Intermittent automatic spraying system for mine sprinkler and mine sprinkler
By designing the intermittent automatic spraying system for mining sprinklers, the time relay and speed control solenoid valves are used to achieve intermittent spraying of sprinkler nozzles, solving the safety problems and waste of water resources caused by excessive sprinklers, and achieving a safer and more water-saving sprinkler effect.
Patent Information
- Application Number
- CN202323635279.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-28
- Publication Date
- 2025-04-08
- Estimated Expiration
- 2033-12-28
AI Technical Summary
When existing sprinkler trucks sprinkle water on ramps and working platforms, continuous sprinkling of water causes excessive water to sprinkle in some operating areas, causing safety problems such as slippage and overcurrent of dump trucks and excessive loss of traction motors. At the same time, excessive sprinkling of water also wastes water resources, and one-handed control of the sprinkler switch increases driving safety risks.
A intermittent automatic spraying system for mining sprinklers is designed, and the speed-regulating solenoid valve is controlled through a time relay, which intermittently drives the hydraulic motor and water pump to realize intermittent spraying of the sprinkler head.
It realizes intermittent automatic control of sprinklers, reduces the problem of excessive sprinklers, reduces the safety risks of dump trucks and the loss of traction motors, saves water resources, and eliminates the safety hazards of one-handed control of sprinkler switches.
Smart Images

Figure CN222731578U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of sprinkler truck control, in particular to an intermittent automatic spraying system of a mine sprinkler truck and a mine sprinkler truck. Background Art
[0002] In recent years, with the continuous extension of coal mining, environmental governance and ecological restoration around coal mines have become one of the important tasks of various coal enterprises. Environmental governance in the operating area has become the main focus of current work. Watering and dust reduction is a relatively effective way to reduce dust around the operation. There has always been a problem in the actual operation process: the watering system of the sprinkler truck is mainly composed of high spray, low spray, gravity self-flow, strong internal circulation, high-pressure water cannon and spray, etc. The sprinkler truck mainly uses high-ground spray to continuously sprinkle water and dust reduction when sprinkling water on the ramp and the operating platform. Continuous sprinkling will cause excessive sprinkling of water in some operating areas. When the dump truck of the soil dump is running on the ramp, it will slip and overcurrent, which is easy to cause safety problems of the dump truck and excessive loss of the traction motor of the dump truck. Excessive sprinkling also causes waste of water resources; the appropriate amount of sprinkling at the operating plate and ramp of the soil dump can improve the environment of the coal mine operating area. It is necessary to control the steering wheel with one hand and the switch with the other hand, which poses a great safety hazard to driving. Utility Model Content
[0003] The purpose of the utility model is to provide an intermittent automatic spraying system for a mining sprinkler truck and a mining sprinkler truck in order to solve at least one of the above technical problems.
[0004] In the first aspect, an embodiment of the utility model provides an intermittent automatic spraying system for a mining sprinkler truck, which is applied to a mining sprinkler truck; it includes: a speed regulating solenoid valve, a hydraulic motor, a water pump and a time relay; wherein the speed regulating solenoid valve is connected to the hydraulic system of the hydraulic motor, the hydraulic motor is connected to the water pump in a transmission connection, the water pump is connected to a sprinkler nozzle, and the intermittent contacts of the time relay are connected to the control end of the speed regulating solenoid valve; the time relay is used to control the intermittent on and off of the speed regulating solenoid valve; the speed regulating solenoid valve is used to control the on and off of the hydraulic system, thereby controlling the start and stop of the hydraulic motor; the hydraulic motor is used to intermittently drive the water pump to work, thereby driving the sprinkler nozzle to perform intermittent spraying operations in the spoil yard.
[0005] Furthermore, the model of the time relay includes DH48S-S.
[0006] Furthermore, a butterfly valve is provided between the water pump and the sprinkler head for controlling the cut-off and conduction of the sprinkler head.
[0007] Furthermore, the butterfly valve is electrically connected to a butterfly valve switch, and the butterfly valve switch is used to control the on and off of the butterfly valve.
[0008] Furthermore, it also includes a power supply, which is electrically connected to the butterfly valve switch.
[0009] Furthermore, it also includes a spray switch connected to the control end of the time relay and used to control the start and stop of the time relay.
[0010] Furthermore, the spray switch is also electrically connected to the power supply.
[0011] In a second aspect, an embodiment of the utility model further provides a mining sprinkler truck, comprising the intermittent automatic spraying system for the mining sprinkler truck described in the first aspect.
