Ground water and electricity pipeline laying and positioning structure

By designing a water and electricity pipeline laying setting structure containing multiple shells and connecting line hammers, real-time monitoring and warning of floor tiles water and electricity lines installation is achieved, and the problem of inability to detect the installation level in real time in the existing technology is solved, and the installation is improved Accuracy and security.

CN221989945UActive Publication Date: 2024-11-12GOLD MANTIS HOME ELECTRONICS BUSINESS SUZHOU CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420212994.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-29
Publication Date
2024-11-12
Estimated Expiration
2034-01-29

AI Technical Summary

Technical Problem

During the installation of existing floor tiles, the positioning devices of the water and power lines cannot be monitored and warned in real time, resulting in the inability to detect and correct in time when the installation is not level.

Method used

A set-position structure for laying ground water and electricity pipelines is designed, including multiple housings and connecting wire hammers. Through rotation and sliding mechanisms, when the water and electricity line installation is tilted, the hammer tip of the wire hammer comes into contact with a specific groove and conducts the circuit. The speaker emits a warning sound to achieve real-time monitoring and warning.

Benefits of technology

This structure can not only measure on a non-level ground, but also monitor and warn the installation level of water and electricity lines in real time to ensure installation accuracy and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221989945U_ABST
    Figure CN221989945U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of ground water and electricity installation, and particularly discloses a ground water and electricity pipeline laying and positioning structure which comprises a first shell, a fourth shell connected with the first shell, a second shell vertically connected with the first shell and a third shell arranged under the first shell. A winding post is fixed in the middle of the rotating shaft, a connecting wire is wound on the winding post, a plumb bob is fixed at one end of the connecting wire, a sliding block is arranged under the plumb bob, a second groove is formed in the upper surface of the sliding block, a loudspeaker is arranged in the second shell, after the third shell is placed on the ground, one end of the third shell abuts against a floor tile to be detected, and the height of the plumb bob and the position of the sliding block are adjusted. The plumb bob is arranged in the second groove, so that the plumb bob tip of the plumb bob is suspended right above the second groove, and when the hydroelectric circuit is inclined during installation, the loudspeaker sounds to give an alarm, so that the installation levelness of the hydroelectric circuit to be detected can be monitored and alarmed in real time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of floor tile installation equipment, in particular to a ground water and electricity pipeline laying positioning structure. Background Art

[0002] Floor tiles are a kind of floor decoration material, also called floor tiles, which have the characteristics of hardness, pressure resistance, wear resistance, moisture resistance, etc. Some floor tiles are glazed on the surface and have a decorative effect. Floor tiles are mostly used on the ground and floors of public buildings and civil buildings. There are many varieties of floor tiles, and there is a lot of room for choice. According to the material, they can be divided into glazed tiles, non-slip tiles, polished tiles, vitrified tiles, etc.

[0003] At present, the positioning device used in the installation process of water and electricity lines on the floor of modular floor tiles mostly adopts theodolite for measurement. During measurement, the theodolite is placed on a tripod, and the center of the instrument is aligned with the ground measuring station with a plumb bob or an optical plummet. The instrument is leveled with a level, and then the measuring target is aimed with a telescope. Finally, the horizontal and vertical angles are measured with a horizontal and vertical dials. When the tilt angle of the floor tiles exceeds the threshold, a manual warning is issued. Although this measuring instrument is simple to operate, it cannot perform real-time monitoring and warning. Utility Model Content

[0004] The utility model aims to solve the shortcomings in the prior art and proposes a ground water and electricity pipeline laying positioning structure.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] A ground water and electricity pipeline laying positioning structure includes a first shell, a fourth shell elastically connected to the first shell, a second shell vertically connected to the first shell, and a third shell arranged directly below the first shell, wherein a rotating shaft is rotatably connected in the fourth shell, a winding pole is fixed in the middle of the rotating shaft, a connecting wire is wound around the winding pole, a plumb bob is fixed at one end of the connecting wire away from the winding pole, a conductive slider is arranged directly below the plumb bob, and a second groove with a triangular cross-section is arranged on the upper surface of the slider.

