High-insulativity drawer type test cabinet

By installing relays and heavy-duty sockets and plugs made of boron nitride material in the drawer-type test cabinet, the problems of bulkiness and poor insulation performance of the traditional low-voltage insulation test cabinet are solved, and convenient operation and maintenance and high-precision testing are achieved.

CN221860504UActive Publication Date: 2024-10-18FUJIAN NEBULA ELECTRONICS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323560711.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-26
Publication Date
2024-10-18
Estimated Expiration
2033-12-26

AI Technical Summary

Technical Problem

The electrical inner panel of the traditional low-voltage insulation test cabinet is laid in a vertical plane, which makes it bulky and inconvenient to operate and maintain. The insulation performance is poor, which affects the test results.

Method used

Design a high-insulation drawer-type test cabinet, install the relay in the drawer, and use heavy-duty sockets and plugs made of boron nitride material to improve the insulation performance and simplify the operation and maintenance process.

Benefits of technology

It significantly improves the operation and maintenance convenience and insulation performance of the test cabinet, reduces the installation workload, and improves the test accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221860504U_ABST
    Figure CN221860504U_ABST
Patent Text Reader

Abstract

The utility model provides a high-insulativity drawer-type test cabinet in the technical field of battery module test equipment, and the cabinet comprises a cabinet body which is internally provided with a plurality of test bins; the drawers are respectively connected with the test bins in a sliding manner; the universal meter is arranged in the cabinet body; the insulation voltage-withstanding instrument is arranged in the cabinet body; the heavy load module is connected with the test end of the insulation voltage-withstanding instrument; the relay group is arranged in each drawer and is connected with the universal meter and the heavy load module; the voltage acquisition module is arranged in the cabinet body and is connected with the relay group; the probe is connected with the voltage acquisition module; and the PLC is arranged in the cabinet body and is respectively connected with the universal meter, the insulation voltage-withstanding instrument, the relay group and the voltage acquisition module. The test cabinet has the advantages that the operation and maintenance convenience and the insulation performance of the test cabinet are greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of battery module testing equipment, in particular to a high-insulation drawer-type testing cabinet. Background Art

[0002] With the increasing depletion of traditional energy and the exposure of many problems in its production and use, the development of new energy has become a social hotspot. Among them, battery modules (power lithium batteries) are an important component of new energy vehicles and the demand is growing.

[0003] After the battery module is produced, it needs to be subjected to a low-voltage insulation test. During the low-voltage insulation test, it is necessary to measure the insulation value of an odd or even number of cells in the battery module connected in parallel. Since a battery module contains a large number of cells, more probes are required for the test, and each probe needs to switch the test circuit through a relay. The number of relays also increases accordingly, often reaching hundreds. The electrical inner board of a traditional low-voltage insulation test cabinet is laid on a vertical plane, and relays and other devices are installed on the electrical inner board, which makes the electrical inner board not only bulky, but also adds a lot of installation workload to the staff, which brings a lot of inconvenience to the operation and maintenance of the low-voltage insulation test cabinet. In addition, the insulation performance of heavy loads in traditional low-voltage insulation test cabinets is poor, which will cause the insulation value between the tested cells to be small.

[0004] Therefore, how to provide a high-insulation drawer-type test cabinet to improve the convenience of operation and maintenance of the test cabinet and the insulation performance has become a technical problem that needs to be solved urgently. Summary of the invention

[0005] The technical problem to be solved by the utility model is to provide a high-insulation drawer-type test cabinet to improve the convenience of operation and maintenance of the test cabinet and the insulation performance.

[0006] The utility model is implemented as follows: a high-insulation drawer-type test cabinet, comprising:

[0007] A cabinet with several test chambers inside;

[0008] A plurality of drawers are respectively slidably connected to one of the test chambers;

[0009] a multimeter, arranged in the cabinet;

[0010] An insulation withstand voltage tester, arranged in the cabinet;

[0011] A heavy-load module connected to the test end of the insulation withstand voltage tester;

[0012] A relay group is arranged in each of the drawers and connected to the multimeter and the heavy-duty module;

[0013] A voltage acquisition module is disposed in the cabinet and connected to the relay group;

[0014] A plurality of probes connected to the voltage acquisition module;

[0015] A PLC is arranged in the cabinet and is connected to the multimeter, the insulation withstand voltage tester, the relay group and the voltage acquisition module respectively;

[0016] The reload module comprises:

[0017] a boron nitride heavy-load socket connected to the relay group;

[0018] A boron nitride heavy-load plug has one end connected to the boron nitride heavy-load socket and the other end connected to the insulation withstand voltage instrument.

[0019] Furthermore, four hanging rings are symmetrically provided at the four corners of the top of the cabinet, and two cabinet doors are provided on the front.

[0020] Furthermore, the relay group includes a plurality of relays, and each relay is connected to the PLC.

[0021] The advantages of the utility model are: BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The present invention will be further described below in conjunction with the embodiments with reference to the accompanying drawings.

[0023] Figure 1 This is one of the structural schematic diagrams of a high-insulation drawer-type test cabinet of the utility model.

[0024] Figure 2 This is the second structural schematic diagram of a high-insulation drawer-type test cabinet of the utility model.

[0025] Figure 3 The utility model discloses a circuit principle block diagram of a high-insulation drawer-type test cabinet.

