Bladder fistulization tube
By introducing a pressure detection and alarm module and a negative pressure cleaning structure into the cystostomy tube, the problem of blockage caused by urine impurities is solved, timely reminder and quick cleaning of blockage are achieved, and the patient's comfort and continuity of urination are improved.
Patent Information
- Application Number
- CN202323662655.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-30
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2033-12-30
AI Technical Summary
The existing cystostomy tube is blocked due to urine impurities, and the timely treatment is insufficient, resulting in patient discomfort.
A cystostomy tube including a main catheter, an airway, a flow channel, a urinary catheter head, a balloon, a pressure detection module and a cleaning tube is designed. The pressure detection module and alarm module are used to remind blockages, and the negative pressure cleaning structure is used to quickly clear the blockage. to keep the pipes clear.
It achieves timely reminder and quick cleaning of cystostomy tube blockage, reduces patient discomfort, and ensures continuous use of urination.
Smart Images

Figure CN221845616U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of medical instruments, and more specifically to a cystostomy tube. Background Art
[0002] Cystostomy is a procedure that involves puncturing the bladder above the pubic bone to drain urine due to lower urinary tract obstruction. A urinary catheter is inserted to drain urine to the outside of the body, thereby relieving urinary tract obstruction and maintaining the body's water, electrolyte and internal environment balance. Cystostomy is to relieve the patient's damaged bladder, drain the urine remaining in the body, and relieve kidney pressure. Patients should regularly change the catheter, disinfect the stoma, and change the dressing to keep the catheter clean and unblocked.
[0003] At present, the ostomy tube left in the bladder may be blocked due to the high content of impurities in the urine. However, the current ostomy tubes are not able to deal with the blockage problem in a timely manner, which can easily cause physical discomfort to patients. Utility Model Content
[0004] In order to overcome the above-mentioned defects of the prior art, an embodiment of the utility model provides a bladder fistula tube. The technical problem to be solved by the utility model is that the current fistula tube is affected by problems such as the high content of impurities in urine, which may cause blockage in the tube, and the current fistula tube lacks timely processing of the blockage problem in the tube, which easily causes physical discomfort to the patient.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a bladder fistula catheter, comprising a main catheter, an airway and a flow channel are separated in the main catheter, a catheter head is arranged at one end of the main catheter, an air bag connected to the airway is arranged on the outer surface of the main catheter close to the catheter head, a trachea connected to the airway is arranged on the main catheter, a first pressure detection module for detecting the pressure in the bladder is arranged on the side in the flow channel and close to the catheter head, a second pressure detection module for detecting the pressure in the flow channel is arranged in the main catheter, a pressure alarm module is arranged on the main catheter, a cleaning tube and a secondary catheter are disassembled and connected in sequence at one end of the main catheter facing away from the catheter head, a blockage cleaning port is fixedly connected on the cleaning tube, and a blockage cleaning structure is disassembled and connected on the blockage cleaning port.
[0006] In a preferred embodiment, the first pressure detection module and the second pressure detection module are both electrically connected to the pressure alarm module via an external controller.
[0007] In a preferred embodiment, the main conduit, the cleaning conduit and the auxiliary conduit are movably connected in sequence.
[0008] In a preferred embodiment, a first valve is provided on the cleaning pipe, and a second valve is provided on the blocked cleaning port.
[0009] In a preferred embodiment, the blockage cleaning structure includes a negative suction pipe movably plugged into the blockage cleaning port, a piston slidably connected to the negative suction pipe, and a pull rod fixedly connected to the piston.
[0010] In a preferred embodiment, a gasket is provided on the main conduit, a fixing sleeve is fixedly connected to the gasket, and the fixing sleeve is movably mounted on the main conduit.
[0011] Technical effects and advantages of the utility model:
[0012] 1. The utility model sets a first pressure detection module for detecting the internal pressure at the bladder position, and sets a second pressure detection module for detecting the pressure in the flow channel in the main catheter. The pressure data provided by the two are used to test the pressure of urine in the bladder passing through the main catheter. When a pressure difference occurs, it means that the urination of the main catheter is not smooth enough, that is, there is a possibility of blockage. The pressure alarm module is used to remind the urination blockage, which can provide an alarm function for the urination of the fistula tube and meet the timely reminder effect of urination blockage.
[0013] 2. The utility model provides a cleaning tube and a blockage cleaning structure to adaptively open and close the cleaning tube and the first valve and the second valve on the blockage cleaning port. The blockage cleaning structure can provide negative pressure in the main conduit by means of negative pressure suction, which can promote the blockage in the main conduit to move to the cleaning tube position, thereby achieving the effect of quickly clearing the blockage. The cleaning tube is detachably connected with the main conduit and the auxiliary conduit, so as to remove the cleaning tube and then connect the main conduit and the auxiliary conduit, so that urination can continue while conveniently cleaning the blockage. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 The utility model is a schematic diagram of the planar structure of a cystostomy tube.
