Supporting structure for hydraulic engineering pipeline
By designing a pipeline support structure for water conservancy engineering including substrate, screw and H-shaped steel, the problems of complex structure and insufficient adjustment in the prior art are solved, flexible adjustment of pipeline support angle and height is achieved, and laying efficiency and adaptability are improved. .
Patent Information
- Application Number
- CN202420749513.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-11
- Publication Date
- 2024-12-06
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The supporting frame of the existing water conservancy engineering pipeline is complex and has high cost. It cannot adjust the axial, radial and support angle of the pipeline, and is insufficient in adaptability.
A support structure including a substrate, a first screw, a connecting plate, an H-shaped steel, a joist and a fixture are designed. By adjusting the matching and height adjustment mechanism of the first screw and the waist groove, the axial, radial and Height adjustment facilitates the adjustment of the support angle and height of the pipe.
The pipeline laying process is simplified, the cost is reduced, the flexibility to adjust the pipeline support angle and height is improved, and the docking effect is enhanced.
Smart Images

Figure CN222122429U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water conservancy projects, in particular to a supporting structure for water conservancy project pipelines. Background Art
[0002] Water conservancy projects are projects used to control and allocate natural surface water and groundwater. During the construction of water conservancy projects, various water conservancy pipelines need to be laid underground or above ground to play a certain role in water transportation. When laying pipelines, support frames are usually used to erect them and complete the docking, making the connection between water pipes tighter.
[0003] After searching, the patent with announcement number CN220416453U discloses a water conservancy pipeline support frame, which is provided with a hydraulic telescopic rod, a scissors-type telescopic arm component, a pulley, a bottom sliding connecting rod, a bottom fixed connecting rod, a top sliding connecting rod, a top fixed connecting rod, a top support block and a bottom support block. The bottom sliding connecting rod is pulled by the hydraulic telescopic rod, and the bottom sliding connecting rod is translated along the groove of the bottom support block through the pulley, thereby driving the X-shaped telescopic arm unit formed by the scissors-type telescopic arm component to perform telescopic action, thereby realizing the vertical height adjustment of the lower clamp along the guide rod.
[0004] Although the above scheme can adjust the support height of the pipeline, the overall structure is complex and uses equipment such as hydraulic telescopic rods, resulting in high costs. In addition, the scheme can only adjust the support height of the pipeline within a certain range, and cannot adjust the pipeline axially and radially, and cannot deflect the pipeline at a certain angle in the horizontal direction, which needs to be improved. Utility Model Content
[0005] The purpose of the utility model is to provide a supporting structure for a water conservancy project pipeline to solve the problems raised in the above background technology.
[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0007] A support structure for a water conservancy project pipeline comprises a base plate, a plurality of mounting holes are provided on the top of the base plate, a plurality of first screw rods are fixedly connected to the top of the base plate, a connecting plate is provided on the top of the base plate, a plurality of mutually parallel first waist grooves are provided on the top of the connecting plate and at corresponding positions of each first screw rod, a pad and a first nut are sleeved after the first screw rod passes through a first waist groove, an H-shaped steel is fixedly connected to the top of the connecting plate via a plurality of vertical rods, a joist is connected to the H-shaped steel via a height adjustment mechanism, and a plurality of clamps are fixedly connected to the top of the joist.
[0008] As a further solution of the utility model: the height adjustment mechanism includes a plurality of second screws fixedly installed at the bottom of the supporting beam, and the top and bottom of the H-shaped steel and the corresponding parts of each second screw are penetrated with through holes for inserting the second screws, and the outer wall of the second screw is cooperated with a second nut and a third nut.
[0009] As a further solution of the utility model: the second nut and the third nut are respectively located on the upper and lower sides of a flange plate of the H-shaped steel.
[0010] As a further solution of the utility model: both ends of the H-shaped steel are fixedly connected with vertical plates, the bottom of the supporting beam is fixedly connected with two channel steels, the two ends of the H-shaped steel are located in the corresponding channel steels, a first bolt is passed through the vertical plate, and a second waist groove is opened on the outer wall of the channel steel corresponding to the first bolt, and the first bolt passes through the corresponding second waist groove and is matched with a fourth nut.
