Cooperative office-based project type working plan management system

A work plan and collaborative office technology, applied in computing, data processing applications, instruments, etc., can solve the problems of single management users and inability to interact

Inactive Publication Date: 2011-05-25
INSPUR COMMON SOFTWARE
View PDF0 Cites 40 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] At the same time, the management users in these plan management systems are often single, and the relevant people on

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Cooperative office-based project type working plan management system
  • Cooperative office-based project type working plan management system
  • Cooperative office-based project type working plan management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0036] as attached figure 1 As shown, in the plan management system disclosed in the present invention, firstly, management personnel such as the project manager formulate the project plan, decompose the project into sub-projects, and specify relevant attributes and persons in charge for each sub-project; the persons in charge of the sub-projects in the system After seeing the sub-projects assigned by the superior managers, they can be further subdivided into smaller sub-project tasks. Each project task has a clear person in charge. Once assigned, the relevant person in charge will See the tasks you are responsible for in the system. Once the project plan is subdivided, a general plan will be formed, and then automatically submitted to the relevant process for approval. After approval, a definite project plan will be formed. The above process is the formation process of the project plan, such as figure 1 As shown in steps 1, 2, and 3, the entire process is completed in the c...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a cooperative office-based project type working plan management system, which belongs to the technical field of computer application. The system comprises a project view and a time plan view, wherein a user works in the project view and the time plan view; the project plan can be automatically converted into a time plan for guiding daily work; the change, approval, authority and the like of the plan are managed; after tracking is performed at the end of the time plan, tracking data is automatically reflected in the project plan; simultaneously, various plan summary reports, plan change reports and the like can be generated for management decision. Compared with the prior art, the system realizes automatic generation of the time plan according to data of the project plan; simultaneously, tracking data of the time plan is automatically synchronized into the project plan, the progress of a project is reflected and the user can exchange the plans or run the plans according to a flow in various processes, so that the project plan and the time plan are managed uniformly.

Description

technical field [0001] The invention relates to a computer application technology, in particular to a collaborative office-based project-type work plan management system. Background technique [0002] At present, most of the plan management systems are mostly a single type of management, either the management of project plans or the management of work plans. The management of the project plan is mainly to divide the project into stages, plan and manage the time and resources of each work in each stage, and use the setting of corresponding milestones, comparison points, baselines, etc. to track more accurately The completion of the plan; in the work plan management, it is necessary to manually integrate the plans of multiple projects to form a phased work plan, and track and manage these plans, but these tracking data are not reflected in the project plan. [0003] The project plan reflects an overall plan, while the work plan actually subdivides the project plan according t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/00G06Q10/06
Inventor 田尚杰吴西云
Owner INSPUR COMMON SOFTWARE
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products