A green belt structure for ecological garden recreational landscape sketches

By designing the structure of the green belt of ecological garden amusement landscape sketches, closely connecting green flower gardens and amusement facilities, the problem of insufficient practicality of the existing landscaping belt is solved, environmental purification, noise reduction and the provision of children's entertainment venues is achieved, and sand filling and water accumulation problems are solved through the design of slope sections and drainage branches.

CN222744712UActive Publication Date: 2025-04-11WUHAN ENGINEERING CO LTD OF CHINA RAILWAY SEVENTH GROUP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421528925.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-01
Publication Date
2025-04-11
Estimated Expiration
2034-07-01

AI Technical Summary

Technical Problem

It is difficult for existing landscaping belts to closely connect green flower gardens with amusement facilities, resulting in insufficient practicality of green belts.

Method used

A green belt structure of ecological garden amusement landscape sketches is designed, including the amusement area, the first pedestrian pavement, the second pedestrian pavement and the green plant area. A second pedestrian pavement is set up on the lower side of the amusement area, and the green plant area is extended on the side. The first pedestrian pavement is connected to the second pedestrian pavement. Slope sections are set up around the sand pool to reduce the belt out of sand, and drainage branches are set up to prevent water accumulation of sand pits.

Benefits of technology

By closely connecting green flower gardens and recreation facilities, the practicality of the green belt is improved, the environment is purified, noise is reduced, and children are provided with a place to relax and recreate. At the same time, the design of slope sections and drainage branches reduces sand filling and water accumulation problems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222744712U_ABST
    Figure CN222744712U_ABST
Patent Text Reader

Abstract

The utility model discloses an ecological garden recreational landscape small piece green belt structure, comprising: a recreational area, a first pedestrian road surface, a second pedestrian road surface and a green plant area; the second pedestrian road surface is arranged at the lower side of the recreational area, and the remaining three sides of the recreational area are extended outwardly to be provided with green plant areas, wherein the first pedestrian road surface is extended at the left and right sides of the recreational area, and the first pedestrian road surface is connected to the second pedestrian road surface. The utility model closely connects the green flower garden with the recreational facilities, and improves the practicality of the green belt.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of ecological gardens, and more specifically, to a green belt structure of an ecological garden recreational landscape sketch. Background Art

[0002] The landscaping project is a project to build landscape gardens and green spaces. Landscaping provides people with a good place to rest, culturally entertain, get close to nature, and satisfy people's desire to return to nature. It is an important measure to protect the ecological environment and improve the urban living environment. With the development of the economy, landscaping has also transformed from traditional gardens to modern gardens combined with urban development. Green belts should not only consider greening and flower projects, but also effectively combine recreational and leisure areas with them to improve the effectiveness of green belt projects. Utility Model Content

[0003] The utility model aims to provide an ecological garden recreational landscape sketch green belt structure, which closely connects the greening flower garden with the recreational facilities and improves the practicability of the green belt.

[0004] The technical solution adopted by the utility model to solve this technical problem is: an ecological garden recreational landscape small piece green belt structure, comprising: a recreational area, a first pedestrian road surface, a second pedestrian road surface and a green plant area; the second pedestrian road surface is arranged at the lower side of the recreational area, and the remaining three side surfaces of the recreational area are extended outwardly to be provided with green plant areas, wherein the first pedestrian road surface is extended on the left and right sides of the recreational area, and the first pedestrian road surface is connected to the second pedestrian road surface;

[0005] Among them, the ground of the recreation area is paved with a safety mat, and the recreation area includes a sand pit; the sand pit includes a sand pool and a slope section; the bottom of the sand pool includes a rammed soil layer, a gravel layer, a non-woven geotextile layer, a coarse sand layer, and a fine sand layer from bottom to top; the side walls of the sand pool are composed of a rammed soil layer, a concrete cushion layer and a brick layer at the bottom, and the height of the brick layer is slightly higher than the height of the fine sand layer; the slope section is arranged around the sand pool, and the slope section is a hill-like structure, one end of the slope section is connected to the safety mat, and the other end of the slope section extends into the inner wall of the sand pool and is connected thereto.

