A method for using an early-stripping support column erection device

By utilizing the deflection and lifting functions of the early-dismantling support column erection equipment, the problem of instability during the transportation and erection of steel columns in confined spaces is solved. This enables rapid and automatic centering of the steel columns at the installation position and ensures verticality, making it suitable for sloping terrain.

CN123109401APending Publication Date: 2026-11-17CHINA RAILWAY CONSTRUCTION ENGINEERING GROUP +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202611323744.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-28
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In confined spaces such as railway stations, cranes are difficult to use, resulting in unstable transport and erection of steel columns, and making it difficult to achieve rapid and automatic alignment of the steel columns at the installation location.

Method used

The early-dismantling support column erection equipment utilizes a deflection mechanism and lifting function. The upper deflection bracket is driven to rotate by a hydraulic motor. Combined with the design of sliding shaft and sliding support, it ensures that the steel column is stably clamped during the deflection process. The height position is adjusted by a second hydraulic cylinder to adapt to changes in terrain slope.

Benefits of technology

To achieve smooth transportation and erection of steel columns in confined spaces, ensure the verticality of the steel columns, adapt to terrain slopes, reduce the risk of overturning caused by deflection, and achieve rapid automatic centering.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109401A_ABST
    Figure CN123109401A_ABST
Patent Text Reader

Abstract

This invention relates to a method for using an early-dismantling support column erection device, the specific steps of which include: S1. Preparation stage: the chassis assembly performs a transfer operation, the rotary platform performs a planar rotation operation, and the erection frame performs a load-bearing operation; S2. Execution stage: the deflection mechanism performs a deflection and lifting docking operation, wherein S2 includes: S2.1. the hydraulic motor performs a revolution operation, which drives the upper deflection bracket to rotate, and the upper and lower deflection brackets clamp the steel column; S2.2. the lower deflection bracket performs a rotation operation, which slides along the arc-shaped groove and rotates in coordination; S2.3. the second hydraulic cylinder adjusts the height of the steel column by lifting. This invention aims to solve the problem of crane operation in confined spaces, ensure the smooth and safe transportation and erection of steel columns, and especially solve the height change caused by deflection to solve the problem of rapid and automatic centering of the steel column in the installation position, which is suitable for sloping terrain.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of column erection machines, and more particularly to a method of using an early-release support column erection device. Background Technology

[0002] For example, Chinese invention patent application publication number CN121345042A discloses a high pier structure of steel shell concrete composite near an existing railway and a rapid construction method during the skylight period. It mainly uses a crane to erect the steel column by lifting the steel column. However, the crane relies on a large space. When the space is small, such as when the site is small during the construction of a railway passenger station or canopy, the steel column is often used as an early dismantling support column to build the formwork frame. At this time, it is difficult to use the crane, and adjusting the posture of the steel column in a small space becomes a problem. Summary of the Invention

[0003] The purpose of this invention is to provide a method for using an early-dismantling support column erection device, which is beneficial in construction difficulties such as railway passenger stations where it is difficult for cranes to stand, ensuring the smooth and safe transportation and erection of steel columns; in particular, it can use deflection and lifting functions to solve the problem of rapid and automatic centering of steel columns in the installation position.

[0004] To achieve the above objectives, a method for using an early-removal support column erection device is adopted, which specifically includes the following steps: S1. Preparation stage: The chassis assembly performs a transfer operation, and the chassis assembly has a base frame assembly; the rotary platform performs a planar rotation operation, and the rotary platform is installed on the base frame assembly, and the rotary platform has a cantilever platform; the erecting frame performs a bearing operation, and the erecting frame is installed at the cantilever end of the cantilever platform; S2: Execution phase: The deflection and lifting docking operation is performed by the deflection mechanism, which is installed on the erecting frame; The specific steps in S2 include: S2.1. The rotation operation is performed by a hydraulic motor. The hydraulic motor is mounted on an upper sliding support, which is slidably assembled on the erecting frame. A lower sliding support is also slidably assembled in the erecting frame, and a support rod is fixed between the upper and lower sliding supports. The drive shaft of the hydraulic motor passes through the upper sliding support and the erecting frame, and an upper deflection bracket is installed at the end of the drive shaft. A lower deflection bracket is spaced below the upper deflection bracket. S2.2. The lower deflection bracket performs the revolution operation; the upper and lower deflection brackets are clamped together on the steel column. After the steel column is rotated by the upper deflection bracket, the steel column drives the lower deflection bracket to rotate; a sliding shaft is installed on the back of the lower deflection bracket, and the sliding shaft passes through the arc-shaped groove; the arc-shaped groove is distributed in the lower sliding support, and a limit head is set at one end of the sliding shaft on the back of the lower sliding support; if the center line of the arc coincides with the center line of the drive shaft of the hydraulic motor, the lower deflection bracket slides along the trajectory of the arc-shaped groove. S2.3: The lifting and docking operation is performed by the second hydraulic cylinder; the second hydraulic cylinder is fixed on the back of the middle part of the erecting frame, and the piston rod end of the second hydraulic cylinder is fixed on the upper sliding support; the second hydraulic cylinder drives the upper sliding support and the lower sliding support to slide downward as a whole, thereby adjusting the height position of the steel column after the deflection angle is adjusted downward.

