A construction material handling device for construction labor
By designing a material handling device for construction, the problem of cumbersome and easy slippage of pipe handling is solved, and the effect of time saving and pipe protection is achieved.
Patent Information
- Application Number
- CN202420174244.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-24
- Publication Date
- 2025-04-04
- Estimated Expiration
- 2034-01-24
AI Technical Summary
During construction, the handling of pipes is cumbersome, time-consuming and labor-intensive, and is prone to slip and damage.
A construction labor construction material handling device is designed, including a base plate, a partition plate, a pipe loading box and a plate loading box. The pipe loading box has a limiting portion and a first snap-in connection for fixing and limiting the pipe to avoid slipping.
Through this device, the binding and disassembly time of pipes is significantly saved, the pipes are slipped and damaged, and the construction efficiency is improved.
Smart Images

Figure CN222713519U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction material handling, in particular to a building labor construction material handling device. Background Art
[0002] In the prior art, pipes are frequently used in the construction process of construction sites. When using pipes, workers often carry the pipes to the construction site, or use carts to carry the pipes. When using carts to carry pipes, the pipes are bundled with ropes and put on the carts after being bundled. After arriving at the construction site, the ropes are untied and the pipes are unloaded, which makes the transportation of pipes cumbersome, time-consuming and labor-intensive. In addition, the construction pipes are easy to slip off the carts, thereby damaging the pipes.
[0003] In view of this, the present utility model is proposed. Utility Model Content
[0004] The utility model provides a construction material handling device for construction labor services.
[0005] This application provides the following technical solutions:
[0006] A construction material handling device for construction services, comprising:
[0007] A bottom plate, on which a vertical partition plate is arranged, the partition plate is parallel to the width direction of the bottom plate, and a plurality of moving wheels are evenly arranged at the bottom of the bottom plate;
[0008] A plate loading box, which is located on the bottom plate on one side of the partition plate and is used for loading construction plates;
[0009] A pipe loading box, the pipe loading box is located on the bottom plate on the other side of the partition plate, and the pipe loading box has a limiting part, and the limiting part is used to fix the construction pipes;
[0010] The pipe loading box and the plate loading box respectively have a first clamping portion and a second clamping portion, and the first clamping portion and the second clamping portion respectively abut against the construction pipe and the construction plate.
[0011] Furthermore, the pipe loading box includes a first main plate body and first side plates perpendicular to both sides of the first main plate body;
[0012] One end of the two first side plates facing away from the first main plate is connected to the partition plate;
[0013] The first main plate body, the two first side plates and the partition plate are enclosed to form a first accommodating cavity;
[0014] The limiting portion is located in the first accommodating cavity.
[0015] Further, the limiting part includes a lower limiting plate, an upper limiting plate and a middle limiting plate;
[0016] The lower limit plate is fixed to the bottom of the first accommodating chamber;
[0017] The middle limit plate and the upper limit plate are arranged away from the lower limit plate from top to bottom;
[0018] The lower limit plate and the upper limit plate are evenly provided with arc grooves along the width direction of the bottom plate on one side facing the middle limit plate and on both sides of the middle limit plate;
[0019] The upper limit plate or the lower limit plate matches with the arc groove on the side close to the middle limit plate.
[0020] Furthermore, there are multiple middle limiting plates.
[0021] Further, the first clamping portion includes a first clamping plate;
[0022] A first opening is formed on the side wall of the first main body;
[0023] The upper end surface of the first main board body is provided with a first sliding groove from top to bottom, which matches with the first clamping plate;
[0024] The first opening is connected to the first chute;
[0025] The first clamping plate can be slidably disposed in the first sliding groove.
[0026] Furthermore, it also includes a limit rod and a screw rod vertically arranged on the upper end surface of the lower limit plate;
[0027] The limit rod and the screw rod both penetrate the middle limit plate and the upper limit plate;
[0028] The screw rod can be movably arranged on the lower limit plate;
[0029] The middle limit plate and the upper limit plate are both connected with the lead screw thread.
