Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

126 results about "Work plan" patented technology

Information system operation and maintenance work ticket auxiliary auditing method based on large model

The invention relates to the technical field of work ticket auxiliary auditing, and discloses an information system operation and maintenance work ticket auxiliary auditing method based on a large model, and the method comprises the steps: obtaining the content of a work ticket, carrying out the text cleaning of the content, and constructing a content accuracy auditing prompt word; the cue word is transmitted into a large model, and a content accuracy auditing opinion is obtained; constructing a work scheme rationality auditing prompt word, and obtaining a work scheme rationality auditing opinion and a potential risk point list; constructing a safety measure completeness auditing prompt word, and obtaining a safety measure completeness auditing opinion; obtaining a content compliance auditing opinion, and generating a final work ticket auxiliary auditing opinion; according to the method, the auditing efficiency, quality and safety are comprehensively improved, and a powerful guarantee is provided for safe and stable operation of an enterprise information system. And meanwhile, through knowledge precipitation and a continuous optimization mechanism, continuous improvement of the auditing capability is realized, and core competitiveness of enterprise operation and maintenance management is formed.
Owner:STATE GRID INFORMATION & TELECOMM BRANCH +1

Systems and methods for generating changes to workplace plans using generative ai

Systems and methods for assessing the feasibility of a proposed contact center work plan are disclosed. The plan may include a proposed workload and a proposed performance metric and the method may include: generating, based on the proposed contact center work plan and data indicative of previous feasible contact center work plans, a feasibility for the proposed contact center work plan; and where the feasibility is below a threshold, generating, using a large language model, a modified contact center work plan for a user with a feasibility above the threshold, the modified contact center work plan comprising a modification to one or more aspects of the contact center work plan.
Owner:NICE LTD

Alternative shift generation technologies

PendingUS20250348807A1ForecastingAutomatic exchangesWork planShift schedule
A system for generating alternative shifts for contact center agent scheduling according to an embodiment includes a system that receives a staffing requirement forecast indicative of a number of agents required to handle a workload forecast. Agent data is received for a plurality of agents. The system receives a service level override value and performs column generation to identify shifts for the agents based on the staffing requirement forecast, agent working rules, and work plan constraints. A subset of the shifts is selected to generate an optimized agent shift schedule. A request to replace an individual shift of the optimized shift schedule with an alternative shift is received. In response, the system identifies the alternative shift from the plurality of shifts based on the service level override value. The individual shift is replaced with the identified alternative shift on the optimized shift schedule.
Owner:GENESYS CLOUD SERVICES INC

Command system, coordination system, and command method

To provide a system that provides assistance so that a user who directs countermeasures after a crisis can make a decision for crisis countermeasures more accurately or more quickly.SOLUTION: A command system comprises: an integrated information acquisition unit that acquires integrated information obtained by integrating troop information relating to the status of on-site troops in a disaster area, with sensing data or processed sensing data, the sensing data including image data or point cloud data or spatial data obtained by sensing the disaster area from above by a flying vehicle; an integrated information display unit that displays the integrated information to a control device used by a user who directs the on-site troops; and a work plan command unit that issues a work command as to a work instruction or a work plan for the on-site troops. The work plan command unit causes information about the work instruction or the work plan to be displayed by at least one of a troop terminal used by the on-site troops and the control device.SELECTED DRAWING: Figure 1
Owner:TERRA LABO INC

Work plan management method

PendingJP2025170531AInstrumentsWork planWorkload
To provide a work plan management method that periodically reviews a work plan on the basis of an actual work result at a work site and efficiently manages work progress.SOLUTION: A work plan management method comprises the steps of: generating a work plan by using a parameter related to a worker, the work plan including an amount of work for a predetermined period longer than a predetermined time based on an amount of work for each predetermined time by one or more workers; acquiring a work result including an amount of work results performed by the worker for every predetermined time; adjusting, on the basis of a difference between the work plan and the most latest N (N: a set value which is an integer equal to or greater than 2) times of work results acquired for every predetermined time, the parameter of the worker; updating the work plan by using adjustment results of the parameter; and outputting updated results of the work plan to a viewer.SELECTED DRAWING: Figure 7
Owner:PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTD

Production planning device, production planning system, and production planning method

