Hoisting device for high-rise building equipment

By designing the structure of I-steel and locking components in the lifting device of high-rise building equipment, the problem of cumbersome bundling operations during pipeline lifting is solved, rapid bundling and flexible adjustment are achieved, and construction efficiency and safety are improved.

CN222612699UActive Publication Date: 2025-03-14浙江鸿翔建设集团股份有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421077887.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-17
Publication Date
2025-03-14
Estimated Expiration
2034-05-17

AI Technical Summary

Technical Problem

In the construction of high-rise buildings, the bundling operation of the existing technology during pipeline lifting is cumbersome, the bundling speed is slow, and it is difficult to meet the construction efficiency and safety requirements.

Method used

A high-rise building equipment lifting device is designed, using I-steel and a locking assembly located on both sides of the bottom of the I-steel. The locking assembly includes a curved plate, an open frame and a fastening screw, and can achieve rapid binding and flexible adjustment through sliding connection and threaded fastening.

Benefits of technology

The device can quickly bind pipes, short adjustment time and fast binding speed, adapt to the lifting needs of different pipe lengths, and improve construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222612699U_ABST
    Figure CN222612699U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of hoisting of building equipment, in particular to a hoisting device for high-rise building equipment. The high-rise building equipment hoisting device comprises I-shaped steel and two sets of locking assemblies arranged on the two sides of the bottom of the I-shaped steel. Wherein the locking assembly comprises an arc-shaped plate, an arc-shaped cavity is formed in the arc-shaped plate, and a bandage is fixedly embedded in one end of the arc-shaped plate; and an open frame is fixedly installed at the top of the arc-shaped plate, the open frame is arranged on a lower wing plate of the I-shaped steel in a sleeving mode and connected with the lower wing plate in a sliding mode, and fastening screws in threaded connection are inserted into threaded through holes formed in the plate walls of the two sides of the open frame. According to the hoisting device for the high-rise building equipment, the locking assembly arranged on the I-shaped steel can be used for quickly binding a pipeline and can be flexibly adjusted according to the specific length of the hoisted pipeline, and compared with a traditional mode that the pipeline is bound through a binding belt, the adjusting time is short, and the binding speed is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building equipment hoisting, in particular to a high-rise building equipment hoisting device. Background Art

[0002] In the process of high-rise building construction, the lifting of equipment is an important and complex link. The following are some key points and precautions about the lifting of high-rise building equipment: Selection of lifting scheme: According to the type, size and weight of the equipment, as well as the specific conditions of the construction site, choose a suitable lifting scheme; common equipment lifting schemes include using tower cranes, truck cranes, winches and other mechanical equipment for vertical lifting, or disassembling the equipment and manually moving it to the floor using an elevator for assembly. Each scheme has its advantages and disadvantages, and it is necessary to comprehensively consider factors such as construction efficiency, cost, and safety to make a choice; Safety measures: Equipment lifting is a high-altitude operation, and safety is of vital importance. During the lifting process, safety operating procedures must be strictly followed to ensure that workers wear protective measures such as safety helmets and safety shoes. At the same time, a safety supervision team should be established to supervise and manage to reduce the occurrence of accidents.

[0003] At present, when pipes are hoisted to high-rise buildings, they are basically hoisted by crane. Two straps are tied to the two ends of the large-diameter pipe, and the other ends of the two straps are hoisted on the hook of the crane. The operation is cumbersome and the binding speed is slow.

[0004] Therefore, it is necessary to provide a new high-rise building equipment lifting device to solve the above-mentioned technical problems. Utility Model Content

[0005] In order to solve the above technical problems, the utility model provides a high-rise building equipment lifting device.

[0006] The utility model provides a high-rise building equipment lifting device comprising:

[0007] I-beams, and

[0008] Two locking components are arranged on both sides of the bottom of the I-beam;

[0009] The locking assembly comprises an arc-shaped plate, an arc-shaped cavity is formed on the arc-shaped plate, and a binding strap is fixedly engaged at one end of the arc-shaped plate;

[0010] An open frame is fixedly installed on the top of the arc plate, and the open frame is sleeved on the lower wing plate of the I-beam and slidably connected with the lower wing plate. Threaded fastening screws are inserted into the threaded through holes opened on the two side wall panels of the open frame.

[0011] Preferably, the upper and lower inner plate walls of the open frame are fixedly engaged with limiting ribs, and the limiting ribs are inserted into the sliding grooves provided on the lower wing plate of the I-beam and are slidably connected to the sliding grooves.

[0012] Preferably, a buckle is fixedly mounted on the arc plate at one end of the arc plate.

[0013] Preferably, bristles are embedded on the inner surface of the strap.

[0014] Preferably, suspension columns are fixedly embedded on both sides of the upper wing plate of the I-beam, and suspension ropes are fixedly embedded on the two suspension columns.

[0015] Preferably, the other ends of the two suspension ropes are fixedly embedded in the connecting column, and a steel wire rope is fixedly embedded in the top of the connecting column.

[0016] Preferably, the strap is located on the arc-shaped plate below the arc-shaped cavity, and the buckle is located on the arc-shaped plate on the same side of the strap.

[0017] Compared with the related art, the high-rise building equipment lifting device provided by the utility model has the following beneficial effects:

[0018] The locking assembly arranged on the I-beam of the utility model can quickly bundle the pipe and can be flexibly adjusted according to the specific length of the hoisting pipe. Compared with the traditional hoisting pipe using binding belts to bundle the pipe, the adjustment time is short and the bundling speed is fast. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 A structural schematic diagram of a preferred embodiment of the high-rise building equipment lifting device provided by the utility model;

[0020] Figure 2 for Figure 1 Schematic diagram of the structure of the locking assembly shown.

