Top-returning-free reversed beam sealing structure for tower crane penetrating through reserved opening of basement top plate

By designing a combined structure of rectangular reserved hole, longitudinal back-top secondary reverse beam, cantilever transverse reinforcement and closure plate at the reserved hole of the tower crane through the basement roof, the problem of cumbersome space and closure of the hole is solved, and safety is achieved Improvement of performance and construction efficiency.

CN222045155UActive Publication Date: 2024-11-22THE THIRD CONSTR ENG CO LTD OF CHINA CONSTR SECOND ENG BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420653918.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-01
Publication Date
2024-11-22
Estimated Expiration
2034-04-01

AI Technical Summary

Technical Problem

The reserved hole of the tower crane through the basement roof panel needs to be back on the roof, which takes up a large space, affects the decoration and mechanical and electrical construction, hinders the passage of pedestrian vehicles, and the existing hole closure measures are cumbersome and inconvenient to demolish.

Method used

A closed structure of tower cranes through the basement roof panel reserved hole without back-top, adopts rectangular hole without back-top, vertical back-top secondary reverse beam, cantilevered transverse bar, water-stop steel plate and closure plate to form a waterproof ridge and double closed structure , reduce the cantilever length to control deflection and cracks, and use the cantilever transverse rib as the stressed rib for subsequent sealing.

Benefits of technology

It realizes construction without back-top frames, reduces construction costs, simplifies the process of opening closure and demolition, ensures structural safety, and is suitable for the construction of reserved openings on the basement roof panel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222045155U_ABST
    Figure CN222045155U_ABST
Patent Text Reader

Abstract

A back-jacking-free reversed beam sealing structure for a tower crane penetrating through a reserved hole of a basement top plate comprises frame columns, frame main beams and the basement top plate, the reserved hole of the tower crane is formed in the basement top plate, two back-jacking-free secondary reversed beams are symmetrically arranged on the two sides of the reserved hole, and the two ends of each back-jacking-free secondary reversed beam are fixedly connected to the corresponding frame main beam. The bottom face of the back-jacking-free secondary reversed beam is flush with the bottom face of the basement top plate, the top face of the back-jacking-free secondary reversed beam is higher than the top face of the basement top plate, two sets of cantilever transverse bars are embedded in the two sides of the reserved hole, a set of longitudinal keels are erected on the upper sides of the cantilever transverse bars, a bottom layer sealing plate is laid on the longitudinal keels, and a top layer sealing plate is laid on the top plate reserved section. Deflection and cracks of the basement top plate are controlled by reducing the overhanging length of the basement top plate, so that back-jacking of the hole is avoided, meanwhile, double closing of the hole is achieved by designing and embedding the overhanging transverse bars and forming a waterproof ridge, and the structure is widely applied to construction that the hole must be reserved in the basement top plate due to construction requirements.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of temporary closure of tower crane penetration holes, in particular to a tower crane penetration through a basement top plate reserved hole free top return inverted beam closure structure. Background Art

[0002] With the large-scale construction of high-rise buildings in my country, high-rise buildings generally use integral basements, and the basement roof must reserve an opening to pass the tower crane standard section. After such an opening is reserved, the roof around the opening is in a cantilevered stress state, and a support frame needs to be set up at the bottom of the roof to return to the top. This practice occupies a large space in the basement, which not only affects the interlaced construction of decoration and electromechanical, but also hinders the passage of pedestrians and vehicles and poses the risk of collision and instability.

[0003] At the same time, after the reserved opening is set, the opening needs to be temporarily closed to prevent workers from falling or debris from falling, and to prevent construction water from flowing into the opening. Existing opening closing measures generally require a closing structure to be set up on the top plate around the opening. The closing structure is generally designed in a cone shape. The opening is closed and surrounded by a cone-shaped template and painted with warning markings. This method is cumbersome to construct and inconvenient to dismantle. Utility Model Content

[0004] The purpose of the utility model is to provide a tower crane through the basement top plate reserved opening without the need for a top-returning reverse beam closing structure, to solve the existing tower crane opening top plate lower part requires a support frame for top return, there is a technical problem of occupying a large basement space, affecting the decoration and mechanical and electrical interlaced construction, hindering the passage of pedestrians and vehicles and there is a risk of collision and instability; it is also necessary to solve the technical problem of cumbersome construction of the opening closing measures and the inconvenience of dismantling.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] A tower crane passes through a reserved hole in a basement top plate, and a closed structure without a back-up anti-beam includes a frame column, a frame main beam and a basement top plate. Both ends of the frame main beam are fixedly connected to the frame columns on both sides. A reserved hole for a tower crane section is opened on the basement top plate. The reserved hole is rectangular, and the size of the reserved hole is larger than the cross-sectional size of the tower crane section. The tower crane section passes through the reserved hole.

