Hydrate sand prevention device with screen pipe rotational flow filtration three-stage coupling

By adopting a three-stage coupled screen tube cyclone filtration structure in hydrate mining, combined with a first-stage sand control screen, a second-stage cyclone separator and a third-stage sand control filter cotton, the problem of fine silty sand sand control in the existing technology is solved. The problem of insufficient capacity is achieved, and efficient hydrate production and well wall stability are achieved.

CN221856692UActive Publication Date: 2024-10-18YIBIN UNIV
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323345457.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-07
Publication Date
2024-10-18
Estimated Expiration
2033-12-07

Smart Images

  • Figure CN221856692U_ABST
    Figure CN221856692U_ABST
Patent Text Reader

Abstract

The utility model discloses a hydrate sand prevention device with screen pipe rotational flow filtration three-stage coupling, and mainly solves the problems that the sand prevention device in the prior art cannot meet the balance between fine silt sand prevention and large exploitation quantity and is complex in structure. The hydrate sand prevention device comprises a top connector, a three-stage coupling device and a bottom connector which are sequentially connected from top to bottom. The third-stage coupling device comprises a first-stage sand control screen pipe connected with the outer wall of the top connector and the outer wall of the bottom connector, a plurality of through holes formed in the pipe wall of the first-stage sand control screen pipe and provided with filter screens, and a second-stage cyclone separator installed in the first-stage sand control screen pipe and communicated with the top connector and the bottom connector. And the third-stage sand prevention filter cotton is arranged at an overflow port and a pipe wall of the second-stage cyclone separator. By means of the scheme, the purpose of fine sand prevention is achieved, and high practical value and popularization value are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of hydrate exploitation, and in particular relates to a hydrate sand prevention device with three-stage coupling of screen tube cyclone filtration. Background Art

[0002] Natural gas hydrates are widely distributed in marine sediments and permafrost around the world. As a clean energy with abundant reserves, they are expected to solve my country's energy shortage problem. At present, the exploitation of natural gas hydrates mainly uses methods such as pressure reduction, solid fluidization, heating, and gas replacement to decompose the hydrates, and then extract and recover the generated gas. During the fluid extraction process, sediment particles may fall off and migrate, which will cause sand production. Sand production may cause problems such as formation deficit and well wall instability. On the other hand, the fine sand carried in the fluid will cause wear and blockage to electric submersible pumps, wellbores and other mining equipment, affecting the continued exploitation of hydrates. Because my country's natural gas hydrate reservoirs have the characteristics of shallow burial depth, weak cementation, and small particle size of the constituent sediments, they are more prone to sand production, which puts higher requirements on sand control tools.

[0003] At present, the methods and devices used for sand control in hydrate mining are mainly based on the traditional sand control screen pipe using the pressure reduction method and the underground in-situ separation and sand removal method and device based on the solid fluidization method. Such as the composite sand control system and method and multifunctional sand control screen pipe proposed in patents No. 202110300763.8 and 202122200068.2, and the tubular underground in-situ separation and sand removal device proposed in patents No. 202210423542.4, 202210423852.6 and 202211303232.5. The sand control screen pipe can effectively prevent large particles of sand from entering the wellbore, thereby suppressing problems such as wellbore wall collapse, but its sand control ability for fine silt is limited, and the screen flow capacity required when it can prevent fine silt is very small, which will seriously affect the gas production of the hydrate reservoir. The underground in-situ separation and sand removal device can effectively remove relatively fine sand particles, and can remove fine silt particles under the generation of very large centrifugal force, but it must use a tiny cyclone, which cannot meet the requirements of large-scale hydrate production and gas production. Conventional sized cyclones cannot remove fine silt particles, and complex structures such as special-sized series and parallel connections must be used. Therefore, the existing devices cannot meet the requirements of hydrate production in my country, especially in the depressurization method of mining that is expected to be commercially exploited, and new sand control devices are urgently needed. How to balance the hydrate production volume and the fine sand control effect is a key problem that cannot be solved by existing technologies. Utility Model Content

[0004] The purpose of the utility model is to provide a hydrate sand control device with three-stage coupling of screen tube cyclone filtration based on the pressure reduction mining method, mainly to solve the problem that the sand control device in the prior art cannot meet the balance between fine sand control of fine silt particles and large mining volume, and has a complex structure.

