Electric power line stringing device for constructional engineering
By introducing fixing devices, up and down moving devices, clamping devices and adjusting devices into the power line wiring device of construction projects, the problem that the existing technology cannot fix wire rollers of different sizes and adjust the height is solved, and the wire rollers are firmly fixed. and height adjustment, improving the flexibility and safety of erection.
Patent Information
- Application Number
- CN202323297098.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-05
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2033-12-05
AI Technical Summary
The existing construction engineering power line wiring device cannot fix wire rollers of different sizes, and cannot adjust the height of the wiring, making it inconvenient to use.
A wiring device including a base, a fixing device, an up and down moving device, a clamping device and an adjusting device is designed. Through components such as a biaxial motor, an electric telescopic rod and a limit wheel, the fixation and height of wire rollers of different sizes are achieved. adjust.
It achieves stable fixation and height adjustment of wire rollers of different sizes, reduces the friction between the cable and the limiting wheel, facilitates the movement and fixation of the device, and improves the flexibility and safety of power line erection.
Smart Images

Figure CN221885866U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of electric power in construction engineering, in particular to a wiring device for electric power lines in construction engineering. Background Art
[0002] In construction projects, power engineering plays an indispensable role. First of all, power engineering is one of the infrastructures necessary for the normal operation of construction projects. Whether it is residential, commercial buildings or industrial facilities, power supply is needed to drive the operation of various equipment and systems, such as lighting, elevators, air conditioning, etc. Secondly, the design and construction quality of power engineering are directly related to the safety and reliability of the building. A reasonably planned and stably operating power system can ensure the normal use of the building and prevent fires and other accidents. When installing electricity in construction projects, wire stringing devices will be used. The existing wire stringing devices cannot fix wire rollers of different sizes, and their use is limited. At the same time, the existing wire stringing devices cannot adjust the height of the wires, which is inconvenient to use. Utility Model Content
[0003] The technical problem to be solved by the utility model is to overcome the above problems and provide a construction engineering power line stringing device, which can fix wire rollers of different sizes and adjust the height of the stringing.
[0004] To solve the above technical problems, the technical solution provided by the utility model is: a construction engineering power line wiring device, comprising a base, a first groove is installed on the left side of the upper surface of the base, a fixing device is installed in the first groove, two fixing columns are symmetrically installed on the fixing device, second grooves are respectively opened on opposite sides of the two fixing columns, an up and down moving device is installed in the second groove, a wire roller is installed between the two up and down moving devices, a first supporting frame is installed on the right side of the upper surface of the base, a second supporting frame is rotatably installed on the upper end of the first supporting frame, a first electric telescopic rod is installed on the end of the second supporting frame away from the first supporting frame, a third supporting frame is installed on the telescopic end of the first electric telescopic rod, clamping devices are respectively installed on the upper surfaces of the second supporting frame and the third supporting frame, a fixing plate is installed on the right side of the first supporting frame, and an adjusting device is installed on the fixing plate.
[0005] As an improvement, the fixing device includes a dual-axis motor, which is fixedly installed at the center position of the first groove. The two output shaft ends of the dual-axis motor are symmetrically installed with a first screw and a second screw, respectively. The first screw and the second screw rotate in opposite directions, and two fixing columns are symmetrically installed on the first screw and the second screw.
[0006] As an improvement, the up and down moving device includes a first motor, which is fixedly mounted at the upper end of the second groove, a third screw is mounted on the output shaft end of the first motor, a first slider is mounted on the third screw, a rotating rod is rotatably mounted on the first slider, and a wire roller is mounted between the two rotating rods.
[0007] As an improvement, the clamping device includes a mounting column, a third groove is provided on the front side of the mounting column, a second motor is installed at the upper end of the third groove, a fourth screw is installed at the output shaft end of the second motor, the fourth screw includes a first thread segment and a second thread segment, the first thread segment and the second thread segment are of reverse thread design, second sliders are symmetrically installed on the first thread segment and the second thread segment, a rotating shaft is rotatably installed on the second slider, and a limiting wheel is installed on the end of the rotating shaft away from the second slider.
