high water level threshold, the float valve (4) triggers the power distribution box (3) to start the water pump (2); when the water level in the well drops to the preset low water level threshold, the float valve (4) triggers the power distribution box (3) to stop the water pump (2).
3. The foundation pit support dewatering and control system according to claim 1, characterized in that: The water level gauge (5) is a water level gauge (5) for a deep water dewatering well (1). Its instrument body is fixed at the wellhead, and the measuring line (6) extends vertically along the well wall to the bottom of the well. The signal output terminal of the water level gauge (5) is electrically connected to the control unit in the distribution box (3).
4. The foundation pit support dewatering and control system according to claim 3, characterized in that: The power distribution box (3) is equipped with an early warning unit. The early warning unit is connected to the control unit and is configured to output an early warning signal when the rate of change of water level in the well exceeds a preset threshold.
5. The foundation pit support dewatering and control system according to claim 1, characterized in that: The electronic water meter (7) is an electronic cumulative water meter, which is connected in series to the wellhead outlet section of the water outlet pipe of the water pump (2).
6. The foundation pit support dewatering and control system according to claim 1, characterized in that: The dewatering well (1) includes a well wall pipe (8), and the lower part of the well wall pipe (8) has multiple water-permeable holes (9). The outside of the water-permeable holes (9) is wrapped with a water filter screen (10), and the bottom of the dewatering well (1) is filled with a gravel filter layer (11).
7. The foundation pit support dewatering and control system according to claim 6, characterized in that: The upper part of the well wall pipe (8) is an impermeable solid pipe section (12), and the outer wall of the solid pipe section (12) and the inner wall of the well hole are filled with a clay sealing layer (13); the wellhead of the dewatering well (1) is covered with a steel mesh cover plate (14).
8. The foundation pit support dewatering and control system according to claim 1, characterized in that: The float valve (4) is fixedly installed in the well wall of the dewatering well (1) at the position corresponding to the preset dewatering water level, and its sensing end is suspended in the water body inside the well.
9. The foundation pit support dewatering and regulation system according to claim 7, characterized in that: The main body of the water level gauge (5) is fixed to the inner wall of the wellhead of the dewatering well (1) or to the steel mesh cover plate (14).
10. A method for regulating dewatering of a foundation pit support, characterized by, Includes the following steps: Step 1: Install several deep well dewatering wells (1) in the foundation pit, install a water pump (2) and a float valve (4) in each dewatering well (1), install a water level gauge (5) at the wellhead of the dewatering well (1), connect an electronic water meter (7) in series on the water outlet pipe of the water pump (2), and configure a dedicated power distribution box (3) for each dewatering well (1). Connect the float valve (4), water level gauge (5) and water pump (2) to the corresponding power distribution box (3) respectively. Step 2: The water level in the dewatering well (1) is sensed by the float valve (4), and the water pump (2) is automatically started and stopped via the distribution box (3): when the water level in the well rises to the preset high value, the water pump (2) is automatically started to perform the pumping operation; when the water level in the well drops to the preset low value, the water pump (2) is automatically stopped. Step 3: The water level data in the dewatering well (1) is collected in real time by the water level gauge (5) and transmitted to the power distribution box (3) for real-time monitoring. When the rate of change of water level exceeds the preset threshold, an early warning is triggered. Step 4: The pumping volume of each dewatering well (1) is measured in real time using an electronic water meter (7), and the daily pumping volume of a single well and the total dewatering volume of the entire foundation pit are recorded and statistically analyzed.