A schedule delay analysis system and method based on SCL criteria and contract anchoring technology
The schedule delay analysis system based on the SCL criterion solves the problem of inaccuracy in the determination of schedule delays in traditional methods, realizes the clear determination of the responsibilities of all parties in the project and reduces claims, thereby improving the certainty and efficiency of project management.
Patent Information
- Application Number
- CN202611375811.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-07
- Publication Date
- 2026-11-17
AI Technical Summary
Traditional methods cannot determine project delays in a timely and accurate manner, leading to endless disputes and claims among all parties involved in engineering projects. The SCL principle has not formed a normalized governance mechanism for all parties responsible for governance in traditional applications.
This paper presents a schedule delay analysis system based on the SCL criterion and contract anchoring technology. The system includes a data acquisition module, an EOT engine for the engineering implementation of the SCL criterion, and a cloud report generation module. Through rule calculation and impact analysis, the system expands the application scope of the SCL criterion and forms a normalized governance mechanism for all governance stakeholders.
It enables timely and accurate determination of construction delays, improves the certainty of project schedules, and guides responsible parties to prevent delays and reduce claims disputes through a negative feedback closed-loop mechanism.
Smart Images

Figure FT_1 
Figure FT_2
Abstract
Description
Technical Field
[0001] This invention relates to the fields of engineering project management and computer information technology, specifically to a schedule delay analysis system and method based on the SCL criterion and contract anchoring technology. Background Technology
[0002] In the management of large-scale engineering projects, the calculation and attribution of responsibility for schedule delays is an extremely complex engineering challenge. Traditional methods lack the technical means for rule-based calculation and impact analysis, often resulting in the inability to make timely and accurate determinations after delays occur. This leads to endless disputes among all parties and triggers frequent claims and counterclaims. Furthermore, the SCL (Standardized Complaints) principle is typically used only for single-claim arbitration between the two contracting parties (Party A and Party B) in traditional application scenarios, and has not yet formed a routine schedule governance mechanism for all responsible parties. Summary of the Invention
[0003] The purpose of this invention is to provide a schedule delay analysis system and method based on the SCL criterion and contract anchoring technology. Through rule calculation and impact analysis, it solves the problem that traditional methods cannot determine schedule delays in a timely and accurate manner. Furthermore, it expands the adjudication logic of the SCL criterion from a single claim arbitration between the two parties to a normalized governance mechanism for all governance responsible parties, thereby improving the schedule certainty of major engineering projects.
[0004] To achieve the above objectives, the present invention provides the following technical solution: a schedule delay analysis system based on SCL criteria and contract anchoring technology, including a data acquisition module, an SCL criterion engineering implementation negative feedback EOT engine and a cloud report generation module, the system working in conjunction with a CCL work completeness review module and an RSH evaluation engine.
[0005] The data acquisition module obtains project plan data and responsibility event data through a structured semantic model embedded in the plan carrier.
[0006] The SCL criterion-based engineering implementation negative feedback EOT engine is based on the SCL criterion algorithm core. This engine uses the CPM network model and SCL criterion to dynamically anchor contract durations and employs expected impact analysis to calculate the net impact EOT of dominant liability events.
[0007] The core computational model of the negative feedback EOT engine, which is used to engineer the SCL criterion, is as follows: EOT=max(min(exp-plan, exp-cur), min(sube-cur, sub), 0).
[0008] Where exp represents the expected impact on the planned duration, cur represents the current contract duration (i.e., the sum of the anchored contract duration and the total EOT approved by the client), plan represents the updated planned duration, sube represents the end position of the responsibility event sub-network, and sub represents the length of the responsibility event sub-network.
[0009] In this calculation model, for a responsibility event, the system extracts the first comparison result min(exp-plan, exp-cur), which is used to limit: only the expected impact that exceeds the updated plan and the current contract period constitutes the net impact of the responsibility event; it extracts the second comparison result min(sube-cur, sub), requiring the client to unconditionally bear the delay after exceeding the contract period; since the first two minimization expressions may both have negative values, but the overall solution path requires the first two expressions, the model is finally constructed by taking the larger value and truncating it to 0. When the calculation result is 0, it means that the responsibility event has not caused a substantial extension of the contract period, and the responsibility event is still recorded as a responsibility event.