[0030] Furthermore, the plate loading box includes a second main plate body and two second side plates perpendicular to the second main plate body;
[0031] One end of the two second side plates facing away from the second main plate is connected to the partition plate;
[0032] The second main plate body, the two second side plates and the partition plate are enclosed to form a second accommodating cavity;
[0033] A plurality of groups of support components are evenly arranged on the side close to the two second side plates, and the plurality of groups of support components are arranged at intervals along the height direction of the second side plates;
[0034] The support assembly consists of a plurality of support wheels arranged along the length direction of the second side plate body.
[0035] Further, the second clamping portion includes a second clamping plate;
[0036] The side wall of the second main body is provided with a second opening;
[0037] A second sliding groove matching with the second clamping plate is provided on the upper end surface of the second main board body from top to bottom;
[0038] The second opening is connected to the second chute;
[0039] The second clamping plate can be slidably disposed in the second sliding groove.
[0040] Further, the moving wheel has a telescopic rod;
[0041] The upper end of the telescopic rod is connected to the bottom of the base plate;
[0042] The lower end of the telescopic rod is connected to the moving wheel;
[0043] A shock-absorbing spring is sleeved on the telescopic rod.
[0044] Furthermore, a handle is provided on the side of the first main body facing away from the partition plate.
[0045] By adopting the above technical solution, the utility model has the following beneficial effects:
[0046] The construction pipes are loaded through the pipe loading box arranged on the bottom plate, and the construction pipes are fixed and limited by the limiting part and the first clamping part. Compared with bundling the construction pipes with ropes, the time for bundling and disassembling the construction pipes is saved, and the construction pipes can be prevented from slipping and being damaged by slipping.
[0047] The specific implementation modes of the present utility model are further described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0048] The accompanying drawings are part of this application and are used to provide a further understanding of the utility model. The schematic embodiments of the utility model and their descriptions are used to explain the utility model, but do not constitute an improper limitation on the utility model. Obviously, the drawings described below are only some embodiments. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. In the drawings:
[0049] Figure 1 A schematic diagram of the structure of a construction material handling device for construction services provided in this embodiment;
[0050] Figure 2 A schematic diagram of the structure of the construction material handling device for construction services provided in this embodiment after the first clamping plate and the second clamping plate are opened;
[0051] Figure 3 for Figure 2 Another perspective structural diagram of the construction material handling device provided for construction labor;
[0052] Figure 4 for Figure 3 Another perspective structural diagram of the construction material handling device provided for construction labor;
[0053] Figure 5 A top view of the construction material handling device provided in this embodiment.
[0054] : Illustration numerals: 1. bottom plate; 2. partition plate; 3. pipe loading box; 4. plate loading box; 5. moving wheel; 6. handle; 31. first slide groove; 32. first side plate; 33. first main plate; 34. first clamping plate; 35. knob; 36. limit part; 37. limit rod; 38. screw rod; 41. second side plate; 42. second slide groove; 43. second main plate; 44. second clamping plate; 45. supporting wheel; 51. telescopic rod; 52. shock-absorbing spring; 361. lower limit plate; 362. upper limit plate; 363. middle limit plate.
[0055] It should be noted that these drawings and textual descriptions are not intended to limit the conceptual scope of the present invention in any way, but rather to illustrate the concept of the present invention for those skilled in the art by referring to specific embodiments. DETAILED DESCRIPTION
[0056] See also Figures 1 to 5 As shown, an embodiment of the present application provides a construction labor material handling device, including a base plate 1, a plate loading box 4 and a pipe loading box 3. A vertical partition plate 2 is arranged on the base plate 1, and the partition plate 2 is parallel to the width direction of the base plate 1. A plurality of movable wheels 5 are evenly arranged on the bottom of the base plate 1. The plate loading box 4 is located on the base plate 1 on one side of the partition plate 2, and is used for loading construction plates. The pipe loading box 3 is located on the base plate 1 on the other side of the partition plate 2. The pipe loading box 3 has a limiting portion 36, and the limiting portion 36 is used to fix the construction pipes. The pipe loading box 3 and the plate loading box 4 respectively have a first clamping portion and a second clamping portion, and the first clamping portion and the second clamping portion are respectively in contact with the construction pipes and the construction plates.