It is possible to update a process plan, a work plan, and a production plan in a short time with respect to a production fluctuation event and flexibly deal with the production fluctuation. A production planning device includes: a process plan generation unit which generates a plurality of process plans including an alternative process plan, the process plans relating to a production process of a product; a work plan generation unit which generates a work plan corresponding to each of the process plans; a production plan generation unit which generates a production plan using the plurality of process plans and the work plan; and a production plan redrafting unit which redrafts a production plan using the plurality of process plans and the work plan when a production fluctuation event occurs.
Owner:HITACHI LTD

Electric power tool lending method, device, computer equipment, readable storage medium and program product

PendingCN122390637AWork planResource management
The application relates to an electric power tool taking method and device, computer equipment, a computer readable storage medium and a computer program product, and relates to the technical field of intelligent electric power resource management, and can improve the automatic flow efficiency of electric power tools. The method comprises the following steps: obtaining a work plan associated with a tool taking user based on a tool taking request of the tool taking user; determining a tool use list corresponding to the tool taking user according to the work plan; obtaining taking identification data of electric power tools to be taken through a sensing device of a storage space; obtaining tool state data corresponding to the electric power tools to be taken based on the taking identification data; comparing and verifying the taking identification data and the tool state data with target identification data corresponding to the tool use list and a preset state condition respectively; and determining a tool taking record based on the taking identification data and the tool state data if the comparison and verification is passed.
Owner:GUANGZHOU POWER SUPPLY BUREAU GUANGDONG POWER GRID CO LTD

Robot control device, robot control system, robot, and robot control method

A robot control device (11) is provided with: a determining unit (33) for determining the progress status of first work in accordance with a work instruction; a search unit (35) for searching for a partner (17) capable of providing specific information for changing the progress status of the first work to a continuation-possible status if the progress status of the first work is a continuation-not-possible status; an estimating unit (37) for estimating the total work cost including second work for changing the progress status of the first work from the continuation-not-possible status to the continuation-possible status; a plan creating unit (38) for creating a work plan including the second work for the partner (17) on the basis of the estimated total work cost; and a control unit (39) for causing the work including the second work complying with the created work plan to be performed. The plan creating unit (38) creates the work plan so as to minimize the total work cost.
Owner:HITACHI LTD

Intelligent management method and system for enterprise work plan

The invention discloses an intelligent management method and system for enterprise work plans, relates to the field of enterprise intelligent management, and can solve the problems of poor collaboration and nonstandard flow caused by information dispersion, low permission and progress management and control efficiency, no datamation risk pre-judgment and optimization mechanism in enterprise work plan management at the present stage. Comprising the following steps: determining a basic management environment of an enterprise according to an enterprise organization structure and authority system, cloud side end collaborative hardware and system operation parameters; determining a hierarchical task list according to the basic management environment and the enterprise strategic target; according to the hierarchical task list, allocating each hierarchical task to a corresponding execution main body and pushing a task notification message to the execution main body; and acquiring real-time progress data of each level of task, and performing closed-loop management on the execution process of each level of task according to the real-time progress data. The method and the device are used for intelligently managing the enterprise work plans.
Owner:ANHUI DINGXIN PROJECT MANAGEMENT LTD BY SHARE LTD

Rail transit intelligent maintenance scheduling system and method and storage medium

The invention provides a rail transit intelligent maintenance scheduling system and method and a storage medium. The system comprises a unified configuration platform used for generating configuration information containing a maintenance process and / or a resource demand and / or an optimization target; a plan generation engine which automatically generates a work plan based on the configuration information; the algorithm scheduling engine is used for performing scheduling optimization based on an operational research algorithm suitable for rail transit maintenance; and the feasibility checking engine is used for ensuring that the scheduling result meets the constraint condition. The problem of complexity of maintenance scheduling in the rail transit industry can be effectively solved, the scheduling efficiency is remarkably improved, human errors are reduced, an existing system does not need to be transformed on a large scale, the cost is reduced, and the reliability of maintenance work is improved.
Owner:SIEMENS MOBILITY TECH BEIJING CO LTD

Managing workflow for autonomous work machine or fleet thereof

PCT designated stageWO2025254893A1MowersResourcesCompletion timeWork plan
An autonomous work vehicle is scheduled to perform work at the work site according to an initial work plan. The initial work plan estimates a scheduled end time for the work. Due to various inputs, such as a signal from a worker, an environmental condition, or the like, a completion time is determined that is different than the scheduled end time. During or after the autonomous work vehicle works the work site, a signal is sent to the autonomous work vehicle to complete work at an adjusted end time different than the scheduled end time based on the manual completion time. The initial work is plan adjusted such that the autonomous work vehicle finishes the work by the adjusted end time.
Owner:THE TORO COMPANY +2

