Electricity consumption forecasting devices, operating machinery, electricity consumption forecasting systems, electricity consumption forecasting methods and procedures
By predicting the power consumption of the machine's battery using a power consumption prediction device and charging it at the optimal time, the problem of battery degradation is solved, and the efficient use and life extension of the battery are achieved.
Patent Information
- Application Number
- CN202580029249.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2024-05-14
- Filing Date
- 2025-03-28
- Publication Date
- 2026-11-17
AI Technical Summary
In existing technologies, the batteries of operating machinery cannot be charged to the optimal level at the best time, leading to accelerated battery deterioration.
The power consumption prediction device predicts the power consumption of the battery based on the work plan and charges it at the optimal time. It includes a power consumption prediction unit, an output unit, and a plan acquisition unit, and outputs the predicted power consumption.
It effectively inhibits battery degradation, ensures that the battery is charged at the optimal time in the work plan, and extends battery life.
Smart Images

Figure CN123125611A_ABST
Abstract
Description
Technical Field
[0001] This disclosure relates to power consumption prediction devices, operating machinery, power consumption prediction systems, power consumption prediction methods, and procedures.
[0002] This application claims priority to Japanese Patent Application No. 2024-078746, filed on May 14, 2024, the contents of which are incorporated herein by reference. Background Technology
[0003] In recent years, operational machinery equipped with batteries and powered by these batteries has become increasingly common. These batteries are charged periodically. Therefore, technologies to prompt users to charge their vehicles have been proposed. For example, a known charging control method involves calculating a one-day estimated consumption based on the vehicle's historical battery consumption data, setting a recommended charging threshold based on this estimated consumption, a lower limit of remaining capacity, and the battery's surplus capacity, and issuing a notification to prompt charging when the battery's remaining capacity falls below the recommended charging threshold (for example, see Patent Document 1 below).
[0004] Existing technical documents
[0005] Patent documents
[0006] Patent Document 1: Japanese Patent No. 7198851 Summary of the Invention
[0007] The problem that the invention aims to solve
[0008] However, in the existing technology, it is sometimes impossible to charge the battery of the operating machinery to the optimal amount of power at the best time, which may sometimes lead to accelerated battery deterioration.
[0009] The purpose of this disclosure is to provide a power consumption prediction device, a working machine, a power consumption prediction system, a power consumption prediction method, and a program that can suppress the deterioration of the battery in a working machine.
[0010] Methods for solving problems
[0011] According to a first aspect of this disclosure, the power consumption prediction device comprises: a planning acquisition unit that acquires a work plan, the work plan including the work content to be performed by a work machine equipped with a battery and the work time for performing the work content; a power consumption prediction unit that predicts the power consumption of the battery in the work plan based on the work plan acquired by the planning acquisition unit; and an output unit that outputs the power consumption predicted by the power consumption prediction unit.
[0012] Invention Effects
[0013] The above method can suppress the deterioration of the batteries in the operating machinery. Attached Figure Description
[0014] Figure 1 This is a diagram illustrating an example of the network structure of a power consumption prediction system implemented in this way.
[0015] Figure 2 This is a block diagram illustrating an example of the structure of a machine.
[0016] Figure 3 It is a block diagram representing the hardware structure of the computer devices in the power consumption prediction server, operating machinery (ECU), and management terminal.
[0017] Figure 4A This is a diagram representing an example of a job plan stored in the job plan database.
[0018] Figure 4B This is a diagram representing an example of a power consumption list stored in a power consumption list DB.
[0019] Figure 5 This is a diagram illustrating an example of the functional structure of a power consumption prediction system.
[0020] Figure 6A This is a flowchart illustrating the power consumption prediction method performed by the power consumption prediction server.
[0021] Figure 6B This is a flowchart representing the alternative discrimination process performed by the power consumption prediction server.
[0022] Figure 7 This is a flowchart illustrating the charging control method performed by the operating machinery.
[0023] Figure 8 This is a flowchart indicating whether the operating machinery needs charging.
[0024] Figure 9 This is a flowchart representing the charging prediction time calculation process performed by the operating machinery. Detailed Implementation
[0025] <Implementation Method>
[0026] Electricity Consumption Prediction System 1
[0027] Figure 1 This is a diagram illustrating an example of the network structure of a power consumption prediction system implemented in this way. (See diagram for example.) Figure 1As shown, the power consumption prediction system 1 includes a power consumption prediction server 100, multiple operating machines 110, a charger 111, and a management terminal 120. The power consumption prediction system 1 is deployed to work sites where operating machines 110, such as construction sites and quarries, are operating. The power consumption prediction system 1 predicts the power consumption of the batteries carried by the operating machines 110.
[0028] exist Figure 1 In the power consumption prediction system 1 shown, the power consumption prediction server 100, multiple operating machines 110, and the management terminal 120 are connected in a communicable manner via a network 140. It should be noted that the charger 111 can also be connected to each device in a communicable manner via the network 140. Each device is a computer device equipped with a CPU (Central Processing Unit), ROM (Read Only Memory), RAM (Random Access Memory), communication unit, etc.
[0029] The power consumption prediction server 100 is an example of a power consumption prediction device. The power consumption prediction server 100 predicts the power consumption corresponding to the work content of each machine 110. Specifically, the power consumption prediction server 100 has a work plan DB (database) 101 and a power consumption list DB 102. The work plan DB 101 stores the work plan containing each work content of each machine 110. The power consumption list DB 102 stores a list of power consumption (power consumption per unit time) consumed in each work content of each machine 110. Based on the information stored in the work plan DB 101 and the power consumption list DB 102, the power consumption prediction server 100 predicts the power consumption in the work plan of each machine 110.
[0030] Operating machinery 110 includes, for example, various heavy machinery such as hydraulic excavators, bulldozers, dump trucks, and wheel loaders. Operating machinery 110 is equipped with battery 203 (…). Figure 2 The battery 203 is used as a storage battery. The working machine 110 uses the power stored in the battery 203 to carry out its work. The working machine 110 is used according to the work plan.
[0031] Charger 111 is installed in a designated standby location for the machine 110. When the machine 110 is in standby mode, charger 111 is periodically connected to battery 203 to charge battery 203.