[0007] Two longitudinally parallel non-returning secondary reverse beams are symmetrically arranged at the cantilevered ends of the basement top plate on both sides of the reserved opening. The two ends of the non-returning secondary reverse beams are fixedly connected to the frame main beams on both sides respectively. The bottom surface of the non-returning secondary reverse beam is flush with the bottom surface of the basement top plate, and the top surface of the non-returning secondary reverse beam is higher than the top surface of the basement top plate. A top plate reserved section with the installation width of the water-stop steel plate is reserved between the inner side of the non-returning secondary reverse beam and the edge of the reserved opening. The load transfer path of the basement top plate is the non-returning secondary reverse beam, frame column beam and frame column in sequence.

[0008] A water-stop steel plate is buried in the middle of the thickness of the basement top plate, with the opening of the water-stop steel plate facing downward and the outer half of the water-stop steel plate buried in the reserved section of the top plate.

[0009] Two groups of cantilever transverse reinforcements are symmetrically embedded at the cantilever ends of the basement top plate on both sides of the reserved opening. The longitudinal length of the cantilever transverse reinforcements is the longitudinal length of the reserved opening. Each group of cantilever transverse reinforcements is perpendicular to the side wall of the reserved opening and the outer end is embedded in the basement top plate, and the embedding depth exceeds the beam body of the secondary anti-beam without returning to the top. The inner end of the cantilever transverse reinforcement is the cantilever part, which is cantilevered in the reserved opening. The cantilever length is greater than 2 / 3 of the width of the reserved opening. A gap is reserved between the inner end of the cantilever transverse reinforcement and the tower crane section for installation and disassembly.

[0010] A set of longitudinal keels are set up on the upper side of the cantilevered part of the cantilevered transverse reinforcement. A bottom-level closing plate is laid flat on the longitudinal keels. The bottom-level closing plate is located below the elevation of the water-stop steel plate. The width of the bottom-level closing plate is adapted to the distance between the side wall of the reserved opening and the tower crane section. The inner end of the bottom-level closing plate is pressed against the tower crane section and closes the reserved opening.

[0011] The top surface of the secondary reverse beam without returning to the top is higher than the top surface of the reserved section of the top plate to form a waterproof sill. A top-level closing plate is laid flat on the reserved section of the top plate. The outer end of the top-level closing plate is pressed against the inner corner of the waterproof sill, and the inner end is pressed against the tower crane section, thus sealing the reserved opening for the second time.

[0012] The basement top slab includes top slab top reinforcement and top slab bottom reinforcement. The top slab top reinforcement includes top slab transverse top reinforcement and top slab longitudinal top reinforcement. The top slab bottom reinforcement includes top slab transverse bottom reinforcement and top slab longitudinal bottom reinforcement.

[0013] The secondary anti-beam without top return is a reinforced concrete beam constructed integrally with the basement top slab. The secondary anti-beam without top return includes secondary anti-beam main reinforcement and secondary anti-beam stirrups. The main reinforcement of the secondary anti-beam includes the main reinforcement at the top of the anti-beam, the main reinforcement in the middle of the anti-beam and the main reinforcement at the bottom of the anti-beam.

[0014] The main reinforcement at the bottom of the inverted beam within the range of the secondary inverted beam without top return is also served by the longitudinal bottom reinforcement of the top slab, and the main reinforcement in the middle of the inverted beam within the range of the secondary inverted beam without top return is also served by the longitudinal top reinforcement of the top slab.

[0015] The cantilevered transverse reinforcement is located at the lower side of the top plate transverse and bottom reinforcement, and the cantilevered transverse reinforcement is connected with the steel bars of the secondary reverse beam without returning to the top by binding.

[0016] The top closing plate and the bottom closing plate are both formwork panels.