[0007] Preferably, a first cavity is provided in the first shell, a spring is provided in the first cavity, the spring is a compression spring, a second boss is provided at one end of the fourth shell close to the spring, one end of the fourth shell close to the second boss is abutted against the spring, one end of the fourth shell close to the second boss is slidably connected in the first cavity, and a first inward boss is provided on the inner wall of the first shell close to one end of the fourth shell, and the first boss is abutted against the second boss when the fourth shell is pulled out of the first cavity.

[0008] Preferably, a fourth cavity is provided in the fourth shell, a first through hole facing the ground is provided in the middle of the fourth shell, a connecting wire is passed through the first through hole, a fixing column is fixed to the fourth cavity next to the first through hole, a fixed pulley is provided on the fixing column for guiding the connecting wire, one end of the connecting wire is fixed to the winding column, a wire bob is fixed to the end of the connecting wire away from the winding column, and a rotating shaft is axially fixed at both ends of the winding column.

[0009] Preferably, a second through hole is provided at the rotating shaft on the inner wall of the fourth shell, and both ends of the rotating shaft pass through the through holes to be rotatably connected to the fourth shell, a knob is fixed to the end of the rotating shaft away from the ground, and the knob protrudes out of the surface of the fourth shell, and a protrusion is fixed to the end of the rotating shaft close to the ground, and the protrusion is arranged in the second through hole, and a third groove is provided at the position of the protrusion in the second through hole, and when the rotating shaft rotates, the protrusion can abut against the inner wall of the third groove, that is, the rotating shaft needs to be pulled up to realize the rotation of the rotating shaft.

[0010] Preferably, the third shell is located directly below the first shell, a third cavity is provided in the third shell, a first groove is provided at the upper end of the third shell, the first groove is located directly below the plumb bob, a slider is provided in the first groove, a second groove with a triangular cross-section is provided at the upper end of the slider, the second groove is located directly below the tip of the plumb bob, a connecting rod is slidably connected to the slider, the axial direction of the connecting rod is perpendicular to the axial direction of the plumb bob, and both ends of the connecting rod are fixed on the inner wall of the second groove.

[0011] Preferably, a fixing block is provided on the ground side of the third cavity, and the fixing block is fixed on the inner wall of the ground side of the third shell. A threaded hole perpendicular to the ground is provided in the middle of the fixing block, and the fixing block is threadedly connected with a threaded column, and a base is provided at one end of the threaded column close to the ground.

[0012] Preferably, the rotating shaft, winding pole, connecting wire, sliding block and bobbin are all made of conductive metal.

[0013] The beneficial effects of the utility model are as follows: the electric wires in the ground water and electricity pipeline laying positioning structure connect the slider, the connecting rod, the switch, the battery, the speaker, the rotating shaft, the winding column, the connecting wire, and the plumb bob in sequence; the ground water and electricity pipeline laying positioning structure is placed on the ground next to the floor tile to be measured; the level of the ground water and electricity pipeline laying positioning structure is preliminarily adjusted by rotating the base; then the end of the third shell away from the second shell is pressed against the floor tile to be measured; at this time, the end of the fourth shell away from the first shell is pressed against the floor tile to be measured; the height of the plumb bob is adjusted by rotating the knob; and then the slider is moved. The plumb bob is suspended just above the second groove, and the button is pressed to turn on the switch. When the water and electricity line installation is tilted, the fourth shell that is against the floor tile will be displaced, and at the same time, the plumb bob connected to the fourth shell will also be displaced. When the displacement reaches a certain degree, the hammer tip of the plumb bob will contact the inner wall of the second groove. At this time, the circuit connected to the battery will be turned on, and the speaker will sound to start warning. The ground water and electricity pipeline laying positioning structure can not only perform measurements on uneven ground, but also realize real-time monitoring and warning of the installation level of the water and electricity line to be measured. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 This is a top view of a ground water and electricity pipeline laying positioning structure proposed by the utility model;

[0015] Figure 2 for Figure 1 The sectional view with AA as the cutting line;

[0016] Figure 3 for Figure 1 A partial enlarged view of the C position in the middle;

[0017] Figure 4 for Figure 1 Partial front view in direction B.