[0005] In this method, the hydraulic motor in the deflection mechanism drives the upper deflection bracket to rotate. The upper deflection bracket clamps onto the steel column, thus causing the steel column to rotate. As the steel column rotates, the lower deflection bracket follows suit. At this time, the sliding shaft slides along the arc-shaped trajectory of the arc-shaped groove, ensuring that both ends of the steel column remain stably clamped during deflection. This solves the problem of easy swaying of the steel column with single-point clamping and the problem of the upper deflection bracket bearing all the torque caused by the steel column. Then, the second hydraulic cylinder drives the upper sliding support to slide up or down. The upper and lower sliding supports are connected by... With the support rods connected as a whole, the upper and lower sliding supports can slide up or down as a whole, meaning the steel column can slide up or down as a whole. This solves the problem of height position changes caused by the deflection itself, and facilitates splicing with the lower section of the steel column or the steel column support. In this way, even if there are slope issues in the terrain, such as considering the impact of the drainage slope layer, the verticality of the steel column can be guaranteed by deflecting the steel column. Of course, the slope of the drainage slope layer is generally very small, and the corresponding deflection range can also be set very small. By reducing the deflection range, the risk of overturning caused by excessive deflection of the steel column can be further reduced.

[0006] This invention aims to solve the problem of cranes being difficult to operate in confined spaces, ensuring the smooth and safe transport and erection of steel columns, especially addressing the height changes caused by deflection to enable rapid and automatic centering of steel columns at the installation position, and is suitable for sloping terrain. Attached Figure Description

[0007] Figure 1 This is a schematic diagram of the structure of this embodiment.

[0008] Figure 2 This is a schematic diagram of the assembly structure of the erecting frame and the deflection mechanism.

[0009] Figure 3 This is a schematic diagram of the assembly structure of the hydraulic motor and the upper deflection bracket.

[0010] Figure 4 This is a schematic diagram of the internal assembly structure of the sleeve section.

[0011] Figure 5 This is a schematic diagram of the assembly structure of the lower deflection bracket and the sliding shaft.

[0012] Figure 6 This is a schematic diagram of the assembly structure of the upper clamping mechanism, the lower clamping mechanism, and the lifting frame.

[0013] Figure 7 This is a schematic diagram of the assembly structure of the upper clamping mechanism and the erecting frame.

[0014] Figure 8 This is a schematic diagram of the assembly structure of the lower clamping mechanism and the erecting frame.

[0015] Figure 9 This is a schematic diagram of the assembly structure of the cantilever platform.

[0016] Figure 10 This is a schematic diagram of the assembly structure of the cantilever platform and the fourth hydraulic cylinder.

[0017] Figure 11 This is a schematic diagram of the assembly structure of the slewing platform and the underframe assembly.

[0018] Figure 12 This is a schematic diagram of the assembly structure of the underframe assembly and the chassis assembly.

[0019] Figure 13 A schematic diagram of the assembly structure of the outriggers to prevent overturning.

[0020] Figure 14 This is a frontal view of the deflected steel column.

[0021] Figure 15 This is a view of the deflected steel column from the back.

[0022] Reference numerals: 100, chassis assembly; 101, track frame; 102, track assembly; 200. Chassis assembly; 201. Skin; 300. Rotary platform; 301. Base; 400. Cantilever platform; 401. Sliding platform section; 402. Track section; 403. Roller; 404. Single-sided support; 405. End support; 500. Erection frame; 501. Cavity; 502. Inner crossbeam; 503. Track rod; 504. Slide groove; 600. First hydraulic cylinder; 700. Deflection mechanism; 701. Upper sliding support; 702. Lower sliding support; 70201. Arc-shaped groove; 703. Support rod; 704. Fixed support; 705. Second hydraulic cylinder; 706. Hydraulic motor; 707. Upper deflection bracket; 70701. Rotating handle; 70702. Arc-shaped support rod; 70703. Partial sleeve; 70704. Bearing cap; 70705. Locking element; 70706. Cylinder bracket; 70707. Third hydraulic cylinder; 70708. Arc-shaped clamp; 70709. Bearing.

[0023] 708. Sliding shaft; 709. Lower deflection bracket; 70901. Root handle; 70902. Bushing; 800, steel column; 900, coupling; 1000. Upper clamping mechanism; 1001, Sliding clamp; 100101, Curved surface; 100102, Sliding bar; 1002. Double-rod hydraulic cylinder; 1003. First lug plate; 1100, Lower clamping structure; 1200, Elevated layer; 1300, Fourth hydraulic cylinder; 1400, Rotation device; 1500, Support; 1600, Anti-tipping outriggers; 1601, T-shaped sleeves; 1602, Outrigger cylinders; 1603, Foot pads.

[0024] 1700, hydraulic station; 1800, engine; 1900, counterweight. Detailed Implementation

[0025] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0026] In the description of this invention, it should be noted that the terms "center," "upper," "lower," "left," "right," "vertical," "horizontal," "inner," and "outer," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are used only for the convenience of describing the invention and for simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on the invention. The terms "first," "second," and "third" are used for descriptive purposes only and should not be construed as indicating or implying relative importance. Furthermore, unless otherwise explicitly specified and limited, the terms "installed," "connected," and "linked" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal communication of two components. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.