[0032] The management terminal 120 is a terminal device used by managers for on-site supervision and other operations. The management terminal 120 is a computer device such as a personal computer equipped with a display. The management terminal 120 is, for example, deployed in an office at the work site. It should be noted that the management terminal 120 can also be a mobile terminal device such as a smartphone or tablet.
[0033] "Operating Machinery 110"
[0034] Figure 2 This is a block diagram illustrating an example of the structure of the operating machinery 110. For example... Figure 2 As shown, the work machine 110 includes a vehicle body ECU (Electronic Control Unit) (201), an on-board monitor 202, a battery 203, a DC / DC converter 204a, an inverter 204b, a work device motor 205, and a travel body motor 206.
[0035] The vehicle body ECU 201 controls the actions of the various parts 202 to 207 of the working machinery 110 by reading and executing the prescribed program.
[0036] The vehicle-mounted monitor 202 displays various information under the control of the vehicle's ECU 201. This information includes battery 203 status information such as remaining charge and usage status, as well as the work plan for the operating machinery 110. The vehicle-mounted monitor 202 is a touch panel-type display that receives input from the operator.
[0037] Battery 203 is a rechargeable battery. Battery 203 uses stored power to operate the working device motor 205 and the driving body motor 206. Battery 203 is used within an appropriate charge range. For example, from the viewpoint of preventing degradation, battery 203 stores power in a manner that maintains a lower limit (e.g., 20%) of charge reserve even when the power is depleted, and an upper limit (e.g., 80%) of charge reserve even when the charge is at its maximum.
[0038] DC / DC converter 204a converts the DC current from charger 111 into the desired voltage and charges battery 203. Additionally, DC / DC converter 204a converts the DC current from battery 203 into the desired voltage and supplies it to the bus.
[0039] Inverter 204b converts the DC current flowing in the bus into AC current to drive the working device motor 205 and the traveling body motor 206.
[0040] The working device motor 205 is a motor that actuates a part of the working device of the working machine 110 (e.g., the bucket if it is a hydraulic excavator).
[0041] The traveling body motor 206 is a motor that actuates a traveling body. The traveling body may include tires or tracks. The traveling body motor 206 is, for example, a motor that actuates tires or tracks.
[0042] Functional Structure of Various Computer Devices
[0043] Figure 3 This is a block diagram showing the hardware structure of the computer device of the various devices in the power consumption prediction system 1. The computer 300 is installed in the power consumption prediction server 100, the working machinery 110 (vehicle ECU 201), the charger 111, and the management terminal 120.
[0044] Computer 300 includes processor 301, main memory 302, storage 303, and interface 304. Processor 301 reads various programs stored in storage 303, expands them in main memory 302, and executes them according to the program. Additionally, processor 301 secures storage areas in main memory 302 according to the program. Examples of processor 301 include CPU (Central Processing Unit), GPU (Graphics Processing Unit), and microprocessors.
[0045] Storage 303 may include, for example, a magnetic disk, an optical disk, an optical disc, or a semiconductor memory. Storage 303 may be an internal medium directly connected to the bus of computer 300, or an external medium connected to computer 300 via interface 304 or a communication line. Furthermore, when the program is distributed to computer 300 via a communication line, computer 300 receiving the distribution may also expand and execute the program in main memory 302.
[0046] If the device equipped with computer 300 is machine 110, charger 111, and manager terminal 120, then the input device and output device are connected to computer 300 via interface 304.
[0047] Input devices may include, for example, touch panels and operation buttons. In the case of the work machine 110, input devices may also include, for example, a camera and a GNSS (Global Navigation Satellite System) unit.
[0048] Output devices include, for example, a display and speakers. In the case of the administrator terminal 120, output devices may also include, for example, a printer.
[0049] Job plans stored in job plan DB101
[0050] Next, the job plan stored in the job plan DB101 will be explained. Additionally, the power consumption prediction server 100 uses the job plan DB101 as an example of a unit power consumption storage unit.
[0051] Figure 4A This is a diagram representing an example of a job plan stored in job plan DB101. For example... Figure 4A As shown, the work plan DB101 includes the following items: "Machine ID", "Machine Model", "Charger ID", "Battery Capacity (kWh)", "Charging Capacity (kW)", "Work Plan ID", "Work Content", "Work Start Time", "Work End Time", and "Work Time (h)". By inputting data into each item, the work plans 401 (401a, 401b, 401c) are stored as records.
[0052] "Operating Machinery ID" represents the identification information that identifies the operating machinery 110. For example, "Operating Machinery ID" is a unique number pre-assigned to the operating machinery 110, specifically, it is the vehicle number of the operating machinery 110.
[0053] "Model" indicates the category of the operating machinery 110 (hydraulic excavator, bulldozer, dump truck, etc.).
[0054] "Charger ID" represents identification information that identifies charger 111. For example, "Charger ID" is a unique number pre-assigned to charger 111; specifically, it is the model number of charger 111.
[0055] "Battery capacity (kWh)" indicates the maximum battery capacity of the battery 203 of the working machine 110. The "battery capacity" is predetermined for each model of the working machine 110.
[0056] "Balance of battery capacity (kWh)" indicates the remaining battery capacity of the battery 203 of the operating machine 110.
[0057] "Charging capacity (kW)" indicates the amount of charge per hour when battery 203 is charged via charger 111. The charging capacity of battery 203 is predetermined for each battery 203 of the working machine 110. The charging capacity of charger 111 is predetermined for each type of charger 111. "Charging capacity" is the lower of the charging capacity of charger 111 and the charging capacity of battery 203. That is, "charging capacity" varies depending on the combination of charger 111 and battery 203 of the working machine 110.
[0058] "Job Plan ID" indicates the identification information for job plan 401.
[0059] "Work content" indicates the category of work performed by the machine 110.
[0060] "Start time of the task" indicates the start time (year, month, day, and hour) of the task.
[0061] "End time of assignment" indicates the end time (year, month, day, and time) of the assignment.
[0062] "Assignment time" refers to the time elapsed between the start and end times of the assignment.
[0063] The work plan 401 is generated by inputting various information into the manager terminal 120. For example, when generating the work plan 401, the manager determines the tasks to be performed and the task time for each machine 110. Alternatively, the task time can be calculated for each machine 110 based on the workload of the task to be performed and the number of machines 110. Figure 4A The battery capacity and charging capability recorded in the work plan 401 are predetermined based on the model of the machine 110 and the type of charger 111. Therefore, the manager inputs a combination of items such as "Machine ID," "Charger ID," "Work Content," "Work Start Time," and "Work End Time" to create the work plan. In other words, inputting items such as "Battery Capacity," "Charging Capacity," "Machine Model," and "Work Time" is not required when generating the work plan 401. It can also automatically retrieve which charger 111 is connected to the machine 110.
