Future-oriented cross-sectional interactive collaboration methods, systems, electronic devices, and storage media for main and distribution networks

By unifying multi-source data with timestamps as the benchmark, a future power grid section integrating main and distribution networks across the entire domain is generated, and a cross-system collaborative mechanism is established. This solves the problems of data silos and collaboration in the future simulation and safety verification of main and distribution networks, and achieves efficient and traceable simulation and risk prediction, thereby enhancing the feasibility of engineering implementation.

CN123121501APending Publication Date: 2026-11-17NARI TECH CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611303202.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-26
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing technologies cannot achieve refined scheduling for future simulation and security verification of main and distribution networks. They suffer from data silos, lack of access and alignment capabilities for multi-source heterogeneous data, lack of standardized control mechanisms for long-term time-series sections, lack of standardized collaborative interaction mechanisms for main and distribution networks, and fragmented security verification capabilities, resulting in low simulation accuracy, poor collaboration, and weak engineering applicability.

Method used

By unifying multi-source data with preset timestamps as a benchmark, data alignment is achieved, generating a future power grid section integrating main and distribution across the entire domain, establishing a cross-system collaborative mechanism, adopting globally unique identifier binding relationships, constructing a software and hardware integrated closed-loop system, and supporting full-time batch security verification.

Benefits of technology

It achieves data fusion between main and distribution networks, improves simulation collaboration efficiency, supports full-time cross-section traceability and control, accurately predicts risks, enhances project feasibility, and meets the 48-hour long-time integrated simulation requirements of provincial power grids.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123121501A_ABST
    Figure CN123121501A_ABST
Patent Text Reader

Abstract

This invention discloses a method, system, electronic device, and storage medium for interactive collaboration of future-state cross-sections in a main distribution network. The method includes: obtaining multi-source data; calling a future-state cross-section generation service scheduling service to cyclically execute a preset number of independent time-series cross-section calculation tasks; performing distributed state estimation of the distribution network based on the multi-source data, supplementing missing data for distribution networks without predictive measurement devices, associating main network Proto boundary cross-section data with the complete distribution network topology through a global device ID, generating a single-time-series, full-domain integrated main and distribution future power grid cross-section, and automatically overwriting historical data using cross-sections with the same timestamp; synchronously writing the single-time-series, full-domain integrated main and distribution future power grid cross-section into a local Proto file and a CASEVIEW case library, where the case library management platform automatically generates the corresponding time-series main network model_id and distribution network model_id, and establishing a one-to-one binding relationship between the two unique identifiers through a global model_id mapping table.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to a main distribution network control method, and in particular to a future-state cross-sectional interactive coordination method, system, electronic device, and storage medium for the main distribution network. Background Technology

[0002] With the continuous advancement of the construction of new power systems, the power grid dispatching and operation mode is undergoing a refined transformation from traditional real-time monitoring and post-event handling to pre-event simulation and risk prediction. Provincial power grid dispatching operations urgently need to rely on future-state power grid sections to complete core tasks such as simulating the power grid operation conditions over a long time series of the next 48 hours, coordinating equipment maintenance verification, predicting load fluctuation risks, and optimizing pre-dispatch methods. This places extremely high demands on the completeness, timeliness, coordination, and accuracy of future-state power grid simulation.

[0003] Currently, traditional main and distribution network future state simulation and security verification technologies have many core technical bottlenecks, making it difficult to meet the needs of refined scheduling services. The specific shortcomings are as follows:

[0004] First, the problem of data silos in the main and distribution network systems is prominent. The existing main network EMS simulation system and distribution network DMS simulation system are independent of each other, with a fragmented architecture and no standardized automated data exchange channel. The main network only outputs cross-sectional data of 220kV and above high-voltage power grids, lacking the underlying topology and measurement information of the 10kV distribution network; the distribution network only conducts its own load forecasting simulation independently, and cannot synchronously link with the high-voltage boundary time-series operating conditions of the main network. The splicing of main and distribution cross-sections relies entirely on manual import and verification, which is prone to problems such as timing misalignment, equipment ID mismatch, and data inconsistency, resulting in extremely low simulation accuracy.

