A gourd-shaped steel pipe joint clamp

By designing the hoist-shaped steel pipe joint card, using components such as the main card body, side pipe and top plate, the problems of inconvenience in connection with T-shaped and cross, and the poor resistance to strength and material waste of overlapping and cross structures in the construction of steel pipe scaffolding are solved, and the effect of improving construction safety and aesthetics is achieved.

CN222701484UActive Publication Date: 2025-04-01POWERCHINA RAILWAY CONSTR +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420478467.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-12
Publication Date
2025-04-01
Estimated Expiration
2034-03-12

AI Technical Summary

Technical Problem

In the construction of steel pipe scaffolding, the lack of appropriate tools during T-shaped docking and cross docking, resulting in inconvenience in construction, and the overlapping and cross-section structure has problems such as poor strength resistance of cross bars, waste of materials, decreased aesthetics and increased safety risks.

Method used

A hoist-shaped steel pipe joint card is designed, including a main card body, a first side tube, a first top plate and a first top pin. Through the design of these components, the strength of the transverse steel pipe can be improved without wasting materials and the length of exposed steel pipes can be reduced, thereby improving the safety and aesthetics of construction.

Benefits of technology

The joint card solves the problems of poor strength resistance and material waste of crossbars in the overlapping and intersecting structure, improves the safety and aesthetics of construction, and reduces the risk of scratches and injuries of the frame.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222701484U_ABST
    Figure CN222701484U_ABST
Patent Text Reader

Abstract

The utility model discloses a gourd-shaped steel pipe joint clamp, comprising a main clamp body, a first top plate and a first top pin: the two ends of the main clamp body are open hollow tube bodies, and the steel pipe can pass through the main clamp body, and the side wall of the main clamp body is provided with a first side tube connected thereto; a first top plate is provided in the first side tube, and the first top plate can rotate or slide up and down in the first side tube; the first top pin is provided in the first side tube together with the first top plate, and is threadedly connected with the first side tube, and the end of the first top pin that penetrates into the inner cavity of the main clamp body can be rotatably connected with the first top plate, and the first top pin can be rotated to drive the first top plate to press against the steel pipe inserted into the main clamp body. The gourd-shaped steel pipe joint clamp can improve the strength of the transverse steel pipe, and at the same time can reduce the waste of materials and improve the safety of the entire connection clamp construction site.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of engineering construction, in particular to a gourd-shaped steel pipe joint clamp. Background Art

[0002] Scaffolding construction, as a common auxiliary operation in on-site construction, is widely used in various construction occasions, including high-altitude operations, deep foundation pit operations, bridges, building construction, open-cut structures, etc., and has a wide range of applications.

[0003] In the process of steel pipe scaffolding and support operation, there is a common situation that the corresponding tool-type accessories are often lacking, causing many inconveniences in the on-site scaffolding and support construction. Such situations are T-joint and cross-joint situations. For these on-site construction, longer steel pipes are usually used, using cross clamps or universal clamps to form a superimposed and crossed structure.

[0004] There are certain disadvantages of overlapping and intersecting structures. They are as follows:

[0005] 1. The overlapping intersection has the disadvantage of poor cross bar strength resistance. The vertical downward force is the shear force of the buckle node, and the tolerance is small.

[0006] 2. Compared with butt joint, overlapping and crossing wastes pipe materials. It will increase the overall material consumption, which is quite significant for the whole project.

[0007] 3. The outward extension of the pipe head reduces the aesthetics, and is not suitable for construction sites that have high requirements on appearance, such as guardrails.

[0008] 4. Excessive horizontal steel pipes increase the risk of the frame being scratched and people being injured by the frame. Utility Model Content

[0009] In view of the deficiencies in the prior art, the technical problem to be solved by the utility model is to provide a gourd-shaped steel pipe joint clamp, which can improve the strength of the horizontal steel pipe, while reducing material waste and improving the safety of the entire connection clamp construction site.

[0010] In order to achieve the above object, the utility model is implemented through the following technical scheme: a gourd-shaped steel pipe joint clamp, comprising:

[0011] A main card body, wherein both ends of the main card body are open hollow tubes, a steel pipe can pass through the main card body, and a side wall of the main card body is provided with a first side tube connected thereto;

[0012] A first top plate, wherein the first side tube is provided with the first top plate, and the first top plate can rotate or slide up and down on the first side tube; and

[0013] The first ejector pin is arranged in the first side tube together with the first ejector plate and is threadedly connected to the first side tube. The end of the first ejector pin that penetrates into the inner cavity of the main card body is rotatably connected to the first ejector plate. By rotating the first ejector pin, the first ejector plate can be driven to be pressed against the steel tube inserted into the main card body.