[0027] Example 1 like Figure 1As shown, an early-dismantling support column erection device has the function of enabling the steel column to deflect and rise and fall during deflection, thereby solving the problem of steel column connection affected by changes in the verticality of the steel column due to terrain changes. Figure 1 This is a schematic diagram of the structure of this embodiment. In the figure, a base frame assembly 200 is mounted on the chassis assembly 100, a rotating platform 300 is mounted on the base frame assembly 200, and a cantilever platform 400 is mounted on the rotating platform 300. The root of the erecting frame 500 is hinged to the end of the cantilever platform 400. A first hydraulic cylinder 600 is installed between the cantilever platform 400 and the erecting frame 500. The cylinder end of the first hydraulic cylinder 600 is hinged to the mid-span position of the cantilever platform 400, and the piston rod end of the first hydraulic cylinder 600 is hinged to the erecting frame 500. The hinge position between the first hydraulic cylinder 600 and the erecting frame 500 is spaced apart from the hinge position between the cantilever platform 400 and the erecting frame 500. Figure 1 In the middle, two first hydraulic cylinders 600 are installed side by side, and are respectively hinged to the hinge shafts extending from both sides of the erecting frame 500.

[0028] like Figure 2 As shown, Figure 2 This is a schematic diagram of the assembly structure of the lifting frame and the deflection mechanism. The lifting frame 500 has a cavity 501 extending coaxially in the middle. Inner crossbeams 502 are arranged on both the upper and lower sides of the cavity 501. Two spaced track rods 503 are arranged between the upper and lower inner crossbeams 502. A deflection mechanism 700 is arranged between the two track rods 503. exist Figure 2 In the middle, the deflection mechanism 700 includes an upper sliding support 701 and a lower sliding support 702, which are slidably assembled between two spaced track rods 503; a support rod 703 is fixed between the upper sliding support 701 and the lower sliding support 702. exist Figure 2 In the middle of the erecting frame 500, a fixed support 704 is provided on the back side. A second hydraulic cylinder 705 is installed on the fixed support 704. The cylinder end of the second hydraulic cylinder 705 is installed on the fixed support 704, and the piston rod end of the second hydraulic cylinder 705 is installed on the upper sliding support 701. A hydraulic motor 706 is also installed on the upper sliding support 701. The drive shaft of the hydraulic motor 706 passes through the upper sliding support 701 and is then fixed on the upper deflection bracket 707. The upper deflection bracket 707 is clamped on the steel column 800. exist Figure 2In the middle, an arc-shaped groove 70201 with the center line of the drive shaft of the hydraulic motor 706 as the arc center line is provided on the lower sliding support 702; a sliding shaft 708 with a limit head at one end extends into the back of the arc-shaped groove 70201. The sliding shaft 708 can slide in the arc-shaped groove 70201. The size of the limit head of the sliding shaft 708 is larger than the width of the arc-shaped groove 70201, so that the limit head of the sliding shaft 708 is stuck on the side of the arc-shaped groove 70201 away from the steel column 800. After the sliding shaft 708 passes through the arc-shaped groove 70201, the lower deflection bracket 709 is installed. The lower deflection bracket 709 is spaced apart from the upper deflection bracket 707 and is also clamped on the steel column 800.

[0029] like Figure 3 As shown, Figure 3 This is a schematic diagram of the assembly structure of the hydraulic motor and the upper deflection bracket. One of the functions of this embodiment is to achieve stable rotation of the upper deflection bracket. Figure 3 In the middle, the upper deflection bracket 707 includes a rotating handle portion 70701 and an arc-shaped support rod portion 70702 extending from both sides of the rotating handle portion 70701; exist Figure 3 In the middle, a sleeve portion 70703 is provided on the back side of the rotating handle portion 70701, and a bearing cap 70704 is installed on the end side of the sleeve portion 70703; exist Figure 3 In the middle, a locking element 70705 is provided on the front side of the rotating handle 70701; exist Figure 3 In the middle, the end of the arc-shaped support rod 70702 is equipped with a cylinder bracket 70706, the cylinder bracket 70706 is equipped with a third hydraulic cylinder 70707, and the piston rod end of the third hydraulic cylinder 70707 is equipped with an arc-shaped clamping plate 70708.

[0030] like Figure 4 As shown, Figure 4 This is a schematic diagram of the internal assembly structure of the sleeve section. Figure 4 In the middle, a bearing 70709 is encapsulated inside the sleeve portion 70703, and the bearing 70709 is encapsulated inside the sleeve portion 70703 by a bearing cap 70704; A coupling 900 is installed in the inner ring of bearing 70709. A locking element 70705 is installed at one end of coupling 900 near the steel column clamping side, and the drive shaft of hydraulic motor 706 is installed at the other end away from the steel column clamping side. Coupling 900 is a sleeve coupling, which can be fixed to the sleeve part of coupling 900, the shaft part of locking element 70705, and the shaft part of drive shaft of hydraulic motor 706 by key or pin; or external threads are machined on the outside of coupling 900; the shaft part of drive shaft end is a hollow shaft with internal threads machined, and coupling 900 is screwed into drive shaft, thereby making the overall length shorter and the structure more compact.

[0031] like Figure 5 As shown, Figure 5 This is a schematic diagram of the assembly structure of the lower deflection bracket and the sliding shaft. The third function of this embodiment is to achieve stable revolution of the lower deflection bracket. Figure 5 In the middle, the lower deflection bracket 709 also has the same arc-shaped support rod, cylinder bracket, third hydraulic cylinder and arc-shaped clamp as the upper deflection bracket 707. The difference is that the arc-shaped support rod extends from both sides of the root shank 70901, and the back of the root shank 70901 is the bushing 70902, which is fitted with the shaft of the sliding shaft 708.