[0018] In the figure: 1 first shell, 11 first cavity, 12 spring, 13 first boss, 14 second boss, 2 second shell, 21 second cavity, 22 speaker, 3 third shell, 31 third cavity, 32 first groove, 33 battery, 34 switch, 341 button, 35 connecting rod, 36 slider, 361 second groove, 37 fixed block, 38 threaded column, 381 base, 4 fourth shell, 41 fourth cavity, 42 winding column, 421 knob, 422 rotating shaft, 423 boss, 43 first through hole, 44 fixed pulley, 441 fixed column, 45 second through hole, 451 third groove, 5 plumb bob, 51 connecting wire, 6 electric wire. DETAILED DESCRIPTION

[0019] In order to facilitate the understanding of the present invention, the present invention will be described more comprehensively with reference to the relevant drawings. The drawings provide preferred embodiments of the present invention. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present invention more thoroughly and comprehensively understood.

[0020] It should be noted that when an element is referred to as being "fixed to" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only and do not represent the only implementation method.

[0021] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used herein are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.

[0022] Please refer to Figure 1-4 A ground water and electricity pipeline laying positioning structure, comprising a first shell 1, a fourth shell 4 elastically connected to the first shell 1, a second shell 2 vertically connected to the first shell 1, and a third shell 3 arranged directly below the first shell 1, wherein a rotating shaft 422 is rotatably connected in the fourth shell 4, a winding post 42 is fixed in the middle of the rotating shaft 422, a connecting wire 51 is wound around the winding post 42, a plumb bob 5 is fixed at one end of the connecting wire 51 away from the winding post 42, a conductive slider 36 is arranged directly below the plumb bob 5, a second groove 361 with a triangular cross section is arranged on the upper surface of the slider 36, and a The speaker 22, after placing the third shell 3 on the ground, the end of the third shell 3 away from the second shell 2 is pressed against the floor tile to be measured. At this time, the end of the fourth shell 4 away from the first shell 1 will also press against the floor tile to be measured. The height of the plumb bob 5 and the position of the slider 36 are adjusted so that the tip of the plumb bob 5 is suspended just above the second groove 361. When the floor tile tilts, the fourth shell 4 will be displaced under the action of the spring 12, and the plumb bob 5 connected to the fourth shell 4 will also move accordingly. When the floor tile tilts to a certain degree, the plumb bob 5 will touch the slider 36, and the speaker 22 will emit a sound to serve as a warning.

[0023] A first cavity 11 is provided in the first shell 1, and a spring 12 is provided in the first cavity 11, and the spring 12 is a compression spring. A second boss 14 is provided at one end of the fourth shell 4 close to the spring 12, and one end of the fourth shell 4 close to the second boss 14 abuts against the spring 12. One end of the fourth shell 4 close to the second boss 14 is slidably connected in the first cavity 11, and an inward first boss 13 is provided on the inner wall of the first shell 1 close to one end of the fourth shell 4, and the first boss 13 abuts against the second boss 14 when the fourth shell 4 is pulled out of the first cavity 11.

[0024] A fourth cavity 41 is provided in the fourth shell 4, a first through hole 43 facing the ground is provided in the middle of the fourth shell 4, a connecting wire 51 is passed through the first through hole 43, the connecting wire 51 is made of conductive metal, a fixing column 441 is fixed beside the first through hole 43 of the fourth cavity 41, a fixed pulley 44 is provided on the fixing column 441 for guiding the connecting wire 51, one end of the connecting wire 51 is fixed on the winding column 42, the winding column 42 is made of conductive metal, a plumb bob 5 is fixed on the end of the connecting wire 51 away from the winding column 42, the plumb bob 5 is made of conductive metal Material, a rotating shaft 422 is axially fixed at both ends of the winding post 42, and the rotating shaft 422 is made of conductive metal material. An electric wire 6 is connected to the rotating shaft 422. A second through hole 45 is provided at the rotating shaft 422 on the inner wall of the fourth shell 4. Both ends of the rotating shaft 422 pass through the through hole 45 and are rotatably connected to the fourth shell 4. A knob 421 is fixed at the end of the rotating shaft 422 away from the ground, and the knob 421 protrudes from the surface of the fourth shell 4. After rotating the knob 421, the rotating shaft 422 rotates to wind the connecting wire 51 around the winding post 42, thereby realizing the lifting and lowering of the plumb bob 5 fixed at one end of the connecting wire 51.