[0011] As a further solution of the utility model: the clamp includes a lower hoop and an upper hoop, the lower hoop and the upper hoop are detachably connected through the cooperation of multiple second bolts and fifth nuts, and the lower hoop is fixedly connected to the top of the support beam.
[0012] Compared with the prior art, the beneficial effects of the utility model are:
[0013] In the utility model, the first screw rod is matched with different first waist grooves, and the position of the first screw rod is adjusted in the first waist groove, so that the angle between the connecting plate and the base plate can be adjusted, and the position of the clamp can be adjusted in the axial and radial directions of the pipeline. Then, the height adjustment mechanism is adjusted to adjust the height of the clamp, so as to facilitate the adjustment of the support angle and support height of the pipeline during the laying process of the pipeline, thereby facilitating the docking of adjacent pipelines, and the use effect is good. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 The present invention is a structural schematic diagram of a support structure for a water conservancy project pipeline.
[0015] Figure 2 The schematic diagram is a top view of the structure of a connecting plate in a supporting structure for a water conservancy project pipeline.
[0016] Figure 3 The present invention is a structural schematic diagram of a vertical plate in a supporting structure for a water conservancy project pipeline.
[0017] Figure 4 The figure is a schematic diagram of the structure of a clamp used in a supporting structure of a water conservancy project pipeline.
[0018] Figure 5The present invention is a structural schematic diagram of the cooperation between a first screw rod and a first waist groove in a supporting structure for a water conservancy project pipeline.
[0019] Among them, the base plate 1, the mounting hole 2, the first screw rod 3, the connecting plate 4, the first waist groove 5, the cushion block 6, the first nut 7, the vertical rod 8, the H-shaped steel 9, the through hole 10, the support beam 11, the second screw rod 12, the second nut 13, the third nut 14, the channel steel 15, the second waist groove 16, the first bolt 17, the fourth nut 18, the clamp 19, the lower hoop 20, the upper hoop 21, the second bolt 22, the fifth nut 23, and the vertical plate 24. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0021] See also Figures 1 to 5 In an embodiment of the utility model, a support structure for a water conservancy project pipeline includes a base plate 1, a plurality of mounting holes 2 are provided on the top of the base plate 1, a plurality of first screws 3 are fixedly connected to the top of the base plate 1, a connecting plate 4 is provided on the top of the base plate 1, a plurality of mutually parallel first waist grooves 5 are provided on the top of the connecting plate 4 and at the corresponding positions of each first screw 3, a cushion block 6 and a first nut 7 are provided after the first screw 3 passes through a first waist groove 5, an H-shaped steel 9 is fixedly connected to the top of the connecting plate 4 through a plurality of vertical rods 8, a joist 11 is connected to the H-shaped steel 9 through a height adjustment mechanism, and a plurality of clamps 19 are fixedly connected to the top of the joist 11.
[0022] By adopting the above solution, when in use, the base plate 1 is fixed on the concrete foundation, and then the first screw rod 3 is matched with different first waist grooves 5, and the position of the first screw rod 3 is adjusted in the first waist groove 5, so that the angle between the connecting plate 4 and the base plate 1 can be adjusted, and the position of the clamp 19 in the axial and radial directions of the pipeline can be adjusted (such as Figure 2 and Figure 5 As shown), the height adjustment mechanism is then adjusted to adjust the height of the clamp 19, thereby facilitating adjustment of the support angle and support height of the pipeline during the laying of the pipeline, thereby facilitating docking of adjacent pipelines, and achieving good use effect.
[0023] Specific combination Figure 1 and Figure 3The height adjustment mechanism includes a plurality of second screw rods 12 fixedly mounted at the bottom of the joist 11. The top and bottom of the H-shaped steel 9 and the corresponding positions of each second screw rod 12 are penetrated with through holes 10 for inserting the second screw rod 12. The outer wall of the second screw rod 12 is provided with a second nut 13 and a third nut 14. The second nut 13 and the third nut 14 are respectively located on the upper and lower sides of a flange plate of the H-shaped steel 9.