[0005] Second, there is a lack of capability for accessing and aligning multi-source heterogeneous data. The three core data categories—distribution transformer load forecasting, power grid maintenance plans, and main grid boundary sections—are distributed among the commercial databases of the control cloud, the three power security zones, and the main grid file server, respectively. Their data storage partitions, storage formats, time-series standards, and table structures are completely inconsistent. Traditional technologies lack automated data parsing, time-series alignment, and validity verification mechanisms. Massive amounts of 48-hour long-time-series data are prone to missing, duplicate, and corrupted data, making it impossible to support fully automated time-series simulations.

[0006] Third, there is a lack of standardized management and control mechanisms for long-term time-series cross-sections. Traditional solutions rely solely on local file storage for single-point-of-time cross-section data, lacking globally unique identifiers, automatic overwriting, expiration cleanup, and batch maintenance mechanisms. This makes it impossible to achieve batch querying, downloading, backtracking, and visualization of 192 consecutive time-series cross-sections over 48 hours, resulting in extremely poor traceability and controllability of the time-series cross-sections.

[0007] Fourth, there is no standardized collaborative interaction mechanism between the main network and the distribution network. The calculation processes of the main network and the distribution network sections are independent of each other, there is no request-response service communication link, the main network cannot automatically trigger the distribution network synchronous simulation, the distribution network cannot actively subscribe to the main network time-series boundary data, there is no unique identifier mapping relationship for the sections, and the cross-system collaborative simulation is completely disconnected.

[0008] Fifth, the safety verification capability is fragmented. Existing technologies only support power flow calculation and simple safety verification for a single point in time. They cannot perform continuous N-1 / NM fault analysis, risk tracing, weak section location and graded early warning by traversing the entire 48-hour time series sections in batches, and cannot achieve long-term normalized risk prediction.

[0009] Sixth, there is insufficient support for project implementation. Existing related technologies only remain at the functional algorithm level, without supporting electronic equipment and computer storage media solutions adapted to project deployment. This makes it impossible to form an integrated hardware and software closed-loop system, resulting in poor versatility and stability in implementation.

[0010] In summary, existing technologies cannot meet the requirements of provincial power grids for 48-hour long-sequence, integrated main and distribution, fully automated, traceable, and high-precision future state simulation and safety verification. There is an urgent need for a systematic, standardized, and implementable integrated hardware and software solution. Summary of the Invention

[0011] Purpose of the invention: The purpose of this invention is to provide a method, system, electronic device, and computer-readable storage medium for interactive and collaborative future-state cross-sections of main and distribution networks.

[0012] Technical solution: The present invention provides a future-state cross-section interactive coordination method for main and distribution networks, comprising:

[0013] (1) Obtain distribution transformer load forecast data, three-zone commercial warehouse maintenance plan data, and main grid Proto boundary section data, and use the preset timestamp as the global time series reference to obtain multi-source data;

[0014] (2) Use the main network future section service program EmsFutureCase Service to issue a batch of full-time collaborative calculation requests with a preset duration. After receiving the full-time collaborative calculation requests with a preset duration using the distribution network future section service program DmsFutureCase Service, call the future section generation service FutureDmsrtnet scheduling service to execute a preset number of independent time-series section calculation tasks in a loop.

[0015] (3) Perform distributed state estimation of distribution network based on multi-source data, complete the missing data of distribution network without predictive measurement equipment, associate the main network Proto boundary section data with the complete distribution network topology through global device ID, generate a single time series full domain main and distribution integrated future power grid section, and automatically cover historical data using sections with the same timestamp;

[0016] (4) The future grid section of the main and distribution network is synchronously written into the local Proto file and the CASEVIEW case library. The case library management platform automatically generates the main grid model_id and distribution network model_id corresponding to the time series. The one-to-one binding relationship between the two unique identifiers, main grid model_id and distribution network model_id, is established through the global model_id mapping relationship table.

[0017] Preferably, after step (4), the following steps are also included:

[0018] (5) The main network carries the target time series main network model_id to initiate a section saving request or section reading request. The distribution network matches the corresponding distribution network model_id through the global model_id mapping relationship table, retrieves the target section and writes it to the real-time library under the future application. After completing the data interaction, the distribution network returns a standardized response message to the main network.

[0019] Preferably, after step (5), the following steps are also included:

[0020] (6) Lightweight pas_wlt future state applications batch load time segment to the real-time library under the future state application, and realize free switching of time segments through the graphical browser;

[0021] Preferably, after step (6), the following steps are also included:

[0022] (7) Complete power flow calculation and N-1 / NM security analysis by traversing independent time-series sections one by one, identify various power grid over-limit and weak sections, divide multi-level early warning according to the preset over-limit amplitude and risk duration, and automatically generate a full-time security verification report and risk source analysis results including risk identification objects and risk levels.