[0064] The administrator terminal 120 sends the entered items to the power consumption forecasting server 100. The power consumption forecasting server 100 stores the items received from the administrator terminal 120 in the job plan DB 101. It should be noted that the "job plan ID" can be appended by the power consumption forecasting server 100 or the administrator terminal 120 as a serial number, etc. In addition, the "job time" is automatically calculated by the power consumption forecasting server 100 or the administrator terminal 120.
[0065] Unit power consumption list stored in power consumption list DB102
[0066] Next, the unit power consumption list stored in the power consumption list DB102 will be described. The power consumption prediction server 100 includes the power consumption list DB102 as an example of a unit power consumption storage unit. The unit power consumption list is the power consumed per unit period for each job. The unit power consumption list is pre-set information. The unit power consumption list can be updated by authorized operators.
[0067] Figure 4BThis is a diagram representing an example of a power consumption list stored in power consumption list DB102. For example... Figure 4B As shown, the power consumption list DB102 contains items such as "Model", "Operation Content", and "Unit Power Consumption (kW)". By inputting data for each item, the power consumption list 411 (411a, 411b, 411c) is stored as a record.
[0068] "Model" indicates the category of the operating machinery 110 (hydraulic excavator, bulldozer, dump truck, etc.).
[0069] "Work content" indicates the category of work that the machine 110 can perform.
[0070] "Power consumption per unit" refers to the power consumed per unit of time for each type of work activity.
[0071] It should be noted that the work plan DB101 and the power consumption list DB102 are not limited to being equipped in the power consumption prediction server 100. They can also be equipped in other devices besides the power consumption prediction server 100.
[0072] Functional Structure of Power Consumption Prediction System 1
[0073] Figure 5 This is a diagram illustrating an example of the functional structure of a power consumption prediction system. (For example...) Figure 5 As shown, the power consumption forecasting server 100 includes functional units such as a planning acquisition unit 501, a unit power consumption extraction unit 502, a power consumption forecasting unit 503, a receiving and transmitting unit 504, a battery reserve acquisition unit 505, and a work machinery determination unit 506. Each functional unit is implemented by the processor 301 of the power consumption forecasting server 100. That is, each functional unit is implemented by the processor 301 of the power consumption forecasting server 100 executing a predetermined program stored in the storage 303.
[0074] The plan is to obtain Department 501 from Work Plan DB101 ( Figure 4A Obtain work plan 401. (For example...) Figure 4A As shown, the work plan 401 includes the work content (item of work content) to be performed by the work machine 110 and the work time (item of work time) to be performed on the work content.
[0075] Unit power consumption extraction unit 502 extracts power consumption from power consumption list DB102 ( Figure 4B The unit power consumption is extracted from the power consumption list 411. The extracted unit power consumption is the unit power consumption corresponding to the work content shown in the work plan 401 obtained by the planning acquisition unit 501. For example, such as work plan 401a ( Figure 4AIn that case, if the job content is "excavation", then the unit power consumption extraction unit 502 will extract the power consumption from the power consumption list 411a ( Figure 4B Extract the unit power consumption "20kW" corresponding to "dig".
[0076] The power consumption prediction unit 503 predicts the power consumption of the battery 203 in the work plan 401 based on the work plan obtained by the planning acquisition unit 501. Specifically, the power consumption prediction unit 503 predicts (calculates) the power consumption by multiplying the unit power consumption extracted by the unit power consumption extraction unit 502 with the work time obtained from the work plan 401.
[0077] The transceiver unit 504 is an example of an output unit. The transceiver unit 504 outputs (transmits) the work power consumption predicted by the power consumption prediction unit 503. The output destination of the transceiver unit 504 is, for example, the work machine 110 and the manager terminal 120. If the work machine 110 and the manager terminal 120 receive the work power consumption output from the transceiver unit 504, they will display the work power consumption respectively.
[0078] Regarding the warning
[0079] In this embodiment, a warning can be issued based on the remaining charge level of the battery 203. Specifically, the remaining charge level acquisition unit 505 obtains the charge level from the work plan DB101 ( Figure 4A The transceiver unit 504 obtains the remaining charge level of battery 203. If the remaining charge level is insufficient relative to the power consumed during operation, the transceiver unit 504 outputs a warning message indicating this. The warning, for example, indicates that the remaining charge level of battery 203 is insufficient relative to the power consumed during operation.
[0080] Regarding alternative vehicles
[0081] In this embodiment, a replacement vehicle can be prepared based on the remaining charge of the battery 203. Specifically, the work equipment determination unit 506 determines other work equipment 110 when the remaining charge is insufficient relative to the power consumed for work. Specifically, the work equipment determination unit 506 determines other work equipment 110 to perform insufficient work based on the work plans of the other work equipment 110. Regarding this particular example, using... Figure 6B To be described later.
[0082] The receiving / distributing unit 504 outputs information indicating other work machines 110 (work machines 110 that can be replaced) determined by the work machine determination unit 506. This information includes the work machine ID, the time during which it can be used as a replacement vehicle, etc.
[0083] Functional Structure of Operation Machinery 110
[0084] like Figure 5 As shown, the work machine 110 (ECU 201) includes functional units such as a power consumption acquisition unit 521, a power storage acquisition unit 522, a charging prediction time calculation unit 523, a time acquisition unit 524, and an indication unit 525. Each functional unit is implemented by the processor 301 of the work machine 110. That is, each functional unit is implemented by the processor 301 of the ECU 201 executing a predetermined program stored in the storage 303.
[0085] The power consumption acquisition unit 521 acquires the work power consumption output by the transceiver unit 504 of the power consumption prediction server 100. If the work machine 110 receives the work power consumption from the power consumption prediction server 100, it stores it in a storage unit such as a storage device 303. Therefore, the power consumption acquisition unit 521 acquires the work power consumption stored in this storage unit. The timing for the power consumption acquisition unit 521 to acquire the work power consumption is, for example, when it is possible to start charging the battery 203. This timing is, for example, when the work machine 110 is positioned at a designated charging location. It should be noted that the timing for sending the work power consumption to the work machine 110 is, for example, when the power consumption prediction server 100 predicts the work power consumption (the timing for formulating a work plan).