[0017] The bottom closed plate is composed of two horizontally arranged bottom closed long plates and two longitudinally arranged bottom closed short plates. Both the bottom closed long plates and the bottom closed short plates are rectangular and are arranged around the tower crane section. The bottom closed short plates are parallel to the longitudinal keel, and the bottom closed long plates are perpendicular to the longitudinal keel.

[0018] The top-floor enclosed plate is composed of two horizontally arranged top-floor enclosed long plates and two vertically arranged top-floor enclosed short plates. Both the top-floor enclosed long plates and the top-floor enclosed short plates are rectangular and are arranged around the tower crane section. The top-floor enclosed short plate is parallel to the secondary reverse beam without returning to the top. The three sides of the top-floor enclosed long plate are erected on the upper side of the basement top plate, and the other side is pressed against the tower crane section.

[0019] The cantilever transverse reinforcement is a whole steel bar or the cantilever transverse reinforcement is formed by extending the embedded section and the cantilever section. The embedded section and the cantilever section are extended by an extension tube pre-embedded in the side wall of the reserved opening.

[0020] The dimension that the top surface of the secondary beam without top return is higher than the top surface of the basement roof, that is, the height of the waterproof sill is a, and the width of the secondary beam without top return is 2a.

[0021] Compared with the prior art, the utility model has the following characteristics and beneficial effects:

[0022] 1. In existing frame structures, vertical loads are derived from deadweight and various live loads. Unless there are special loads, most vertical loads are designed as uniformly distributed loads, which may act directly on the frame, where the floor slab is placed on the frame beam, or may be transferred to the frame in the form of concentrated loads through other components such as secondary beams. The floor slab is placed on the secondary beams that are not frame beams, and then transferred to the frame beams by the secondary beams. The vertical load of the frame structure is borne by the beam-slab system, and then transferred to the columns, and then to the foundation by the columns.

[0023] The utility model adds a counter-beam at the opening, that is, adds a secondary beam at the end of the cantilevered plate, transfers the floor load to the secondary beam, and then transfers it to the main beam of the frame. Under the premise of ensuring the safety of the structure, the deflection and cracks of the basement top plate are controlled by reducing the cantilever length of the basement top plate, thereby realizing the opening without returning to the top, and the crack width and deflection of the cast-in-place plate can meet the safety specifications and meet the structural safety.

[0024] The utility model adds a counter beam at the opening, which eliminates the need for the construction of steel pipe support returning to the top of the tower crane opening during production and construction, greatly reduces the construction cost, and also creates conditions for the passage of the basement and early construction.

[0025] 2. Based on the secondary anti-return beam without top return, the utility model is designed to embed cantilevered transverse reinforcement, and then lay the keel and the bottom layer closing plate on it for the first closing. The height of the secondary anti-return beam without top return is higher than the basement top plate to form a waterproof slab, and then the top layer closing plate is used for the second closing to achieve double closing of the opening.

[0026] Third, the two closing plates of the utility model are easy to dismantle, and the cantilevered transverse reinforcement can be used as a force-bearing reinforcement for pouring concrete when the subsequent hole is blocked.

[0027] The utility model can reduce the construction of the top return frame and realize double closure of the opening, has the characteristics of convenient construction, and can be widely used in the construction where an opening must be reserved on the basement top plate due to construction requirements. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] The utility model is further described in detail below in conjunction with the accompanying drawings.

[0029] Figure 1 It is a side structural schematic diagram of the utility model.

[0030] Figure 2 yes Figure 1 A partial enlarged view of the .

[0031] Figure 3 yes Figure 1 Schematic diagram of the cross-sectional structure at the location of the middle cantilever transverse reinforcement.

[0032] Figure 4 yes Figure 1 Schematic diagram of the cross-sectional structure at the location of the mid-longitudinal keel.

[0033] Figure 5 yes Figure 1 Schematic diagram of the cross-sectional structure of the location of the middle and bottom closing plates.

[0034] Figure 6 yes Figure 1 Schematic diagram of the cross-sectional structure of the location of the water stop steel plate.

[0035] Figure 7 yes Figure 1 Schematic diagram of the structure after the water-stop steel plate and the bottom closing plate are overlapped.

[0036] Figure 8 yes Figure 1 Schematic diagram of the cross-sectional structure of the location of the top closing plate.