[0026] Marking Description:

[0027] 100-A high-insulation drawer-type test cabinet, 1-cabinet body, 2-drawer, 3-multimeter, 4-insulation withstand voltage tester, 5-heavy load module, 6-relay group, 7-voltage acquisition module, 8-probe, 9-PLC, 11-hanging ring, 12-cabinet door. DETAILED DESCRIPTION

[0028] The embodiment of the utility model provides a high-insulation drawer-type test cabinet 100, which solves the problem that in the prior art, the electrical inner board of the low-voltage insulation test cabinet is laid out in a vertical plane, and relays and other devices are installed on the electrical inner board, which makes the electrical inner board not only bulky, but also adds a lot of installation workload for the staff, that is, it brings a lot of inconvenience to the operation and maintenance of the low-voltage insulation test cabinet, and the technical problem of poor insulation performance under heavy load, thereby achieving the technical effect of greatly improving the convenience of operation and maintenance of the test cabinet and the insulation performance.

[0029] The technical solution in the embodiment of the utility model is to solve the above-mentioned problem, and the overall idea is as follows: the relay is installed in the drawer 2, and during operation and maintenance, only the drawer 2 needs to be pulled out to improve the convenience of operation and maintenance of the test cabinet 100; the socket and plug of the heavy-load module 5 are set to be boron nitride heavy-load sockets and boron nitride heavy-load plugs to improve the insulation performance of the test cabinet 100.

[0030] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0031] Please refer to Figures 1 to 3 As shown, a preferred embodiment of a high-insulation drawer-type test cabinet of the utility model comprises:

[0032] A cabinet 1 is provided with a plurality of test chambers (not shown) inside; the cabinet 1 is used to carry the test cabinet 100; the test chamber is used to accommodate the drawer 2;

[0033] A plurality of drawers 2 are respectively connected in a sliding manner to one of the test chambers and are used to install the relays to improve the convenience of operation and maintenance;

[0034] a multimeter 3, disposed in the cabinet 1, for testing the battery module (not shown) through the probe 8;

[0035] An insulation withstand voltage tester 4, arranged in the cabinet 1, for testing the battery module through the probe 8;

[0036] A heavy-load module 5 is connected to the test end of the insulation withstand voltage tester 4 and is used to isolate the positive and negative electrodes of the insulation withstand voltage tester 4 to improve the test accuracy;

[0037] A relay group 6, arranged in each of the drawers 2 and connected to the multimeter 3 and the heavy-load module 5, for switching the test circuit;

[0038] A voltage acquisition module 7, which is arranged in the cabinet 1 and connected to the relay group 6, is used to collect the voltage of the battery module and has multiple test channels;

[0039] A plurality of probes 8 connected to the voltage acquisition module 7 and used to connect to the poles of the battery module;

[0040] A PLC 9 is arranged in the cabinet 1 and is connected to the multimeter 3, the insulation withstand voltage tester 4, the relay group 6 and the voltage acquisition module 7 respectively; the PLC 9 is used to control the operation of the test cabinet 100. In specific implementation, it is sufficient to select a PLC that can realize this function from the prior art, and it is not limited to any model. Moreover, the control program is well known to those skilled in the art, and can be obtained by those skilled in the art without creative labor;

[0041] The reload module 5 comprises:

[0042] a boron nitride heavy-duty socket (not shown), connected to the relay group 6;

[0043] A boron nitride heavy-duty plug (not shown) is connected to the boron nitride heavy-duty socket at one end and connected to the insulation withstand voltage instrument 4 at the other end. The insulation performance of boron nitride is much higher than that of aluminum oxide and aluminum nitride, so the socket and plug made of boron nitride are used to improve the insulation performance.

[0044] Four hanging rings 11 are symmetrically arranged at the four corners of the top of the cabinet body 1 , and two cabinet doors 12 are arranged on the front; the hanging rings 11 are used for transplanting the test cabinet 100 ; and the cabinet doors 12 are used for providing protection for the test cabinet 100 .

[0045] The relay group 6 includes a plurality of relays (not shown), each of which is connected to the PLC 9 .

[0046] Working principle of this utility model:

[0047] The probe 8 is connected to the pole of the battery module, the PLC 9 controls the relay group 6 to switch the test circuit, and the low-voltage insulation test of the battery module is performed through the multimeter 3 and the insulation withstand voltage tester 4. During the test, the voltage value is collected in real time through the voltage acquisition module 7. When a fault occurs and maintenance is required, the cabinet door 12 is opened and the drawer 2 is pulled out for inspection.

[0048] In summary, the advantages of the present invention are:

[0049] Although the specific implementation methods of the present invention are described above, those skilled in the art should understand that the specific embodiments described are only illustrative and are not intended to limit the scope of the present invention. Equivalent modifications and changes made by those skilled in the art in accordance with the spirit of the present invention should be included in the scope of protection of the claims of the present invention.

Claims

1. A high insulation drawer-type test cabinet, characterized in that: include: A cabinet with several test chambers inside; A plurality of drawers are respectively slidably connected to one of the test chambers; a multimeter, arranged in the cabinet; An insulation withstand voltage tester, arranged in the cabinet; A heavy-load module connected to the test end of the insulation withstand voltage tester; A relay group is arranged in each of the drawers and connected to the multimeter and the heavy-duty module; A voltage acquisition module is disposed in the cabinet and connected to the relay group; A plurality of probes connected to the voltage acquisition module; A PLC is arranged in the cabinet and is connected to the multimeter, the insulation withstand voltage tester, the relay group and the voltage acquisition module respectively; The reload module comprises: a boron nitride heavy-load socket connected to the relay group; A boron nitride heavy-load plug has one end connected to the boron nitride heavy-load socket and the other end connected to the insulation withstand voltage instrument.

2. A high insulation drawer-type test cabinet as claimed in claim 1, characterized in that: Four hanging rings are symmetrically arranged at the four corners of the top of the cabinet body, and two cabinet doors are arranged on the front.

3. A high insulation drawer-type test cabinet as claimed in claim 1, characterized in that: The relay group includes a plurality of relays, and each relay is connected to the PLC.