Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

149 results about "Work plan" patented technology

Methods and apparatus to determine zones for machine operation

Systems, apparatus, articles of manufacture, and methods are disclosed to determine a boundary for a work plan. An example apparatus includes circuitry to instantiate the machine-readable instructions to: detect a first attribute and a second attribute based on a characteristic of a plot of land, the first attribute corresponds to an uncertain feature in the plot of land; determine a first machine operation based on the first attribute and a second machine operation based on the second attribute; determine a first boundary around a first region, the first region including a first area of the plot of land including the first attribute; determine a second boundary around a second region, the second region including a second area of the plot of land including the second attribute; and determine a work plan based on the first boundary, the second boundary, and a relevance between the first attribute and the second attribute.
Owner:DEERE & CO

Unattended automatic control system of bucket wheel machine

The invention belongs to the technical field of bucket wheel machine control, and discloses an unattended automatic control system of a bucket wheel machine, which is characterized in that a three-dimensional modeling technology is utilized to respectively construct geometric models of a coal yard, a bucket wheel machine and a material pile, and the geometric models are combined to generate a dynamic coal yard model; positioning information of the bucket wheel machine is obtained through the wireless positioning technology, and an automatic moving path of the bucket wheel machine is generated in combination with the dynamic coal yard model and the material taking work plan and sent to a bucket wheel controller to control the moving state of the bucket wheel machine; the safety stability between the bucket wheel machine and the material pile in the material taking process is evaluated according to the automatic moving path of the bucket wheel machine and the microwave measurement technology, and a limit protection device is driven based on the evaluation result to conduct protection operation on the material pile; and judging the accuracy of the automatic moving path of the bucket wheel machine according to a material taking result, and analyzing the feasibility of bucket wheel machine automatic control based on an accuracy result to determine an automatic control strategy of the bucket wheel machine. According to the invention, the requirements on operators are greatly reduced, and the labor cost is reduced.
Owner:HUADIAN WEIFANG POWER GENERATION CO LTD

Archive opening auditing method and system and storage medium

The invention provides a file open auditing method and system and a storage medium, and the method comprises the steps: obtaining an auditing work plan, training a preset auditing model based on the auditing work plan, and obtaining a localized auditing model; receiving auditing data, and determining target personnel participating in auditing based on the auditing data to perform security screening; performing quality processing on the auditing data to obtain digital auditing data; based on the digital auditing data and the localized auditing model, obtaining a preliminary auditing opinion; generating a reexamination instruction, and receiving a reexamination result; compiling a data set based on the reexamination result and the digital reexamination data, training a localized reexamination model by using the data set to obtain an updated reexamination model, judging whether the updated reexamination model meets the reexamination accuracy or not, if so, determining the updated reexamination model as the localized reexamination model, and outputting the reexamination result; and if not, training a preset auditing model based on the auditing work plan to obtain a localized auditing model. The method can improve the situation that a large amount of manpower resources are consumed for archive auditing work.
Owner:SHANGHAI TAIYU INFORMATION TECH

Work plan management method and device based on intelligent management and control platform

The invention provides a work plan management method and device based on an intelligent management and control platform. The method comprises the following steps: firstly, obtaining an annual work plan, generating a preliminary target file through an automatic importing function, then setting rules according to the work field and category, carrying out verification and error correction on the target file, generating a corrected monthly plan file, then correcting the monthly plan through a temporary work plan, and forming a final weekly and daily work plan. And the completion progress is visually displayed in real time. According to the application, automatic proofreading, automatic splitting and automatic issuing of the annual plan are realized through the intelligent management and control platform, and the corresponding port is set for workers to modify the monthly plan and add the temporary plan, so that automation of planning and overall planning is realized, and the problem that in the prior art, all work planning, distribution and overall planning work are completed manually, and the working efficiency is high is solved. The efficiency is low and the accuracy is difficult to guarantee.
Owner:GUANGDONG DIANWANG GONGSI YUNFU POWER SUPPLY BUREAU

Production line operation and maintenance management system based on big data

The invention discloses a production line operation and maintenance management system based on big data, and relates to the technical field of production line management, and the system comprises a production and storage module which is used for calculating an optimal production and storage plan; the optimal output module is used for calculating the optimal output of each production line; the production plan making module is used for making a work plan of each production line; the recording and feedback module is used for establishing a production log list and recording and feeding back actual production conditions; and the cloud storage, arrangement and analysis module is used for establishing a cloud database platform and storing, arranging and analyzing the production logs. The method has the advantages that the daily average optimal production output of each production line is calculated by analyzing the customer demand quantity and the production output of each production line, the problem is found in time and the production mode is adjusted by comparing the actual value and the predicted value of the daily average production output, more elastic mechanisms are given to the production line, the efficiency is improved, and the production cost is reduced. And resource waste is reduced.
Owner:广东沁桦智能环境技术有限公司

