Recycling bin for construction site construction waste

By setting up extrusion plates and alarms in the recycling bin, the weight of construction waste triggers the alarm to remind workers that the recycling bin is full, solving the problem of difficulty in timely discovering the full recycling bin in the existing technology, and improving the speed of construction waste recycling and cleaning efficiency.

CN222330614UInactive Publication Date: 2025-01-10SHANDONG BAOHENG NEW BUILDING MATERIALS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421200847.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-29
Publication Date
2025-01-10
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

When the existing recycling bin is filled with construction waste, it is difficult for workers to find that the recycling bin is full in time, resulting in the reduction of the recycling speed of construction waste and the inability to clean up the garbage in the recycling bin in time.

Method used

A recycling bin including an extrusion plate and an alarm was designed. The extrusion plate moves in a vertical direction through the weight of construction waste, triggering an alarm switch, and the alarm reminds workers that the recycling bin is full and needs to be cleaned in time.

Benefits of technology

Effectively remind workers that the recycling bin is full, avoiding nowhere to be recycled for construction waste, improve the recycling speed of construction waste, and clean up the garbage in the recycling bin in a timely manner.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222330614U_ABST
    Figure CN222330614U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of recycling bins, in particular to a recycling bin for construction waste of a construction site, which comprises a base, a base plate is arranged on the base, a plurality of recycling bins arranged side by side are arranged on the base plate, and the recycling bin is characterized by further comprising a squeezing plate, and the squeezing plate is arranged on the inner wall of the recycling bin and used for bearing the construction waste poured into the recycling bin. And a guide part is arranged between the extrusion plate and the recycling box. The extrusion plate and the alarm are arranged, the alarm switch is turned on, and the alarm starts to give an alarm, so that workers are reminded that the recycling bin is full and the recycling bin needs to be cleaned in time, the situation that excessive construction waste cannot be recycled due to the fact that the workers cannot find that the recycling bin is full is avoided, the recycling speed of the construction waste is increased, and the labor intensity of workers is reduced. And meanwhile, the garbage in the recycling bin is cleaned in time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of recycling boxes, in particular to a recycling box for construction waste on construction sites. Background Art

[0002] A construction site is a space for people to live and use, which is constructed with building materials such as earth, bricks, tiles, stones and wood (reinforced concrete and profiles in modern times), such as houses, bridges, factories, gymnasiums, cave dwellings, water towers and temples, etc. During construction on the construction site, a certain amount of construction waste will be generated. The recycling bin is a container for recycled garbage, which is generally square or rectangular.

[0003] The existing technology still has the following defects: during the recycling process of construction waste, when the recycling bin is full of garbage, workers cannot find out in time that the recycling bin is full, resulting in the excess construction waste having nowhere to be recycled, reducing the recycling speed of construction waste, and also resulting in the garbage in the recycling bin not being cleaned up in time. In view of this, we propose a recycling bin for construction waste on construction sites. Utility Model Content

[0004] In order to make up for the above shortcomings, the utility model provides a recycling box for construction waste on construction sites.

[0005] The technical solution of the utility model is:

[0006] A recycling box for construction waste on a construction site, comprising a base, a base plate provided on the base, and a plurality of recycling boxes arranged side by side provided on the base plate, characterized in that it also comprises:

[0007] An extrusion plate, which is arranged on the inner wall of the recycling box and is used to carry the construction waste poured into the recycling box. A guide portion is arranged between the extrusion plate and the recycling box;

[0008] A rain shelter is arranged on the recycling box to block rainwater entering the recycling box, and a locking portion is arranged between the rain shelter and the recycling box.

[0009] Furthermore, a first spring is provided between the extrusion plate and the recycling box, and one end of the first spring is fixed to the extrusion plate, and the other end is fixed to the inner wall of the recycling box. An alarm switch is provided on the inner wall of the recycling box, and an alarm is provided on the awning.

[0010] Furthermore, the guide portion includes guide blocks fixed on both sides of the extrusion plate, and the inner wall of the recovery box is provided with a guide groove matching the guide block, protrusions are provided on both sides of the guide block, and the inner wall of the guide groove is provided with a strip groove matching the protrusions.

[0011] Furthermore, a fixing plate is provided on the recycling box, and the locking portion includes a plurality of latch sleeves fixed on the rain shelter and arranged side by side, and a slot matching the latch in the latch sleeve is provided on the fixing plate.

[0012] Furthermore, a connecting column is provided on the latch in the latch sleeve, and the two connecting columns are connected by a connecting rod.

[0013] Furthermore, a recovery plate is provided on the awning, and a plurality of positioning plates arranged side by side are provided on the awning, the positioning plates are located on both sides of the recovery plate, and a fixing portion is provided between the positioning plates and the recovery plates.