[0037] Figure markings: 1-frame column, 2-frame main beam, 3-basement top plate, 31-top plate transverse top reinforcement, 32-top plate longitudinal top reinforcement, 33-top plate transverse bottom reinforcement, 34-top plate longitudinal bottom reinforcement, 35-top plate reserved section, 4-reserved opening, 5-tower crane section, 6-secondary anti-beam without top return, 61-secondary anti-beam main reinforcement, 611-anti-beam top main reinforcement, 612-anti-beam middle main reinforcement, 613-anti-beam bottom main reinforcement, 62-secondary anti-beam stirrups, 7-cantilever transverse reinforcement, 8-waterstop steel plate, 9-installation and disassembly gap, 10-longitudinal keel, 11-bottom floor closed plate, 111-bottom floor closed long plate, 112-bottom floor closed short plate, 12-top floor closed plate, 121-top floor closed long plate, 122-top floor closed short plate. DETAILED DESCRIPTION

[0038] See Example Figure 1-8As shown, a tower crane passes through a reserved hole in the basement roof and has a closed structure without a back-up beam, comprising a frame column 1, a frame main beam 2 and a basement roof 3. There are four frame columns 1 and four frame main beams 2. Both ends of the frame main beam 2 are fixedly connected to the frame columns 1 on both sides. A reserved hole 4 for a tower crane section is opened on the basement roof 3. The reserved hole 4 is rectangular, and the size of the reserved hole 4 is larger than the cross-sectional size of a tower crane section 5. The tower crane section 5 passes through the reserved hole 4.

[0039] See also Figure 1-8 As shown, two longitudinally parallel non-returning secondary reverse beams 6 are symmetrically arranged on both sides of the reserved opening 4 and the cantilevered ends of the basement top plate 3. The two ends of the non-returning secondary reverse beams 6 are respectively fixedly connected to the frame main beams 2 on both sides. The bottom surface of the non-returning secondary reverse beams 6 is flush with the bottom surface of the basement top plate 3, and the top surface of the non-returning secondary reverse beams 6 is higher than the top surface of the basement top plate 3. A top plate reserved section 35 with the installation width of the water-stop steel plate is reserved between the inner side of the non-returning secondary reverse beams 6 and the edge of the reserved opening 4. The load transfer path of the basement top plate 3 is the non-returning secondary reverse beams 6, frame column beams and frame columns in sequence.

[0040] In this embodiment, the dimension a that the top surface of the secondary reverse beam 6 is higher than the top surface of the basement roof 3 is, and the width of the secondary reverse beam 6 is 2a, where a=100 mm.

[0041] See also Figure 1-2 As shown in FIGS. 6-7 , a water-stop steel plate 8 is buried in the middle of the thickness of the basement top plate 3, with the opening of the water-stop steel plate 8 facing downward, and the outer half of the water-stop steel plate 8 is buried in the top plate reserved section 35. In this embodiment, the buried width of the water-stop steel plate is 150 mm.

[0042] See also Figure 1-2 As shown, the basement top slab 3 includes top slab top reinforcement and top slab bottom reinforcement, the top slab top reinforcement includes top slab transverse top reinforcement 31 and top slab longitudinal top reinforcement 32, and the top slab bottom reinforcement includes top slab transverse bottom reinforcement 33 and top slab longitudinal bottom reinforcement 34. The top-free secondary inverted beam 6 is a reinforced concrete beam constructed integrally with the basement top slab 3, the top-free secondary inverted beam 6 includes secondary inverted beam main reinforcement 61 and secondary inverted beam stirrups 62, and the secondary inverted beam main reinforcement 61 includes inverted beam top main reinforcement 611, inverted beam middle main reinforcement 612 and inverted beam bottom main reinforcement 613. The inverted beam bottom main reinforcement 613 within the range of the top-free secondary inverted beam 6 is also served by the top slab longitudinal bottom reinforcement 34, and the inverted beam middle main reinforcement 612 within the range of the top-free secondary inverted beam is also served by the top slab longitudinal top reinforcement 32.