[0086] When the power consumption acquisition unit 521 acquires the power consumed during operation, the energy storage acquisition unit 522 acquires the remaining energy of the battery 203. The battery 203 is equipped with a BMU (Battery Monitoring Unit). The BMU monitors the state of the battery 203, including state of charge (SOC), voltage, capacity, and temperature. The energy storage acquisition unit 522 acquires the remaining energy from the BMU. In addition to acquiring the remaining energy, the energy storage acquisition unit 522 also acquires the charging capacity of the battery 203 or the charging capacity of the charger 111. Regarding the charging capacity, it is assumed to acquire the value included in the work plan 401 of the work plan DB101, but it is not limited to this; it can also acquire values pre-input to the vehicle monitor 202, etc. Furthermore, if the charging capacity can be detected by the charger 111, the power consumption acquisition unit 521 can also acquire the charging capacity from the charger 111.
[0087] The charging prediction time calculation unit 523 calculates the predicted charging time required to charge the battery 203 based on the power consumption obtained by the power consumption acquisition unit 521, the remaining energy storage obtained by the energy storage content acquisition unit 522, and the charging capacity. Specifically, the charging prediction time calculation unit 523 calculates the required charging amount (kWh) by subtracting the remaining energy storage from the power consumption. Furthermore, the charging prediction time calculation unit 523 calculates the predicted charging time by dividing the required charging amount (kWh) by the charging capacity (kW).
[0088] The time acquisition department 524 obtains the work plan 401 from the power consumption prediction server 100. Figure 4A The start time of the operation is determined by the power consumption prediction server 100. If the machine 110 receives the operation plan 401 from the power consumption prediction server 100, it stores it in a storage unit such as storage 303. Therefore, the time acquisition unit 524 acquires the operation start time stored in this storage unit. The timing for acquiring the operation start time is, for example, when it is possible to start charging the battery 203. It should be noted that the timing for sending the operation start time to the machine 110 is, for example, when the power consumption prediction server 100 predicts the power consumption of the operation (the timing for formulating the operation plan).
[0089] The indicator unit 525 provides instructions related to the start of charging of the battery 203. This instruction may be, for example, an instruction to start charging when the battery 203 is connected to the charger 111 (automatic charging start instruction). Alternatively, for example, when the battery 203 is not connected to the charger 111, the instruction may include both an instruction urging the battery 203 to connect to the charger 111 and an instruction to start charging (manual charging start instruction).
[0090] The instruction unit 525 issues instructions based on the charging prediction time calculated by the charging prediction time calculation unit 523. Specifically, the charging start time is the time obtained by subtracting the charging prediction time calculated by the charging prediction time calculation unit 523 from the operation start time obtained by the time acquisition unit 524. The calculation of the charging start time can be performed by the charging prediction time calculation unit 523 or by the instruction unit 525.
[0091] "method"
[0092] Next, the power consumption prediction method performed by the power consumption prediction server 100 of the embodiment will be described.
[0093] Figure 6A This is a flowchart illustrating the power consumption prediction method performed by the power consumption prediction server 100. Figure 6A In the process, the power consumption prediction server 100 determines whether the work plan 401 has been input or updated from the management terminal 120. Figure 4A (Step S601).
[0094] The power consumption prediction server 100 remains on standby until the work plan 401 is input or updated (step S601: "No"). When the work plan 401 is input or updated (step S601: "Yes"), the power consumption prediction server 100 obtains the work plan 401 input or updated by the administrator terminal 120 (step S602).
[0095] Next, the power consumption prediction server 100 extracts the job time (the value obtained by subtracting the job start time from the job end time) from the job plan 401 (step S603). Then, the power consumption prediction server 100 retrieves the power consumption list DB102 ( Figure 4B The unit power consumption corresponding to the work plan 401 is extracted from the power consumption list 411 (step S604). Next, the power consumption prediction server 100 calculates (predicts) the power consumption of the work by multiplying the work time extracted in step S603 and the unit power consumption extracted in step S604 (step S605).
[0096] Then, the power consumption prediction server 100 will calculate the power consumption of the operation and compare it with the power consumption from the operation plan 401. Figure 4A The power consumption prediction server 100 compares the obtained power storage capacity with the power consumption of the operation to determine whether the power storage capacity is insufficient relative to the power consumption of the operation (step S606). If the power storage capacity is not insufficient relative to the power consumption of the operation (step S606: "No"), the power consumption prediction server 100 proceeds to step S609.
[0097] On the other hand, if the remaining power storage is insufficient relative to the power consumed during operation (step S606: "Yes"), the power consumption prediction server 100 outputs a warning indicating that the remaining power storage is insufficient relative to the power consumed during operation (step S607). Then, the power consumption prediction server 100 performs a substitution determination process to determine whether there is a substitute operating machine 110. Figure 6B Next, the power consumption prediction server 100 outputs the power consumption of the operation predicted in step S605 (step S609), ending a series of processes.
[0098] Alternative discrimination processing performed by the power consumption prediction server 100
[0099] Figure 6B This is a flowchart illustrating the alternative decision-making process performed by the power consumption prediction server 100. It should be noted that the following uses job plan 401b (… Figure 4A The value of ) and the power consumption list 411a ( Figure 4B Let's take the value of ) as an example to illustrate.
[0100] exist Figure 6B In this process, the power consumption prediction server 100 subtracts the work plan 401 from the work power consumption predicted in step S605 (60kWh = 20kW × 3h). Figure 4A ) The remaining energy storage capacity (e.g., 50kWh) is calculated, and the insufficient energy capacity ("60kWh" - "50kWh" = "10kWh") is calculated (step S611).
[0101] Then, the power consumption prediction server 100 calculates the shortfall time ("10kWh" / "20kW" = "0.5h") by dividing the shortfall power (10kWh) by the unit power consumption (e.g., 20kW) (step S612).
[0102] Next, the power consumption prediction server 100 calculates the working time from the start of the operation without recharging by dividing the remaining energy storage (e.g., 50 kWh) by the unit power consumption (e.g., 20 kW) ("50 kWh" / "20 kW" = 2.5 h) (step S613).