[0008] As an improvement, the adjustment device includes a rotating seat, which is fixedly mounted on the upper surface of the fixed plate, and a second electric telescopic rod is rotatably mounted on the rotating seat, and the telescopic end of the second electric telescopic rod is rotatably mounted on the lower surface of the second support frame.
[0009] As an improvement, self-locking moving wheels are installed on the lower surface of the base.
[0010] As an improvement, the left side of the base is a sliding ramp.
[0011] As an improvement, a fixing ring is installed on the right side of the third support frame.
[0012] Compared with the prior art, the utility model has the following advantages: when in use, the utility model can fix wire rollers of different sizes through the provided fixing device and the up-and-down moving device; the cable can be fixed through the provided clamping device, and the limiting wheel can rotate to reduce the friction between the cable and the cable; the installation height of the cable can be adjusted through the provided first electric telescopic rod and the second electric telescopic rod; the provided self-locking moving wheel facilitates the movement and fixation of the entire device. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 The utility model is a three-dimensional structural schematic diagram of a construction engineering power line stringing device.
[0014] Figure 2 The utility model is a structural schematic diagram of a wire roller of a power line stringing device for a construction project.
[0015] Figure 3 The utility model is a right side sectional structural schematic diagram of an up and down moving device of a power line stringing device for a construction project.
[0016] Figure 4The utility model is a structural schematic diagram of a clamping device for a power line stringing device in a construction project.
[0017] Figure 5 The utility model is a right side sectional view of a clamping device for a power line stringing device in a construction project.
[0018] As shown in the figure: 1. Base; 2. First groove; 3. Dual-axis motor; 4. First screw; 5. Second screw; 6. Fixed column; 7. Second groove; 8. Up and down moving device; 9. Wire roller; 10. First support frame; 11. Second support frame; 12. First electric telescopic rod; 13. Third support frame; 14. Clamping device; 15. Fixed plate; 16. Adjusting device; 17. Fixing device; 18. First motor; 19. Third screw; 20. First slider; 21. Turning rod; 22. Mounting column; 23. Third groove; 24. Second motor; 25. Fourth screw; 26. Second slider; 27. Rotating shaft; 28. Limiting wheel; 29. Rotating seat; 30. Second electric telescopic rod; 31. Self-locking moving wheel; 32. Sliding ramp; 33. Fixed ring. DETAILED DESCRIPTION
[0019] The utility model is further described in detail below in conjunction with the accompanying drawings.
[0020] Combined with Figure 1 To Attachment Figure 5 A power line stringing device for a construction project comprises a base 1, a first groove 2 is installed on the left side of the upper surface of the base 1, a fixing device 17 is installed in the first groove 2, two fixing columns 6 are symmetrically installed on the fixing device 17, second grooves 7 are respectively opened on the opposite sides of the two fixing columns 6, an up-and-down moving device 8 is installed in the second groove 7, a wire roller 9 is installed between the two up-and-down moving devices 8, a first supporting frame 10 is installed on the right side of the upper surface of the base 1, a second supporting frame 11 is rotatably installed on the upper end of the first supporting frame 10, a first electric telescopic rod 12 is installed at the end of the second supporting frame 11 away from the first supporting frame 10, a third supporting frame 13 is installed at the telescopic end of the first electric telescopic rod 12, a fixing ring 33 is installed on the right side of the third supporting frame 13, and clamping devices 14 are respectively installed on the upper surfaces of the second supporting frame 11 and the third supporting frame 13. A fixing plate 15 is installed on the right side of the first supporting frame 10, and an adjusting device 16 is installed on the fixing plate 15.