[0043] See also Figure 1-2 As shown in Figure 3-4, two groups of cantilever transverse reinforcements 7 are symmetrically embedded on both sides of the reserved opening 4 and the cantilevered ends of the basement top plate 3. The longitudinal length of the cantilever transverse reinforcement 7 is the longitudinal length of the reserved opening 4, which is greater than the cantilever transverse reinforcement 7 and is located at the lower side of the top plate transverse bottom reinforcement 31. The cantilever transverse reinforcement 7 is connected to the steel bars of the secondary reverse beam 6 without returning to the top by binding.

[0044] In other embodiments, the cantilever transverse reinforcement 7 is a whole steel bar or the cantilever transverse reinforcement 7 is formed by extending two steel bars, an embedded section and a cantilever section, and the embedded section and the cantilever section are extended by an extension tube pre-buried in the side wall of the reserved opening 4.

[0045] Each group of cantilevered transverse reinforcement 7 is perpendicular to the side wall of the reserved opening 4 and the outer end is buried in the basement top plate 3, and the buried depth exceeds the beam body of the non-returning secondary anti-beam 6. The inner end of the cantilevered transverse reinforcement 7 is the cantilevered part, which is cantilevered in the reserved opening 4. The cantilevered length is greater than 2 / 3 of the width of the reserved opening 4. An installation and disassembly gap 9 is reserved between the inner end of the cantilevered transverse reinforcement 7 and the tower crane section 5.

[0046] See also Figure 1-4 As shown, a group of longitudinal keels 10 are set up on the upper side of the cantilevered part of the cantilevered transverse reinforcement 7. The longitudinal keels 10 are wooden squares. A bottom layer closing plate 11 is laid flat on the longitudinal keels 10. The bottom layer closing plate 11 is located below the elevation of the water-stop steel plate 8. The width of the bottom layer closing plate 11 is adapted to the distance between the side wall of the reserved opening 4 and the tower crane section 5. The inner end of the bottom layer closing plate 11 presses against the tower crane section 5 to close the reserved opening 4.

[0047] In this embodiment, four longitudinal keels 10 are provided, the outermost one is closely attached to the inner wall of the top plate reserved section 35 , and the innermost one is flush with the inner end of the cantilevered transverse reinforcement 7 .

[0048] See also Figure 1-2 As shown, the top surface of the secondary anti-return beam 6 is higher than the top surface of the top plate reserved section 35 to form a waterproof sill, and the height of the waterproof sill is a. The top plate reserved section 35 is flatly paved with a top closing plate 12, the outer end of the top closing plate 12 is tightly pressed against the inner corner of the waterproof sill, and the inner end is tightly pressed against the tower crane section 5 and the secondary closed reserved opening 4. The top closing plate 12 and the bottom closing plate 11 are both template panels.

[0049] See also Figure 1-2 As shown in , 6, the bottom closed plate 11 is composed of two transversely arranged bottom closed long plates 111 and two longitudinally arranged bottom closed short plates 112. The bottom closed long plates 111 and the bottom closed short plates 112 are both rectangular and are arranged around the tower crane section 5. The bottom closed short plates 112 are parallel to the longitudinal keel 10, and the bottom closed long plates 111 are perpendicular to the longitudinal keel 10.

[0050] See also Figure 1-2 As shown in , 8, the top-level closing plate 12 is composed of two transversely arranged top-level closing long plates 121 and two longitudinally arranged top-level closing short plates 122. The top-level closing long plates 121 and the top-level closing short plates 122 are both rectangular and are arranged around the tower crane section 5. The top-level closing short plates 122 are parallel to the secondary reverse beam 6. The three sides of the top-level closing long plate 121 are erected on the upper side of the basement top plate 3, and the other side is pressed tightly against the tower crane section 5.

[0051] The construction process of this application is as follows:

[0052] Step 1: Design the size and reinforcement of the secondary beam 6 without top return according to the load borne near the reserved opening 4 of the basement top plate 3, use Yingjianke design software to perform finite element analysis on the added secondary beam without top return, verify whether its overall bending moment value, floor deflection value, and floor crack value can meet the requirements of the specification, and review the reinforcement.

[0053] Step two, when tying the steel bars of the frame main beams 2 on both sides, leave stubble in advance for the steel bars of the secondary reverse beam 6 without returning to the top; tie the steel bars of the basement top plate 3, the steel bars of the secondary reverse beam 6 without returning to the top and the cantilevered transverse bars 7, fix the water-stop steel plate 8, and then cast it in one piece to form a reserved opening 4 and the secondary reverse beam 6 without returning to the top. In this embodiment, the outer end of the water-stop steel plate 8 is connected to the outer beam surface of the secondary reverse beam 6.