[0032] like Figure 6 As shown, Figure 6 This is a schematic diagram of the assembly structure of the upper clamping mechanism, the lower clamping mechanism, and the erecting frame. The fourth function of this embodiment is to achieve long-distance lifting and lowering of the steel column; Figure 6 In the middle, the upper part of the erecting frame 500 is provided with an upper clamping mechanism 1000, and the lower part of the erecting frame 500 is provided with a lower clamping mechanism 1100.

[0033] like Figure 7 As shown, Figure 7 This is a schematic diagram of the assembly structure of the upper clamping mechanism and the erecting frame. Figure 7 In the middle, the upper clamping mechanism 1000 includes two sliding clamping plates 1001 and a double-rod hydraulic cylinder 1002; the sliding clamping plate 1001 has an arc-shaped part 100101, which is used to clamp the steel column. The root of the sliding clamping plate 1001 is a sliding bar part 100102. The upper part of the erecting frame 500 is provided with a sliding groove 504; the cross-sectional shape of the sliding bar part 100102 and the sliding groove 504 are both T-shaped to fit each other.

[0034] exist Figure 7 In the middle, the double-outlet hydraulic cylinder 1002 is mounted between two first ear plates 1003, and the first ear plates 1003 are fixed to the upper front of the erecting frame 500; the two cylinder ends of the double-outlet hydraulic cylinder 1002 are fixed on the first ear plates 1003, and the two piston rods of the double-outlet hydraulic cylinder 1002 extend out from the hole in the middle of the first ear plate 1003, and the ends of the piston rods of the double-outlet hydraulic cylinder 1002 are installed on the second ear plate 1004; the second ear plate 1004 is fixed on the sliding clamp 1001.

[0035] like Figure 8 As shown, Figure 8 This is a schematic diagram of the assembly structure of the lower clamping mechanism and the erecting frame. Figure 8 In the middle, the components of the lower clamping mechanism 1100 are the same as those of the upper clamping mechanism, except that the double-outlet hydraulic cylinder, the first ear plate and the second ear plate are installed below the sliding clamping plate. Correspondingly, the lower part of the erecting frame 500 is also provided with a sliding groove 504 to slide and adapt to the sliding bar part of the sliding clamping plate of the lower clamping mechanism 1100. Both of them are T-shaped in cross-section and are compatible with each other.

[0036] exist Figure 6 In the process of raising or lowering the steel column, the long-distance lifting and lowering of the steel column mainly relies on the deflection mechanism 700. During the process of raising or lowering the steel column, the upper clamping mechanism 1000 and the lower clamping mechanism 1100 are in a detached state. At this time, the sliding clamp is driven by the double-outlet hydraulic cylinder and is far away from the steel column 800, which also creates space for the steel column 800 to deflect. In this state, the steel column 800 can both rise and fall and deflect. However, due to the limited stroke of the deflection mechanism 700, it can only raise or lower the column by a small distance each time. Therefore, after the deflection mechanism 700 completes one stroke, the upper clamping mechanism 1000 and the lower clamping mechanism 1100 need to re-clamp the steel column 800 to maintain the height after the position change. At this time, the deflection mechanism 700 needs to disengage from the steel column 800 and retract to its original position. During the retraction process, the deflection mechanism 700 will not pull the steel column 800 back to its original position. After returning to its original position, the deflection mechanism 700 repeats the stroke, and then the deflection mechanism 700 clamps the steel column again. After the deflection mechanism 700 completes the clamping, the upper clamping mechanism 1000 and the lower clamping mechanism 1100 disengage from the steel column again, allowing the deflection mechanism 700 to raise or lower the steel column by one stroke again. This allows the two strokes of the deflection mechanism 700 to be accumulated, enabling the steel column to achieve a long distance of raising and lowering.

[0037] exist Figure 8 In the middle, the base of the erecting frame 500 is U-shaped, and the two ends of the U-shape are hinged to the two sides of the end of the cantilever platform 400.

[0038] like Figure 9 As shown, Figure 9 This is a schematic diagram of the cantilever platform's assembly structure. The fifth function of this embodiment is to enable the extension and retraction of the cantilever platform, thereby driving the steel columns to translate. Figure 9 In the middle, the cantilever platform 400 includes a central sliding platform section 401 and track sections 402 located on both sides of the sliding platform section 401; rollers 403 are slidably mounted in the track section 402, and the rollers 403 are V-groove rollers, and the corresponding upper and lower guide rail surfaces on the inner side of the track section 402 also adopt V-shaped guide rail surfaces adapted to them; the rollers 403 are mounted on single-sided supports 404; the single-sided supports 404 are evenly distributed on the rotary platform 300, arranged in two rows side by side, to be erected on both sides of the cantilever platform 400, at this time the cantilever platform 400 is suspended and installed on the rotary platform 300, and an elevated layer 1200 appears between the cantilever platform 400 and the rotary platform 300; exist Figure 9 In the middle, the slewing platform 300 is also equipped with a hydraulic station 1700, an engine 1800, and a counterweight 1900.

[0039] like Figure 10 As shown, Figure 10This is a schematic diagram of the assembly structure of the cantilever platform and the fourth hydraulic cylinder. The fourth hydraulic cylinder 1300 is installed in the elevated layer 1200. The cylinder end of the fourth hydraulic cylinder 1300 is installed on the base 301 on the rotary platform 300. The piston rod end of the fourth hydraulic cylinder 1300 is installed on the end seat 405 at the bottom of the cantilever platform 400.