[0015] Figure 2 For the utility model Figure 1 Schematic diagram of the structure without the cleaning tube.
[0016] Figure 3 It is a structural schematic diagram of the cleaning pipe and the blockage cleaning structure of the utility model.
[0017] The accompanying drawings are marked as follows: 1. main catheter; 2. airway; 3. flow channel; 4. catheter head; 5. airbag; 6. trachea; 7. first pressure detection module; 71. second pressure detection module; 8. pressure alarm module; 9. cleaning tube; 91. blockage cleaning port; 10. secondary catheter; 11. blockage cleaning structure; 111. negative suction tube; 112. piston; 113. pull rod; 12. first valve; 13. second valve; 14. gasket; 15. fixing sleeve. DETAILED DESCRIPTION
[0018] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0019] Combined with reference Figure 1-Figure 3 The utility model provides a bladder fistula catheter, comprising a main catheter 1; the main catheter 1 can pass through the fistula opening into the bladder for catheterization; an airway 2 and a flow channel 3 are separated in the main catheter 1, and a catheter head 4 is arranged at one end of the main catheter 1; urine in the bladder can enter the main catheter 1 through the catheter head 4; an air bag 5 connected with the airway 2 is arranged on the outer surface of the main catheter 1 close to the catheter head 4, and a trachea 6 connected with the airway 2 is arranged on the main catheter 1; in the present application, the trachea 6 can be filled with liquid or gas in cooperation with an external injection device to control the change and expansion of the air bag 5 and to abut against the inner wall of the bladder, and the air bag 5 can be made to fit against the inner wall of the bladder by gently pulling the main catheter 1.
[0020] A first pressure detection module 7 for detecting the pressure in the bladder is provided in the flow channel 3 and on one side close to the catheter head 4; in the present application, the first pressure detection module 7 can use a first pressure sensor to detect the pressure in the bladder; a second pressure detection module 71 for detecting the pressure in the flow channel 3 is provided in the main catheter 1; in the present application, a second pressure sensor can be used in the second pressure detection module 71 to detect the pressure in the flow channel 3 of the main catheter 1. When the pressure data of the two are similar, it means that the urine in the bladder is effectively discharged through the main catheter 1; conversely, when the pressure data of the first pressure detection module 7 is greater than that of the second pressure detection module 7, the urine in the bladder is effectively discharged through the main catheter 1. When the pressure data of the second pressure detection module 71 is obtained, it means that there is a pressure difference problem in the main catheter 1 due to blockage; a pressure alarm module 8 is provided on the main catheter 1; in the present application, the pressure alarm module 8 can adopt an audible and visual alarm, and the pressure alarm module 8 can alarm when a blockage occurs in the main catheter 1; the end of the main catheter 1 facing away from the catheter head 4 is disassembled and connected with a cleaning tube 9 and a secondary catheter 10 in sequence; the end of the secondary catheter 10 facing away from the cleaning tube 9 can be connected with a urine bag; a blockage cleaning port 91 is fixedly connected on the cleaning tube 9, and a blockage cleaning structure 11 is disassembled and connected to the blockage cleaning port 91.
[0021] In this embodiment, the pressure data provided by the first pressure detection module 7 and the second pressure detection module 71 are used to test the pressure of urine in the bladder passing through the main catheter 1. When a pressure difference occurs, it indicates the possibility of blockage in urination in the main catheter 1, so that the pressure alarm module 8 is used to remind the urination blockage, thereby satisfying the effect of timely reminder of urination blockage; at the same time, under the warning provided by the alarm information, the blockage cleaning structure 11 uses negative pressure suction to provide negative pressure in the main catheter 1, which can promote the blockage in the main catheter 1 to move to the position of the cleaning tube 9. With the detachable connection of the cleaning tube 9, the blockage can be quickly cleaned without affecting the use of the fistula tube for urination.
[0022] The first pressure detection module 7 and the second pressure detection module 71 are both electrically connected to the pressure alarm module 8 by an external controller; the pressure signals measured by the first pressure detection module 7 and the second pressure detection module 71 are received and processed by the external controller. When there is a pressure difference between the pressure data of the two, the controller can control the pressure alarm module 8 to issue an audible and visual reminder of blockage.
[0023] The main catheter 1, the cleaning tube 9 and the auxiliary catheter 10 are movably connected in sequence; in this way, the connection between the tubes can be disassembled, and the removal of the cleaning tube 9 can facilitate the cleaning of the blockage sucked in by the negative pressure. After the cleaning tube 9 is removed, the main catheter 1 and the auxiliary catheter 10 are connected and used, so that the bladder can continue to be used for urination.