[0006] As a further solution of the utility model, the slope section includes, from bottom to top, a rammed soil layer, a crushed stone layer, a concrete shaping layer, a cement mortar slope leveling layer and an EPDM rubber floor cushion layer, wherein the rammed layer and the crushed stone layer are both in a flat state, and the slope section is shaped into a hill-like structure through the C20 concrete shaping layer.

[0007] As a further solution of the utility model, the gravel layer of the sand pool is provided with a seepage drainage pipe, the gravel layer of the slope section is provided with a seepage drainage pipe and a plurality of drainage branch pipes, one end of the drainage branch pipe is connected to the seepage drainage pipe of the gravel layer of the slope section, the other end of the drainage branch pipe passes through the brick layer and is connected to the sand pool, and the non-woven geotextile layer at the bottom of the sand pool extends toward the side wall of the sand pool to the bottom of one end of the slope section.

[0008] As a further solution of the utility model, one or more of trees, shrubs and herbaceous plants are planted in the greening plant area.

[0009] As a further solution of the utility model, a blind path is arranged on the second pedestrian road surface.

[0010] As a further solution of the utility model, a white marble bench is arranged at the junction of the upper side of the recreation area and the green plant area.

[0011] As a further solution of the utility model, the thickness of the safety mat is 30 mm, and the safety mat comprises EPDM mats of at least three colors.

[0012] As a further solution of the utility model, the recreation area also includes a climbing mechanism.

[0013] The utility model has at least the following beneficial effects: the structure of the ecological garden recreational landscape small piece green belt closely connects the green flower garden with the recreational facilities to form a characteristic activity area, which can purify the environment, reduce noise, and provide a leisure and entertainment place for children. By setting a slope section around the sand pool to form a slope, the sand can be reduced from being brought out of the sand pool. The drainage branch pipe can divert part of the rainwater in the sand pool to the seepage drainage pipe of the slope section and drain it away in time to prevent water accumulation in the sand pit.

[0014] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through research and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a structural schematic diagram of the green belt structure of the utility model ecological garden recreation landscape sketch;

[0016] Figure 2 It is a structural schematic diagram of a sand pit in one embodiment of the utility model;

[0017] Figure 3 is a cross-sectional view of a sand pit according to an embodiment of the utility model;

[0018] Figure 4 It is a structural schematic diagram of a climbing mechanism of an embodiment of the utility model.

[0019] Among them, 1-the first pedestrian pavement, 2-the second pedestrian pavement, 3-the green plant area, 4-the sand pit, 401-the compacted soil layer, 402-the crushed stone layer, 403-the non-woven geotextile layer, 404-the coarse sand layer, 405-the fine sand layer, 406-the concrete cushion layer, 407-the brick layer, 408-the concrete shaping layer, 409-the cement mortar slope leveling layer, 410-the EPDM rubber cushion layer, 411-the seepage drainage pipe, 412-the drainage branch pipe, 413-the slope section, 5-the climbing mechanism, 51-the simulated hillside, 52-the climbing net, 53-the slide, 6-the safety mat, 7-the white marble bench. DETAILED DESCRIPTION

[0020] The utility model is described in detail and completely below in conjunction with the accompanying drawings. A person of ordinary skill in the art will be able to implement the utility model based on these descriptions. Before describing the utility model in conjunction with the accompanying drawings, it should be particularly pointed out that the technical solutions and technical features provided in each part of the utility model, including the following description, can be combined with each other without conflict.

[0021] In addition, the embodiments of the present invention involved in the following description are generally only a part of the embodiments of the present invention, rather than all of the embodiments. Therefore, based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0022] The following is a further detailed description of the utility model in conjunction with the accompanying drawings and implementations, and its specific implementation process is as follows:

[0023] like Figures 1 to 4 As shown, the utility model provides an ecological garden recreation landscape small piece green belt structure, comprising: a recreation area, a first pedestrian pavement 1, a second pedestrian pavement 2 and a green plant area 3; the second pedestrian pavement 2 is arranged at the lower side of the recreation area, and the remaining three sides of the recreation area are extended outwardly to be provided with green plant areas 3, wherein the first pedestrian pavement 1 is extended and arranged on the left and right sides of the recreation area, and the first pedestrian pavement 1 is connected with the second pedestrian pavement 2, that is, the first pedestrian pavement 1 is arranged in the green plant area 3 for pedestrians to pass through;