[0040] like Figure 11 As shown, Figure 11 This is a schematic diagram of the assembly structure of the slewing platform and the underframe assembly. Figure 11 In the middle, the slewing platform 300 is mounted on the slewing device 1400 on the base frame assembly 200; the slewing device 1400 includes a slewing bearing and a slewing drive assembly, which drives the slewing platform 300 to rotate on the slewing bearing.

[0041] exist Figure 11 In the middle, a layer of skin 201 is laid on the upper surface of the underframe assembly 200; like Figure 12 As shown, Figure 12 This is a schematic diagram of the assembly structure of the underframe assembly and the chassis assembly. Figure 12 In the chassis assembly 200, the underframe assembly 200 is mounted on supports 1500 distributed on the chassis assembly 100; the chassis assembly 100 includes: track frame 101 and track assemblies 102 mounted on both sides of track frame 101, and supports 1500 are distributed at intervals on track frame 101.

[0042] like Figure 13 As shown, Figure 13 A schematic diagram of the assembly structure of the anti-tipping outriggers is shown. Figure 13 In the middle, the anti-overturning outrigger 1600 includes a T-shaped sleeve 1601 and an outrigger cylinder 1602 installed in the T-shaped sleeve 1601. The outrigger cylinder 1602 is placed vertically, and a foot pad 1603 is installed at the end of its piston rod.

[0043] exist Figure 13 In the middle, the T-shaped sleeve 1601 extends from the front and rear crossbeams of the base frame assembly 200, and corresponding hydraulic cylinders can be distributed in the front and rear crossbeams of the base frame assembly 200 to control the extension of the T-shaped sleeve 1601.

[0044] like Figure 14 As shown, Figure 14 This is a frontal view of the steel column deflection. Figure 14 In the middle, the steel column 800 deflected slightly.

[0045] like Figure 15 As shown, Figure 15 Rear view of the deflected steel column. Figure 15 In the middle, the sliding shaft 708 moves to one end of the arc-shaped groove 70201.

[0046] A small deflection is sufficient to adapt to the slope and drainage surface of the railway passenger station, and it does not deflect the steel column too much outward, thus preventing the center of gravity of the steel column from deviating too much and the torque applied to the clamping point from being too large.

[0047] Example 2 A method for using an early-stripping support column erection device includes the following steps: S1. Preparation stage: The chassis assembly 100 performs the transfer operation, and the chassis assembly 100 has a base frame assembly 200; the rotary platform 300 performs the planar rotation operation, and the rotary platform 300 is mounted on the base frame assembly 200, and the rotary platform 300 has a cantilever platform 400; the erecting frame 500 performs the bearing operation, and the erecting frame 500 is mounted on the cantilever end of the cantilever platform 400; S2: Execution phase: The deflection and lifting docking operation is performed by the deflection mechanism 700, which is installed on the erecting frame 500; The specific steps in S2 include: S2.1. The rotation operation is performed by a hydraulic motor 706, which is mounted on an upper sliding support 701. The upper sliding support 701 is slidably mounted on the erecting frame 500. A lower sliding support 702 is also slidably mounted in the erecting frame 500, and a support rod 703 is fixed between the upper sliding support 701 and the lower sliding support 702. The drive shaft of the hydraulic motor 706 passes through the upper sliding support 701 and the erecting frame 500, and an upper deflection bracket 707 is mounted at the end of the drive shaft. A lower deflection bracket 709 is spaced below the upper deflection bracket 707. S2.2. The lower deflection bracket 709 performs the revolution operation; the upper deflection bracket 707 and the lower deflection bracket 709 are clamped together on the steel column 800. After the steel column 800 is rotated by the upper deflection bracket 707, the steel column 800 drives the lower deflection bracket 709 to rotate; a sliding shaft 708 is installed on the back of the lower deflection bracket 709, and the sliding shaft 708 passes through the arc groove 70201; the arc groove 70201 is distributed in the lower sliding support 702, and a limit head is provided at one end of the sliding shaft 708 on the back of the lower sliding support 702; if the center line of the arc coincides with the center line of the drive shaft of the hydraulic motor 706, then the lower deflection bracket 709 slides along the trajectory of the arc groove 70201; S2.3: The lifting and docking operation is performed by the second hydraulic cylinder 705; the second hydraulic cylinder 705 is fixed on the back of the middle part of the erecting frame 500, and the piston rod end of the second hydraulic cylinder 705 is fixed on the upper sliding support 701; the second hydraulic cylinder 705 drives the upper sliding support 701 and the lower sliding support 702 to slide downward as a whole, thereby adjusting the height position of the steel column 800 after the deflection angle is adjusted downward.