[0021] The fixing device 17 includes a dual-axis motor 3, which is fixedly installed at the center position of the first groove 2. The two output shaft ends of the dual-axis motor 3 are symmetrically installed with the first screw 4 and the second screw 5, respectively. The first screw 4 and the second screw 5 rotate in opposite directions. Two fixing columns 6 are symmetrically installed on the first screw 4 and the second screw 5. The up and down moving device 8 includes a first motor 18, which is fixedly installed at the upper end of the second groove 7. The output shaft end of the first motor 18 is installed with a third screw 19, and the third screw 19 is installed with a first slider 20. A rotating rod 21 is rotatably installed on the first slider 20, and a wire roller 9 is installed between the two rotating rods 21.
[0022] Specifically, the wire roller 9 is moved from the sliding ramp 32 to the upper surface of the base 1 along the center position of the base 1, and the first motor 18 is started. The first rotating shaft 18 drives the third screw 19 to rotate, and the third screw 19 drives the first slider 20 to move up and down. The first slider 20 drives the rotating rod 21 to move up and down, and the rotating rod 21 is aligned with the center position of both ends of the wire roller 9. Then, the dual-axis motor 3 is started, and the dual-axis motor 3 drives the first screw 4 and the second screw 5 to rotate. The first screw 4 and the second screw 5 rotate in opposite directions, driving the two fixed columns 6 to move relative to each other, and then driving the up and down moving device 8 to move relative to each other, so that the rotating rod 21 is inserted into the center position of the wire roller 9 for fixing. Then, the first motor 18 is started to drive the third screw 19 to rotate, driving the first slider 20 to move upward, and then driving the rotating rod 21 to move upward, thereby driving the wire roller 9 to move upward and lift the wire roller 9 off the upper surface of the base 1.
[0023] The clamping device 14 includes a mounting column 22, a third groove 23 is provided on the front side of the mounting column 22, a second motor 24 is installed at the upper end of the third groove 23, a fourth screw 25 is installed at the output shaft end of the second motor 24, the fourth screw 25 includes a first thread segment and a second thread segment, the first thread segment and the second thread segment are designed with reverse threads, a second slider 26 is symmetrically installed on the first thread segment and the second thread segment, a rotating shaft 27 is rotatably installed on the second slider 26, and a limiting wheel 28 is installed at the end of the rotating shaft 27 away from the second slider 26.
[0024] Specifically, the electric wires are pulled from the middle of the left limiting wheel 28 to the middle of the right limiting wheel 28, and then fixed on the fixing ring 33, and the second motor 24 is started. The second motor 24 drives the fourth screw 25 to rotate. The fourth screw 25 includes a first thread segment and a second thread segment. The first thread segment and the second thread segment are designed with reverse threads. The first thread segment and the second thread segment respectively drive the second slider 26 to move relative to each other, and the second slider 26 drives the rotating shaft 27 to move relative to each other. The second rotating shaft 27 drives the two limiting wheels 28 to move relative to each other, and the electric wires are limited and fixed. When the electric wires are pulled, the limiting wheel 28 will rotate accordingly to reduce the friction between the limiting wheel 28 and the electric wires.
[0025] The adjusting device 16 includes a rotating seat 29 which is fixedly mounted on the upper surface of the fixing plate 15 . A second electric telescopic rod 30 is rotatably mounted on the rotating seat 29 . The telescopic end of the second electric telescopic rod 30 is rotatably mounted on the lower surface of the second support frame 11 .
[0026] Specifically, when the height of the wire needs to be adjusted, the second electric telescopic rod 30 is started to push the second support frame 11 to move upward, and at the same time, the bottom of the second electric telescopic rod 30 can rotate around the rotating seat 29, and the telescopic end of the second electric telescopic rod 30 can rotate around the second support frame 11. The second support frame 11 rotates around the first support frame 10, and the second support frame 11 can be lifted. Then, the first electric telescopic rod 12 is started to drive the third support frame 13 to move upward. At this time, the fixed ring 33 will pull the wire to move upward, and the wire roller 9 will rotate accordingly.
[0027] Specifically, self-locking moving wheels 31 are installed on the lower surface of the base 1 to facilitate the movement and fixation of the entire device.