[0014] Furthermore, a raising step is provided on the inner wall of the main card body.

[0015] Furthermore, the inner wall of the raised step is a semicircular arc surface adapted to the outer wall of the steel pipe.

[0016] Furthermore, the bottom surface of the first top plate is an arc-shaped surface adapted to the outer wall of the steel pipe.

[0017] Furthermore, a threaded anti-dropping nut is sleeved at intervals on the top of the first ejector pin.

[0018] Furthermore, a spherical joint is arranged on the first top plate, a spherical slot is formed at the end of the first top pin, and the spherical joint is rotatably arranged in the spherical slot.

[0019] Furthermore, it also includes a single-sided card body, both ends of which are open hollow tubes, and the steel pipe can pass through the single-sided card body. One end of the single-sided card body is connected and communicated with the side wall of the main card body.

[0020] Furthermore, the side wall of the single-sided card body is provided with a second side tube connected thereto, a second top plate is provided in the second side tube, a second top pin is inserted in the second side tube, the second top pin is threadedly connected to the second side tube, and the end of the second top pin penetrating into the inner cavity of the single-sided card body is rotatably connected to the second top plate, and the second top pin can be rotated to drive the second top plate to be pressed against the steel pipe inserted into the single-sided card body.

[0021] Furthermore, it also includes an extended card body, both ends of which are open hollow tubes, and one end of the extended card body can be detachably connected to the end of the main card body or the end of the single-sided card body.

[0022] Furthermore, the side wall of the extended card body is provided with a third side tube connected thereto, a third top plate is provided in the third side tube, a third top pin is inserted in the third side tube, the third top pin is threadedly connected to the third side tube, and the end of the third top pin penetrating into the inner cavity of the extended card body is rotatably connected to the third top plate, and the third top pin can be driven to press against the steel pipe inserted into the extended card body by rotating.

[0023] Beneficial effects of the utility model:

[0024] When using the above-mentioned gourd-shaped steel pipe joint clamp, first insert one end of the two steel pipes to be connected into the main card body from both ends of the main card body, or pass the steel pipe through the entire main card body, and then rotate the first push pin to drive the first push plate to press on the steel pipe, so that the main card body and the steel pipe can be connected and fixed.

[0025] The use of this gourd-shaped steel pipe joint clamp has the following advantages:

[0026] 1. Since the downward force is the shear force of the buckle node, the tolerance is small, which can solve the disadvantage of poor strength resistance of the cross bar of the overlapped intersection.

[0027] 2. Since there is no need for overlapping and crossing, the problem of wasting pipes compared with butt jointing can be solved.

[0028] 3. It can reduce the length of the pipe head extending outward, thereby improving the aesthetics of construction with high requirements on appearance.

[0029] 4. Since the redundant horizontal steel pipes are reduced, the risk of the frame being scratched and the risk of injury to people can be reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] In order to more clearly illustrate the specific implementation of the utility model, the following will briefly introduce the drawings required for use in the specific implementation. In all the drawings, each element or part is not necessarily drawn according to the actual scale.

[0031] Figure 1 A schematic diagram of a gourd-shaped steel pipe joint clamp provided in one embodiment of the utility model;

[0032] Figure 2 for Figure 1 A schematic diagram of a gourd-shaped steel pipe joint clamp without a first ejector pin is shown;

[0033] Figure 3 for Figure 1 A schematic diagram of a gourd-shaped steel pipe joint clamp having a single-side clamp body connected to both sides thereof is shown;

[0034] Figure 4 for Figure 1 A schematic diagram of a single-side clamp body in a gourd-shaped steel pipe joint clamp is shown;

[0035] Figure 5 for Figure 1 A schematic diagram of a gourd-shaped steel pipe joint clamp and a single-side clamp body combined into a T shape is shown;

[0036] Figure 6 for Figure 1 A schematic diagram of a gourd-shaped steel pipe joint clamp and a single-side clamp body combined to connect steel pipes is shown;

[0037] Figure 7 for Figure 1 A schematic diagram of a gourd-shaped steel pipe joint clamp, a single-side clamp body, and an extended clamp body combined to connect steel pipes is shown;

[0038] Reference numerals:

[0039] 100, main card body; 110, first side tube; 120, raised step; 200, first top plate; 210, spherical joint; 300, first top pin; 310, anti-drop nut; 400, single-sided card body; 410, second side tube; 500, extended card body; 510, third side tube. DETAILED DESCRIPTION

[0040] The following embodiments of the technical solution of the utility model are described in detail in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the utility model, and are therefore only used as examples, and cannot be used to limit the protection scope of the utility model.