State-monitoring device and maintenance work assistance method

A state-monitoring device includes: a state estimating unit to estimate a state of an instrument using operation information of a train on which the instrument is mounted; an instrument arrangement storing unit to store instrument arrangement information indicating arrangement of the instrument in the train; and a work plan output unit to extract the instrument to be maintained that requires inspection or component replacement on the basis of a state estimation value of the instrument, and output information regarding maintenance work in which the instrument to be maintained and the instrument arrangement information are associated with each other.
Owner:MITSUBISHI ELECTRIC CORP

Work planning program, work planning method, and information processing device

A work planning program for causing a computer to execute first specification processing of specifying, for each of a plurality of candidate routes to sequentially travel a plurality of work positions included in a plurality of orders, each of combinations of the orders such that a total sum of movement distances, in which each of a plurality of workers travels work positions specified by a combination of orders assigned to each of the plurality of workers in a case where the plurality of orders is assigned to the plurality of workers, satisfies a first predetermined condition, and second specification processing of selecting a candidate route in which the total sum of the movement distances of each of the plurality of workers satisfies a second predetermined condition among the plurality of candidate routes obtained by executing the first specification processing, and specifying a travel order in which the total sum of the movement distances of each of the plurality of workers satisfies a third predetermined condition by exchanging the travel order in the combination of the orders assigned to each of the plurality of workers.
Owner:FUJITSU LTD

Automatic work line control device and control method therefor

A controller of a control device that controls an automatic work line including a plurality of mechanical operating devices generates a work plan based on work instruction information including a work amount of a work plan target time unit of the automatic work line, outputs the generated work plan, and controls torque of each of the plurality of mechanical operating devices over a target period of the work plan based on the work plan of each of the plurality of mechanical operating devices.
Owner:HITACHI LTD

Sequencing machine work

A method of determining work zones (334,336,338, 340, 342) includes receiving work site data, determining an actual site model (112) based on the work site data, determining a desired site model (114), and comparing the actual site model (112) to the desired site model (114) to determine a work plan, the work plan having work stages including a first work stage and a second work stage. The method further includes determining a first work zone (334, 336, 338, 340, 342) of the first work stage of the work plan, including a first plurality of work locations (302, 304, 306, 308, 312), and determining a second work zone (334, 336, 338, 340, 342) of the second work stage of the work plan, including a second plurality of work locations (302, 304, 306, 308, 312). The method further includes determining a safety zone (334, 336, 338, 340, 342), and determining a sequence for performing work for at least one of the first work zone (334, 336, 338, 340, 342), the first work locations (302,304,306, 308, 312), the second work zone (334, 336, 338, 340, 342), or the second work locations (302, 304, 306, 308, 312) based on the safety zone (334, 336, 338, 340, 342).
Owner:CATERPILLAR INC

Work plan creation method and work plan creation system

The invention provides a work plan creation method and a work plan creation system capable of easily creating an appropriate work plan for a field. A work vehicle (1) for traveling and working on a field is provided with: an information input unit (60) for inputting work plan information relating to a work plan for traveling and working by means of the work vehicle (1); a work plan creation unit (61) that creates a work plan on the basis of a learning model that performs machine learning on the inputted work plan information; and an information output unit (62) that outputs the created work plan to the work vehicle (1).
Owner:YANMAR HLDG CO LTD

Program, print job management device, print job management system, and print job management method

To provide a program, a print job management device, a print job management system, and a print job management method that can quickly correct a work plan for a delayed print job.SOLUTION: A control unit of a management server in a print job management system, displays, in cooperation with a print job management program, progress and volume of a plurality of jobs relating to an ordered print with respect to a work plan on a job management screen of an administrator terminal for a process unit in which a job is located.SELECTED DRAWING: Figure 6
Owner:KONICA MINOLTA INC

Autonomous traveling work system, autonomous traveling work method, management server, and program