Information system operation and maintenance work ticket auxiliary auditing method based on large model

The invention relates to the technical field of work ticket auxiliary auditing, and discloses an information system operation and maintenance work ticket auxiliary auditing method based on a large model, and the method comprises the steps: obtaining the content of a work ticket, carrying out the text cleaning of the content, and constructing a content accuracy auditing prompt word; the cue word is transmitted into a large model, and a content accuracy auditing opinion is obtained; constructing a work scheme rationality auditing prompt word, and obtaining a work scheme rationality auditing opinion and a potential risk point list; constructing a safety measure completeness auditing prompt word, and obtaining a safety measure completeness auditing opinion; obtaining a content compliance auditing opinion, and generating a final work ticket auxiliary auditing opinion; according to the method, the auditing efficiency, quality and safety are comprehensively improved, and a powerful guarantee is provided for safe and stable operation of an enterprise information system. And meanwhile, through knowledge precipitation and a continuous optimization mechanism, continuous improvement of the auditing capability is realized, and core competitiveness of enterprise operation and maintenance management is formed.
Owner:STATE GRID INFORMATION & TELECOMM BRANCH +1

Systems and methods for generating changes to workplace plans using generative ai

Systems and methods for assessing the feasibility of a proposed contact center work plan are disclosed. The plan may include a proposed workload and a proposed performance metric and the method may include: generating, based on the proposed contact center work plan and data indicative of previous feasible contact center work plans, a feasibility for the proposed contact center work plan; and where the feasibility is below a threshold, generating, using a large language model, a modified contact center work plan for a user with a feasibility above the threshold, the modified contact center work plan comprising a modification to one or more aspects of the contact center work plan.
Owner:NICE LTD

Alternative shift generation technologies

PendingUS20250348807A1ForecastingAutomatic exchangesWork planShift schedule
A system for generating alternative shifts for contact center agent scheduling according to an embodiment includes a system that receives a staffing requirement forecast indicative of a number of agents required to handle a workload forecast. Agent data is received for a plurality of agents. The system receives a service level override value and performs column generation to identify shifts for the agents based on the staffing requirement forecast, agent working rules, and work plan constraints. A subset of the shifts is selected to generate an optimized agent shift schedule. A request to replace an individual shift of the optimized shift schedule with an alternative shift is received. In response, the system identifies the alternative shift from the plurality of shifts based on the service level override value. The individual shift is replaced with the identified alternative shift on the optimized shift schedule.
Owner:GENESYS CLOUD SERVICES INC

Finish rolling speed and strip steel parameter setting method

The embodiment of the invention provides a finish rolling speed and strip steel parameter setting method which comprises the following steps: when the head of strip steel reaches an inlet of a finish rolling unit, detecting the head temperature of the strip steel, and obtaining strip steel working plan parameters corresponding to the strip steel from a working plan; according to the head temperature of the strip steel and the corresponding work plan parameters, a strip steel speed and cooling water parameter table is inquired, a target record item is obtained through matching, and a speed parameter and a cooling water supply parameter corresponding to the target record item serve as a speed parameter and a cooling water supply parameter of the strip steel in the finish rolling period; and the speed parameter and the cooling water supply parameter of the strip steel in the finish rolling period are sent to the secondary model.
Owner:LIUZHOU IRON & STEEL CO LTD

Command system, coordination system, and command method

To provide a system that provides assistance so that a user who directs countermeasures after a crisis can make a decision for crisis countermeasures more accurately or more quickly.SOLUTION: A command system comprises: an integrated information acquisition unit that acquires integrated information obtained by integrating troop information relating to the status of on-site troops in a disaster area, with sensing data or processed sensing data, the sensing data including image data or point cloud data or spatial data obtained by sensing the disaster area from above by a flying vehicle; an integrated information display unit that displays the integrated information to a control device used by a user who directs the on-site troops; and a work plan command unit that issues a work command as to a work instruction or a work plan for the on-site troops. The work plan command unit causes information about the work instruction or the work plan to be displayed by at least one of a troop terminal used by the on-site troops and the control device.SELECTED DRAWING: Figure 1
Owner:TERRA LABO INC