[0023] Prior to this, the distribution transformer load forecast data includes the globally unique identifier (ID) of the distribution transformer equipment, the date to which the forecast data belongs, the time sequence timestamp, the active power forecast of the distribution transformer, and the reactive power forecast of the distribution transformer.

[0024] The maintenance plan data for the commercial warehouse in Zone 3 includes the maintenance equipment ID, maintenance start time, maintenance end time, equipment energization indicator, and maintenance status.

[0025] The mainnet Proto boundary profile data includes the NasBusResult bus structure, NasLoadResult load structure, NasBusResult storage device ID, NasBusResult storage device electrical island number, NasBusResult storage device topology node number, NasBusResult storage device bus voltage, NasBusResult storage device voltage phase angle field, NasLoadResult storage device ID, NasLoadResult storage device electrical island number, NasLoadResult storage device topology node number, NasLoadResult storage device active power load, NasLoadResult storage device reactive power load, and NasLoadResult storage device load current field.

[0026] Prior to step (4), the independent time series section is identified globally by a 15-minute timestamp. Before the independent time series section is written, if there is a historical section with the same timestamp, the independent time series section is used to replace the historical section.

[0027] Prior to step 7, the risk identification objects include distribution lines, transmission lines, main transformers, busbars, and regional transmission sections, and the risk levels are classified as general risk, important risk, and emergency risk.

[0028] The present invention provides a future-state cross-section interactive coordination method system for main and distribution networks, comprising:

[0029] The multi-source data access module is used to acquire distribution transformer load forecast data, three-zone commercial warehouse maintenance plan data, and main grid Proto boundary section data, and uses a preset timestamp as the global time series reference to obtain multi-source data;

[0030] The main network and distribution network collaborative section service cluster module is used to use the main network future section service program EmsFutureCaseService to issue batch full-time-series collaborative calculation requests of preset duration, and use the distribution network future section service program DmsFutureCaseService to receive the full-time-series collaborative calculation requests of preset duration, and call the future section generation service FutureDmsrtnet scheduling service to execute a preset number of independent time-series section calculation tasks in a loop.

[0031] Simultaneously, the time-stamped section automatic overlay module is used to perform distributed state estimation of the distribution network based on multi-source data, complete the missing data of the distribution network without predictive measurement devices, associate the main network Proto boundary section data with the complete distribution network topology through global device ID, generate a single time-series full-domain main and distribution integrated future power grid section, and automatically overlay historical data using the same timestamp section.

[0032] The unique identifier binding module is used to synchronously write the future grid section of the main and distribution networks in a single time series into the local Proto file and the CASEVIEW case library. The case library management platform automatically generates the main grid model_id and distribution network model_id for the corresponding time series, and establishes a one-to-one binding relationship between the two types of unique identifiers, the main grid model_id and the distribution network model_id, through a global model_id mapping relationship table.

[0033] An electronic device according to the present invention includes a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the program to implement the steps of any of the methods described herein.

[0034] The present invention provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of any of the methods described herein.

[0035] Beneficial Effects: Compared with existing technologies, this invention has the following significant advantages: 1. Breaking down data silos between main and distribution networks and achieving multi-source data fusion. This invention standardizes and integrates multi-source heterogeneous data from control cloud load forecasting, three-zone maintenance plans, and main grid boundary sections, unifying 15-minute time series benchmarks for automatic alignment, supplementing missing distribution network measurements based on state estimation, and splicing together to form a unified main and distribution network section, completely solving the industry pain points of low efficiency, time series misalignment, and data distortion caused by manual splicing. 2. Constructing a standardized cross-system collaborative mechanism with a high degree of automation. Based on a custom Proto communication protocol, a two-way request-response link between main and distribution networks is built. Time series sections are bound one-to-one through a global model_id mapping table, supporting automatic collaborative simulation and accurate data interaction between main and distribution networks without manual intervention, significantly improving simulation collaboration efficiency. 3. Achieving standardized full lifecycle management of long time series sections. The system innovatively adopts a dual-mode storage approach combining local files and the CASEVIEW platform, supporting automatic section overwriting, expired data cleanup, batch querying, and downloading. 192 time-series sections are traceable, controllable, and retrospective, resolving the issues of chaotic management and resource redundancy inherent in traditional time-series section management. 4. Full-time-series batch security verification enables proactive risk prediction. It can automatically complete 48-hour full-time-series section power flow calculations, N-1 / NM security analysis, limit violation identification, and risk classification and early warning. It accurately locates weak equipment and sections in the power grid, predicting operational risks arising from load fluctuations and equipment maintenance, supporting pre-schedule optimization decisions. 5. Compliant with power safety architecture, ensuring strong engineering feasibility. It strictly adheres to power safety zoning standards, achieving compliant data transmission across three zones for zone-one calculations, with end-to-end data verification ensuring information security. Simultaneously, it is equipped with dedicated electronic equipment and storage media, forming an integrated hardware and software closed-loop solution, adaptable to deployment on various levels of control cloud platforms. Attached Figure Description