[0025] Furthermore, a protrusion 423 is fixed to one end of the rotating shaft 422 close to the ground, and the protrusion 423 is arranged in the second through hole 45. A third groove 451 is arranged at the position of the protrusion 423 in the second through hole 45. When the rotating shaft 422 rotates, the protrusion 423 can abut against the inner wall of the third groove 451, that is, the rotating shaft 422 needs to be pulled upward to realize the rotation of the rotating shaft 422.

[0026] A second cavity 21 is provided in the second shell 2, a speaker 22 is provided in the second cavity 21, the speaker 22 is fixed on the inner wall of the second shell 2, and a wire 6 is connected to the speaker 22. A third shell 3 is vertically fixed to the second shell 2, and the third shell 3 is located directly below the first shell 1. A third cavity 31 is provided in the third shell 3, a battery 33 and a switch 34 are provided in the third cavity 31, the battery 33 is fixed on the inner wall of the third shell 3 and is connected to the wire 6, the switch 34 is fixed on the inner wall of the third shell 3 away from the ground and is connected to the wire 6, a switch 34 is provided on the upper end of the switch 34, the switch 34 passes through a through hole (not shown) of the third shell 3 and protrudes from the surface of the third shell 3, a first groove 32 is provided on the upper end of the third shell 3, the first groove 32 is located directly below the plumb bob 5, a slider 36 is provided in the first groove 32, and a second groove 3 with a triangular cross section is provided on the upper end of the slider 36. 61, the second groove 361 is located directly below the hammer tip of the plumb bob 5, and is slidably connected to the slider 36 with a connecting rod 35, the axial direction of the connecting rod 35 is perpendicular to the axial direction of the plumb bob 5, the connecting rod 35 is made of conductive metal material and both ends are fixed on the inner wall of the second groove 361, when the ground water and electricity pipeline laying positioning structure is located on an uneven ground, the hammer tip of the plumb bob 5 is not facing the second groove 361, at this time, the slider 36 can be moved to move the second groove 361 on the slider 36 to directly below the hammer tip of the plumb bob 5, the ground side of the third cavity 31 is provided with a fixing block 37, the fixing block 37 is fixed on the inner wall of the ground side of the third shell 3, a threaded hole perpendicular to the ground is provided in the middle of the fixing block 37, the fixing block 37 is threadedly connected with a threaded column 38, and a base 381 is provided on the end of the threaded column 38 close to the ground, the base 381 is used to directly contact the ground, and the level of the ground water and electricity pipeline laying positioning structure can be adjusted by rotating the base 381.

[0027] In this embodiment, the electric wire 6 connects the slider 36, the connecting rod 35, the switch 34, the battery 33, the speaker 22, the rotating shaft 422, the winding pole 42, the connecting wire 51, and the plumb bob 5 in sequence, and the ground water and electricity pipeline laying positioning structure is placed on the ground next to the floor tile to be tested, and the level of the ground water and electricity pipeline laying positioning structure is preliminarily adjusted by rotating the base 381, and then the end of the third shell 3 away from the second shell 2 is pressed against the floor tile to be tested, and the fourth shell 4 moves into the first cavity 11 against the spring 12. At this time, the end of the fourth shell 4 away from the first shell 1 is pressed against the floor tile to be tested, and the fourth shell 4 is moved into the first cavity 11. Rotate the knob 421 to adjust the height of the plumb bob 5, and then move the slide 36 so that the plumb bob 5 hovers directly above the second groove 361. It should be noted that the hammer tip of the plumb bob 5 remains in the second groove 361. Press the button 341 to turn on the switch 34. When the water and electricity line installation is tilted, the fourth shell 4 that is against the floor tile will be displaced. At the same time, the plumb bob 5 connected to the fourth shell 4 will also be displaced. When the displacement reaches a certain extent, the hammer tip of the plumb bob 5 will contact the inner wall of the second groove 361. At this time, the circuit connected to the battery 33 will be turned on, and the speaker 22 will sound to start the alarm.