[0024] By adjusting the height of the second nut 13 and the third nut 14 on the second screw rod 12 and clamping the second nut 13 and the third nut 14 on the upper and lower sides of a flange plate of the H-beam 9 at the same time, the height of the clamp 19 can be fixed on the H-beam 9, which is simple and convenient to operate.
[0025] Specific combination Figure 1 and Figure 3 On the basis of the previous embodiment, further, both ends of the H-shaped steel 9 are fixedly connected with vertical plates 24, the bottom of the support beam 11 is fixedly connected with two channel steels 15, the two ends of the H-shaped steel 9 are located in the corresponding channel steels 15, the vertical plates 24 are penetrated by first bolts 17, and the outer wall of the channel steel 15 is provided with a second waist groove 16 corresponding to the first bolt 17, and the first bolt 17 is passed through the corresponding second waist groove 16 and then matched with a fourth nut 18.
[0026] Through the cooperation between the channel steel 15 and the H-shaped steel 9, the up and down movement of the support beam 11 can be guided on the H-shaped steel 9. Through the cooperation between the fourth nut 18 and the first screw rod 17, the channel steel 15 and the corresponding vertical plate 24 can be locked, thereby improving the stability of the connection between the support beam 11 and the H-shaped steel 9.
[0027] Specific combination Figure 4 In one embodiment of the utility model, the clamp 19 includes a lower hoop 20 and an upper hoop 21, and the lower hoop 20 and the upper hoop 21 are detachably connected through the cooperation of multiple second bolts 22 and fifth nuts 23, and the lower hoop 20 is fixedly connected to the top of the support beam 11.
[0028] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.
Claims
1. A support structure for a water conservancy project pipeline, Features: The invention comprises a base plate (1), the top of which is provided with a plurality of mounting holes (2), the top of which is fixedly connected with a plurality of first screw rods (3), the top of which is provided with a connecting plate (4), the top of which is provided with a plurality of mutually parallel first waist grooves (5), the first screw rod (3) passing through a first waist groove (5) and then being sleeved with a cushion block (6) and a first nut (7), the top of which is fixedly connected with an H-shaped steel (9) via a plurality of vertical rods (8), the H-shaped steel (9) being connected with a joist (11) via a height adjustment mechanism, the top of which is fixedly connected with a plurality of clamps (19).
2. A support structure for a water conservancy project pipeline according to claim 1, Features: The height adjustment mechanism comprises a plurality of second screw rods (12) fixedly mounted on the bottom of the support beam (11); through holes (10) for inserting the second screw rods (12) are provided at the top and bottom of the H-shaped steel (9) corresponding to the respective second screw rods (12); and the outer wall of the second screw rod (12) is fitted with a second nut (13) and a third nut (14).
3. A support structure for a water conservancy project pipeline according to claim 2, Features: The second nut (13) and the third nut (14) are respectively located on the upper and lower sides of a flange plate of the H-shaped steel (9).
4. A support structure for a water conservancy project pipeline according to claim 1, Features: Both ends of the H-shaped steel (9) are fixedly connected with vertical plates (24), and the bottom of the support beam (11) is fixedly connected with two channel steels (15). The two ends of the H-shaped steel (9) are located in the corresponding channel steels (15). A first bolt (17) is passed through the vertical plate (24), and a second waist groove (16) is opened at the outer wall of the channel steel (15) corresponding to the first bolt (17). The first bolt (17) passes through the corresponding second waist groove (16) and is matched with a fourth nut (18).
5. A support structure for a water conservancy project pipeline according to claim 1, Features: The clamp (19) comprises a lower hoop (20) and an upper hoop (21); the lower hoop (20) and the upper hoop (21) are detachably connected through the cooperation of a plurality of second bolts (22) and a fifth nut (23); and the lower hoop (20) is fixedly connected to the top of the supporting beam (11).