Work planning system and work planning method

Provided is a work planning system including a processor and a storage unit connected to the processor. The storage unit stores a plurality of shipping orders, work network information pertaining to a process for work necessary for shipping, and resource information pertaining to a plurality of resources that can be used for work. The processor classifies work corresponding to the plurality of shipping orders into a plurality of tasks on the basis of a prescribed condition and the work network information, generates a process plan including allocation of the resources to the process for each of the tasks on the basis of the resource information, and outputs the generated process plan.
Owner:LOGISTEED LTD

Collection and analysis method and system based on intelligent factory intelligent data

The invention discloses an acquisition and analysis method and system based on intelligent data of a smart factory, and relates to the technical field of intelligent data acquisition and analysis, and the method comprises the steps: S10, analyzing the dynamic production data and basic production data of each production line of the smart factory; s20, analyzing the real-time risk coefficient of the production plan executed by the smart factory; s30, analyzing the dynamic production data regulation and control value of each production line of the smart factory in the remaining working time period; and S40, carrying out intelligent management and control on the real-time work plan of each production line of the smart factory. According to the method, the dynamic production model of the intelligent factory is constructed according to the analyzed production data, the real-time completion degree of the intelligent factory on the production plan can be rapidly analyzed, the influence of the number of unqualified products and the equipment aging condition on the analysis result does not need to be considered in the process, the analysis time is shortened, and meanwhile the production efficiency is improved. And the analysis precision is improved.
Owner:WENCESHI INFORMATION TECH NANJING CO LTD

Work plan management method

PendingJP2025170531AInstrumentsWork planWorkload
To provide a work plan management method that periodically reviews a work plan on the basis of an actual work result at a work site and efficiently manages work progress.SOLUTION: A work plan management method comprises the steps of: generating a work plan by using a parameter related to a worker, the work plan including an amount of work for a predetermined period longer than a predetermined time based on an amount of work for each predetermined time by one or more workers; acquiring a work result including an amount of work results performed by the worker for every predetermined time; adjusting, on the basis of a difference between the work plan and the most latest N (N: a set value which is an integer equal to or greater than 2) times of work results acquired for every predetermined time, the parameter of the worker; updating the work plan by using adjustment results of the parameter; and outputting updated results of the work plan to a viewer.SELECTED DRAWING: Figure 7
Owner:PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTD

Production planning device, production planning system, and production planning method

It is possible to update a process plan, a work plan, and a production plan in a short time with respect to a production fluctuation event and flexibly deal with the production fluctuation. A production planning device includes: a process plan generation unit which generates a plurality of process plans including an alternative process plan, the process plans relating to a production process of a product; a work plan generation unit which generates a work plan corresponding to each of the process plans; a production plan generation unit which generates a production plan using the plurality of process plans and the work plan; and a production plan redrafting unit which redrafts a production plan using the plurality of process plans and the work plan when a production fluctuation event occurs.
Owner:HITACHI LTD

Electric power tool lending method, device, computer equipment, readable storage medium and program product

PendingCN122390637AWork planResource management
The application relates to an electric power tool taking method and device, computer equipment, a computer readable storage medium and a computer program product, and relates to the technical field of intelligent electric power resource management, and can improve the automatic flow efficiency of electric power tools. The method comprises the following steps: obtaining a work plan associated with a tool taking user based on a tool taking request of the tool taking user; determining a tool use list corresponding to the tool taking user according to the work plan; obtaining taking identification data of electric power tools to be taken through a sensing device of a storage space; obtaining tool state data corresponding to the electric power tools to be taken based on the taking identification data; comparing and verifying the taking identification data and the tool state data with target identification data corresponding to the tool use list and a preset state condition respectively; and determining a tool taking record based on the taking identification data and the tool state data if the comparison and verification is passed.
Owner:GUANGZHOU POWER SUPPLY BUREAU GUANGDONG POWER GRID CO LTD

System

To provide a system.SOLUTION: A system includes: means for entering information such as a type of farm work, region, crop, and work plan; generative AI means for generating an optimal farm work schedule in accordance with the entered information; and means for outputting the generated schedule.SELECTED DRAWING: Figure 1
Owner:SOFTBANK GROUP CORP