[0010] The SCL criteria are implemented in a negative feedback EOT engine to calculate the net impact EOT of responsible events and simultaneously output schedule health indicators, forming a schedule governance system with EOT as its core. The system does not perform current contract schedule adjustments; the current contract schedule is dynamically adjusted manually based on the EOT approved by the client.
[0011] The RSH evaluation engine calculates the project health index, which serves as a derived expression of the EOT negative feedback signal. This index guides the responsible parties to prevent project delays at the source and strive for zero defects.
[0012] The beneficial effects of this invention are as follows: By implementing the SCL criteria in an engineering manner, the negative feedback EOT engine performs dynamic anchoring of contract duration based on the CPM network model and SCL criteria, ensuring that the calculation benchmark always conforms to the current state of the contract; by synchronously outputting duration health indicators, it guides all governance responsible parties to take proactive preventive measures at the source, driving proactive responsibility; and by outputting reports through the cloud report generation module, a negative feedback closed loop is formed. Attached Figure Description
[0013] Figure 1 This is a block diagram of the system architecture for project delay analysis provided in an embodiment of the present invention.
[0014] Figure 2 A flowchart of the project delay analysis method provided in an embodiment of the present invention. Detailed Implementation
[0015] The following is combined with Figure 1 and Figure 2 The present invention will be further described below.
[0016] The system provides a pre-defined structured semantic model, requiring clients to perform the following embedding operations in their planning software (including mainstream planning platforms such as P6, Project, and Zebra Schedule): Set the task name for the corresponding row of the updated Work Breakdown Structure (WBS) to "plan"; set the task name for the corresponding row of the expected impact Work Breakdown Structure (WBS) to "exp"; and insert a responsibility event sub-network template. The responsibility event sub-network is jointly developed by Party A, Party B, and the governance responsible party, using network planning technology that is isomorphic to the schedule plan. It establishes a logical connection with the updated plan, forming the expected impact plan, used to define the dominant responsibility events. "sube" represents the end position of the responsibility event sub-network (i.e., the summative task duration of the sub-network's virtual parent WBS), and "sub" represents the length of the responsibility event sub-network (i.e., the summative task duration of the sub-network). Through these operations, the original schedule data and responsibility event data in the planning platform are automatically mapped into structured data recognizable by the system.
[0017] The system does not read the original contract duration file. For each analysis, the dynamically adjusted current contract duration (cur) is manually entered; this value serves as the baseline anchor for the analysis, and the project critical path (CPM) is constructed based on it. To protect customer data security, all input data is deleted immediately after the system analysis is completed, and no original customer information is retained.
[0018] The SCL criterion-based engineering implementation negative feedback EOT engine employs the Expected Impact Analysis (TIA) method to calculate the net impact EOT of dominant responsibility events. The system receives expected impact planned duration data (exp), current contract duration data (cur), updated planned duration data (plan), and the end position (sube) and length (sub) of the responsibility event sub-network. The system automatically performs data comparison and truncation through the following logical model: (1) Extract the first comparison result as min(exp - plan, exp - cur), which is used to limit only the expected impact that exceeds the update plan and the current contract period to constitute the net impact of the liability event; (2) Extract the second comparison result, which is min(sube - cur, sub), and require Party A to unconditionally bear the delays after the contract period; (3) Finally, the net impact value of EOT is generated: EOT = max(first comparison result, second comparison result, 0). Since the first two steps may produce negative values, but the overall solution path requires the first two expressions, in order to ensure the integrity of the solution path, the model is truncated to 0 by taking the larger value. When the calculation result is 0, the responsibility event is still recorded as a responsibility event.
[0019] The SCL criteria are implemented in a negative feedback EOT engine to calculate the net impact EOT of responsible events and simultaneously output schedule health indicators. The system does not perform current contract schedule adjustments; the current contract schedule is dynamically adjusted manually based on the EOT approved by the client.
[0020] The RSH evaluation engine calculates the project health index, which serves as a derived expression of the EOT negative feedback signal. This index guides the responsible parties to prevent project delays at the source and strive for zero defects.