[0048] Example 3 like Figures 1-15As shown, an early-release support column erection device includes a chassis assembly 100, a base frame assembly 200 mounted on the chassis assembly 100, a rotating platform 300 mounted on the base frame assembly 200, a cantilever platform 400 mounted on the rotating platform 300, and an erection frame 500 mounted on the cantilever platform 400. A deflection mechanism 700 is mounted on the erection frame 500, and the deflection mechanism 700 includes: The upper sliding support 701 and the lower sliding support 702 are slidably assembled in the erector 500 with the upper and lower sliding supports 701 and 702 being spaced apart. A support rod 703 is fixed between the upper sliding support 701 and the lower sliding support 702. Fixed support 704 is installed on the back of the middle part of the erector 500; The second hydraulic cylinder 705 has its cylinder end mounted on the fixed support 704 and its piston rod end mounted on the upper sliding support 701. A hydraulic motor 706 is mounted on an upper sliding support 701, and its drive shaft passes through the upper sliding support 701 and the lifting frame 500. The upper deflection bracket 707 is mounted at the end of the drive shaft and is clamped on the steel column 800; The arc-shaped groove 70201 is provided on the lower sliding support 702, and its arc center line coincides with the drive shaft center line of the hydraulic motor 706. The sliding shaft 708 is slidably assembled in the arc-shaped groove 70201, and one end of it located on the back of the lower sliding support 702 has a limiting head; it passes through the arc-shaped groove 70201 and the lifting frame 500. The lower deflection bracket 709 is installed at the through end of the sliding shaft 708; it is also clamped on the steel column 800 and is spaced vertically from the upper deflection bracket 707.

[0049] With this structure, the hydraulic motor 706 in the deflection mechanism 700 drives the connected upper deflection bracket 707 to rotate. The upper deflection bracket 707 clamps onto the steel column 800, thus causing the steel column 800 to rotate. As the steel column 800 rotates, the lower deflection bracket 709 follows suit. At this time, the sliding shaft 708 slides along the arc-shaped trajectory of the arc-shaped groove 70201, ensuring that both ends of the steel column 800 remain stably clamped during deflection. This solves the problem of easy swaying of the steel column 800 when clamped at a single point and the problem of the upper deflection bracket bearing all the torque caused by the steel column. Then, the second hydraulic cylinder 705 drives the upper sliding support 701 to slide up or down. The upper sliding support 701 and the lower sliding support 702 are connected as a whole by the support rod 703. The upper sliding support 701 and the lower sliding support 702 can slide up or down as a whole, that is, the steel column 800 can slide up or down as a whole, in order to solve the problem of height position change caused by the deflection itself, and facilitate splicing with the lower section of steel column or steel column support. In this way, even if there is a slope problem in the terrain, such as considering the influence of the drainage slope layer, the verticality of the steel column can be guaranteed by deflecting the steel column. Of course, the slope of the drainage slope layer is generally very small, and the corresponding deflection range can also be set very small. By reducing the deflection range, the risk of overturning caused by excessive deflection of the steel column can be further reduced.

[0050] In this embodiment, the erecting frame 500 has a cavity 501 extending coaxially in the middle, and inner crossbeams 502 are arranged on the upper and lower sides of the cavity 501; two spaced track rods 503 are arranged in the cavity 501 between the two inner crossbeams 502, and the upper sliding support 701 and the lower sliding support 702 are installed between the two track rods 503, and the track rods 503 are slidably adapted to the upper sliding support 701 and the lower sliding support 702.

[0051] By adopting this structure, the overall structural rigidity of the erector frame 500 is improved by adding an inner crossbeam 502, and the span of the track rod 503 in the cavity 501 is reduced. The track rod 503 does not need to be longer than the erector frame 500, thereby reducing the maximum mid-span bending moment of the track rod 503 and preventing the track rod from tilting or deforming during the deflection operation.

[0052] In this embodiment, the cantilever end of the cantilever platform 400 is connected to the root of the erecting frame 500 by a hinge, and the cylinder end of the first hydraulic cylinder 600 is hinged at the mid-span position of the cantilever platform 400. The piston rod end of the first hydraulic cylinder 600 is hinged to the erecting frame 500. The hinge position of the first hydraulic cylinder 600 and the erecting frame 500 is spaced apart from the hinge position of the cantilever platform 400 and the erecting frame 500.

[0053] With this structure, the cantilever platform 400 is hinged to the erecting frame 500, and the pitch angle of the erecting frame 500 is adjusted by the telescopic drive of the first hydraulic cylinder 600. The piston rod end of the first hydraulic cylinder 600 is connected to the erecting frame 500, which can adjust the pitch angle of the erecting frame 500 in real time according to changes in terrain or construction needs, thereby indirectly adjusting the pitch angle of the steel column 800. Thus, combined with the above, both the pitch angle and the deflection angle of the steel column 800 can be adjusted.

[0054] In this embodiment, the upper deflection bracket 707 includes: The rotating handle 70701 and the arc-shaped support rod 70702 extending from both sides of the rotating handle 70701; Sleeve portion 70703 is disposed on the back side of the rotating handle portion 70701; Bearing cap 70704 is installed on the end side of the sleeve portion 70703; Locking member 70705 is fitted on the front side of the rotating handle 70701; The bearing 70709 is encapsulated within the sleeve portion 70703 and pressed by the bearing cap 70704; The coupling 900 is installed on the inner ring of the bearing 70709. The locking element 70705 is assembled at one end of the coupling near the steel column 800, and the drive shaft of the hydraulic motor 706 is assembled at the other end of the coupling away from the steel column 800.

[0055] This structure, through the cooperation of the sleeve portion 70703 and the bearing 70709, ensures the stable rotation of the upper deflection bracket 707. Simultaneously, the rigid connection between the coupling 900 and the locking member 70705, and the rigid connection between the coupling 900 and the drive shaft of the hydraulic motor 706, further enhances rotational stability. The locking member 70705 firmly locks the rotating handle portion 70701, preventing unstable rotation.

[0056] In this embodiment, a hydraulic cylinder bracket 70706 is installed at the end of the arc-shaped support rod 70702, a third hydraulic cylinder 70707 is installed in the hydraulic cylinder bracket 70706, and an arc-shaped clamping plate 70708 is installed at the piston rod end of the third hydraulic cylinder 70707.