[0014] Furthermore, the fixing part includes a positioning shaft fixed on the recovery plate, and the positioning plate is provided with a positioning groove matching the positioning shaft, the positioning shaft is provided with a card block, and the positioning shaft is provided with a receiving groove for accommodating the card block, and the positioning groove is provided with a plurality of card slots matching the card block and arranged in a ring.

[0015] Furthermore, the accommodating groove and the clamping block are connected via a second spring, and one end of the second spring is fixed to the clamping block, and the other end is fixed to the inner wall of the accommodating groove.

[0016] Compared with the prior art, the beneficial effects of the utility model are:

[0017] The utility model provides an extrusion plate and an alarm, and lifts the recovery plate to tilt the recovery plate, and inverts the construction waste onto the extrusion plate in the recovery box through the tilted recovery plate. By continuously pouring in construction waste, the weight generated by the construction waste squeezes the extrusion plate, and the extrusion plate moves in a vertical direction to deform the first spring. When the extrusion plate moves to contact the alarm switch, the extrusion plate squeezes the alarm switch, thereby turning on the alarm switch, and the alarm starts to sound the alarm, thereby reminding the workers that the recovery box is full and that the recovery box needs to be cleaned in time, thereby avoiding the situation where the workers fail to find that the recovery box is full, resulting in the excess construction waste having nowhere to be recycled, thereby improving the recovery speed of the construction waste and cleaning the waste in the recovery box in time. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0019] Figure 2 This is a schematic diagram of the internal structure of the base of the utility model;

[0020] Figure 3 for Figure 2 A schematic diagram of the enlarged structure at A in the middle;

[0021] Figure 4 This is a schematic diagram of the internal structure of the recycling box of the utility model;

[0022] Figure 5 This is a schematic diagram of the structure of the extruded plate of the utility model;

[0023] Figure 6 It is a schematic diagram of the cutaway structure of the positioning plate of the utility model.

[0024] In the figure:

[0025] 1. Base;

[0026] 11. Electric push rod; 111. Connecting rod; 112. Connecting frame;

[0027] 2. Substrate;

[0028] 21. Recycling box; 211. Guide groove; 212. Identification plate;

[0029] 22. Extrusion plate; 221. First spring; 222. Alarm switch; 223. Guide block;

[0030] 3. Awning;

[0031] 31. Recovery plate; 32. Fixed plate;

[0032] 33. Latch sleeve; 331. Connecting column; 332. Connecting rod;

[0033] 34. Positioning plate;

[0034] 35. Positioning shaft; 351. Second spring; 352. Block. DETAILED DESCRIPTION

[0035] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0036] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0037] See also Figure 1-6 The utility model describes the above technical solution in detail through the following embodiments:

[0038] A recycling bin for construction waste on a construction site, comprising a base 1, a base plate 2 being provided on the base 1, and a plurality of recycling bins 21 arranged side by side being fixedly mounted on the base plate 2, characterized in that it also comprises:

[0039] The extrusion plate 22 is arranged on the inner wall of the recycling box 21, and is used to carry the construction waste poured into the recycling box 21. A guide portion is arranged between the extrusion plate 22 and the recycling box 21; in this embodiment, a first spring 221 is arranged between the extrusion plate 22 and the recycling box 21, and one end of the first spring 221 is fixed to the extrusion plate 22, and the other end is fixed to the inner wall of the recycling box 21, an alarm switch 222 is fixedly installed on the inner wall of the recycling box 21, and an alarm is fixedly installed on the awning 3. By continuously pouring in construction waste, the weight generated by the construction waste squeezes the extrusion plate 22, and the extrusion plate 22 moves in the vertical direction, causing the first spring 221 to deform. When the extrusion plate 22 moves to contact the alarm switch 222, the extrusion plate 22 squeezes the alarm switch 222, thereby turning on the alarm switch 222, and the alarm starts to alarm.

[0040] In this embodiment, the guide portion includes guide blocks 223 fixed to both sides of the extrusion plate 22, and the inner wall of the recovery box 21 is provided with a guide groove 211 matching the guide block 223, fixed mounting blocks are provided on both sides of the guide block 223, and the inner wall of the guide groove 211 is provided with a strip groove matching the protrusion. By providing the guide block 223 and the protrusion, the extrusion plate 22 will not deviate during the movement.

[0041] A rain shelter 3 is provided on the recycling box 21 to block rainwater entering the recycling box 21, and a locking portion is provided between the rain shelter 3 and the recycling box 21. In this embodiment, a fixing plate 32 is fixedly installed on the recycling box 21, and the locking portion includes a plurality of latch sleeves 33 fixed on the rain shelter 3 and arranged side by side, and a slot matching the latch in the latch sleeve 33 is provided on the fixing plate 32. The latch in the latch sleeve 33 is pulled out of the slot, thereby removing the rain shelter 3 from the recycling box 21.