[0057] In the above scheme, the construction pipes are loaded through the pipe loading box 3 set on the base plate 1, and the construction pipes are fixed and limited by the limiting part 36 and the first clamping part. Compared with using ropes to bundle the construction pipes, the time for bundling and disassembling the construction pipes is saved, and the construction pipes can be prevented from slipping and damaged.
[0058] See also Figure 1 and Figure 2 As shown, the pipe loading box 3 includes a first main body 33 and first side plates 32 perpendicular to the first main body 33. The ends of the two first side plates 32 facing away from the first main body 33 are connected to the partition plate 2. The first main body 33, the two first side plates 32 and the partition plate 2 are combined to form a first accommodating cavity. The limiting portion 36 is located in the first accommodating cavity. The construction pipes are loaded in the first accommodating cavity and are fixed by the limiting portion 36.
[0059] See also Figure 3 As shown, the limiting portion 36 includes a lower limiting plate 361, an upper limiting plate 362 and a middle limiting plate 363. The lower limiting plate 361 is fixed to the bottom of the first accommodating cavity. The middle limiting plate 363 and the upper limiting plate 362 are arranged away from the lower limiting plate 361 from top to bottom. The lower limiting plate 361 and the upper limiting plate 362 are evenly provided with arc grooves along the width direction of the bottom plate 1 toward one side of the middle limiting plate 363 and on both sides of the middle limiting plate 363. The arc grooves on the side close to the upper limiting plate 362 or the lower limiting plate 361 and the middle limiting plate 363 match.
[0060] In the above scheme, the construction pipes are placed in two arc-shaped grooves close to each other between the lower limit plate 361 and the middle limit plate 363 or the upper limit plate 362 and the middle limit plate 363. When loading the construction pipes, if there are construction pipes of different diameters, construction pipes of the same diameter can be placed on the same layer, and construction pipes of different diameters can be loaded.
[0061] There are multiple middle limit plates 363, and multiple middle limit plates 363 can increase the number of loaded construction pipes, thereby improving the transportation efficiency of the construction pipes.
[0062] See also Figure 2 and Figure 3 As shown, the first clamping portion includes a first clamping plate 34, a first opening is provided on the side wall of the first main board body 33, and a first slide groove 31 matching the first clamping plate 34 is provided on the upper end surface of the first main board body 33 from top to bottom, the first opening is connected to the first slide groove 31, and the first clamping plate 34 can be slidably set in the first slide groove 31.
[0063] In the above scheme, the first opening is used to load and unload the construction pipes. After the loading of the construction pipes is completed, the first clamping plate 34 is inserted into the first slide groove 31, so that the first clamping plate 34 limits the construction pipes to avoid displacement of the construction pipes along the length direction of the first side plate 32, and prevents the construction pipes from sliding out of the first accommodating cavity. After reaching the construction point, the first clamping plate 34 is pulled out of the first slide groove 31, and the limiting part 36 is opened, so that the construction pipes can be pulled out of the arc groove.
[0064] See also Figure 3 and Figure 4 As shown, the limit part 36 also includes a limit rod 37 and a screw rod 38 vertically arranged on the upper end surface of the lower limit plate 361, the limit rod 37 and the screw rod 38 both penetrate the middle limit plate 363 and the upper limit plate 362, the screw rod 38 is movably arranged on the lower limit plate 361, the middle limit plate 363 and the upper limit plate 362 are both threadedly connected with the screw rod 38, the limit rod 37 is used to improve the sliding stability of the middle limit plate 363 and the upper limit plate 362, and the end of the screw rod 38 away from the lower limit plate 361 is connected to the knob 35.