[0012] The utility model provides an intermittent automatic spraying system for a mine sprinkler truck and a mine sprinkler truck, which realizes the intermittent automatic spraying mode of the mine sprinkler truck through a time relay, which is convenient and quick, alleviates the safety problem of the dump truck caused by excessive watering of the spoil field and the excessive loss problem of the traction motor of the dump truck in the prior art, and eliminates the safety hazard caused by one-handed operation during driving. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] In order to more clearly illustrate the implementation methods of the present application or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0014] Figure 1 A schematic diagram of an intermittent automatic spraying system for a mining sprinkler truck provided in an embodiment of the utility model.
[0015] In the figure: 10, speed control solenoid valve, 20, hydraulic motor, 30, water pump, 40, time relay, 50, sprinkler head, 60, butterfly valve, 70, butterfly valve switch, 80, power supply, 90, spray switch. DETAILED DESCRIPTION
[0016] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0017] Figure 1Schematic diagram of an intermittent automatic spraying system for a mining sprinkler truck provided according to an embodiment of the utility model, the system is applied to a mining sprinkler truck. Figure 1 As shown, the system includes: a speed regulating solenoid valve 10, a hydraulic motor 20, a water pump 30 and a time relay 40. The speed regulating solenoid valve 10 is connected to the hydraulic system of the hydraulic motor 20, the hydraulic motor 20 is in transmission connection with the water pump 30, the water pump 30 is connected to the sprinkler head 50, and the intermittent contact of the time relay 40 is connected to the control end of the speed regulating solenoid valve 10.
[0018] Specifically, in the embodiment of the utility model, the time relay 40 is used to control the intermittent on and off of the speed regulating solenoid valve 10;
[0019] The speed regulating solenoid valve 10 is used to control the on and off of the hydraulic system, thereby controlling the start and stop of the hydraulic motor 20;
[0020] The hydraulic motor 20 is used to intermittently drive the water pump 30 to work, thereby driving the sprinkler head 50 to perform intermittent spraying operations in the soil dump.
[0021] Preferably, in the embodiment of the utility model, the model of the time relay 40 includes DH48S-S. Specifically, the DH48S-S time relay is a cyclic delay relay, and the control time is between 0.01s-99h, and the cyclic timing on-off operation can be performed according to the set control time. For example, if the control time is set to 10s, the working process of the DH48S-S time relay is: power on for 10s, then disconnect for 10s, and then power on and off cyclic control.
[0022] Specifically, Figure 1 As shown, a butterfly valve 60 is further provided between the water pump 30 and the sprinkler head 50 for controlling the cut-off and conduction of the sprinkler head 50 .
[0023] The butterfly valve 60 is electrically connected to the butterfly valve switch 70 , wherein the butterfly valve switch 70 is used to control the on-off of the butterfly valve 60 .
[0024] Specifically, Figure 1 As shown, a power supply 80 is also included. The power supply 80 is electrically connected to the butterfly valve switch 70 and is used to supply power to the butterfly valve switch 70.
[0025] Specifically, Figure 1 As shown, a spray switch 90 is also included, which is connected to the control end of the time relay 40 and is used to control the start and stop of the time relay 40.
[0026] Specifically, Figure 1 As shown, the spray switch 90 is also electrically connected to the power source 80 .
[0027] The embodiment of the utility model provides an intermittent automatic spraying system for a mining sprinkler truck, in which the timed on and off of the time relay 40 is used to control the action of the speed regulating solenoid valve 10, and the speed regulating solenoid valve 10 adjusts the oil pressure of the water pump through the oil volume to adjust the working state of the water pump 30, so that the water truck performs intermittent spraying.
[0028] Specifically, when the coil of the time relay 40 is de-energized, the intermittent contacts are in a normally closed state, and the speed control solenoid valve 10 is powered on for a long time to control the hydraulic power system and the water pump 30 to work normally; when the coil of the time relay 40 is energized, the intermittent contacts work, and the hydraulic power system is controlled by controlling the on and off of the speed control solenoid valve 10, so that the hydraulic motor 20 and the water pump 30 work intermittently, thereby realizing intermittent automatic control of spraying during the spraying process, and the intermittent time and the spraying time can be adjusted and work automatically, thereby completing the required time control.
[0029] The intermittent automatic spraying system of a mining sprinkler provided by the embodiment of the utility model has the following technical effects compared with the traditional sprinkler:
[0030] (1) The operation is simpler. After the time is set on the time relay 40, the time relay 40 automatically adjusts. When the time is working, turn on the switch, and the spraying automatically enters the intermittent spraying mode. It is convenient and quick, and can realize intermittent automatic control of watering with good effect.
[0031] (2) Intermittent spraying can be achieved on various road sections. The amount of water sprayed on the ground is uniform and moderate, and the dust reduction effect is obvious.
[0032] (3) Reduce the problem of motor overcurrent damage caused by excessive watering of operating vehicles. Intermittent spraying can be achieved on various road sections, and the amount of water sprayed on the ground is uniform and moderate. When vehicles are driving on such roads, it is not easy for the vehicle to slip due to excessive water, causing the motor to idle and cause motor overcurrent damage.