[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is as follows:

[0006] A hydrate sand control device with three-stage coupling of screen tube cyclone filtration comprises a top joint, a three-stage coupling device and a bottom joint connected in sequence from top to bottom; the three-stage coupling device comprises a first-level sand control screen tube connected to the outer walls of the top joint and the bottom joint, a plurality of through holes with filter screens provided on the wall of the first-level sand control screen tube, a second-level cyclone separator installed inside the first-level sand control screen tube and connected to the top joint and the bottom joint, and a third-level sand control filter cotton installed on the overflow port and the tube wall of the second-level cyclone separator.

[0007] Furthermore, the top joint includes a top channel connected to the overflow port of the secondary cyclone separator, a recovery pipe connecting channel connected to the top channel, and a top mounting boss opened on the lower periphery of the top joint and used to install the primary sand control screen pipe.

[0008] Specifically, the bottom joint includes a bottom mounting groove for installing the bottom flow port of the secondary cyclone separator, a bottom sand discharge channel whose top is connected to the bottom mounting groove, a truncated cone-shaped sand storage cavity which is connected to the bottom of the bottom sand discharge channel, and a bottom mounting boss which is opened on the outer periphery of the upper part of the bottom joint and is used to install the primary sand control screen pipe.

[0009] Compared with the prior art, the utility model has the following beneficial effects:

[0010] (1) The utility model adopts a three-stage sand control structure to remove sand from the hydrate mixed slurry, which can not only obtain high-purity hydrates, but also has a simple structure. The first-stage sand control screen can support the well wall to prevent the well wall from collapsing, and at the same time improve the seepage capacity of the reservoir, which can effectively and quickly decompose the hydrate slurry.

[0011] (2) The three-stage coupled sand control structure of the utility model adopts a traditional sand control screen to initially prevent large sand particles from entering without affecting the seepage capacity of the reservoir. The cyclone separator is used as the second-stage sand control and can be equipped with an optimal diameter when the underground space permits to achieve the maximum processing capacity. The sand control filter cotton adopts fine filtration, and the minimum filtration particle can be as small as 0.5 microns. The three-stage coupling can achieve fine sand control and prevent damage to components such as pumps connected to the upper end of the recovery pipe connection channel. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a structural schematic diagram of the utility model.

[0013] Figure 2 for Figure 1 Cross-sectional view at AA in the middle.

[0014] Figure 3 It is the installation diagram of the utility model.

[0015] In the above drawings, the component names corresponding to the reference numerals are as follows:

[0016] 1-top joint, 11-top channel, 12-recovery pipe connecting channel, 13-top mounting boss, 2-third-stage coupling device, 21-first-stage sand control screen, 22-through hole, 23-second-stage cyclone separator, 24-third-stage sand control filter cotton, 3-bottom joint, 31-bottom mounting groove, 32-bottom sand discharge channel, 33-sand storage cavity, 34-bottom mounting boss, 4-ground, 5-seawater layer, 6-formation, 7-hydrate reservoir, 8-natural gas, 9-coarse sand particles, 10-fine sand particles, 101-ultrafine sand particles. DETAILED DESCRIPTION

[0017] The present invention is further described below in conjunction with the accompanying drawings and embodiments. The implementation methods of the present invention include but are not limited to the following embodiments.

[0018] Example

[0019] like Figures 1 to 3 As shown, a hydrate sand control device with three-stage coupling of screen tube cyclone filtration includes a top joint 1, a three-stage coupling device 2 and a bottom joint 3 connected in sequence from top to bottom; the three-stage coupling device 2 includes a first-level sand control screen tube 21 connected to the outer walls of the top joint 1 and the bottom joint 3, a plurality of through holes 22 with filter screens opened on the wall of the first-level sand control screen tube 21, a second-level cyclone separator 23 installed inside the first-level sand control screen tube 21 and connected to the top joint 1 and the bottom joint 3, and a third-level sand control filter cotton 24 installed on the overflow port and the wall of the second-level cyclone separator 23.

[0020] Installation steps: The installation principle is from inside to outside and from bottom to top. First, dock the secondary cyclone separator for filtering fine sand particles at the bottom mounting groove 31 of the bottom joint 3, and the bottom flow port of the secondary cyclone separator is embedded in the bottom mounting groove 31. Install the third-level sand-proof filter cotton 24 for filtering ultrafine sand particles on the overflow port and pipe wall of the secondary cyclone separator 23, and then sleeve the first-level sand-proof screen tube 21 for filtering coarse sand particles on the outside of the secondary cyclone separator 2. The lower part of the first-level sand-proof screen tube 21 is installed on the shoulder of the bottom mounting boss 34. Finally, dock the top channel 11 of the top joint 1 with the overflow port of the secondary cyclone separator 23, and at the same time, install the upper part of the first-level sand-proof screen tube 21 on the shoulder of the top mounting boss 13. Finally, connect the external natural gas recovery pipe to the recovery pipe connecting channel 12 of the top joint 1.

