New and old roadbed pavement splicing structure
By using combined structures such as connectors, positioning rods and splicing blocks in the splicing structure of the new and old roadbed and pavement, the problems of stability and shear resistance at the splicing joint are solved, the connection strength and compression resistance between the roadbed and the pavement are improved, and the service life is extended. life.
Patent Information
- Application Number
- CN202420405925.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-04
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-03-04
AI Technical Summary
In the existing technology, the positioning effect of the splicing structure of the old and new roadbeds is poor, resulting in height inconsistencies and looseness at the splicing joints, and the lack of reinforcement structures, which affects the service life of the road surface and roadbed.
It adopts a combined structure including connectors, transverse positioning rods, longitudinal positioning rods, splicing blocks and asphalt layers. Through the insertion of the transverse and longitudinal positioning rods and the fixation of the splicing blocks, the connection stability between the roadbed and the road surface is increased, and the sand and gravel are used. The base layer and water-based epoxy resin fog seal layer improve the overall hardness and water permeability of the base layer.
It improves the stability and strength of the spliced structure of the old and new roadbed pavements, avoids height inconsistencies and looseness at the splicing points, and at the same time enhances the pressure and water resistance of the base layer, extending the service life of the road surface and roadbed.
Smart Images

Figure CN221877579U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of roadbed and pavement engineering, and in particular relates to a new and old roadbed and pavement splicing structure. Background Art
[0002] With the rapid development of China's social economy, the proportion of private cars owned by people is increasing. This also leads to traffic congestion on some roads due to their small width. In addition, the cost of building a new road is high, so the old road is generally spliced and widened. In the existing technology, the new and old roadbeds are spliced in a step-by-step manner. The positioning effect of the splicing is poor, which leads to the phenomenon that the new and old roads are prone to height inconsistency. At the same time, the splicing is prone to looseness, and there are certain use defects. The existing new and old roadbed pavement splicing structure is generally a simple splicing structure. Due to the lack of multiple reinforcement structures, the overall strength and shear resistance of the roadbed and pavement have not been improved. After the new roadbed and new pavement are spliced with the old roadbed and old pavement, cracks may occur due to the shear resistance effect, affecting the service life of the pavement and roadbed.
[0003] The information disclosed in this background technology section is only intended to increase the understanding of the overall background of the present invention, and should not be regarded as acknowledging or suggesting in any form that the information constitutes the prior art already known to a person skilled in the art. Utility Model Content
[0004] The utility model aims to provide a new and old roadbed and pavement splicing structure.
[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0006] A new and old roadbed pavement splicing structure comprises an old roadbed, an old pavement is arranged above the old roadbed, a new roadbed is arranged on one side of the old roadbed, a new pavement is arranged above the new roadbed, a connecting piece is arranged between the old roadbed and the new roadbed, multiple groups of transverse positioning rods are arranged on both sides of the connecting piece, multiple groups of transverse positioning holes are opened on the inner sides of the old roadbed and the new roadbed, a splicing pavement is arranged above the connecting piece, multiple groups of longitudinal positioning rods are arranged on both sides of the splicing pavement, multiple groups of longitudinal positioning holes are opened on the old roadbed and the new roadbed, multiple groups of splicing blocks are arranged on the bottom surface of the splicing pavement, and multiple groups of splicing grooves are opened on the old roadbed and the new roadbed.
[0007] Preferably, the bottom of the new roadbed is set as a gravel layer, the top of the gravel layer is set as a base layer, the top of the base layer is set as a mixed layer, and the top of the mixed layer is set as a top gravel layer. The old roadbed, the new roadbed and the top surface of the spliced pavement are all provided with an asphalt layer to increase the overall hardness of the base layer, prevent the base layer from collapsing due to rain erosion, and make the surface layer as a whole have a buffering efficiency.
[0008] Preferably, limiting holes are provided on both the old roadbed and the new roadbed, and through holes are provided on multiple groups of splicing blocks. The diameter of the limiting holes is consistent with that of the through holes, and limiting pins are inserted in the limiting holes to facilitate supporting and fixing the new roadbed and the old roadbed.