[0036] Figure 1This is a schematic diagram of the system architecture of the present invention;

[0037] Figure 2 This is a flowchart of the 48-hour time series profile generation, dual-mode storage, and model_id binding process of the present invention. Detailed Implementation

[0038] like Figure 1 As shown, this invention proposes a future-state cross-section interactive and collaborative method for main and distribution networks, comprising a distribution transformer load prediction subunit, a maintenance plan reading subunit, and a main grid boundary section analysis subunit. The distribution transformer load prediction subunit is used to connect to the provincial dispatching and control cloud prediction data table, parse the unique identifier of the distribution transformer equipment, the prediction date, and the time-series load value every 15 minutes, and extract the 48-hour 96-point distribution transformer time-series predicted power. The maintenance plan reading subunit is used to read the maintenance plan data from the commercial database of the three power zones, extract the maintenance equipment ID, maintenance start and end time, equipment energization flag, and maintenance status, and generate a time-series topology shielding list. The main grid boundary section analysis subunit is used to parse the main grid NasCaseInfo standard Proto file, and extract the bus voltage, phase angle, and active, reactive, and current boundary measurements of the load.

[0039] The main-distribution collaborative section service cluster includes the EmsFutureCase main network service program, the DmsFutureCase distribution network service program, and the FutureDmsrtnet future state estimation and scheduling service. It is used to coordinate and schedule 192 time-series section computing tasks over 48 hours with a time-series step of 15 minutes, so as to realize the triggering and task control of main-distribution collaborative computing.

[0040] It receives multi-source time-series data, completes missing measurements in the distribution network, and splices the high-voltage boundary data of the main network with the distribution network topology using the device ID as the association key to generate a single-time-series complete main and distribution integrated future section. It automatically overwrites the original section data for repeated calculation tasks at the same timestamp.

[0041] It integrates Proto local files and CASEVIEW case management platform dual storage channels, automatically assigns globally unique model_id to time-series sections of the main network and distribution network, and supports section condition query, data integrity verification, automatic cleanup of expired sections, and batch download of all time-series sections to the real-time library.

[0042] Based on the ServiceRtnetToDms standardized Proto communication protocol, it realizes bidirectional request and response interaction between the main network and the distribution network. It has a built-in global model_id mapping table. The main network completes the section saving and reading requests by carrying its own model_id. The distribution network accurately matches the corresponding distribution network model_id through the global model_id mapping table, realizing accurate reading and writing and data synchronization of cross-system sections.

[0043] This is a standalone, lightweight pas_wlt application used to batch retrieve 48-hour full-time-series cross-sections from the CASEVIEW platform, download them to a dedicated real-time library, and visualize the power grid operating conditions at any time-series node through a power grid single-line diagram browser.

[0044] Batch traversal of 192 time-series main and distribution integrated sections over 48 hours, sequentially performing full network power flow calculation, N-1 / NM static safety verification, automatic screening of anticipated faults, identification of overload and voltage limit exceedance of lines / main transformers / buses / transmission sections, location of weak nodes in the power grid, risk classification marking, automatic generation of verification reports, and risk time-series source tracing analysis.

[0045] The ServiceRtnetToDms communication protocol includes RequestMsg request messages and AnswerMsg response messages. The RequestMsg request message includes the scene name, time sequence number, read / write type, calculation type, model identification number (model_id), and global request ID fields. The AnswerMsg request message includes the response matching ID, task execution success identifier, and exception failure reason text fields.