[0054] Step 3: Pass the tower crane section 5 through the reserved hole.

[0055] Step 4: Set up the longitudinal keel 10 on the cantilevered transverse reinforcement 7 in the reserved opening.

[0056] Step 5: Cut the template panel according to the reserved opening 4 to form a bottom closing plate 11 and a top closing plate 12.

[0057] Step seven, then lay the bottom closing plate 11 on the longitudinal keel 10 to form a primary seal.

[0058] Step eight, lay the top sealing plate 12 between the waterproof sill and the tower crane section 5 to form a secondary seal.

[0059] Step nine, when the tower crane needs to be dismantled after use, first remove the top closing plate 12 on the basement ceiling 3; then push the bottom closing plate 11 in the installation gap 9 in the basement, continue to remove it on the basement ceiling 3, and finally remove the longitudinal keel 10.

[0060] Step ten, the cantilevered transverse reinforcement 7 is used as the force-bearing reinforcement for pouring concrete when the reserved opening 4 is subsequently blocked, and a bottom formwork is supported at the lower side of the reserved opening 4, and then poured into shape.

[0061] In step two, the cantilevered transverse reinforcement 7 can also be set as an embedded section and a cantilevered section. The embedded section and the pre-embedded extending tube are pre-embedded in this step, and the end face of the extending tube is flush with the side wall of the reserved opening 4. Then, before step four, the cantilevered section and the embedded section are connected as one through the extending tube on the side wall of the reserved opening 4.

Claims

1. A tower crane passes through a reserved hole in a basement top plate and does not need to be closed by a reverse beam, comprising a frame column (1), a frame main beam (2) and a basement top plate (3), wherein both ends of the frame main beam (2) are fixedly connected to the frame columns (1) on both sides, and a reserved hole (4) for a tower crane section is opened on the basement top plate (3), the reserved hole (4) is rectangular, the size of the reserved hole (4) is larger than the cross-sectional size of the tower crane section (5), and the tower crane section (5) passes through the reserved hole (4), characterized in that: Two longitudinal parallel non-returning secondary inverted beams (6) are symmetrically arranged at the cantilevered ends of the basement top plate (3) on both sides of the reserved opening (4). The two ends of the non-returning secondary inverted beam (6) are respectively fixedly connected to the frame main beams (2) on both sides. The bottom surface of the non-returning secondary inverted beam (6) is flush with the bottom surface of the basement top plate (3). The top surface of the non-returning secondary inverted beam (6) is higher than the top surface of the basement top plate (3). A top plate reserved section (35) of the installation width of the water stop steel plate is reserved between the inner side of the non-returning secondary inverted beam (6) and the edge of the reserved opening (4). The load transfer path of the basement top plate (3) is the non-returning secondary inverted beam (6), the frame column beam and the frame column in sequence. A water-stop steel plate (8) is buried in the middle of the thickness of the basement top plate (3), the opening of the water-stop steel plate (8) faces downward, and the outer half of the water-stop steel plate (8) is buried in the top plate reserved section (35). Two groups of cantilever transverse reinforcements (7) are symmetrically embedded at the cantilevered ends of the basement top plate (3) on both sides of the reserved opening (4). The longitudinal arrangement length of the cantilever transverse reinforcements (7) is the longitudinal length of the reserved opening (4). Each group of cantilever transverse reinforcements (7) is perpendicular to the side wall of the reserved opening (4) and the outer end is embedded in the basement top plate (3). The embedding depth exceeds the beam body of the non-returning secondary anti-beam (6). The inner end of the cantilever transverse reinforcement (7) is a cantilevered part, which is cantilevered in the reserved opening (4). The cantilevered length is greater than 2 / 3 of the width of the reserved opening (4). An installation and disassembly gap (9) is reserved between the inner end of the cantilever transverse reinforcement (7) and the tower crane section (5). A set of longitudinal keels (10) are arranged on the upper side of the cantilevered portion of the cantilevered transverse reinforcement (7), and a bottom closing plate (11) is laid flat on the longitudinal keel (10). The bottom closing plate (11) is located below the elevation of the water stop steel plate (8), and the width of the bottom closing plate (11) is adapted to the distance between the side wall of the reserved opening (4) and the tower crane section (5). The inner end of the bottom closing plate (11) is pressed against the tower crane section (5) to close the reserved opening (4). The top surface of the secondary anti-return beam (6) is higher than the top surface of the top plate reserved section (35) to form a waterproof sill. The top plate reserved section (35) is flatly paved with a top closing plate (12). The outer end of the top closing plate (12) is tightly pressed against the inner corner of the waterproof sill, and the inner end is tightly pressed against the tower crane section (5), and the secondary closed reserved opening (4).