[0009] Preferably, one end of the old road surface and the new road surface is provided with a reinforcement block, and the bottom surface of the spliced road surface is provided with a connecting groove adapted to the reinforcement block, thereby increasing the contact area between the spliced road surface and the reinforcement block.
[0010] Preferably, the asphalt layer consists of a three-layer structure, and the particle size of the asphalt aggregate decreases from bottom to top each time, which can increase the compression resistance of the asphalt layer.
[0011] Preferably, concrete layers are provided at the joints between the old road surface and the new road surface on both sides of the spliced road surface, so that the spliced road surface can be in close contact with the new road surface and the old road surface respectively.
[0012] Preferably, the mixed layer is composed of a water-based epoxy resin mist seal layer, which increases the overall water permeability and binds a small amount of moisture in the mixed layer, so that the surface layer as a whole has a buffering efficiency.
[0013] Preferably, the top ends of the transverse positioning rod and the longitudinal positioning rod are both chamfered, so that the transverse positioning rod and the longitudinal positioning rod are more convenient to be plugged in.
[0014] Compared with the prior art, the utility model has the following beneficial effects:
[0015] (1) In the utility model, a connecting piece, a transverse positioning rod, a transverse positioning hole, a longitudinal positioning rod, a longitudinal positioning hole, a reinforcing block and a connecting groove are arranged to cooperate with each other. The transverse positioning rod is inserted into the transverse positioning hole, and the longitudinal positioning rod is inserted into the longitudinal positioning hole, so as to complete the stable splicing of the old roadbed and the new roadbed, ensure the stability of the connection between the old roadbed and the new roadbed, improve the structural strength of the connection, avoid the phenomenon that the new and old roads are easily inconsistent in height during splicing, and the phenomenon that the splicing is easy to loosen.
[0016] (2) In the utility model, the new roadbed and the old roadbed are supported and fixed by cooperating the splicing road surface, the splicing blocks, the splicing grooves, the limiting holes, the through holes and the limiting pins. The splicing blocks on the splicing road surface are inserted into the splicing grooves and installed by the limiting pins in combination with the limiting holes, thereby improving the connection stability.
[0017] (3) In the utility model, by arranging a gravel layer and a top gravel layer, the stability of the foundation pit can be increased, so that the soil in the base layer will not be washed away by the water flow, causing the bottom to collapse. The overall hardness of the base layer is increased by the mixed layer to prevent the base layer from being washed away by rain and causing collapse. Finally, the overall water permeability is increased by the water-based epoxy resin mist seal layer to bind a small amount of water in the mixed layer, so that the surface layer as a whole has a buffering efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0019] Figure 2 for Figure 1 Exploded diagram of
[0020] Figure 3 This is a schematic diagram of the spliced pavement structure of the utility model;
[0021] Figure 4 This is a schematic diagram of the structure of the connector of the utility model;
[0022] Figure 5 It is a schematic diagram of the new roadbed structure of the utility model.
[0023] Description of main reference numerals:
[0024] 1. Old roadbed; 2. Old road surface; 3. New roadbed; 4. New road surface; 5. Connectors; 6. Horizontal positioning rods; 7. Horizontal positioning holes; 8. Spliced road surface; 9. Longitudinal positioning rods; 10. Longitudinal positioning holes; 11. Splicing blocks; 12. Splicing grooves; 13. Gravel layer; 14. Base layer; 15. Mixed layer; 16. Top gravel layer; 17. Asphalt layer; 18. Limiting holes; 19. Through holes; 20. Limiting pins; 21. Reinforcement blocks; 22. Connecting grooves; 23. Concrete layer. DETAILED DESCRIPTION
[0025] The following is a clear and complete description of the technical solution of the utility model patent. Obviously, the described embodiments are part of the embodiments of the utility model, not all of them. Based on the embodiments of the utility model, all other embodiments obtained by technicians in this field without creative work are within the scope of protection of the utility model.