[0057] With this structure, the third hydraulic cylinder 70707 can be stably installed by using the cylinder bracket 70706 and the third hydraulic cylinder 70707 in conjunction. The arc-shaped clamping plate 70708 can provide a clamping function, further enhancing the stability of clamping the steel column.

[0058] In this embodiment, the lower deflection bracket 709 also has the same arc-shaped support rod, cylinder bracket, third hydraulic cylinder and arc-shaped clamp as the upper deflection bracket 707. The difference is that the arc-shaped support rod extends from both sides of the root handle 70901, and the back of the root handle 70901 is the bushing 70902, which is fitted with the shaft of the sliding shaft 708.

[0059] With this structure, the lower deflection bracket 709 and the sliding shaft 708 can maintain the same motion trajectory, and the lower deflection bracket 709 can also be supported by the sliding shaft 708 during rotation.

[0060] In this embodiment, the cantilever platform 400 includes a central sliding platform section 401 and track sections 402 located on both sides of the sliding platform section 401. Rollers 403 are slidably mounted in the track sections 402. The rollers 403 are mounted on single-sided supports 404. The single-sided supports 404 are evenly distributed on the rotary platform 300, so that the cantilever platform 400 is suspended on the rotary platform 300, forming an elevated layer 1200. A fourth hydraulic cylinder 1300 is installed in the elevated layer 1200. The cylinder end of the fourth hydraulic cylinder 1300 is mounted on a base 301 on the rotary platform 300, and the piston rod end of the fourth hydraulic cylinder 1300 is mounted on an end seat 405 at the bottom of the cantilever platform 400.

[0061] With this structure, the extension and retraction of the cantilever platform 400 is driven by the telescopic movement of the fourth hydraulic cylinder 1300; through the cooperation of the single-sided support 404, the roller 403 and the track 402, the friction and vibration during the sliding process of the cantilever platform 400 are reduced, and the service life of the equipment is extended.

[0062] In this embodiment, the rotary platform 300 is mounted on the rotary device 1400 on the base frame assembly 200.

[0063] With this structure, the slewing device 1400 is installed on the base frame assembly 200, and the slewing platform 300 is then assembled on the slewing device 1400, so that the slewing platform 300 can be driven to rotate by the slewing device 1400.

[0064] In this embodiment, the underframe assembly 200 is mounted on supports 1500 distributed on the chassis assembly 100; the chassis assembly 100 includes: a track frame 101 and track assemblies 102 mounted on both sides of the track frame 101; the supports 1500 are spaced apart on the track frame 101.

[0065] This structure supports 1500 overhead underframe assemblies 200, allowing the underframe assembly 200 to be higher than the tracks on both sides, so that the planar dimensions of the underframe assembly 200 are not limited by the track assemblies 102 on both sides.

[0066] In this embodiment, anti-tipping outriggers 1600 are installed on both sides of the crossbeam at the end of the base frame assembly 200. The anti-tipping outriggers 1600 include a T-shaped sleeve 1601 and an outrigger cylinder 1602 installed in the T-shaped sleeve 1601. The outrigger cylinder 1602 is placed vertically, and a foot pad 1603 is installed at the end of its piston rod.

[0067] With this structure, the anti-overturning outrigger 1600 can expand the support range, and the foot pad 1603 is supported on the ground, using the ground reaction force to increase the anti-overturning moment.

[0068] This embodiment aims to solve the problem of crane operation in confined spaces, ensure the smooth and safe transportation and erection of steel columns, and especially solve the problem of height changes caused by deflection to enable rapid and automatic centering of steel columns in the installation position. It is suitable for sloping terrain.

[0069] The above description, in conjunction with specific preferred embodiments, provides a further detailed explanation of the present invention. It should not be construed that the specific implementation of the present invention is limited to these descriptions. For those skilled in the art, several equivalent substitutions or obvious modifications can be made without departing from the concept of the present invention, and all such modifications, achieving the same performance or purpose, should be considered within the scope of protection of the present invention.

Claims

1. A method for using an early-stripping support column erection device, characterized in that... The steps include the following: S1. Preparation stage: The transfer operation is performed by the chassis assembly (100), which has a base frame assembly (200); the planar rotation operation is performed by the rotary platform (300), which is mounted on the base frame assembly (200) and has a cantilever platform (400); the load-bearing operation is performed by the erector (500), which is mounted on the cantilever end of the cantilever platform (400); S2: Execution phase: The deflection and lifting docking operation is performed by the deflection mechanism (700), which is installed on the erecting frame (500); The feature is that the specific steps in S2 include: S2.

1. The rotation operation is performed by a hydraulic motor (706). The hydraulic motor (706) is mounted on an upper sliding support (701), which is slidably mounted on the erecting frame (500). A lower sliding support (702) is also slidably mounted in the erecting frame (500), and a support rod (703) is fixed between the upper sliding support (701) and the lower sliding support (702). The drive shaft of the hydraulic motor (706) passes through the upper sliding support (701) and the erecting frame (500), and an upper deflection bracket (707) is mounted at the end of the drive shaft. A lower deflection bracket (709) is spaced below the upper deflection bracket (707). S2.