[0021] The cloud report generation module receives the above calculation results and outputs the "Cloud Report on Project Delay Analysis". The cloud report includes EOT negative feedback signals and project health indicators. Among them, the EOT negative feedback signals are used to indicate the net impact of the responsibility event on the contract period and become the core of the negative feedback of the project period management system. The project health indicators are used to guide each party responsible for management to prevent themselves from having project delay responsibility events, forming a negative feedback closed loop.
Claims
1. A system for delay analysis based on SCL criteria and contract anchor technique, characterized in that, include: The data acquisition module is used to acquire project plan data and responsibility event data through the structured semantic model embedded in the plan carrier; The SCL criterion-based engineering implementation negative feedback EOT engine is used to calculate the net impact EOT of dominant responsibility events based on the CPM network model and SCL criterion, using the expected impact analysis method. It also makes intelligent allocation judgments based on the responsibility attribution: when the responsibility event is the responsibility of Party A, if Party A approves the extension, the current contract period will be adjusted; when the responsibility event is not the responsibility of Party A, the period will not be extended and the current contract period will not be adjusted. The cloud report generation module is used to output a "Cloud Report on Project Delay Analysis" that includes EOT negative feedback signals; Regardless of whether the schedule is postponed or not, the system synchronously outputs schedule health indicators, forming a negative feedback mechanism for the schedule governance system with EOT as its core. This mechanism guides the responsible parties to prevent themselves from incurring responsibility for schedule delays at the source.
2. The delay analysis system of claim 1, wherein, The structured semantic model requires setting the task name of the corresponding row in the Work Breakdown Structure (WBS) of the updated plan to "plan" and the task name of the corresponding row in the Work Breakdown Structure (WBS) of the expected impact plan to "exp", and inserting a responsibility event sub-network template. The responsibility event sub-network is jointly developed by Party A and Party B, written using network planning technology that is isomorphic to the schedule plan, and completes the logical connection with the updated plan to form the expected impact plan, which is used to define the dominant responsibility events. "sube" represents the end position of the responsibility event sub-network, and "sub" represents the length of the responsibility event sub-network.
3. The delay analysis system of claim 1, wherein, The core calculation model of the SCL criterion engineering implementation negative feedback EOT engine is: EOT=max(min(exp-plan, exp-cur), min(sube-cur,sub), 0); where exp is the expected impact on the planned duration, cur is the current contract duration, plan is the updated planned duration, sube is the end position of the responsibility event sub-network, and sub is the length of the responsibility event sub-network.
4. The delay analysis system of claim 1, wherein, The current contract duration is manually entered, and the system does not read the original contract duration file or perform automatic adjustment actions.
5. The delay analysis system of claim 1, wherein, The system works in conjunction with the CCL job completeness review module to perform completeness reviews of planned jobs at the source.
6. The delay analysis system of claim 1, wherein, The system works in conjunction with the RSH evaluation engine to calculate project health indicators, guiding responsible parties to pursue zero defects.
7. The delay analysis system of claim 1, wherein, The system deletes all input data immediately after analysis, without retaining any original customer information.
8. A method for analyzing project delays based on the SCL criterion and contract anchoring technology, characterized in that, Includes the following steps: Project plan data and responsibility event data are obtained by embedding a structured semantic model into the plan carrier; Based on the CPM network model and SCL criterion, the expected impact analysis method is used to calculate the net impact (EOT) of the responsible events for the dominant responsible events, and intelligent routing is determined according to the responsibility attribution: when the responsible event is the responsibility of Party A, if Party A approves the extension, the current contract period will be adjusted; when the responsible event is not the responsibility of Party A, the project period will not be extended and the current contract period will not be adjusted. Output a "Cloud Report on Project Delay Analysis" that includes EOT negative feedback signals; Regardless of whether the schedule is postponed or not, the schedule health index is output simultaneously, forming a negative feedback mechanism for the schedule governance system with EOT as its core. This mechanism guides the responsible parties to prevent themselves from incurring responsibility for schedule delays at the source.
9. The method for analyzing project delays according to claim 8, characterized in that, Before calculating the net impact of the liability event (EOT), the following is also included: The responsibility event sub-network is written using network planning technology that is isomorphic to the schedule plan, and logically connected with the update plan to form the expected impact plan; the responsibility event sub-network is jointly discussed and compiled by Party A and Party B or each governance responsible party, and is used to define the dominant responsibility events.