To provide an autonomous traveling work system, an autonomous traveling work method, a management server, and a program that can be smoothly operated by acquiring information indicating a use situation of a work area and creating a work plan corresponding to the use situation.SOLUTION: The management server (3) includes a situation information acquiring unit (54) that acquires situation information indicating a use situation of the area (100), a difference determining unit (55) that determines whether the use situation is different from a normal use situation of the area (100), a temporary map creating unit (56) that creates a temporary environmental map 101a by reflecting the difference in the use situation on a normal environmental map (101) of the area (100) when the use situation is different from the normal use situation, and a temporary plan creating unit (57) that creates a temporary work plan based on the temporary environmental map 101a.SELECTED DRAWING: Figure 4
Owner:AMANO KK

Sequencing machine work

A method of determining work zones includes receiving work site data, determining an actual site model based on the work site data, determining a desired site model, and comparing the actual site model to the desired site model to determine a work plan, the work plan having work stages including a first work stage and a second work stage. The method further includes determining a first work zone of the first work stage of the work plan, including a first plurality of work locations, and determining a second work zone of the second work stage of the work plan, including a second plurality of work locations. The method further includes determining a safety zone, and determining a sequence for performing work for at least one of the first work zone, the first work locations, the second work zone, or the second work locations based on the safety zone.
Owner:CATERPILLAR INC

Multi-professional daily work plan management method, system and device and storage medium

The invention discloses a multi-specialty day operation plan management method, system and device and a storage medium, and belongs to the technical field of railway management, and the method comprises the steps: compiling a public work specialty day operation plan, an electric service specialty day operation plan and a power supply specialty day operation plan of a target day, and obtaining a multi-specialty day operation plan set of the target day; according to the plan information of each day operation plan in the multi-specialty day operation plan set, performing conflict detection on the day operation plans in the multi-specialty day operation plan set to obtain conflict operation plans; and determining an optimization scheme of each conflicting operation plan, and sending the optimization scheme of each conflicting operation plan to a plan making person. According to the method, the problem of missing detection of the conflicting operation plans caused by manpower is solved, the labor cost is reduced, and the detection efficiency of the conflicting operation plans is improved; meanwhile, an optimization scheme of a conflict operation plan is provided, and operation conflicts in a railway multi-specialty collaborative operation mode are eliminated in time.
Owner:CRSC RESEARCH & DESIGN INSTITUTE GROUP CO LTD

Information processing device, command support system, information processing method, and program

To obtain an information processing device that enables support for appropriately modifying work plans related to the maintenance of railway equipment. [Solution] The information processing device 13 includes a prediction unit 42 that predicts the future train schedule and the future work status related to the maintenance of railway equipment based on timetable information showing the train operation plan, work plan information showing the work plan related to the maintenance of railway equipment, and operation performance information showing the train operation performance, and an operation adjustment plan creation unit 43 that creates an operation adjustment plan including changes to the work plan based on timetable prediction information showing the predicted timetable and work status prediction information showing the predicted work status.
Owner:MITSUBISHI ELECTRIC CORP

Operation plan progress automatic updating method, device, equipment and medium

ActiveCN121448473ARailway traffic control systemsWork planMonitoring status
The invention discloses a method for automatically updating an operation plan. The method comprises the following steps: S1, reading basic data of a station yard; s2, collecting data of each interface; s3, calculating a current hook; if the train set is in the non-shunting monitoring state at present, whether the current operation is finished or not is judged according to the current humping operation mode or the non-humping operation mode of the train set; if the current operation is finished, updating the current hook, and entering the step S4; and S4, updating the execution progress of the operation plan. According to the invention, a multi-system information fusion mechanism is established, and the current hook completion condition in the operation plan is calculated in real time.
Owner:CASCO SIGNAL LTD

System and method for generating work plan for autonomous operation of compactor

A system for generating a work plan for autonomous operation of a compactor in tandem with an earthmoving machine includes a first controller that receives information pertaining to a work area on which the earthmoving machine is required to perform at least one operation. The system also includes a central controller that receives, from the first controller, information pertaining to the work area on which the compactor is required to perform the at least one operation and analyzes the work area for virtually segmenting the work area into a plurality of virtual work areas, and data indicative of a movement of the earthmoving machine through each virtual work area from the plurality of virtual work areas. The central controller determines an optimal direction of movement for the compactor based on the data indicative of the movement of the earthmoving machine, topographical conditions, as well as geometry of the work area.
Owner:CATERPILLAR INC