Robot control device, robot control system, robot, and robot control method

A robot control device (11) is provided with: a determining unit (33) for determining the progress status of first work in accordance with a work instruction; a search unit (35) for searching for a partner (17) capable of providing specific information for changing the progress status of the first work to a continuation-possible status if the progress status of the first work is a continuation-not-possible status; an estimating unit (37) for estimating the total work cost including second work for changing the progress status of the first work from the continuation-not-possible status to the continuation-possible status; a plan creating unit (38) for creating a work plan including the second work for the partner (17) on the basis of the estimated total work cost; and a control unit (39) for causing the work including the second work complying with the created work plan to be performed. The plan creating unit (38) creates the work plan so as to minimize the total work cost.
Owner:HITACHI LTD

Intelligent management method and system for enterprise work plan

The invention discloses an intelligent management method and system for enterprise work plans, relates to the field of enterprise intelligent management, and can solve the problems of poor collaboration and nonstandard flow caused by information dispersion, low permission and progress management and control efficiency, no datamation risk pre-judgment and optimization mechanism in enterprise work plan management at the present stage. Comprising the following steps: determining a basic management environment of an enterprise according to an enterprise organization structure and authority system, cloud side end collaborative hardware and system operation parameters; determining a hierarchical task list according to the basic management environment and the enterprise strategic target; according to the hierarchical task list, allocating each hierarchical task to a corresponding execution main body and pushing a task notification message to the execution main body; and acquiring real-time progress data of each level of task, and performing closed-loop management on the execution process of each level of task according to the real-time progress data. The method and the device are used for intelligently managing the enterprise work plans.
Owner:ANHUI DINGXIN PROJECT MANAGEMENT LTD BY SHARE LTD

Rail transit intelligent maintenance scheduling system and method and storage medium

The invention provides a rail transit intelligent maintenance scheduling system and method and a storage medium. The system comprises a unified configuration platform used for generating configuration information containing a maintenance process and / or a resource demand and / or an optimization target; a plan generation engine which automatically generates a work plan based on the configuration information; the algorithm scheduling engine is used for performing scheduling optimization based on an operational research algorithm suitable for rail transit maintenance; and the feasibility checking engine is used for ensuring that the scheduling result meets the constraint condition. The problem of complexity of maintenance scheduling in the rail transit industry can be effectively solved, the scheduling efficiency is remarkably improved, human errors are reduced, an existing system does not need to be transformed on a large scale, the cost is reduced, and the reliability of maintenance work is improved.
Owner:SIEMENS MOBILITY TECH BEIJING CO LTD

Managing workflow for autonomous work machine or fleet thereof

PCT designated stageWO2025254893A1MowersResourcesCompletion timeWork plan
An autonomous work vehicle is scheduled to perform work at the work site according to an initial work plan. The initial work plan estimates a scheduled end time for the work. Due to various inputs, such as a signal from a worker, an environmental condition, or the like, a completion time is determined that is different than the scheduled end time. During or after the autonomous work vehicle works the work site, a signal is sent to the autonomous work vehicle to complete work at an adjusted end time different than the scheduled end time based on the manual completion time. The initial work is plan adjusted such that the autonomous work vehicle finishes the work by the adjusted end time.
Owner:THE TORO COMPANY +2

Optimization method, optimization system, and program

To propose an optimal work plan while considering the current resources.SOLUTION: An optimization method includes setting a target important achievement degree index which is a target value of an important achievement degree index indicating an important element in a process until achievement of a plan target, setting a changeable range of a parameter having influence on achievement of the plan target, setting an evaluation expression for calculating an index to be used for optimizing the parameter, and calculating the parameter to make an evaluation value which is a value of the evaluation expression calculated using the parameter set within the changeable range, to be equal to or greater than a threshold which is a value of the evaluation expression calculated from the target important achievement degree index.SELECTED DRAWING: Figure 3
Owner:PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTD

State-monitoring device and maintenance work assistance method

A state-monitoring device includes: a state estimating unit to estimate a state of an instrument using operation information of a train on which the instrument is mounted; an instrument arrangement storing unit to store instrument arrangement information indicating arrangement of the instrument in the train; and a work plan output unit to extract the instrument to be maintained that requires inspection or component replacement on the basis of a state estimation value of the instrument, and output information regarding maintenance work in which the instrument to be maintained and the instrument arrangement information are associated with each other.
Owner:MITSUBISHI ELECTRIC CORP