[0033] (4) Save a lot of water resources and achieve more efficient environmental governance. Intermittent spraying can achieve different degrees of spraying on different road surfaces. The amount of water sprayed on the necessary road surface is moderate, and the degree of dust reduction is improved. When working on special road surfaces such as ramps, the amount of water sprayed is intermittent, and the amount of water is moderate, which can just reduce dust on the road surface without causing excessive water flow, which will damage the soil retaining function.
[0034] (5) Effectively extend the service life of the water pump and electric butterfly valve. In the spraying mode of traditional sprinkler trucks, the water pump is always running, which will cause water pump fatigue, reduce working continuity, and greatly reduce life. The intermittent spraying in the utility model can relieve the working time of the water pump, will not cause water pump fatigue, and increase the continuity of each component of the water pump, thereby effectively extending the life of the water pump.
[0035] In the spraying mode of traditional sprinkler trucks, the electric butterfly valve is constantly impacted by water pressure when it is long open, and the valve core in the middle of the butterfly valve has been deformed by high pressure, causing damage to the butterfly valve. In addition, when it is long open and long closed, the valve core rod is prone to rust and deform, causing damage to the butterfly valve. In the intermittent spraying state of the utility model, the electric butterfly valve is in frequent action, and the water pressure changes with the control of the water pump, causing the impact of the butterfly valve core to weaken, and the valve core rod is not easy to rust and deform when it moves back and forth. This can improve the utilization rate of the electric butterfly valve, and under this protection, the service life can be greatly extended.
[0036] (6) Eliminate the potential safety hazard caused by one-handed steering wheel operation during driving. In the traditional spraying mode, the driver must frequently operate the spraying status. If the driver presses the switch while driving, the driver will have to operate the steering wheel with one hand and drive without paying attention, which is very likely to cause a vehicle accident. The intermittent automatic spraying system for a mining sprinkler truck provided by the embodiment of the utility model is completed on time, so the driver does not have to worry about the amount of water sprayed and can concentrate on driving, thus avoiding vehicle accidents caused by driver misoperation or distraction.
[0037] The embodiment of the utility model further provides a mining sprinkler truck, including the intermittent automatic spraying system of the mining sprinkler truck provided by the embodiment of the utility model.
[0038] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.
[0039] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. An intermittent automatic spraying system for a mining sprinkler truck, characterized in that: Applied to a mining sprinkler truck; comprising: a speed regulating solenoid valve, a hydraulic motor, a water pump and a time relay; wherein the speed regulating solenoid valve is connected to the hydraulic system of the hydraulic motor, the hydraulic motor is connected to the water pump in a transmission manner, the water pump is connected to a sprinkler nozzle, and the intermittent contact of the time relay is connected to the control end of the speed regulating solenoid valve; The time relay is used to control the intermittent on and off of the speed regulating solenoid valve; The speed regulating solenoid valve is used to control the on and off of the hydraulic system, thereby controlling the start and stop of the hydraulic motor; The hydraulic motor is used to intermittently drive the water pump to work, thereby driving the sprinkler head to perform intermittent spraying operations in the soil dump; When the time relay coil is de-energized, the intermittent contact is in a normally closed state, and the speed control solenoid valve is energized for a long time to control the hydraulic system and the water pump to work normally; when the time relay coil is energized, the intermittent contact works, and the hydraulic system is controlled by controlling the on and off power of the speed control solenoid valve, so that the hydraulic motor and the water pump work intermittently.
2. The intermittent automatic spraying system for a mining sprinkler according to claim 1 is characterized in that: Models of the time relay include DH48S-S.
3. The intermittent automatic spraying system for a mining sprinkler according to claim 1 is characterized in that: A butterfly valve is also arranged between the water pump and the sprinkler head to control the cut-off and conduction of the sprinkler head.
4. The intermittent automatic spraying system for a mining sprinkler according to claim 3 is characterized in that: The butterfly valve is electrically connected to a butterfly valve switch, and the butterfly valve switch is used to control the on and off of the butterfly valve.
5. The intermittent automatic spraying system for a mining sprinkler according to claim 4 is characterized in that: It also includes a power supply, which is electrically connected to the butterfly valve switch.
6. The intermittent automatic spraying system for a mining sprinkler according to claim 5 is characterized in that: It also includes a spray switch, which is connected to the control end of the time relay and is used to control the start and stop of the time relay.
7. The intermittent automatic spraying system for a mining sprinkler according to claim 6 is characterized in that: The spray switch is also electrically connected to the power supply.
8. A mining sprinkler, characterized in that: The invention comprises the intermittent automatic spraying system for a mining sprinkler truck as described in any one of claims 1 to 7.
Citation Information
Cited By
Waste heat recovery device for pyrite acid-making dry absorption section
CN224151444U