[0026] Example
[0027] See attached Figure 1-5A new and old roadbed pavement splicing structure comprises an old roadbed 1, an old pavement 2 is arranged above the old roadbed 1, a new roadbed 3 is arranged on one side of the old roadbed 1, a new pavement 4 is arranged above the new roadbed 3, a connecting piece 5 is arranged between the old roadbed 1 and the new roadbed 3, a plurality of groups of transverse positioning rods 6 are arranged on both sides of the connecting piece 5, a plurality of groups of transverse positioning holes 7 are provided on the inner sides of the old roadbed 1 and the new roadbed 3, a splicing pavement 8 is arranged above the connecting piece 5, a plurality of groups of longitudinal positioning rods 9 are arranged on both sides of the splicing pavement 8, a plurality of groups of longitudinal positioning holes 10 are provided on the old roadbed 1 and the new roadbed 3, a plurality of groups of splicing blocks 11 are provided on the bottom surface of the splicing pavement 8, and a plurality of groups of splicing grooves 12 are provided on the old roadbed 1 and the new roadbed 3.
[0028] In this embodiment, the bottom of the new roadbed 3 is set as a gravel layer 13, the top of the gravel layer 13 is set as a base layer 14, the top of the base layer 14 is set as a mixed layer 15, and the top of the mixed layer 15 is set as a top gravel layer 16. The old roadbed 1, the new roadbed 3 and the top surface of the spliced pavement 8 are all provided with an asphalt layer 17. The overall hardness of the base layer 14 is increased by the mixed layer 15, and the overall water permeability is increased by the water-based epoxy resin mist seal layer to bind a small amount of moisture in the mixed layer 15.
[0029] In addition, in the present embodiment, limiting holes 18 are provided on both the old roadbed 1 and the new roadbed 3, and through holes 19 are provided on the multiple groups of splicing blocks 11. The apertures of the limiting holes 18 and the through holes 19 are consistent, and limiting pins 20 are inserted into the limiting holes 18. The limiting holes 18 and the through holes 19 are aligned, and the limiting pins 20 are installed in conjunction with the limiting holes 18 to support and fix the new roadbed 3 and the old roadbed 1.
[0030] Secondly, in this embodiment, a reinforcing block 21 is provided at one end of the old road surface 2 and the new road surface 4, and a connecting groove 22 compatible with the reinforcing block 21 is opened on the bottom surface of the spliced road surface 8. The spliced road surface 8 is connected to the reinforcing block 21 by plugging through the connecting groove 22. The connecting groove 22 increases the contact area between the spliced road surface 8 and the reinforcing block 21.
[0031] In this embodiment, the asphalt layer 17 is composed of a three-layer structure, and the particle size of the asphalt aggregate decreases from bottom to top each time. The three-layer structure can increase the compression resistance of the asphalt layer 17.
[0032] In addition, in this embodiment, concrete layers 23 are provided at the connection points between the old road surface 2 and the new road surface 4 on both sides of the spliced road surface 8. Under the action of the concrete layers 23, the spliced road surface 8 can be in close contact with the new road surface 4 and the old road surface 2 respectively.
[0033] Secondly, in this embodiment, the mixed layer 15 is composed of a water-based epoxy resin mist seal layer. Through the design of the water-based epoxy resin mist seal layer, the overall water permeability is increased to bind a small amount of water in the mixed layer 15, so that the overall surface layer has a buffering efficiency.
[0034] Finally, in this embodiment, chamfers are provided at the top ends of the transverse positioning rod 6 and the longitudinal positioning rod 9, and the chamfers provide for greater convenience in plugging the transverse positioning rod 6 and the longitudinal positioning rod 9 together.