[0024] A first valve 12 is provided on the cleaning tube 9, and a second valve 13 is provided on the blocked cleaning port 91; when there is no blockage in the main conduit 1, the first valve 12 on the cleaning tube 9 is in an open state, and the second valve 13 on the blocked cleaning port 91 is in a closed state, and the cleaning tube 9 can be used to circulate urine flowing out of the flow channel 3; conversely, when a blockage warning appears in the main conduit 1, the first valve 12 can be closed and the second valve 13 can be opened, and the blockage cleaning structure 11 acts on the cleaning tube 9 to suck and clean the blockage in the main conduit 1.
[0025] The blockage clearing structure 11 comprises a negative suction pipe 111 movably plugged into the blockage clearing port 91 , a piston 112 slidably connected in the negative suction pipe 111 , and a pull rod 113 fixedly connected to the piston 112 .
[0026] Specifically, by inserting the end of the negative suction tube 111 into the blockage cleaning port 91 and connecting it with the cleaning tube 9, pulling the pull rod 113 drives the piston 112 to move downward in the negative suction tube 111, so that the negative pressure acts on the main tube 1 through the cleaning tube 9, which can promote the movement of the blockage in the main tube 1 until the blockage moves into the cleaning tube 9. During this process, a small amount of blockage will enter the negative suction tube 111. Then, by removing the cleaning tube 9 and connecting the secondary tube 10 to the main tube 1, while facilitating the cleaning of the blockage in the cleaning tube 9, the cooperation of the main tube 1 and the secondary tube 10 can continue to urinate into the urine bag.
[0027] It is worth mentioning that after the pull rod 113 drives the piston 112 to pull once, if the blockage in the main conduit 1 is not completely cleared, the negative suction pipe 111 can be removed and the piston 112 can be reset to the end position of the negative suction pipe 111, so that the negative suction pipe 111 can be placed at the position corresponding to the blockage cleaning port 91 for negative pressure suction.
[0028] A gasket 14 is provided on the main catheter 1, and a fixing sleeve 15 is fixedly connected to the gasket 14, and the fixing sleeve 15 is movably sleeved on the main catheter 1; in the present application, the fixing sleeve 15 can be made of elastic rubber material, so that the fixing sleeve 15 has a movable fixing effect on the main catheter 1 and can also meet the elastic binding effect; the setting of the gasket 14, after the main catheter 1 enters the bladder through the fistula opening, the position of the fixing sleeve 15 is adaptively moved at this time, so that the gasket 14 can be padded on the abdominal skin, and finally the gasket 14 is fixed with a special medical tape to stabilize the use position of the main catheter 1.
Claims
1. A cystostomy catheter, comprising a main catheter (1), characterized in that: The main conduit (1) is divided into an airway (2) and a flow channel (3). A urinary catheter head (4) is provided at one end of the main conduit (1). An air bag (5) connected to the airway (2) is provided on the outer surface of the main conduit (1) close to the urinary catheter head (4). The main conduit (1) is provided with a trachea (6) connected to the airway (2). A first pressure detection module (7) for detecting the pressure in the bladder is provided in the flow channel (3) and on one side close to the urinary catheter head (4). A second pressure detection module (71) for detecting the pressure in the flow channel (3) is provided in the main conduit (1). A pressure alarm module (8) is provided on the main conduit (1). A cleaning tube (9) and a secondary conduit (10) are detachably connected to one end of the main conduit (1) facing away from the urinary catheter head (4). A blockage cleaning port (91) is fixedly connected to the cleaning tube (9). A blockage cleaning structure (11) is detachably connected to the blockage cleaning port (91).
2. A cystostomy catheter according to claim 1, characterized in that: The first pressure detection module (7) and the second pressure detection module (71) are both electrically connected to the pressure alarm module (8) via an external controller.
3. A cystostomy catheter according to claim 1, characterized in that: The main conduit (1), the cleaning conduit (9) and the auxiliary conduit (10) are movably connected in sequence.
4. A cystostomy catheter according to claim 1, characterized in that: The cleaning pipe (9) is provided with a first valve (12), and the blocked cleaning port (91) is provided with a second valve (13).
5. A cystostomy catheter according to claim 1, characterized in that: The blockage cleaning structure (11) comprises a negative suction pipe (111) movably plugged into the blockage cleaning port (91), a piston (112) slidably connected to the negative suction pipe (111), and a pull rod (113) fixedly connected to the piston (112).
6. A cystostomy catheter according to claim 1, characterized in that: The main conduit (1) is provided with a gasket (14), a fixing sleeve (15) is fixedly connected to the gasket (14), and the fixing sleeve (15) is movably sleeved on the main conduit (1).