[0046] The maintenance plan data is stored in the commercial database of the third power safety zone, the system computing service is deployed in the first power safety zone, and a cross-zone security data pass-through interface is built-in to realize compliant reading of data across security zones. The cross-section calculation results are uniformly stored in local files in the first zone and on the CASEVIEW platform.

[0047] In this embodiment, the new generation dispatch and monitoring system for prefecture-level cities is deployed and implemented throughout the entire process. The specific implementation steps are as follows:

[0048] Step 1: The system is deployed on the new generation dispatch and monitoring system of the city. The main network EMS server deploys the EmsFutureCaseService collaborative service, the distribution network DMS server deploys the DmsFutureCase Service and FutureDmsrtnet status estimation dispatch service, and the independent workstation deploys the lightweight pas_wlt visualization application. The backend is connected to the CASEVIEW unified case management platform, the power three-zone maintenance database, and the control cloud load prediction database.

[0049] Step 2: During system operation, the multi-source data access module periodically polls and collects data: it reads 48-hour, 96-point, 15-minute granular transformer load forecast data from the control cloud forecast data table; it automatically synchronizes the maintenance plan ledger from the three-zone commercial database, extracts maintenance equipment information and time-series parameters, and generates a topology shielding list; it batch parses the NasCaseInfoProto files output from the main network to extract high-voltage bus and load boundary time-series measurement data. All data is preprocessed with time-series alignment using a 15-minute timestamp.

[0050] Step 3: The primary and distribution network collaborative service cluster initiates full-time task scheduling, executing 192 independent computation tasks in a loop. It completes missing measurements in the distribution network through future state estimation, associates primary and distribution network topology and boundary data based on device IDs, and generates a complete integrated time-series profile of the primary and distribution network. Simultaneously, the timestamp profile automatically overwrites historical data. After profile generation, it is synchronously written to the local Proto file and the CASEVIEW platform, automatically generating unique model_ids for the primary and distribution networks and establishing mapping and binding relationships.

[0051] Step 4: The main and distribution bidirectional communication modules complete cross-system data interaction based on a custom Proto protocol. The main network accurately retrieves the corresponding time-series distribution network section through model_id, completing real-time database writing and data response. The pas_wlt application batch loads all time-series sections, realizing the visualization of any time-series power grid operating conditions over 48 hours through a single-line diagram, marking out-of-limit and power-loss equipment. The system batch traverses all time-series sections, completing power flow calculation and N-1 / NM safety analysis, risk identification and graded early warning, and automatically outputting standardized safety verification reports. Among them, power flow calculation and N-1 / NM safety analysis include: sequentially disconnecting individual components in the system (lines, transformers, buses, etc.) and verifying whether the power grid exceeds limits after a fault / NM (sequentially disconnecting M components, multiple fault scanning, belonging to the mature static safety verification general process).

[0052] The main network implements bidirectional communication interaction. This invention uses a custom ServiceRtnetToDms communication protocol, which includes two core message types: RequestMsg and AnswerMsg. It also defines two identifier fields: read / write type and calculation type. Read / write type 1 is for section saving tasks, and read / write type 2 is for section reading tasks; calculation type 1 is for state estimation calculation, and calculation type 2 is for pure power flow calculation. When the main network initiates a collaborative calculation or section reading request, it carries a globally unique model_id and a timing identifier. The distribution network accurately matches the corresponding section through a global model_id mapping table. After completing the read / write operation, it returns a response message containing the execution status and the reason for any exceptions, ensuring accurate, stable, and traceable cross-system communication.

[0053] The invention implements a cross-section storage and automatic update mechanism. It uses a precise 15-minute timestamp as the globally unique identifier for time-series cross-sections. Before cross-section generation, it automatically searches the local file directory and the CASEVIEW platform database to verify the existence of historical cross-sections with the same timestamp. If a cross-section exists, it is automatically overwritten, avoiding data redundancy and timing conflicts. Simultaneously, the CASEVIEW platform is configured with a timed cleanup strategy to automatically delete expired cross-section data, freeing up server storage resources and ensuring long-term stable system operation.