[0041] like Figures 1 to 6 As shown, this embodiment provides a gourd-shaped steel pipe joint clamp, which includes a main clamp body 100 , a first top plate 200 and a first top pin 300 .

[0042] Specifically, both ends of the main card body 100 are open hollow tubes, and the steel pipe can pass through the main card body 100. The side wall of the main card body 100 is provided with a first side tube 110 connected thereto. A first top plate 200 is provided in the first side tube 110, and the first top plate 200 can rotate or slide up and down in the first side tube 110. The first top pin 300 is provided in the first side tube 110 and is threadedly connected to the first side tube 110, and the end of the first top pin 300 that penetrates into the inner cavity of the main card body 100 is rotatably connected to the first top plate 200. By rotating the first top pin 300, the first top plate 200 can be driven to be pressed against the steel pipe inserted into the main card body 100.

[0043] When in use, first insert one end of the two steel pipes to be connected into the main card body 100 from both ends of the main card body 100, or pass the steel pipe through the entire main card body 100, and then rotate the first push pin 300 to drive the first top plate 200 to press on the steel pipe, so that the main card body 100 can be connected and fixed to the steel pipe.

[0044] The use of this gourd-shaped steel pipe joint clamp has the following advantages:

[0045] 1. Since the downward force is the shear force of the buckle node, the tolerance is small, which can solve the disadvantage of poor strength resistance of the cross bar of the overlapped intersection.

[0046] 2. Since there is no need for overlapping and crossing, the problem of wasting pipes compared with butt jointing can be solved.

[0047] 3. It can reduce the length of the pipe head extending outward, thereby improving the aesthetics of construction with high requirements on appearance.

[0048] 4. Since the redundant horizontal steel pipes are reduced, the risk of the frame being scratched and the risk of injury to people can be reduced.

[0049] Preferably, a step 120 is provided on the inner wall of the main card body 100. By means of the step 120, the lower half of the steel pipe can be raised, so as to facilitate the compression of the first top plate 200. In specific implementation, the inner wall of the step 120 can be set as a semicircular arc surface that matches the outer wall of the steel pipe. The bottom surface of the first top plate 200 is an arc surface that matches the outer wall of the steel pipe, which can provide stable support for the steel pipe.

[0050] In this embodiment, a threaded anti-drop nut 310 is sleeved at intervals on the top of the first ejector pin 300. When in use, the anti-drop nut 310 can abut against the first side tube 110 to prevent the first ejector pin 300 from rotating in the opposite direction.

[0051] In addition, a ball joint 210 is provided on the first top plate 200. A ball slot is provided at the end of the first top pin 300, and the ball joint 210 can be rotatably mounted in the ball slot, so that the first top pin 300 can rotate conveniently.

[0052] As a preferred embodiment, the connector card further includes a single-sided card body 400. Both ends of the single-sided card body 400 are open hollow tube bodies, and the steel pipe can pass through the single-sided card body 400. One end of the single-sided card body 400 is connected and communicated with the side wall of the main card body 100. Through the single-sided card body 400, the steel pipe can be connected to the side of the main card body 100. When the single-sided card body 400 is provided on both sides of the single-sided card body 400, a cross-shaped connection card can be formed.

[0053] Similarly, the side wall of the single-sided card body 400 is provided with a second side tube 410 connected thereto, a second top plate is provided inside the second side tube 410, a second top pin is inserted into the second side tube 410, the second top pin is threadedly connected to the second side tube 410, and the end of the second top pin penetrating into the inner cavity of the single-sided card body 400 is rotatably connected to the second top plate, and rotating the second top pin can drive the second top plate to be pressed against the steel pipe inserted into the single-sided card body 400.

[0054] The second ejector pin and the second ejector plate can be used to compress the steel pipe inserted into the single-sided card body 400. Of course, in specific implementation, a step 120 can be provided in the single-sided card body 400, and the lower surface of the second ejector plate can also be provided in an arc shape.

[0055] As a more preferred embodiment, it further comprises an extended card body 500. Both ends of the extended card body 500 are open hollow tubes, and one end of the extended card body 500 can be detachably connected with the end of the main card body 100 or the end of the extended card body 500.

[0056] When the extended card body 500 is connected to the main card body 100 or the single-side card body 400, it can further provide support for the steel pipe, thereby improving the stability of the steel pipe connection. The number of extended card bodies 500 can be determined according to actual conditions, and multiple extended card bodies 500 can be connected in sequence.

[0057] Similarly, the side wall of the extended card body 500 is provided with a third side tube 510 connected thereto, and a third top plate is provided inside the third side tube 510. A second top pin is inserted into the third side tube 510, and the third top pin is threadedly connected to the third side tube 510. The end of the third top pin that penetrates into the inner cavity of the extended card body 500 is rotatably connected to the third top plate. Rotating the third top pin can drive the third top plate to be pressed against the steel pipe inserted into the extended card body 500.