Automatic operation control system

To reduce the possibility that deviation phenomenon happens again after occurrence of deviation phenomenon during automatic operation.SOLUTION: An automatic operation control system 1 includes a work machine 10 with a machine body 10a and an attachment 15 attached to the machine body 10a, a detection unit 31 that detects the posture of the work machine 10, and a controller 50. The controller 50 includes an operation control unit 53 that controls automatic operation of the work machine 10 based on a work plan, a deviation amount calculation unit 55 that calculates the amount of deviation between the posture of the work machine 10 during automatic operation detected by the detection unit 31 and a target lifting swing trajectory P2 or a target return swing trajectory P4, and an automatic operation correction unit 57 that corrects the work plan in accordance with the amount of deviation.SELECTED DRAWING: Figure 2
Owner:KOBELCO CONSTR MASCH CO LTD

Task scheduling anomaly monitoring method, device, medium and program product

The present application provides a task scheduling anomaly monitoring method, device, medium and program product, which obtains historical task data of one or more historical task cycles according to the work plan of the current task cycle; determines multiple task time-consuming types and scheduling relationship maps based on the historical task data, and the ratio of the amount of data contained in each task time-consuming type to the total amount of time-consuming data meets the preset proportion requirement; determines at least one timed detection task based on multiple task time-consuming types and scheduling relationship maps; and predicts whether the probability of anomalies in the task scheduling of the target system meets the preset warning requirements based on the detection results of each timed detection task at each detection time point; if so, determines and outputs one or more warning information. This solves the technical problems of existing anomaly monitoring, such as poor response time, inflexible configuration, and only logical-level monitoring, which is not highly coupled with actual business.
Owner:WEBANK (CHINA)

Logistics simulation device, work plan creation method, program, and work method for steel mill

The logistics simulation device has an input information acquisition module (301), a receiving plan generation module (302), a route module (303), a processed material stock placement site module (304), a processed material internal warehouse module (306), a processing equipment module (305), and a control module (307). The control module (307) searches for a route for carrying a material using the route module (303), and the route module (303) searches for a route for carrying a material by combining routes, i.e., small routes, divided according to equipment elements.
Owner:JFE STEEL CORP

Work planning method, work planning system, and program

The invention provides a work planning method, a work planning system, and a program, which can limit the work area of a forklift and realize the application of minimizing human intervention in the work of lifting and lowering goods from a storage rack and the work of transporting the goods. A work planning method for making a picking work plan on the basis of shipment information includes the steps of: determining products to be loaded on an AGV and making a product list; determining a storage shelf corresponding to the commodities in the commodity list; distributing forklifts to goods on the basis of the information of the determined storage shelves; and making work plans including commodity information, work time, and work places for the forklift and the AGV respectively.
Owner:LUO JIDI CO LTD

System and method for generating work plan for autonomous operation of compactor

A system for generating a work plan for autonomous operation of a compactor in tandem with an earthmoving machine includes a first controller that receives information pertaining to a work area on which the earthmoving machine is required to perform at least one operation. The system also includes a central controller that receives, from the first controller, information pertaining to the work area on which the earthmoving machine is required to perform the at least one operation and analyzes the work area for virtually segmenting the work area into a plurality of virtual work areas. The central controller also receives, from the first controller, data indicative of a movement of the earthmoving machine through each virtual work area from the plurality of virtual work areas and determines an optimal direction of movement for the compactor based on the data indicative of the movement of the earthmoving machine.
Owner:CATERPILLAR INC

Auxiliary learning method and device, equipment and storage medium

The embodiment of the invention discloses an auxiliary learning method and device, equipment, a storage medium and a program product, and the method is applied to learning equipment and comprises the steps that at least one piece of work information of a user is acquired, and the work information comprises duration information; a work planning interface corresponding to the at least one piece of work information is displayed, the work planning interface comprises at least one work card, and the work card comprises a work processing control; in response to a trigger operation on a job processing control of a target job card, displaying a job processing interface corresponding to the target job information, the target job card being one of the at least one job card, and the target job information being job information corresponding to the target job card, the job processing interface comprises timing information and duration information of the target job information. The task type homework card can be provided for the user, the planning threshold for the user to start to write the homework is lowered, time and timing reminding are provided in the homework process, and the homework completion efficiency is improved.
Owner:GUANGDONG XIAOTIANCAI TECH CO LTD