[0065] In the above scheme, after the construction pipe is placed in the arc groove, the screw rod 38 is rotated, and the rotation of the screw rod 38 drives the middle limit plate 363 and the upper limit plate 362 to slide downward, so that the two adjacent arc grooves fix the construction pipe; when the construction pipe is disassembled, the screw rod 38 is rotated in the opposite direction, and the screw rod 38 rotates in the opposite direction to drive the middle limit plate 363 and the upper limit plate 362 to slide upward, so that an arc groove is separated from the construction pipe.
[0066] See also Figure 1 and Figure 2 As shown, the plate loading box 4 includes a second main board body 43 and two second side boards 41 perpendicular to the second main board body 43, and the ends of the two second side boards 41 facing away from the second main board body 43 are connected to the partition plate 2, and the second main board body 43, the two second side boards 41 and the partition plate 2 are enclosed to form a second accommodating cavity, and a plurality of groups of support components are evenly arranged on the side close to the two second side boards 41, and the plurality of groups of support components are arranged at intervals along the height direction of the second side boards 41, and the support components are composed of a plurality of support wheels 45 arranged along the length direction of the second side boards 41.
[0067] In the above scheme, by placing the construction boards on the supporting components of the two second side plates 41, the construction boards are located on the supporting wheels 45 at the same height of the two second side plates 41, and the construction boards are spaced apart to facilitate taking the construction boards out of the second accommodating cavity.
[0068] See also Figure 1 , Figure 2 and Figure 3As shown, the second clamping portion includes a second clamping plate 44, a second opening is provided on the side wall of the second main board body 43, a second slide groove 42 matching with the second clamping plate 44 is provided on the upper end surface of the second main board body 43 from top to bottom, the second opening is connected to the second slide groove 42, and the second clamping plate 44 can be slidably set in the second slide groove 42.
[0069] In the above scheme, the second opening is used to load and unload the construction board. After the loading of the construction board is completed, the second clamping plate 44 is inserted into the second slide groove 42, so that the second clamping plate 44 limits the construction board to avoid displacement of the construction board along the length direction of the second side plate 41, and prevents the construction board from sliding out of the second accommodating cavity. After reaching the construction point, the second clamping plate 44 is pulled out of the second slide groove 42 to facilitate pulling the construction board out of the second accommodating cavity.
[0070] See also Figures 1 to 4 As shown, the moving wheel 5 has a telescopic rod 51 , the upper end of the telescopic rod 51 is connected to the bottom of the base plate 1 , the lower end of the telescopic rod 51 is connected to the moving wheel 5 , and a shock-absorbing spring 52 is sleeved on the telescopic rod 51 .
[0071] It should be noted that during the transportation process, due to the uneven road surface of the construction site, the pipes may slip off the cart or collide when they are transported, causing certain damage to the pipes and affecting their construction use.
[0072] In the above scheme, the shock-absorbing spring 52 cooperates with the telescopic rod 51 to reduce the shock of the construction labor material handling device provided in this embodiment, thereby preventing the construction pipes and construction panels from shaking violently and colliding with each other, thereby preventing damage.
[0073] A handle 6 is provided on the side of the first main body 33 facing away from the partition plate 2 .
[0074] The construction pipes are loaded through the pipe loading box 3 arranged on the base plate 1, and the construction pipes are fixed and limited by the limiting part 36 and the first clamping part. Compared with using ropes to bundle the construction pipes, the time for bundling and disassembling the construction pipes is saved, and the construction pipes can be prevented from slipping and being damaged.
[0075] This specific embodiment is merely an explanation of the utility model, and it is not a limitation of the utility model. After reading this specification, those skilled in the art can make non-creative modifications to the embodiment as needed, but as long as it is within the protection scope of the utility model, it is protected by the patent law.