[0054] The system described in the third aspect of this invention refers to a distribution automation master station system. The system includes a CPU processor, large-capacity memory, a hard disk storage device, and a network communication module. The hard disk storage device stores the complete set of program code for timing simulation, data interaction, and security verification of this invention. The CPU processor loads the program and executes the entire calculation task. The network communication module enables cross-network compliant data interaction with the main network, distribution network, control cloud, and the three-zone database. The equipment is deployed in the provincial control zone 1 computer room, independently completing a 48-hour long-time-series integrated simulation and risk verification task. It can directly read and run the program, automatically completing the entire process of multi-source data access, timing profile generation, cross-system interaction, visualization display, and batch security verification. It is convenient to deploy and highly versatile.

[0055] In step 5, the message read / write type identifier 1 corresponds to the section saving task, and the read / write type identifier 2 corresponds to the section reading task; the calculation type identifier 1 corresponds to the state estimation calculation task, and the calculation type identifier 2 corresponds to the pure power flow calculation task.

[0056] In step 7, the risk identification objects include distribution lines, transmission lines, main transformers, busbars, and regional transmission sections. The risk levels are divided into general risk, important risk, and emergency risk. Emergency risk: The out-of-limit amplitude exceeds 120% of the equipment's rated limit or the risk duration is ≥45 minutes. Important risk: The out-of-limit amplitude is within 110%-120% of the equipment's rated limit and the risk duration is between 15 minutes and 45 minutes. General risk: The out-of-limit amplitude is within 100%-110% of the equipment's rated limit or the risk duration is less than 15 minutes.

[0057] To enable those skilled in the art to clearly understand the meaning and composition parameters of the input data source in this application, the key input data terms appearing in this application are defined as follows:

[0058] (1) Distribution transformer load forecast data

[0059] The distribution transformer load forecast data is the time-series forecast result of the distribution transformer for future periods output by the provincial control cloud platform. It is stored in the control cloud forecast data table and is one of the multi-source input data of this invention. This data focuses on a single distribution transformer, outputting predicted power in a fixed 15-minute time step to extrapolate future distribution network load levels, providing distribution network-side load input for the generation of future power grid sections. The distribution transformer load forecast data includes the following core parameter fields:

[0060] transformer__id: The globally unique identifier ID of the distribution transformer, a unified device code across the entire network, with a string data type. An example value is PD-TB-JS-NJ-001234.

[0061] forecast_date: The date to which the forecast data belongs. The data type is date. An example value is 2026-08-22.

[0062] time_stamp: Time-series timestamp, using a 15-minute time step, data type is timestamp, example values ​​are 2026-08-22T00:00:00 and 2026-08-22T00:15:00;

[0063] p_fore: Predicted active power of the distribution transformer, in kW, data type is floating point, example value is 245.6;

[0064] q_fore: Predicted reactive power of the distribution transformer, in kvar, data type is floating point, example value is 78.2.

[0065] For a simulation duration of 48 hours, calculated at 15-minute time steps, a single distribution transformer outputs predicted data for 192 time points. For example, distribution transformer PD-TB-JS-NJ-001234, at timestamp 2026-08-22T08:00:00, has a predicted active power of 320.5kW and a predicted reactive power of 95.3kvar; at the next time point 2026-08-22T08:15:00, the predicted active power is 335.2kW and the predicted reactive power is 102.1kvar. After reading the forecast data table from the control cloud, the system uses `transformer__id` as the association key to assign the predicted power to the corresponding distribution transformer in the distribution network model, serving as the load input condition for future simulation.

[0066] (2) Mainnet Proto boundary section data

[0067] The main grid Proto boundary section data is a standardized Protobuf binary NasCaseInfo file output by the main grid EMS system, providing the future state simulation boundary conditions for the main-distribution coupling high-voltage side in this invention. This file only outputs the electrical information of the main-distribution interaction boundary, not the complete grid model data of the main grid. It is used to limit the voltage, phase angle, and boundary injection power of the high-voltage side nodes of the distribution network, completing the electrical coupling splicing of the main and distribution networks. The NasCaseInfo file contains two main structures: the NasBusResult bus structure and the NasLoadResult load structure.

[0068] NasBusResult (bus structure, main network boundary bus parameters) includes:

[0069] bus_id: A globally unique device ID for the main network bus, with a string data type. An example value is WM-BUS-NJ-110-0567.

[0070] elec_island_no: Electric island number, data type is integer, example value is 1;

[0071] topo_node_id: Topology node number, data type is integer, example value is 10086;

[0072] u_pu: Per-unit value of bus voltage, data type is floating point, example value is 1.023;

[0073] u_phase: Voltage phase angle, in degrees (°), data type is floating point, example value is -8.62;

[0074] time_stamp: The time stamp corresponding to this section. The data type is timestamp. An example value is 2026-08-22T08:00:00.