[0021] Numbers in the figure: 1, I-beam; 1a, sliding groove; 2, locking assembly; 21, arc plate; 21a, arc cavity; 22, strap; 221, bristles; 23, buckle; 24, opening frame; 241, limit rib; 25, fastening screw; 3, hanging column; 4, hanging rope; 5, connecting column; 6, wire rope. DETAILED DESCRIPTION

[0022] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.

[0023] The specific implementation of the present utility model is described in detail below in conjunction with specific embodiments.

[0024] See also Figure 1 to Figure 2 An embodiment of the utility model provides a high-rise building equipment lifting device, which includes: an I-beam 1 and a locking assembly 2.

[0025] In the embodiments of the present invention, please refer to Figure 1 and Figure 2 , two groups of locking components 2 are provided on both sides of the bottom of the I-beam 1, and the locking components 2 include an arc-shaped plate 21, an arc-shaped cavity 21a is provided on the arc-shaped plate 21, and a strap 22 is fixedly engaged at one end of the arc-shaped plate 21, and an opening frame 24 is fixedly installed on the top of the arc-shaped plate 21, and the opening frame 24 is sleeved on the lower wing plate of the I-beam 1 and slidably connected to the lower wing plate, and threaded fastening screws 25 are inserted into the threaded through holes provided on the two side wall plates of the opening frame 24;

[0026] A buckle 23 is fixedly mounted on the upper arc plate at one end of the arc plate 21, the strap 22 is located on the arc plate 21 below the arc cavity 21a, and the buckle 23 is located on the arc plate 21 on the same side of the strap 22;

[0027] Hanging columns 3 are fixedly embedded on both sides of the upper wing plate of the I-beam 1, and hanging ropes 4 are fixedly embedded on the two hanging columns 3. The other ends of the two hanging ropes 4 are fixedly embedded on the connecting columns 5, and the top of the connecting columns 5 is fixedly embedded with steel wire ropes 6.

[0028] It should be noted that: when the pipeline is hoisted to a high-rise building, the two sets of locking components 2 are adjusted according to the length of the pipeline. Specifically, the two sets of locking components 2 are slid along the lower wing plate of the I-beam 1 to adjust the distance between the two arc plates 21, so that the two straps 22 respectively bind the pipeline and divide the pipeline into three equal parts. After the adjustment is completed, the fastening screw 25 is tightened to fix the two sets of open frame types 24. Subsequently, the straps 22 on both sides are respectively passed around the hoisted pipeline and passed through the arc cavity 21a opened on the arc plate 21 and then tightened, and then the straps 22 passing through the arc cavity 21a section are firmly tied to the buckle 23.

[0029] The locking assembly 2 provided on the I-beam 1 can quickly bundle the pipe and can be flexibly adjusted according to the specific length of the hoisted pipe. Compared with the traditional method of bundling the pipe with a binding belt, the adjustment time is short and the bundling speed is fast.

[0030] The upper and lower inner plate walls of the opening frame 24 are fixedly engaged with the limiting ribs 241, and the limiting ribs 241 are inserted into the sliding grooves 1a provided on the lower wing plate of the I-beam 1 and are slidably connected with the sliding grooves 1a, thereby improving the stability of the opening frame 24 when sliding along the lower wing plate of the I-beam 1;

[0031] The inner surface of the binding belt 22 is embedded with bristles 221, which increases the friction between the binding belt 22 and the pipe when the binding belt 22 is used to bind the pipe.

[0032] The above description is only an embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A high-rise building equipment lifting device, characterized in that: include: I-beam (1), and Two locking components (2) are arranged on both sides of the bottom of the I-beam (1); The locking assembly (2) comprises an arc-shaped plate (21), an arc-shaped cavity (21a) is formed on the arc-shaped plate (21), and a binding belt (22) is fixedly engaged at one end of the arc-shaped plate (21); An open frame (24) is fixedly mounted on the top of the arc-shaped plate (21), and the open frame (24) is sleeved on the lower wing plate of the I-beam (1) and slidably connected to the lower wing plate. Threaded fastening screws (25) are inserted into the threaded through holes formed on the two side wall plates of the open frame (24).

2. The high-rise building equipment lifting device according to claim 1, characterized in that: The upper and lower inner plate walls of the opening frame (24) are fixedly engaged with the limiting ribs (241), and the limiting ribs (241) are inserted into the sliding grooves (1a) provided on the lower wing plate of the I-beam (1) and are slidably connected to the sliding grooves (1a).

3. The high-rise building equipment lifting device according to claim 1, characterized in that: A buckle (23) is fixedly mounted on the upper arc plate at one end of the arc plate (21).

4. The high-rise building equipment lifting device according to claim 1, characterized in that: Brush bristles (221) are embedded on the inner surface of the binding belt (22).

5. The high-rise building equipment lifting device according to claim 1, characterized in that: Suspension columns (3) are fixedly embedded on both sides of the upper wing plate of the I-beam (1), and suspension ropes (4) are fixedly embedded on the two suspension columns (3).

6. The high-rise building equipment lifting device according to claim 5, characterized in that: The other ends of the two suspension ropes (4) are fixedly engaged with the connecting column (5), and a steel wire rope (6) is fixedly engaged with the top of the connecting column (5).

7. The high-rise building equipment lifting device according to claim 3, characterized in that: The binding belt (22) is located on the arc-shaped plate (21) below the arc-shaped cavity (21a), and the buckle (23) is located on the arc-shaped plate (21) on the same side as the binding belt (22).