2. The lower deflection bracket (709) performs the revolution operation; the upper deflection bracket (707) and the lower deflection bracket (709) are clamped together on the steel column (800). After the steel column (800) is rotated by the upper deflection bracket (707), the steel column (800) drives the lower deflection bracket (709) to rotate; a sliding shaft (708) is installed on the back of the lower deflection bracket (709), and the sliding shaft (708) passes through the arc groove (70201); the arc groove (70201) is distributed in the lower sliding support (702), and a limit head is provided at one end of the sliding shaft (708) on the back of the lower sliding support (702); the arc center line of the arc groove (70201) coincides with the drive shaft center line of the hydraulic motor (706), then the lower deflection bracket (709) slides along the trajectory of the arc groove (70201); S2.3: The lifting and docking operation is performed by the second hydraulic cylinder (705); the second hydraulic cylinder (705) is fixed on the back of the middle part of the erecting frame (500), and the piston rod end of the second hydraulic cylinder (705) is fixed on the upper sliding support (701); the second hydraulic cylinder (705) drives the upper sliding support (701) and the lower sliding support (702) to slide downward as a whole, thereby adjusting the height position of the steel column (800) after the deflection angle is adjusted downward.

2. The method of using the early-removal support column erection device according to claim 1, characterized in that... The erecting frame (500) has a cavity (501) extending coaxially in the middle, and inner crossbeams (502) are arranged on the upper and lower sides of the cavity (501); two spaced track rods (503) are arranged between the two inner crossbeams (502) in the cavity (501), and the upper sliding support (701) and the lower sliding support (702) are installed between the two track rods (503), and the track rods (503) are slidably adapted to the upper sliding support (701) and the lower sliding support (702).

3. The method of using the early-release support column erection device according to claim 1, characterized in that... The cantilever end of the cantilever platform (400) is connected to the root of the erecting frame (500) by a hinge. The cylinder end of the first hydraulic cylinder (600) is hinged at the mid-span position of the cantilever platform (400), and the piston rod end of the first hydraulic cylinder (600) is hinged to the erecting frame (500). The hinge position of the first hydraulic cylinder (600) and the erecting frame (500) is spaced apart from the hinge position of the cantilever platform (400) and the erecting frame (500).

4. The method of using the early-removal support column erection device according to claim 1, characterized in that... The upper deflection bracket (707) includes: The rotating handle (70701) and the arc-shaped support rod (70702) extending from both sides of the rotating handle (70701). A sleeve portion (70703) is provided on the back side of the rotating handle portion (70701); A bearing cap (70704) is installed on the end side of the sleeve portion (70703); Locking element (70705), which is fitted on the front of the rotating handle (70701); The bearing (70709) is encapsulated within the sleeve portion (70703) and pressed by the bearing cap (70704); A coupling (900) is mounted on the inner ring of the bearing (70709), with the locking element (70705) fitted at one end near the steel column (800) and the drive shaft of the hydraulic motor (706) fitted at the other end away from the steel column (800).

5. The method of using the early-stripping support column erection device according to claim 4, characterized in that... The end of the arc-shaped support rod (70702) is equipped with a cylinder bracket (70706), and a third hydraulic cylinder (70707) is installed in the cylinder bracket (70706). An arc-shaped clamp (70708) is installed on the piston rod end of the third hydraulic cylinder (70707).

6. The method of using the early-stripping support column erection device according to claim 5, characterized in that... The lower deflection bracket (709) also has the same arc-shaped support rod, cylinder bracket, third hydraulic cylinder and arc-shaped clamp as the upper deflection bracket (707). The difference is that the arc-shaped support rod extends from both sides of the root handle (70901), and the back of the root handle (70901) is the bushing (70902); the bushing (70902) is fitted with the shaft of the sliding shaft (708).

7. The method of using the early-stripping support column erection device according to claim 1, characterized in that... The cantilever platform (400) includes a central sliding platform section (401) and track sections (402) located on both sides of the sliding platform section (401). Rollers (403) are slidably mounted in the track sections (402). The rollers (403) are mounted on single-sided supports (404). The single-sided supports (404) are evenly distributed on the rotary platform (300) so that the cantilever platform (400) is suspended on the rotary platform (300) to form an elevated layer (1200). A fourth hydraulic cylinder (1300) is installed in the elevated layer (1200). The cylinder end of the fourth hydraulic cylinder (1300) is mounted on the base (301) on the rotary platform (300), and the piston rod end of the fourth hydraulic cylinder (1300) is mounted on the end seat (405) at the bottom of the cantilever platform (400).

8. The method of using the early-stripping support column erection device according to claim 1, characterized in that... The slewing platform (300) is mounted on the slewing device (1400) on the base frame assembly (200).

9. The method of using the early-stripping support column erection device according to claim 1, characterized in that... The underframe assembly (200) is mounted on supports (1500) distributed on the chassis assembly (100); the chassis assembly (100) includes: a track frame (101) and track assemblies (102) mounted on both sides of the track frame (101); the supports (1500) are spaced apart on the track frame (101).

10. The method of using the early-removal support column erection device according to claim 1, characterized in that... Anti-overturning outriggers (1600) are installed on both sides of the end crossbeam of the underframe assembly (200). The anti-overturning outriggers (1600) include a T-shaped sleeve (1601) and an outrigger cylinder (1602) installed in the T-shaped sleeve (1601). The outrigger cylinder (1602) is placed vertically, and a foot pad (1603) is installed at the end of its piston rod.

Citation Information

Patent Citations

  • Steel shell concrete combined high and large pier column structure adjacent to existing railway and rapid construction method in skylight period

    CN121345042A