[0028] Specifically, the left side of the base 1 is a sliding ramp 32 for facilitating the wire roller 9 to move to the upper surface of the base 1 .
[0029] The above description of the utility model and its implementation methods is not restrictive. The drawings show only one implementation method of the utility model, and the actual structure is not limited thereto. In short, if ordinary technicians in this field are inspired by it and design structural methods and embodiments similar to the technical solution without creativity without departing from the purpose of the invention of the utility model, they should all fall within the protection scope of the utility model.
Claims
1. A construction engineering power line stringing device, comprising a base (1), characterized in that: A first groove (2) is installed on the left side of the upper surface of the base (1), a fixing device (17) is installed in the first groove (2), two fixing columns (6) are symmetrically installed on the fixing device (17), and second grooves (7) are respectively opened on opposite sides of the two fixing columns (6), and an up-and-down moving device (8) is installed in the second groove (7), and a wire roller (9) is installed between the two up-and-down moving devices (8). A first support frame (10) is installed on the right side of the upper surface of the base (1), and the first A second support frame (11) is rotatably mounted on the upper end of the support frame (10); a first electric telescopic rod (12) is mounted on one end of the second support frame (11) away from the first support frame (10); a third support frame (13) is mounted on the telescopic end of the first electric telescopic rod (12); clamping devices (14) are mounted on the upper surfaces of the second support frame (11) and the third support frame (13), respectively; a fixing plate (15) is mounted on the right side of the first support frame (10), and an adjusting device (16) is mounted on the fixing plate (15).
2. A construction engineering power line stringing device according to claim 1, characterized in that: The fixing device (17) comprises a double-axis motor (3), the double-axis motor (3) is fixedly mounted at the center position of the first groove (2), the two output shaft ends of the double-axis motor (3) are symmetrically mounted with a first screw rod (4) and a second screw rod (5), the first screw rod (4) and the second screw rod (5) rotate in opposite directions, and two fixing columns (6) are symmetrically mounted on the first screw rod (4) and the second screw rod (5).
3. A construction engineering power line stringing device according to claim 1, characterized in that: The up-and-down moving device (8) comprises a first motor (18), the first motor (18) being fixedly mounted at the upper end of the second groove (7), a third screw rod (19) being mounted on the output shaft end of the first motor (18), a first slider (20) being mounted on the third screw rod (19), a rotating rod (21) being rotatably mounted on the first slider (20), and a wire roller (9) being mounted between the two rotating rods (21).
4. A construction engineering power line stringing device according to claim 1, characterized in that: The clamping device (14) comprises a mounting column (22), a third groove (23) is provided on the front side of the mounting column (22), a second motor (24) is installed at the upper end of the third groove (23), a fourth screw (25) is installed at the output shaft end of the second motor (24), the fourth screw (25) comprises a first thread segment and a second thread segment, the first thread segment and the second thread segment are designed as reverse threads, a second slider (26) is symmetrically installed on the first thread segment and the second thread segment, a rotating shaft (27) is rotatably installed on the second slider (26), and a limiting wheel (28) is installed at one end of the rotating shaft (27) away from the second slider (26).
5. A construction engineering power line stringing device according to claim 1, characterized in that: The adjusting device (16) comprises a rotating seat (29), the rotating seat (29) being fixedly mounted on the upper surface of the fixed plate (15), a second electric telescopic rod (30) being rotatably mounted on the rotating seat (29), and a telescopic end of the second electric telescopic rod (30) being rotatably mounted on the lower surface of the second support frame (11).
6. A construction engineering power line stringing device according to claim 1, characterized in that: Self-locking moving wheels (31) are installed on the lower surface of the base (1).
7. A construction engineering power line stringing device according to claim 1, characterized in that: The left side of the base (1) is a sliding ramp (32).
8. A construction engineering power line stringing device according to claim 1, characterized in that: A fixing ring (33) is installed on the right side of the third support frame (13).