Work planning program, work planning method, and information processing device

A work planning program for causing a computer to execute first specification processing of specifying, for each of a plurality of candidate routes to sequentially travel a plurality of work positions included in a plurality of orders, each of combinations of the orders such that a total sum of movement distances, in which each of a plurality of workers travels work positions specified by a combination of orders assigned to each of the plurality of workers in a case where the plurality of orders is assigned to the plurality of workers, satisfies a first predetermined condition, and second specification processing of selecting a candidate route in which the total sum of the movement distances of each of the plurality of workers satisfies a second predetermined condition among the plurality of candidate routes obtained by executing the first specification processing, and specifying a travel order in which the total sum of the movement distances of each of the plurality of workers satisfies a third predetermined condition by exchanging the travel order in the combination of the orders assigned to each of the plurality of workers.
Owner:FUJITSU LTD

Automatic work line control device and control method therefor

A controller of a control device that controls an automatic work line including a plurality of mechanical operating devices generates a work plan based on work instruction information including a work amount of a work plan target time unit of the automatic work line, outputs the generated work plan, and controls torque of each of the plurality of mechanical operating devices over a target period of the work plan based on the work plan of each of the plurality of mechanical operating devices.
Owner:HITACHI LTD

Sequencing machine work

A method of determining work zones (334,336,338, 340, 342) includes receiving work site data, determining an actual site model (112) based on the work site data, determining a desired site model (114), and comparing the actual site model (112) to the desired site model (114) to determine a work plan, the work plan having work stages including a first work stage and a second work stage. The method further includes determining a first work zone (334, 336, 338, 340, 342) of the first work stage of the work plan, including a first plurality of work locations (302, 304, 306, 308, 312), and determining a second work zone (334, 336, 338, 340, 342) of the second work stage of the work plan, including a second plurality of work locations (302, 304, 306, 308, 312). The method further includes determining a safety zone (334, 336, 338, 340, 342), and determining a sequence for performing work for at least one of the first work zone (334, 336, 338, 340, 342), the first work locations (302,304,306, 308, 312), the second work zone (334, 336, 338, 340, 342), or the second work locations (302, 304, 306, 308, 312) based on the safety zone (334, 336, 338, 340, 342).
Owner:CATERPILLAR INC

Work plan creation method and work plan creation system

The invention provides a work plan creation method and a work plan creation system capable of easily creating an appropriate work plan for a field. A work vehicle (1) for traveling and working on a field is provided with: an information input unit (60) for inputting work plan information relating to a work plan for traveling and working by means of the work vehicle (1); a work plan creation unit (61) that creates a work plan on the basis of a learning model that performs machine learning on the inputted work plan information; and an information output unit (62) that outputs the created work plan to the work vehicle (1).
Owner:YANMAR HLDG CO LTD

Program, print job management device, print job management system, and print job management method

To provide a program, a print job management device, a print job management system, and a print job management method that can quickly correct a work plan for a delayed print job.SOLUTION: A control unit of a management server in a print job management system, displays, in cooperation with a print job management program, progress and volume of a plurality of jobs relating to an ordered print with respect to a work plan on a job management screen of an administrator terminal for a process unit in which a job is located.SELECTED DRAWING: Figure 6
Owner:KONICA MINOLTA INC

Autonomous traveling work system, autonomous traveling work method, management server, and program

To provide an autonomous traveling work system, an autonomous traveling work method, a management server, and a program that can be smoothly operated by acquiring information indicating a use situation of a work area and creating a work plan corresponding to the use situation.SOLUTION: The management server (3) includes a situation information acquiring unit (54) that acquires situation information indicating a use situation of the area (100), a difference determining unit (55) that determines whether the use situation is different from a normal use situation of the area (100), a temporary map creating unit (56) that creates a temporary environmental map 101a by reflecting the difference in the use situation on a normal environmental map (101) of the area (100) when the use situation is different from the normal use situation, and a temporary plan creating unit (57) that creates a temporary work plan based on the temporary environmental map 101a.SELECTED DRAWING: Figure 4
Owner:AMANO KK

Sequencing machine work

A method of determining work zones includes receiving work site data, determining an actual site model based on the work site data, determining a desired site model, and comparing the actual site model to the desired site model to determine a work plan, the work plan having work stages including a first work stage and a second work stage. The method further includes determining a first work zone of the first work stage of the work plan, including a first plurality of work locations, and determining a second work zone of the second work stage of the work plan, including a second plurality of work locations. The method further includes determining a safety zone, and determining a sequence for performing work for at least one of the first work zone, the first work locations, the second work zone, or the second work locations based on the safety zone.
Owner:CATERPILLAR INC