2. The closed structure of the reserved hole for tower crane passing through the basement top plate according to claim 1 is characterized by: The basement top slab (3) includes top slab top reinforcement and top slab bottom reinforcement, the top slab top reinforcement includes top slab transverse top reinforcement (31) and top slab longitudinal top reinforcement (32), and the top slab bottom reinforcement includes top slab transverse bottom reinforcement (33) and top slab longitudinal bottom reinforcement (34).

3. The closed structure of the reserved hole for tower crane passing through the basement top plate according to claim 2 is characterized by: The secondary inverted beam (6) without top return is a reinforced concrete beam constructed integrally with the basement top slab (3). The secondary inverted beam (6) without top return comprises secondary inverted beam main reinforcement (61) and secondary inverted beam stirrups (62). The secondary inverted beam main reinforcement (61) comprises inverted beam top main reinforcement (611), inverted beam middle main reinforcement (612) and inverted beam bottom main reinforcement (613).

4. The closed structure of the reserved hole for tower crane passing through the basement top plate according to claim 3 is characterized by: The main reinforcement (613) at the bottom of the inverted beam within the range of the secondary inverted beam (6) without top return is concurrently formed by the longitudinal bottom reinforcement (34) of the top slab, and the main reinforcement (612) at the middle of the inverted beam within the range of the secondary inverted beam without top return is concurrently formed by the longitudinal top reinforcement (32) of the top slab.

5. The closed structure of the reserved hole for tower crane passing through the basement top plate according to claim 2 is characterized by: The cantilevered transverse reinforcement (7) is located at the lower side of the top plate transverse bottom reinforcement (33), and the cantilevered transverse reinforcement (7) is connected to the reinforcement of the secondary reverse beam (6) without top return by binding.

6. The closed structure of the reserved hole for tower crane passing through the basement top plate according to claim 1 is characterized by: The top closing plate (12) and the bottom closing plate (11) are both template panels.

7. The closed structure of the reserved hole for tower crane passing through the basement top plate according to claim 6 is characterized by: The bottom closed plate (11) is composed of two bottom closed long plates (111) arranged transversely and two bottom closed short plates (112) arranged longitudinally. The bottom closed long plates (111) and the bottom closed short plates (112) are both rectangular and arranged around the tower crane section (5). The bottom closed short plates (112) are parallel to the longitudinal keel (10), and the bottom closed long plates (111) are perpendicular to the longitudinal keel (10).

8. The closed structure of the reserved hole for tower crane passing through the basement top plate according to claim 6 or 7, characterized in that: The top-level closing plate (12) is composed of two transversely arranged top-level closing long plates (121) and two longitudinally arranged top-level closing short plates (122). The top-level closing long plates (121) and the top-level closing short plates (122) are both rectangular and are arranged around the tower crane section (5). The top-level closing short plates (122) are parallel to the non-returning secondary reverse beam (6). Three sides of the top-level closing long plate (121) are erected on the upper side of the basement top plate (3), and the other side is tightly pressed against the tower crane section (5).

9. The closed structure of the reserved hole for tower crane passing through the basement top plate according to claim 1 is characterized by: The cantilever transverse reinforcement (7) is a whole steel bar or the cantilever transverse reinforcement (7) is formed by extending two steel bars, an embedded section and a cantilever section, and the embedded section and the cantilever section are extended by an extension tube pre-embedded in the side wall of the reserved opening (4).

10. The closed structure of the reserved hole for tower crane passing through the basement top plate according to claim 1 is characterized by: The dimension that the top surface of the non-returning secondary inverted beam (6) is higher than the top surface of the basement top plate (3), i.e., the height of the waterproof sill is a, and the width of the non-returning secondary inverted beam (6) is 2a.