[0042] In this embodiment, a connecting column 331 is fixedly mounted on the latch in the latch sleeve 33, and the two connecting columns 331 are connected by a connecting rod 332, and the connecting column 331 is hinged to the connecting rod 332. By pulling the connecting rod 332, the connecting rod 332 drives the connecting column 331 to move along the vertical direction, and the connecting column 331 drives the latch in the latch sleeve 33 to move, so that the latch in the latch sleeve 33 is disengaged from the slot.

[0043] In this embodiment, a recovery plate 31 is provided on the canopy 3, and a plurality of positioning plates 34 arranged side by side are fixedly installed on the canopy 3, the recovery plate 31 is hinged to the canopy 3, the positioning plates 34 are located on both sides of the recovery plate 31, and a fixing portion is provided between the positioning plates 34 and the recovery plate 31, and a recovery port for recycling garbage is provided on the canopy 3. By lifting the recovery plate 31, the recovery plate 31 is tilted, so that the construction garbage can slide into the recycling box 21 through the tilted recovery plate 31.

[0044] In this embodiment, the fixing part includes a positioning shaft 35 fixed on the recovery plate 31, and the positioning plate 34 is provided with a positioning groove matching the positioning shaft 35, the positioning shaft 35 is provided with a clamping block 352, and the positioning shaft 35 is provided with a receiving groove for accommodating the clamping block 352, and the positioning groove is provided with a plurality of clamping grooves arranged in a ring that match the clamping block 352. By lifting the recovery plate 31, when the recovery plate 31 is adjusted to a certain angle, the clamping block 352 is clamped into the clamping groove to fix the recovery plate 31.

[0045] In this embodiment, the receiving groove and the clamping block 352 are connected by a second spring 351, and one end of the second spring 351 is fixed to the clamping block 352, and the other end is fixed to the inner wall of the receiving groove. By providing the second spring 351, when the recovery plate 31 rotates, the clamping block 352 is squeezed, and the clamping block 352 is squeezed into the receiving groove, so that the second spring 351 is deformed. When the clamping block 352 and the clamping groove are facing each other, the clamping block 352 is clamped into the clamping groove through the deformation of the second spring 351, thereby fixing the recovery plate 31.

[0046] In this embodiment, an electric push rod 11 is provided in the base 1, and the electric push rod 11 is movably connected to the base 1. A connecting rod 111 is fixedly installed on the piston rod in the electric push rod 11, and the connecting rod 111 is connected to the base 2 through a connecting frame 112, and the connecting rod 111 and the connecting frame 112 are fixedly connected, and the connecting frame 112 is fixedly connected to the base 2. The piston rod in the electric push rod 11 drives the connecting rod 111 to move in the vertical direction, the connecting rod 111 drives the connecting frame 112 to move, and the connecting frame 112 drives the base 2 to move, so that one side of the base 2 is lifted, the base 2 is tilted, and the base 2 drives the recycling box 21 to tilt, and the garbage in the recycling box 21 is poured into.

[0047] In this embodiment, a switch and a sign board 212 are fixedly mounted on the recycling box 21, and a battery for increasing the power supply of the electric push rod 11 and the alarm is fixedly mounted in the base 1, and a closed loop is formed between the switch, the battery and the electric push rod 11, and the start and shut down of the battery and the electric push rod 11 are controlled by the switch control loop. By setting the sign board 212, construction waste can be classified and recycled.

[0048] Working principle: first, lift the recovery plate 31 to tilt the recovery plate 31. When the recovery plate 31 rotates, the card block 352 is squeezed and squeezed into the receiving groove, causing the second spring 351 to deform. When the card block 352 and the groove are opposite to each other, the card block 352 is stuck into the groove through the deformation of the second spring 351, thereby fixing the recovery plate 31, pouring construction waste into the recovery plate 31, and the construction waste slides into the recovery box 21 through the tilted recovery plate 31. By continuously pouring construction waste, the weight generated by the construction waste squeezes the squeezing plate 22, and the squeezing plate 22 moves in the vertical direction, causing the first spring 221 to deform. When the squeezing plate 22 moves to contact the alarm switch 222, the squeezing plate 22 squeezes the alarm switch 222, thereby turning on the alarm switch 222, and the alarm starts to alarm. When the worker hears the alarm, The container for storing construction waste should be brought, and the connecting rod 332 should be pulled. The connecting rod 332 drives the connecting column 331 to move in the vertical direction, and the connecting column 331 drives the pin in the pin sleeve 33 to move, so that the pin in the pin sleeve 33 is disengaged from the slot, and the awning 3 is removed from the recycling box 21, and the switch of the electric push rod 11 is turned on. The piston rod in the electric push rod 11 drives the connecting rod 111 to move in the vertical direction, and the connecting rod 111 drives the connecting frame 112 to move, and the connecting frame 112 drives the base plate 2 to move, thereby lifting one side of the base plate 2 to tilt the base plate 2, and the base plate 2 drives the recycling box 21 to tilt, and the garbage in the recycling box 21 is poured into the storage container. As the construction waste on the extrusion plate 22 gradually decreases, the extrusion plate 22 returns to the top of the recycling box 21 through the deformation of the first spring 221. When the base plate 2 is parallel to the base 1, all switches are turned off.