[0035] When in use, firstly, transverse positioning holes, longitudinal positioning holes 10, splicing grooves 12 and limiting holes 18 are opened on the old roadbed 1 and the new roadbed 3, and the multiple groups of transverse positioning rods 6 on the connecting piece 5 are respectively inserted into the transverse positioning holes 7 on the old roadbed 1 and the new roadbed 3 to perform transverse splicing and positioning of the old roadbed 1 and the new roadbed 3, and then the multiple groups of longitudinal positioning rods 9 on the splicing pavement 8 are respectively inserted into the longitudinal positioning holes 10 on the old roadbed 1 and the new roadbed 3 to perform longitudinal splicing and positioning of the old roadbed 1 and the new roadbed 3, and at the same time, the multiple groups of splicing blocks 11 are respectively inserted into the splicing grooves 12 on the old roadbed 1 and the new roadbed 3 so that the through holes 19 are aligned with the limiting holes 18, and then the limiting pins 20 are clamped in the limiting holes 18 and the through holes 19 to splice and fix the old roadbed 1 and the new roadbed 3, and at the same time, the splicing pavement 8 is connected to the reinforcing block 2 through the connecting groove 22. 1 is connected by plugging, and the connecting groove 22 increases the contact area between the spliced pavement 8 and the reinforcing block 21. By setting the gravel layer 13 and the top gravel layer 1613, the stability in the foundation pit can be increased, so that the soil in the base layer 14 will not be washed away by the water flow. The overall hardness of the base layer 14 is increased by the mixed layer 15 to prevent the base layer 14 from being washed away by rain and causing collapse. Finally, the water-based epoxy resin mist seal layer is used to increase the overall water permeability and bind a small amount of water in the mixed layer 15, so that the surface layer has a buffering efficiency as a whole. The asphalt layer 17 is composed of a three-layer structure, and the particle size of the asphalt aggregate decreases from bottom to top each time. The three-layer structure can increase the compressive performance of the asphalt layer 17. Under the action of the concrete layer 23, the spliced pavement 8 can be in close contact with the new pavement 4 and the old pavement 2 respectively.
[0036] The foregoing description of specific exemplary embodiments of the utility model is for the purpose of illustration and illustration. These descriptions are not intended to limit the utility model to the precise form disclosed, and it is clear that many changes and variations can be made based on the above teachings. The purpose of selecting and describing the exemplary embodiments is to explain the specific principles of the utility model and its practical application, so that those skilled in the art can realize and utilize various different exemplary embodiments of the utility model and various different options and changes. The scope of the utility model is intended to be defined by the claims and their equivalents.
Claims
1. A new and old roadbed pavement splicing structure, characterized in that: include: An old roadbed, with an old road surface arranged above the old roadbed; A new roadbed is arranged on one side of the old roadbed, a new road surface is arranged above the new roadbed, a connecting piece is arranged between the old roadbed and the new roadbed, and a plurality of groups of transverse positioning rods are arranged on both sides of the connecting piece; The inner sides of the old roadbed and the new roadbed are provided with a plurality of groups of transverse positioning holes, a splicing pavement is arranged above the connecting piece, a plurality of groups of longitudinal positioning rods are arranged on both sides of the splicing pavement, a plurality of groups of longitudinal positioning holes are arranged on the old roadbed and the new roadbed, a plurality of groups of splicing blocks are arranged on the bottom surface of the splicing pavement, and a plurality of groups of splicing grooves are arranged on the old roadbed and the new roadbed.
2. The new and old roadbed pavement splicing structure according to claim 1 is characterized in that: The bottom of the new roadbed is set as a gravel layer, the top of the gravel layer is set as a base layer, the top of the base layer is set as a mixed layer, the top of the mixed layer is set as a top gravel layer, and the old roadbed, new roadbed and the top surface of the spliced pavement are all set with asphalt layers.
3. The new and old roadbed pavement splicing structure according to claim 1 is characterized in that: Limiting holes are provided on the old roadbed and the new roadbed, through holes are provided on the plurality of groups of splicing blocks, the limiting holes are consistent with the apertures of the through holes, and limiting pins are inserted into the limiting holes.
4. The new and old roadbed pavement splicing structure according to claim 1 is characterized in that: One end of the old road surface and the new road surface is provided with a reinforcement block, and the bottom surface of the spliced road surface is provided with a connecting groove matched with the reinforcement block.
5. The new and old roadbed pavement splicing structure according to claim 2 is characterized in that: The asphalt layer consists of a three-layer structure, and the particle size of the asphalt aggregate decreases from bottom to top each time.
6. The new and old roadbed pavement splicing structure according to claim 1 is characterized in that: Concrete layers are provided at the connection points between the old road surface and the new road surface on both sides of the spliced road surface.
7. The new and old roadbed pavement splicing structure according to claim 2 is characterized in that: The mixed layer is composed of a water-based epoxy resin mist seal layer.
8. The new and old roadbed pavement splicing structure according to claim 1 is characterized in that: The top ends of the transverse positioning rod and the longitudinal positioning rod are both provided with chamfers.
Citation Information
Cited By
New and old roadbed splicing structure based on settlement balancing system
CN120331084A