Claims
1. A construction material handling device, characterized in that: include: A bottom plate (1), wherein a vertical partition plate (2) is arranged on the bottom plate (1), wherein the partition plate (2) is parallel to the width direction of the bottom plate (1), and a plurality of moving wheels (5) are evenly arranged at the bottom of the bottom plate (1); A plate loading box (4), the plate loading box (4) being located on the bottom plate (1) on one side of the partition plate (2) and being used for loading building construction plates; A pipe loading box (3), the pipe loading box (3) is located on the bottom plate (1) on the other side of the partition plate (2), the pipe loading box (3) has a limiting portion (36), and the limiting portion (36) is used to fix the construction pipes; The pipe loading box (3) and the plate loading box (4) respectively have a first clamping portion and a second clamping portion, and the first clamping portion and the second clamping portion respectively abut against the construction pipe and the construction plate.
2. The construction material handling device according to claim 1, characterized in that: The pipe loading box (3) comprises a first main plate body (33) and first side plates (32) perpendicular to both sides of the first main plate body (33); One end of the two first side plates (32) facing away from the first main plate (33) is connected to the partition plate (2); The first main plate body (33), the two first side plates (32) and the partition plate (2) enclose a first accommodating cavity; The limiting portion (36) is located in the first accommodating cavity.
3. The construction material handling device according to claim 2, characterized in that: The limiting portion (36) comprises a lower limiting plate (361), an upper limiting plate (362) and a middle limiting plate (363); The lower limit plate (361) is fixed to the bottom of the first accommodating cavity; The middle limit plate (363) and the upper limit plate (362) are arranged in order from top to bottom, away from the lower limit plate (361); The lower limit plate (361) and the upper limit plate (362) are evenly provided with arc grooves along the width direction of the bottom plate (1) on one side facing the middle limit plate (363) and on both sides of the middle limit plate (363); The upper limit plate (362) or the lower limit plate (361) matches the arc groove on the side close to the middle limit plate (363).
4. The construction material handling device according to claim 3, characterized in that: There are multiple middle limiting plates (363).
5. The construction material handling device according to claim 2, characterized in that: The first clamping portion comprises a first clamping plate (34); A first opening is formed on the side wall of the first main board body (33); The upper end surface of the first main board (33) is provided with a first sliding groove (31) from top to bottom, which is matched with the first clamping plate (34); The first opening is in communication with the first sliding groove (31); The first clamping plate (34) can be slidably disposed in the first sliding groove (31).
6. The construction material handling device according to claim 3, characterized in that: It also includes a limiting rod (37) and a screw rod (38) vertically arranged on the upper end surface of the lower limiting plate (361); The limiting rod (37) and the screw rod (38) both penetrate the middle limiting plate (363) and the upper limiting plate (362); The screw rod (38) is movably arranged on the lower limit plate (361); The middle limit plate (363) and the upper limit plate (362) are both threadedly connected to the screw rod (38).
7. The construction material handling device according to claim 1, characterized in that: The plate loading box (4) comprises a second main plate body (43) and two second side plates (41) perpendicular to the second main plate body (43); One end of the two second side plates (41) facing away from the second main plate (43) is connected to the partition plate (2); The second main plate body (43), the two second side plates (41) and the partition plate (2) together form a second accommodating cavity; A plurality of groups of support components are evenly arranged on the side where the two second side plates (41) are close to each other, and the plurality of groups of support components are arranged at intervals along the height direction of the second side plates (41); The support assembly is composed of a plurality of support wheels (45) arranged along the length direction of the second side plate body (41).
8. The construction material handling device according to claim 7, characterized in that: The second clamping portion comprises a second clamping plate (44); The side wall of the second main board body (43) is provided with a second opening; The upper end surface of the second main board body (43) is provided with a second sliding groove (42) from top to bottom, which is matched with the second clamping plate (44); The second opening is in communication with the second slide groove (42); The second clamping plate (44) can be slidably disposed in the second sliding groove (42).
9. The construction material handling device according to claim 1, characterized in that: The moving wheel (5) has a telescopic rod (51); The upper end of the telescopic rod (51) is connected to the bottom of the base plate (1); The lower end of the telescopic rod (51) is connected to the moving wheel (5); The telescopic rod (51) is sleeved with a shock absorbing spring (52).
10. The construction material handling device according to claim 5, characterized in that: A handle (6) is provided on the side of the first main plate (33) facing away from the partition plate (2).