[0028] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A ground water and electricity pipeline laying positioning structure, characterized in that: The invention comprises a first shell (1), a fourth shell (4) elastically connected to the first shell (1), a second shell (2) vertically connected to the first shell (1), and a third shell (3) arranged directly below the first shell (1); a rotating shaft (422) is rotatably connected inside the fourth shell (4); a winding post (42) is fixed in the middle of the rotating shaft (422); a connecting wire (51) is wound around the winding post (42); a plumb bob (5) is fixed at one end of the connecting wire (51) away from the winding post (42); a slider (36) is arranged directly below the plumb bob (5); and a second groove (361) with a triangular cross-section is arranged on the upper surface of the slider (36).

2. A ground water and electricity pipeline laying positioning structure according to claim 1, characterized in that: A first cavity (11) is arranged in the first shell (1), a spring (12) is arranged in the first cavity (11), and the spring (12) is a compression spring (12). A second boss (14) is arranged at one end of the fourth shell (4) close to the spring (12), and one end of the fourth shell (4) close to the second boss (14) abuts against the spring (12). One end of the fourth shell (4) close to the second boss (14) is slidably connected in the first cavity (11), and an inward first boss (13) is arranged on the inner wall of the first shell (1) close to one end of the fourth shell (4), and when the fourth shell (4) is pulled out of the first cavity (11), the first boss (13) abuts against the second boss (14).

3. A ground water and electricity pipeline laying positioning structure according to claim 1, characterized in that: A fourth cavity (41) is arranged in the fourth shell (4), a first through hole (43) facing the ground is arranged in the middle of the fourth shell (4), a connecting wire (51) is passed through the first through hole (43), a fixing column (441) is fixed beside the first through hole (43) in the fourth cavity (41), a fixed pulley (44) is arranged on the fixing column (441) for guiding the connecting wire (51), one end of the connecting wire (51) is fixed on the winding column (42), a bobbin (5) is fixed on the end of the connecting wire (51) away from the winding column (42), and a rotating shaft (422) is axially fixed at both ends of the winding column (42).

4. A ground water and electricity pipeline laying positioning structure according to claim 3, characterized in that: A second through hole (45) is provided at the rotating shaft (422) on the inner wall of the fourth shell (4), and both ends of the rotating shaft (422) pass through the through holes to be rotatably connected to the fourth shell (4). A knob (421) is fixed to the end of the rotating shaft (422) away from the ground, and the knob (421) protrudes from the surface of the fourth shell (4). A convex block (423) is fixed to the end of the rotating shaft (422) close to the ground, and the convex block (423) is arranged in the second through hole (45). A third groove (451) is provided at the position of the convex block (423) in the second through hole (45). When the rotating shaft (422) rotates, the convex block (423) can abut against the inner wall of the third groove (451), that is, the rotating shaft (422) needs to be pulled upwards before the rotating shaft (422) can be rotated.

5. The ground water and electricity pipeline laying positioning structure according to claim 1 is characterized in that: The third shell (3) is located directly below the first shell (1), a third cavity (31) is provided in the third shell (3), a first groove (32) is provided at the upper end of the third shell (3), the first groove (32) is located directly below the plumb bob (5), a slider (36) is provided in the first groove (32), a second groove (361) with a triangular cross-section is provided at the upper end of the slider (36), the second groove (361) is located directly below the tip of the plumb bob (5), a connecting rod (35) is slidably connected to the slider (36), the axial direction of the connecting rod (35) is perpendicular to the axial direction of the plumb bob (5), and both ends of the connecting rod (35) are fixed on the inner wall of the second groove (361).

6. A ground water and electricity pipeline laying positioning structure according to claim 5, characterized in that: A fixing block (37) is arranged on the ground side of the third cavity (31), the fixing block (37) is fixed on the inner wall of the third shell (3) on the ground side, a threaded hole perpendicular to the ground is arranged in the middle of the fixing block (37), a threaded column (38) is threadedly connected to the fixing block (37), and a base (381) is arranged at one end of the threaded column (38) close to the ground.

7. A ground water and electricity pipeline laying positioning structure according to claim 1, characterized in that: The rotating shaft (422), the winding pole (42), the connecting wire (51), the sliding block (36) and the bobbin (5) are all made of conductive metal materials.