[0049] By providing the squeezing plate 22 and the alarm, the recycling plate 31 is lifted to tilt the recycling plate 31, and the construction waste is inverted on the squeezing plate 22 in the recycling box 21 through the tilted recycling plate 31. By continuously pouring in the construction waste, the weight generated by the construction waste squeezes the squeezing plate 22, and the squeezing plate 22 moves in the vertical direction, causing the first spring 221 to deform. When the squeezing plate 22 moves to contact the alarm switch 222, the squeezing plate 22 squeezes the alarm switch 222, thereby turning on the alarm switch 222, and the alarm starts to sound, thereby reminding the workers that the recycling box 21 is full and the recycling box 21 needs to be cleaned in time, thereby avoiding the situation where the workers fail to find that the recycling box 21 is full, resulting in the excess construction waste having nowhere to be recycled, thereby improving the recycling speed of the construction waste and cleaning the garbage in the recycling box 21 in time.

[0050] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the utility model and are not used to limit the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection of the utility model is defined by the attached claims and their equivalents.

Claims

1. A recycling box for construction waste at a construction site, comprising a base (1), a base plate (2) being provided on the base (1), and a plurality of recycling boxes (21) arranged side by side being provided on the base plate (2), characterized in that: Also includes: An extrusion plate (22), the extrusion plate (22) being arranged on the inner wall of the recycling box (21) and being used for carrying the construction waste poured into the recycling box (21), and a guide portion being arranged between the extrusion plate (22) and the recycling box (21); A rain shelter (3), the rain shelter (3) being arranged on the recovery box (21) and used for shielding rainwater from entering the recovery box (21), and a locking portion being arranged between the rain shelter (3) and the recovery box (21); A first spring (221) is provided between the extrusion plate (22) and the recovery box (21), one end of the first spring (221) is fixed to the extrusion plate (22), and the other end is fixed to the inner wall of the recovery box (21), an alarm switch (222) is provided on the inner wall of the recovery box (21), and an alarm is provided on the rain shelter (3).

2. The recycling box for construction waste on a construction site as claimed in claim 1, characterized in that: The guide portion comprises guide blocks (223) fixed on both sides of the extrusion plate (22), and the inner wall of the recovery box (21) is provided with a guide groove (211) matching the guide block (223), the two sides of the guide block (223) are provided with protrusions, and the inner wall of the guide groove (211) is provided with a strip groove matching the protrusions.

3. The recycling box for construction waste on a construction site as claimed in claim 1, characterized in that: The recovery box (21) is provided with a fixing plate (32), the locking portion comprises a plurality of latch sleeves (33) fixed on the rain shelter (3) and arranged side by side, and the fixing plate (32) is provided with a slot matching with a latch in the latch sleeve (33).

4. The recycling box for construction waste on a construction site as claimed in claim 3, characterized in that: A connecting column (331) is provided on the latch in the latch sleeve (33), and the two connecting columns (331) are connected via a connecting rod (332).

5. The recycling box for construction waste on a construction site as claimed in claim 4, characterized in that: The rain shelter (3) is provided with a recovery plate (31), and a plurality of positioning plates (34) arranged side by side are provided on the rain shelter (3), the positioning plates (34) are located on both sides of the recovery plate (31), and a fixing portion is provided between the positioning plates (34) and the recovery plates (31).

6. The recycling box for construction waste on a construction site as claimed in claim 5, characterized in that: The fixing portion comprises a positioning shaft (35) fixed on the recovery plate (31), and the positioning plate (34) is provided with a positioning groove matching the positioning shaft (35), the positioning shaft (35) is provided with a clamping block (352), and the positioning shaft (35) is provided with a receiving groove for accommodating the clamping block (352), and the positioning groove is provided with a plurality of clamping grooves matching the clamping block (352) and arranged in a ring shape.

7. The recycling box for construction waste on a construction site as claimed in claim 6, characterized in that: The receiving groove and the clamping block (352) are connected via a second spring (351), and one end of the second spring (351) is fixed to the clamping block (352), and the other end is fixed to the inner wall of the receiving groove.