[0075] NasLoadResult (boundary load structure, main grid boundary load parameters) includes:

[0076] load_id: Unique ID for boundary load, data type is string, example value is WM-LD-NJ-110-0567-LD01;

[0077] elec_island_no: Electric island number, data type is integer, example value is 1;

[0078] topo_node_id: Topology node number, associated and matched with the bus topo_node_id, data type is integer, example value is 10086;

[0079] p: Load active power, unit MW, data type is floating point, example value is 28.72;

[0080] q: Reactive power of load, unit Mvar, data type is floating point, example value is 8.45;

[0081] i: Load current, in amperes (A), data type is floating point, example value is 142.3;

[0082] time_stamp: The time stamp corresponding to this boundary measurement. The data type is timestamp, and the example value is 2026-08-22T08:00:00.

[0083] A 110kV main-distribution boundary bus WM-BUS-NJ-110-0567, timestamp 2026-08-22T08:00:00, has a voltage per unit of 1.023 and a voltage phase angle of -8.62°. It is connected to a boundary load WM-LD-NJ-110-0567-LD01, with 28.72MW active power, 8.45Mvar reactive power, and a current of 142.3A. A NasCaseInfoProto boundary file is generated every 15 minutes, resulting in 192 time-series Proto files output over a 48-hour simulation cycle. The future state estimation module reads the Proto files and, using the topology node number (topo_node_id), applies the main grid boundary voltage, phase angle, and boundary load injection to the high-voltage boundary node of the distribution network topology, completing the electrical boundary coupling of the main and distribution networks.

[0084] (3) Maintenance plan data for commercial warehouses in Zone 3

[0085] The maintenance plan data for Zone III commercial power grid is stored in the Zone III commercial power safety database. It stores future power grid maintenance work order information, with core parameters including the maintenance equipment ID, maintenance start time, maintenance end time, equipment energization flag, and maintenance status. The equipment energization flag (0) represents power outage maintenance, and (1) represents live-line work. The maintenance status indicates the work order issuance status. The system generates a time-series topology shielding list based on the maintenance plan and removes the corresponding equipment from the simulation topology within the power outage maintenance time window. For example: Maintenance equipment ID: PD-LINE-NJ-10-2345; Maintenance start and end times: 2026-08-22T09:00:00~2026-08-22T16:00:00; Energization flag: 0 (power outage maintenance); Maintenance status: Issued.

[0086] (4) Historical data

[0087] The historical data mentioned in this invention specifically refers to historical time-series cross-sectional data that has been calculated and persistently stored. This means it is a past time-series integrated main and distribution network future state cross-section that has been generated and saved in local Proto files or the CASEVIEW case management platform, distinct from external raw input data sources such as distribution transformer load forecasts, maintenance plans, and main grid Proto boundary cross-sections. Historical data consists of complete single-timestamp integrated main and distribution network simulation cross-sections that have already been calculated, used for same-timestamp comparison and overlay, batch downloading, and simulation reproduction.

Claims

1. A future-state cross-section interactive coordination method for main and distribution networks, characterized in that, include: (1) Obtain distribution transformer load forecast data, three-zone commercial warehouse maintenance plan data, and main grid Proto boundary section data, and use the preset timestamp as the global time series reference to obtain multi-source data; (2) Use the main network future section service program EmsFutureCase Service to issue a batch of full-time collaborative calculation requests with a preset duration. After receiving the full-time collaborative calculation requests with a preset duration using the distribution network future section service program DmsFutureCase Service, call the future section generation service FutureDmsrtnet scheduling service to execute a preset number of independent time-series section calculation tasks in a loop. (3) Perform distributed state estimation of distribution network based on multi-source data, complete the missing data of distribution network without predictive measurement equipment, associate the main network Proto boundary section data with the complete distribution network topology through global device ID, generate a single time series full domain main and distribution integrated future power grid section, and automatically cover historical data using sections with the same timestamp; (4) The future grid section of the main and distribution network is synchronously written into the local Proto file and the CASEVIEW case library. The case library management platform automatically generates the main grid model_id and distribution network model_id corresponding to the time series. The one-to-one binding relationship between the two unique identifiers, main grid model_id and distribution network model_id, is established through the global model_id mapping relationship table.