[0103] Then, the power consumption prediction server 100 calculates the charging interruption time (17:30) by adding the workable time (2.5h) to the job start time (e.g., 15:00) (step S614).
[0104] Next, the power consumption prediction server 100 obtains the work plans 401 of other operating machines 110 (step S615). Then, the power consumption prediction server 100 refers to the obtained work plans 401 to determine whether there are operating machines 110 that can ensure the amount of work time (0.5h) from the charging interruption time (17:30) (step S616).
[0105] If there is a machine 110 that can guarantee the amount of work time required for the insufficient operation from the moment of charging interruption (step S616: "Yes"), the power consumption prediction server 100 determines, for the machine 110, whether the prescribed charging time can be guaranteed before the moment of charging interruption (17:30) arrives (step S617). The prescribed charging time can be set as a predetermined certain time (e.g., 2 hours) or as a charging time obtained through calculation (the time required to charge the insufficient power).
[0106] If the specified charging time cannot be guaranteed (step S617: "No"), or if in step S616 there is no work machine 110 that can guarantee the insufficient working time from the time of charging interruption (step S616: "No"), the power consumption prediction server 100 outputs that there is no work machine 110 that can replace it (step S618), and proceeds to... Figure 6A Step S609.
[0107] On the other hand, in step S617, if the prescribed charging time can be ensured for the work machinery 110 (step S617: "Yes"), the power consumption prediction server 100 outputs information indicating the work machinery 110 that can be replaced (work machinery ID, information on the time that can be replaced) (step S619). The destination of this information output is the manager terminal 120 and the vehicle monitor 202. That is, this information is notified to the manager and the driver of the work machinery 110. Next, the power consumption prediction server 100 outputs insufficient power to the work machinery 110 that can be replaced (step S620), ending the series of processes.
[0108] Charging control processing performed on operating machinery 110
[0109] Figure 7 This is a flowchart illustrating the charging control process performed by the operating machinery 110. Figure 7 In step S701, the machine 110 determines whether it is a suitable time to start charging. The machine 110 waits until a suitable time to start charging is reached (hereinafter referred to as "rechargeable time") (step S701: "No"). A rechargeable time is, for example, when the machine 110 is positioned in a designated charging location and the battery 203 is connected to the charger 111 via cable. It should be noted that even if the battery 203 is connected to the charger 111 via cable, it is not powered on.
[0110] In step S701, if it is a rechargeable time (step S701: "Yes"), the working machine 110 obtains the work-consuming power that has been received from the power consumption prediction server 100 from the designated storage unit (step S702). It should be noted that if it is another working machine 110 used in place of the work-consuming power, then in step S702, the insufficient power is obtained to replace the work-consuming power for subsequent processing.
[0111] Next, the operating machine 110 performs a charging need-or-not-charging process to determine whether charging is required. Figure 8 (Step S703). Then, the operating machine 110 determines the result of the charging process and whether charging is required (Step S704). If charging is not required (Step S704: "No"), the operating machine 110 ends the series of processes.
[0112] On the other hand, if the result of the charging requirement processing is that charging is required (step S704: "Yes"), the operating machine 110 performs charging prediction time calculation processing. Figure 9 (Step S705). In the charging prediction time calculation process, the charging start time is calculated.
[0113] Then, the operating machine 110 determines whether the current time is the start time of charging (step S706). The operating machine 110 remains on standby until the current time becomes the start time of charging (step S706: "No"). If the current time becomes the start time of charging (step S706: "Yes"), it outputs a charging start instruction to the charger 111, which is already connected to the battery 203, thereby performing charging (step S707). It should be noted that when charging starts, the operating machine 110 may also report "Start charging." or similar messages to the vehicle monitor 202, etc.
[0114] Then, the operating machine 110 determines whether the remaining charge of the battery 203 exceeds the power consumed during operation (step S708). The operating machine 110 returns to step S707 and continues charging until the remaining charge exceeds the power consumed during operation (step S708: "No"). On the other hand, if the remaining charge exceeds the power consumed during operation (step S708: "Yes"), the operating machine 110 outputs a charging completion instruction to the charger 111, thus ending the charging process and concluding the series of steps. It should be noted that at the end of charging, the operating machine 110 may also report "Charging completed." or similar messages to the onboard monitor 202.
[0115] It should be noted that in step S708, besides conditions such as the remaining battery capacity exceeding the power consumed during operation, charging may sometimes be terminated. For example, charging may sometimes be terminated based on the start time of the operation. Specifically, if the start time of the operation is early, charging time may not be guaranteed. More specifically, for example, if the charging start time is set to 9:00 AM, the predicted charging time is set to 3 hours, and the operation start time is set to 11:00 AM, then the operation start time is 2 hours after the start of charging, and sometimes the 3-hour charging time cannot be guaranteed. Therefore, the operating machine 110 terminates charging based on the start time of the operation.
[0116] In addition, if the power consumption of the operation exceeds the battery capacity, further charging is not possible once the battery capacity is reached. In this case, the operating machine 110 also terminates the charging process.
[0117] It should be noted that at the start and end of charging, the operating machine 110 sends information indicating this (charging start notification and charging completion notification) to the power consumption prediction server 100 respectively. Thus, the power consumption prediction server 100 can manage whether each operating machine 110 is charging. It should also be noted that the charging start notification and charging completion notification are not limited to being sent from the operating machine 110 to the power consumption prediction server 100. These notifications can also be sent from the charger 111 to the power consumption prediction server 100, for example.
[0118] "Handling the charging needs of the operating machinery 110"
[0119] Figure 8 This is a flowchart indicating whether the operating machinery 110 needs charging. Figure 8 In the process, the working machine 110 obtains the remaining power of the battery 203 (step S801). Then, the working machine 110 determines whether the remaining power is greater than or equal to the power consumed during operation (step S802). If the remaining power is greater than or equal to the power consumed during operation (step S802: "Yes"), the working machine 110 determines that charging is not required (step S803) and ends the series of processes. On the other hand, if the remaining power is less than or equal to the power consumed during operation (step S802: "No"), the working machine 110 determines that charging is required (step S804) and ends the series of processes.