[0058] The third ejector pin and the third ejector plate can be used to compress the steel pipe inserted into the extended card body 500. Of course, in specific implementation, a step 120 can be provided in the single-sided card body 400, and similarly, the lower surface of the third ejector plate can be provided in an arc shape.

[0059] This connector card has the following advantages:

[0060] 1. Since the downward force is the shear force of the buckle node, the tolerance is small, which can solve the disadvantage of poor strength resistance of the cross bar of the overlapped intersection.

[0061] 2. Since there is no need for overlapping and crossing, the problem of wasting pipes compared with butt jointing can be solved.

[0062] 3. It can reduce the length of the pipe head extending outward, thereby improving the aesthetics of construction with high requirements on appearance.

[0063] 4. Since the redundant horizontal steel pipes are reduced, the risk of the frame being scratched and the risk of injury to people can be reduced.

[0064] 5. Add standard extension sections, and set multiple joints according to different force sizes to ensure the safety of structural connections.

[0065] In addition, it should be noted that this steel pipe joint card can be applied to any pipe diameter material according to the principle, and does not require any processing on the pipe. It can be applied to steel pipe one-way joints, T-joints, and cross joints, and has a wide range of applicability.

[0066] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. These modifications or replacements do not deviate the essence of the corresponding technical solutions from the scope of the technical solutions of the embodiments of the present invention, and they should all be included in the scope of the claims and specification of the present invention.

Claims

1. A gourd-shaped steel pipe joint clamp, characterized in that: include: A main card body, wherein both ends of the main card body are open hollow tubes, a steel pipe can pass through the main card body, and a side wall of the main card body is provided with a first side tube connected thereto; A first top plate, wherein the first side tube is provided with the first top plate, and the first top plate can rotate or slide up and down on the first side tube; and The first ejector pin is arranged in the first side tube together with the first ejector plate and is threadedly connected to the first side tube. The end of the first ejector pin that penetrates into the inner cavity of the main card body is rotatably connected to the first ejector plate. By rotating the first ejector pin, the first ejector plate can be driven to be pressed against the steel tube inserted into the main card body.

2. The gourd-shaped steel pipe joint clamp according to claim 1, characterized in that: A raising step is arranged on the inner wall of the main card body.

3. The gourd-shaped steel pipe joint clamp according to claim 2, characterized in that: The inner wall of the raised step is a semicircular arc surface adapted to the outer wall of the steel pipe.

4. The gourd-shaped steel pipe joint clamp according to claim 1, characterized in that: The bottom surface of the first top plate is an arc-shaped surface adapted to the outer wall of the steel pipe.

5. The gourd-shaped steel pipe joint clamp according to claim 1, characterized in that: The top of the first ejector pin is sleeved with a threaded anti-dropping nut at intervals.

6. The gourd-shaped steel pipe joint clamp according to claim 1, characterized in that: The first top plate is provided with a spherical joint, the end of the first top pin is provided with a spherical slot, and the spherical joint is rotatably mounted in the spherical slot.

7. The gourd-shaped steel pipe joint clamp according to claim 1, characterized in that: It also includes a single-sided card body, both ends of which are open hollow tubes, and the steel pipe can pass through the single-sided card body. One end of the single-sided card body is connected and communicated with the side wall of the main card body.

8. The gourd-shaped steel pipe joint clamp according to claim 7, characterized in that: The side wall of the single-sided card body is provided with a second side tube connected thereto, a second top plate is provided in the second side tube, a second top pin is inserted in the second side tube, the second top pin is threadedly connected to the second side tube, and the end of the second top pin penetrating into the cavity of the single-sided card body is rotatably connected to the second top plate, and the second top pin can be rotated to drive the second top plate to be pressed against the steel pipe inserted into the single-sided card body.

9. The gourd-shaped steel pipe joint clamp according to claim 8, characterized in that: It also includes an extended card body, both ends of which are open hollow tubes, and one end of the extended card body can be detachably sleeved with the end of the main card body or the end of the single-side card body.

10. The gourd-shaped steel pipe joint clamp according to claim 9, characterized in that: The side wall of the extended card body is provided with a third side tube connected thereto, a third top plate is provided in the third side tube, a third top pin is inserted in the third side tube, the third top pin is threadedly connected to the third side tube, and the end of the third top pin penetrating into the inner cavity of the extended card body is rotatably connected to the third top plate, and the third top pin can be rotated to drive the third top plate to be pressed against the steel pipe inserted into the extended card body.