2. The future-state cross-section interactive coordination method for main and distribution networks according to claim 1, characterized in that, Following step (4), the following is also included: (5) The main network carries the target time series main network model_id to initiate a section saving request or section reading request. The distribution network matches the corresponding distribution network model_id through the global model_id mapping relationship table, retrieves the target section and writes it to the real-time library under the future application. After completing the data interaction, the distribution network returns a standardized response message to the main network.

3. The future-state cross-section interactive coordination method for main and distribution networks according to claim 2, characterized in that, Following step (5), the following is also included: (6) Lightweight pas_wlt future state applications batch load timing segments to the real-time library under the future state application, and realize free switching of timing through the graphical browser.

4. The future-state cross-section interactive coordination method for main and distribution networks according to claim 3, characterized in that, Following step (6), the following is also included: (7) Complete power flow calculation and N-1 / NM security analysis by traversing independent time-series sections one by one, identify various power grid over-limit and weak sections, divide multi-level early warning according to the preset over-limit amplitude and risk duration, and automatically generate a full-time security verification report and risk source analysis results including risk identification objects and risk levels.

5. The future-state cross-section interactive coordination method for main and distribution networks according to claim 1, characterized in that, The distribution transformer load forecast data includes the globally unique identifier (ID) of the distribution transformer equipment, the date to which the forecast data belongs, the time sequence timestamp, the active power forecast of the distribution transformer, and the reactive power forecast of the distribution transformer. The maintenance plan data for the commercial warehouse in Zone 3 includes the maintenance equipment ID, maintenance start time, maintenance end time, equipment energization indicator, and maintenance status. The mainnet Proto boundary profile data includes the NasBusResult bus structure, NasLoadResult load structure, NasBusResult storage device ID, NasBusResult storage device electrical island number, NasBusResult storage device topology node number, NasBusResult storage device bus voltage, NasBusResult storage device voltage phase angle field, NasLoadResult storage device ID, NasLoadResult storage device electrical island number, NasLoadResult storage device topology node number, NasLoadResult storage device active power load, NasLoadResult storage device reactive power load, and NasLoadResult storage device load current field.

6. The future-state cross-section interactive coordination method for main and distribution networks according to claim 1, characterized in that, In step (4), the independent time series section is identified globally by a 15-minute timestamp. Before the independent time series section is written, if there is a historical section with the same timestamp, the independent time series section is used to replace the historical section.

7. The future-state cross-section interactive coordination method for main and distribution networks according to claim 1, characterized in that, In step 7, the risk identification objects include distribution lines, transmission lines, main transformers, busbars, and regional transmission sections, and the risk levels are divided into general risk, important risk, and emergency risk.

8. A future-state cross-section interactive coordination method system for main and distribution networks, characterized in that, include: The multi-source data access module is used to acquire distribution transformer load forecast data, three-zone commercial warehouse maintenance plan data, and main grid Proto boundary section data, and uses a preset timestamp as the global time series reference to obtain multi-source data; The main network and distribution network collaborative section service cluster module is used to use the main network future section service program EmsFutureCaseService to issue batch full-time-series collaborative calculation requests of preset duration, and use the distribution network future section service program DmsFutureCaseService to receive the full-time-series collaborative calculation requests of preset duration, and call the future section generation service FutureDmsrtnet scheduling service to execute a preset number of independent time-series section calculation tasks in a loop. Simultaneously, the time-stamped section automatic overlay module is used to perform distributed state estimation of the distribution network based on multi-source data, complete the missing data of the distribution network without predictive measurement devices, associate the main network Proto boundary section data with the complete distribution network topology through global device ID, generate a single time-series full-domain main and distribution integrated future power grid section, and automatically overlay historical data using the same timestamp section. The unique identifier binding module is used to synchronously write the future grid section of the main and distribution networks in a single time series into the local Proto file and the CASEVIEW case library. The case library management platform automatically generates the main grid model_id and distribution network model_id for the corresponding time series, and establishes a one-to-one binding relationship between the two types of unique identifiers, the main grid model_id and the distribution network model_id, through a global model_id mapping relationship table.

9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and running on the processor, characterized in that, When the processor executes the program, it implements the steps of the method according to any one of claims 1 to 8.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that, When executed by a processor, the computer program implements the steps of the method according to any one of claims 1 to 8.