[0120] "Charging prediction time calculation and processing performed by the operating machinery 110"
[0121] Figure 9 This is a flowchart illustrating the charging prediction time calculation process performed by the operating machinery 110. Figure 9 In step S901, the operating machine 110 calculates the amount of charge to be applied to the battery 203 by subtracting the remaining charge of the battery 203 from the electrical power consumed during operation. Then, the operating machine 110 obtains the charging capability (step S902).
[0122] Next, the operating machine 110 calculates the predicted charging time by dividing the charging amount (kWh) calculated in step S901 by the charging capacity (kW) obtained in step S902 (step S903). Then, the operating machine 110 calculates the charging start time by subtracting the predicted charging time calculated in step S903 from the start time of the operation (step S904), thus ending the series of processes.
[0123] Functions and Effects
[0124] Thus, according to this embodiment, the power consumption prediction server 100 predicts and outputs the power consumption of the battery 203 in the work plan based on the work content performed by the machine 110 and the work time for performing the work content. Therefore, the required power consumption of the battery 203 in the work plan can be charged at the optimal time in the work plan. Therefore, battery 203 degradation can be suppressed.
[0125] Furthermore, in this embodiment, the power consumption prediction server 100 extracts the unit power consumption corresponding to the work content shown in the work plan from the power consumption list DB102, and predicts the power consumption of the work based on the extracted unit power consumption and the work time obtained from the work plan. Thus, an appropriate power consumption for the work content can be obtained.
[0126] Furthermore, in this embodiment, the power consumption prediction server 100 outputs a warning when the remaining charge of the battery 203 is insufficient relative to the power consumption of the operation. This allows operators to anticipate when the battery 203's charge is low. Therefore, appropriate measures can be taken to address the warning, preventing work stoppages.
[0127] Furthermore, in this embodiment, when the remaining charge of the battery 203 is insufficient relative to the power consumption of the operation, the power consumption prediction server 100 outputs information indicating alternative work machinery 110 that can be used to perform the insufficient work, based on the work plans of other work machinery. Thus, the operator can anticipate the existence of alternative work machinery 110 when the battery 203's remaining charge is insufficient. Therefore, even if the battery 203's remaining charge is insufficient, the operator can continue working using the alternative work machinery 110.
[0128] Furthermore, in this embodiment, the operating machine 110 calculates the predicted charging time required to charge the battery 203 based on the power consumption for operation obtained from the power consumption prediction server 100, the remaining charge of the battery 203, and the charging capacity of the battery 203, and issues an instruction based on this predicted charging time. Therefore, the required power consumption of the battery 203 in the operation plan can be charged at the optimal time in the operation plan. Thus, battery degradation can be suppressed.
[0129] Furthermore, in this embodiment, if the charging start time is based on the start time of the operation and the calculated charging prediction time, the operating machine 110 outputs an instruction related to the start of charging of the battery 203. Therefore, the battery 203 can be used immediately after charging is completed. This allows for more efficient prevention of battery 203 degradation.
[0130] <Variations on the Implementation Method>
[0131] Hereinafter, variations of the embodiments will be described. It should be noted that in the following variations, the descriptions of the contents described in the above embodiments will be appropriately omitted.
[0132] Variation Example 1
[0133] First, let's describe variation 1. In the above embodiment, the power consumption per unit of storage according to the work content ( Figure 4B The example provided illustrates this point. However, even with the same work content, conditions (such as soil conditions) can vary from site to site, and consequently, the electrical power consumption of the working machinery 110 can differ. In Modification 1, to account for such differences, an example of power consumption per unit of load storage at the site is provided.
[0134] The power consumption list DB102 in Variation Example 1 includes a "site load" item that subdivides the "work content" item. Within the "site load" item, "large," "medium," and "small" are stored according to the load size, and the corresponding unit power consumption is stored accordingly. Therefore, even in the same work, where the soil conditions at each site are different, it is possible to predict the work power consumption corresponding to the conditions (soil conditions) even when the unit power consumption varies.
[0135] It should be noted that the system can also provide feedback on the on-site work results and re-predict the power consumption. For example, the operating machinery 110 sends the on-site load (high load, medium load, low load) as the on-site work result to the power consumption prediction server 100. If the power consumption prediction server 100 receives the on-site load from the operating machinery, it stores it in the power consumption list 411. Furthermore, the power consumption prediction server 100 re-predicts the power consumption based on the unit power consumption corresponding to the received on-site load. In this way, the system can also provide feedback on the on-site work results and re-predict the power consumption.
[0136] Variation Example 2
[0137] Next, Modification 2 will be described. In the above embodiment, an example where the working machine 110 does not have a generator was described. In Modification 2, an example where the working machine 110 has a generator (a so-called hybrid power example) will be described.
[0138] In Modification 2, the generator of the work machine 110 is driven by the onboard engine, thus enabling the battery 203 to be charged even during operation. Therefore, in Modification 2, operation taking into account the charging capacity of the generator is possible. It should be noted that, from the viewpoint of charging efficiency, it is effective to operate the generator while keeping the engine at a specified speed.
[0139] For example, if the generator's charging capacity is set to 10kW and the unit power consumption in this operation is set to 30kW, then the actual unit power consumption is 20kW (30kW - 10kW). Therefore, assuming the battery 203 has a remaining charge (original charge) of 100kWh, then by running the engine at the specified speed, it is possible to perform 5 hours of operation (100kWh ÷ 20kW = 5h).
[0140] It should be noted that, when a generator is available, battery 203 can be charged even when its remaining charge is below a specified value. Charging can also be performed, for example, under light workload conditions (below the specified value). For instance, if the generator's charging capacity is set to 10kW and the unit power consumption in the operation is set to 6kW, then 4kW (10kW - 6kW) of charge can be stored.
[0141] Variation Example 3
[0142] Next, Modification 3 will be described. In Modification 3, an example of real-time monitoring of power consumption will be described. In Modification 3, the power consumption prediction server 100 obtains the power consumption from each operating machine 110 in real time. The power consumption prediction server 100 monitors the slope (usage per unit time) of power consumption for each operating machine 110.
[0143] For example, when the workload is greater than initially planned, the actual power consumption may exceed the predicted power consumption, leading to power shortages. In such cases, the power consumption prediction server 100 can issue a warning about insufficient power even if work continues directly. Furthermore, if a substitute machine 110 is available, the power consumption prediction server 100 can also notify the operator of this situation.