[0021] Working process: The utility model is a hydrate sand control device with three-stage coupling of screen tube cyclone filtration, which is mainly used for the depressurization method of natural gas hydrate exploitation. First, the bottom joint 3 is connected to other downhole tools, and the top joint 1 is connected to the recovery pipe. Then the whole set of tools is installed in the natural gas hydrate exploitation well. The three-stage coupled hydrate sand control device is installed corresponding to the position of the hydrate reservoir, and the first-level sand control screen fits the reservoir wall. After the depressurization exploitation is implemented, the gas and sand mixture obtained by the decomposition of the natural gas hydrate overflows from the hydrate reservoir and enters the first-level sand control screen 21 through the filter mesh through hole 22 on the outside of the first-level sand control screen 21. The first-level sand control screen can not only support the well wall, but also block the coarse sand particles with a diameter of about 60 microns or more on the outside of the first-level sand control screen 21. The sand control screen has a large flow area, so it can achieve the effect of not affecting the seepage capacity of the hydrate reservoir, and the hydrate can be effectively and quickly decomposed. The mixture of sand particles and gas with a particle size of less than 60 microns enters the first-level sand control screen 21 and enters the second-level cyclone separator 23 from the entrance through the cavity filled with the second-level cyclone separator 23 and the first-level sand control screen 21. Under the action of centrifugal force, fine sand particles of 30 to 60 microns enter the outer cyclone field from the second-level cyclone separator 23, and enter the sand storage chamber 33 from the bottom flow port through the bottom sand discharge channel 32. Sand particles with a smaller particle size enter the inner cyclone field and enter the top channel 11 through the overflow port of the second-level cyclone separator 23. Since the overflow port and the pipe wall of the second-level cyclone separator 23 are provided with a third-level sand control filter cotton 24, the filter cotton can filter particles with a particle size as low as 0.5 microns, so it can prevent ultra-fine sand particles from passing through, thereby obtaining high-purity hydrates. The sand stored in the sand storage chamber 33 is deposited downward under the action of its own gravity, thereby backfilling to the bottom of the wellbore.

[0022] The above embodiments are only preferred embodiments of the present utility model and are not intended to limit the protection scope of the present utility model. Any changes that adopt the design principles of the present utility model and are made through non-creative labor on this basis should fall within the protection scope of the present utility model.

Claims

1. A hydrate sand control device with three-stage coupling of screen tube cyclone filtration, It is characterized in that The invention comprises a top joint (1), a three-stage coupling device (2) and a bottom joint (3) which are connected in sequence from top to bottom; the three-stage coupling device (2) comprises a first-level sand-proof screen pipe (21) connected to the outer wall of the top joint (1) and the bottom joint (3), a plurality of through holes (22) provided with filter screens and arranged on the wall of the first-level sand-proof screen pipe (21), a second-level cyclone separator (23) installed inside the first-level sand-proof screen pipe (21) and connected to the top joint (1) and the bottom joint (3), and a third-level sand-proof filter cotton (24) installed on the overflow port and the wall of the second-level cyclone separator (23).

2. A hydrate sand control device with three-stage coupling of screen tube cyclone filtration according to claim 1, It is characterized in that The top joint (1) comprises a top channel (11) connected to an overflow port of a secondary cyclone separator (23), a recovery pipe connecting channel (12) connected to the top channel (11), and a top mounting boss (13) disposed on the outer periphery of the lower portion of the top joint (1) and used for mounting a primary sand control screen pipe (21).

3. A hydrate sand control device with three-stage coupling of screen tube cyclone filtration according to claim 2, It is characterized in that The bottom joint (3) comprises a bottom mounting groove (31) for mounting a bottom flow outlet of a secondary cyclone separator (23), a bottom sand discharge channel (32) whose top is connected to the bottom mounting groove (31), a truncated cone-shaped sand storage chamber (33) which is connected to the bottom of the bottom sand discharge channel (32), and a bottom mounting boss (34) which is provided on the upper periphery of the bottom joint (3) and is used for mounting a primary sand control screen.

Citation Information

Cited By

  • Hydrate sand prevention device with screen pipe rotational flow filtration three-stage coupling

    CN117703317A