The invention provides a
power grid early-stage technology auxiliary decision-making research method based on multi-specification integration. The method comprises the following steps: S1, obtaining
space planning limiting elements in a region and limiting elements related to
site selection and line selection of a
transformer substation; s2, determining substation
site selection and line selectionrules in combination with the
space planning limiting elements and the substation
site selection and line selection related limiting elements; s3, obtaining a plurality of alternative substation siteselection and line selection data from the multi-
source data, and generating a standard GIS element layer; s4, related space analysis is carried out, a conflict part is obtained, and an error
list isgenerated; and S5, obtaining an input layer and a neighbor layer, performing neighbor analysis, and obtaining nearest distance data of site selection and line selection of the
transformer substation.According to the invention, automatic analysis, intelligent recognition and warning of site selection and line selection of the
transformer substation are realized, the refinement degree of early-stage work of a
power grid is improved, and comprehensive auxiliary decisions are provided for work such as power
space planning and site selection and line selection.