[0144] According to Variation 3, when it is determined that the power consumption is greater than the initial work plan, a warning can be issued in real time. Therefore, the operators can take corresponding actions to prevent work from stalling.
[0145] Variation Example 4-1
[0146] Next, Modification 4-1 will be described. In Modification 4-1, an example will be described where the work machine 110 is equipped with the functional units possessed by the power consumption prediction server 100. In Modification 4-1, the work machine 110 may also be equipped with Figure 5 The functional units shown in A are the planning acquisition unit 501, the unit power consumption extraction unit 502, the power consumption prediction unit 503, the receiving and dispatching unit 504, the energy storage reserve acquisition unit 505, and the operating machinery determination unit 506.
[0147] In this way, the power consumption of the battery 203 in the work plan can be predicted based on the work plan containing the work content and the time when the work content is performed, using only the work machine 110.
[0148] Variation Example 4-2
[0149] Next, Modification 4-2 will be described. In Modification 4-2, an example will be described where the power consumption prediction server 100 includes the functional units included in the work machine 110. In Modification 4-2, the power consumption prediction server 100 may also include... Figure 5 The functional units shown in A are the power consumption acquisition unit 521, the energy storage capacity acquisition unit 522, the charging prediction time calculation unit 523, the indicator unit 525, and the time acquisition unit 524.
[0150] In this way, by simply using the power consumption prediction server 100, it is possible to predict the power consumption of the battery 203 in the work plan based on the work plan which includes the work content and the time when the work content is performed.
[0151] Variation Example 5
[0152] Next, variation 5 will be described. In the above embodiment, the variation is based on the power consumption list DB102 ( Figure 4B An example of predicting the power consumption of a task by using the power consumption list 411 is illustrated. In Variation 5, an example of predicting the power consumption of a task using a learned model is illustrated.
[0153] In Variation 5, the learned model learns using input and output samples. Input samples include, for example, the work performed by the machine 110 and the time taken to perform that work. Output samples include, for example, the electrical power consumed by the battery 203. The learned model is, for example, a model represented using a neural network. However, the learned model could also be a Deep Neural Network (DNN). Learning parameters include, for example, the number of layers in the neural network, the number of neurons in each layer, the connection relationships between neurons, the connection weights (connection loads) between neurons, and the threshold of each neuron. The learned model includes an input layer, one or more intermediate layers (hidden layers), and an output layer. Each layer has one or more neurons. The number of intermediate layers, the number of neurons in each layer, etc., are set by the learning parameters.
[0154] The input layer is fed the task content of the operating machine 110 and the task time. The output layer outputs the probability of selecting the electrical power consumption of the task (electrical power consumption 1, electrical power consumption 2, ..., electrical power consumption m). The learned model is trained to ensure that the electrical power consumption output from the output layer is as consistent as possible with the actual selected result (the selection result of the electrical power consumption) when the task content and the task time are input to the input layer.
[0155] On the generation of learned models
[0156] Next, the generation of the learned model by the power consumption prediction server 100 will be described. The power consumption prediction server 100 includes a dataset acquisition unit, a model generation unit, and a model generation storage unit. Each unit is implemented by a processor 301. That is, the processor 301 executes the model generation program contained in the prescribed program to realize the function of each unit. The model generation storage unit is implemented by a memory 303.
[0157] The Dataset Acquisition Department acquires the learning dataset. The Dataset Acquisition Department can acquire the learning dataset from external sources using storage media (such as USB drives) or through communication.
[0158] The learning dataset contains learning samples 1 through N. Each learning sample 1 through N includes input samples and output samples. Input samples are the data fed into the input layer during the training of the learning model. Specifically, the input samples are upper bounds, which are the data fed into the input layer during the training of the learning model.
[0159] Output samples are the data (also called teacher data or positive label) used to compare with the output values from the output layer during the training of the learning model. Output samples are performance information (actual electrical energy consumption) selected based on the work content of the operating machinery 110 and the work time within that work content; they are the teacher data (positive label) used to compare with the output values from the output layer during the training of the learning model.
[0160] The dataset acquisition unit can acquire training samples 1 to N together, or it can acquire them separately. The model generation and storage unit stores the learned model and parameters.
[0161] The model generation unit uses the learning dataset obtained by the dataset acquisition unit to train the learning model and generate a fully trained model. The model generation unit then enables the model storage unit to store the generated fully trained model.
[0162] Specifically, the model generation unit inputs each input sample into the input layer and updates the parameters of the learning model in such a way that the difference between each output value obtained from the output layer and each output sample becomes smaller, thereby generating a fully learned model. As an example, the model generation unit can also use the error backpropagation method (backpropagation) to generate a fully learned model, as shown in (1) to (5) below.
[0163] (1) The model generation unit inputs the input samples of the learning dataset into the input layer and performs calculations in the forward propagation direction of the learning model, thereby obtaining the output value from the output layer. The output value from the output layer represents the probability (likelihood) of each operating parameter being selected.
[0164] (2) The model generation unit calculates the error between the output value from the output layer and the output sample for all input samples, for example, by using the backpropagation method. The output sample is performance information (the actual power consumption of the selected operation). For example, when the operating parameter m is represented as the output sample of the learning sample 1, if the output value obtained from the output layer is the operating parameter m as the input sample of the learning sample 1, then the error related to the learning sample 1 is zero.
[0165] (3) The model generation unit determines whether the calculated error is within the specified value.
[0166] (4) If the calculated error is within the specified value, the model generation unit determines that the various parameters such as the weights of the connections between neurons (the weights of the connections between neurons, the thresholds of each neuron, etc.) have been optimized, ends the learning (training), and completes the generation of the learned model. The learning model with all parameters set as the learned parameters is set as the learned model.
[0167] (5) If the calculated error is not within the specified value, the model generation unit updates various parameters based on the calculated errors. Then, for the learning model with updated parameters, the model generation unit inputs the input sample into the input layer again and repeatedly updates various parameters until the above-mentioned error becomes within the specified value.
[0168] According to Variation 5, the power consumption prediction server 100 can use the learned model to predict and output the power consumption of the battery 203 in the work plan based on the work plan including the work content performed by the machine 110 and the work time for performing the work content. Even so, it can charge the battery 203 with the required power at the optimal time in the work plan. Therefore, it is possible to suppress the degradation of the battery 203.
[0169] <Other Implementation Methods>
[0170] The above description of one embodiment is based on the accompanying drawings. However, the specific structure is not limited to the structure described above, and various design changes can be made.
[0171] In the above-described embodiments of the power consumption prediction server 100 and the operating machine 110, the cases where the programs are stored in the memory 303 have been described, but this is not a limitation. For example, the programs may also be distributed to the power consumption prediction server 100 and the operating machine 110 respectively via communication lines. In this case, the power consumption prediction server 100 and the operating machine 110, upon receiving the distribution, expand the programs in the main memory 302 respectively and execute the aforementioned processing.
[0172] Alternatively, the program can be used to implement a portion of the aforementioned functions. For example, the program can also implement the aforementioned functions by combining with other programs stored in memory 303 or with other programs installed on other devices.
[0173] Furthermore, the power consumption prediction server 100 and the operating machine 110 can also be equipped with a PLD (Programmable Logic Device) based on or replacing the above-described structure. Examples of PLDs include PAL (Programmable Array Logic), GAL (Generic Array Logic), CPLD (Complex Programmable Logic Device), and FPGA (Field Programmable Gate Array). In this case, a portion of the functions implemented by the processor 301 can be implemented by the PLD.
[0174] In addition, the power consumption prediction server 100 and the operating machine 110 can each have multiple processors 301, or they can be composed of multiple computers.
[0175] Industrial availability
[0176] The above method can suppress the deterioration of the batteries in the operating machinery.
[0177] Explanation of reference numerals in the attached figures:
[0178] 1…Power Consumption Prediction System, 100…Power Consumption Prediction Server, 101…Work Plan Database, 102…Power Consumption List Database, 110…Multiple Operating Machines, 111…Charger, 120…Manager Terminal, 201…Body ECU, 202…Vehicle Monitor, 203…Battery, 501…Plan Acquisition Unit, 502…Unit Power Consumption Extraction Unit, 503…Power Consumption Prediction Unit, 504…Receiving and Distributing Unit, 505…Battery Balance Acquisition Unit, 506…Operating Machine Determination Unit, 521…Power Consumption Acquisition Unit, 522…Battery Content Acquisition Unit, 523…Charging Prediction Time Calculation Unit, 524…Time Acquisition Unit, 525…Instruction Unit.
Claims
1. A power consumption prediction device, wherein, The power consumption prediction device includes: The planning department acquires work plans, which include the work content to be performed by battery-powered machinery and the work time for performing the work content. The power consumption prediction unit predicts the power consumption of the battery in the operation plan based on the operation plan obtained by the plan acquisition unit. as well as The output unit outputs the electrical power consumption of the operation as predicted by the power consumption prediction unit.
2. The power consumption prediction device according to claim 1, wherein, The power consumption prediction device includes a unit power consumption extraction unit, which extracts the unit power consumption corresponding to the work content shown in the work plan from a unit power consumption storage unit that stores the unit power consumption for each unit period according to each work content. The power consumption prediction unit predicts the power consumption of the operation based on the unit power consumption extracted by the unit power consumption extraction unit and the operation time obtained from the operation plan.
3. The power consumption prediction device according to claim 1 or 2, wherein, The power consumption prediction device includes a power reserve acquisition unit for obtaining the remaining power reserve of the battery. If the remaining energy storage capacity is insufficient relative to the power consumption of the operation, the output unit outputs a warning message indicating a warning.
4. The power consumption prediction device according to claim 1 or 2, wherein, The power consumption prediction device includes: A charge reserve acquisition unit acquires the charge reserve of the battery; and The work equipment determination unit, when the remaining battery capacity is insufficient relative to the power consumption of the work, determines other work equipment to perform the insufficient workload based on the work plans of other work equipment. The output unit outputs information representing other working machines determined by the working machine determination unit.
5. A work machine connected to the power consumption prediction device according to claim 1 or 2, and comprising the battery, wherein, The operating machinery includes: The power consumption acquisition unit acquires the power consumption of the operation output by the output unit; The energy storage content acquisition unit acquires the remaining energy of the battery and the charging capacity of the battery or the charger connected to the battery. The charging prediction time calculation unit calculates the charging prediction time required to charge the battery based on the power consumption of the operation obtained by the power consumption acquisition unit, the remaining energy of the battery obtained by the energy storage content acquisition unit, and the charging capacity. as well as The instruction unit provides instructions based on the charging prediction time calculated by the charging prediction time calculation unit.
6. The operating machinery according to claim 5, wherein, The operating machine is equipped with a time acquisition unit that obtains the start time of the operation included in the operation time. When the indicator unit becomes the charging start time based on the operation start time obtained by the time acquisition unit and the charging prediction time calculated by the charging prediction time calculation unit, it outputs an indication related to the start of charging of the battery.
7. A power consumption prediction system comprising: The power consumption prediction device according to claim 1 or 2, and the working machinery equipped with the battery, wherein, The operating machinery includes: The power consumption acquisition unit acquires the power consumption of the operation output by the output unit; The energy storage content acquisition unit acquires the remaining energy of the battery and the charging capacity of the battery or the charger connected to the battery. The charging prediction time calculation unit calculates the predicted charging time required to charge the battery based on the power consumption of the operation obtained by the power consumption acquisition unit, the remaining energy storage obtained by the energy storage content acquisition unit, and the charging capacity; and The instruction unit provides instructions based on the charging prediction time calculated by the charging prediction time calculation unit.
8. A method for predicting electricity consumption, wherein, The power consumption prediction device performs a process that includes the following steps: The plan involves obtaining a work plan, which includes the tasks to be performed by battery-powered machinery and the time required to perform those tasks. The power consumption prediction step, based on the work plan obtained in the plan acquisition step, predicts the power consumption of the battery in the work plan. as well as The output step outputs the electrical power consumption of the operation predicted by the power consumption prediction step.
9. A program, wherein, The computer in the power consumption prediction device functions as a component in the following ways: The planning department acquires work plans, which include the work content to be performed by battery-powered machinery and the work time for performing the work content. The power consumption prediction unit predicts the power consumption of the battery in the operation plan based on the operation plan obtained by the plan acquisition unit. as well as The output unit outputs the electrical power consumption of the operation as predicted by the power consumption prediction unit.
Citation Information
Patent Citations
Display system, display method and display program
JP2024078746A