[0024] The ground of the recreation area is paved with a safety mat 6, and the recreation area includes a sand pit 4; the sand pit 4 includes a sand pool and a slope section 413; the bottom of the sand pool includes a rammed soil layer 401 from bottom to top, a crushed stone layer 402 with a density of ≥93%, a thickness of 100 mm, and a non-woven geotextile layer 403, in which two layers of non-woven geotextile are provided in this embodiment; a coarse sand layer 404 with a thickness of 200 mm; a fine sand layer 405 with a thickness of 200 mm; the side wall of the sand pool is composed of a bottom A rammed earth layer 401; a 100 mm thick C20 concrete cushion layer 406 and a brickwork layer 407, wherein the brickwork layer 407 is made of MU10 bricks laid with cement mortar, and the height of the brickwork layer 407 is slightly higher than the height of the fine sand layer 405; the slope section 413 is arranged around the sand pool, and the slope section 413 is a hill-like structure, one end of the slope section 413 is connected to the safety mat 6, and the other end of the slope section 413 extends into the inner wall of the sand pool and is connected thereto.

[0025] The green belt structure of the ecological garden recreation landscape sketch of the present application not only sets up a green plant area 3 and a pedestrian road surface, but also sets up a recreation area, thereby increasing the functionality of the green belt. The existing sand pit 4 is horizontally connected to the safety mat 6, and children can easily bring sand out of the sand pit during play, causing the sand to fill the uneven pit groove of the safety mat 6, which is not easy to clean. The present application sets a slope section 413 around the sand pit to form a slope, which can reduce the sand from the sand pit.

[0026] The present technical scheme may also include the following technical details to better achieve the technical effect: the slope section 413 includes, from bottom to top, a rammed earth layer 401, a crushed stone layer 402, a C20 concrete shaping layer 408, a 30 mm thick cement mortar slope leveling layer 409 and a 30 mm thick EPDM rubber floor cushion layer 410, wherein the rammed layer and the crushed stone layer 402 are both in a flat state, and the slope section 413 is shaped into a hill-like structure through the C20 concrete shaping layer 408, and the 30 mm thick EPDM rubber floor cushion layer 410 is connected to the safety floor mat 6, and the lower structure of the safety floor mat 6 is also composed of a rammed earth layer 401, a crushed stone layer 402, a C20 concrete shaping layer 408, and a 30 mm thick cement mortar layer from bottom to top.

[0027] The technical solution may also include the following technical details to better achieve the technical effect: the gravel layer 402 of the sand pool is provided with an infiltration drainage pipe 411, the gravel layer 402 of the slope section 413 is provided with an infiltration drainage pipe 411 and a plurality of drainage branch pipes 412, one end of the drainage branch pipe 412 is connected to the infiltration drainage pipe 411 of the gravel layer 402 of the slope section 413, the other end of the drainage branch pipe 412 passes through the brickwork layer 407 and communicates with the sand pool, the non-woven geotextile layer 403 at the bottom of the sand pool extends toward the side wall of the sand pool to the bottom of one end of the slope section 413, and the drainage branch pipe 412 is isolated from the sand in the sand pool by the non-woven geotextile layer 403. Since only the infiltration drainage pipe 411 is provided at the bottom of the sand pool, it is impossible to drain the rainwater in time, so the drainage branch pipe 412 is used to divert part of the rainwater in the sand pool to the infiltration drainage pipe 411 of the slope section 413 and drain it away in time, so as to prevent water accumulation in the sand pit 4.

[0028] This technical solution may also include the following technical details to better achieve the technical effect: one or more of trees, shrubs and herbaceous plants are planted in the greening plant area 3.

[0029] arbor

[0030] ①Grow healthy and vigorous, with an expanded crown, normal development of branches and roots, strong root system, and no diseases or pests.

[0031] ② The trunk diameter at breast height shall not be less than 0.2m and the tree height shall not be less than 1.5m (except for bagged trees).

[0032] ③ There shall be no unhealed scars or cut branches with a diameter of more than 2 cm.

[0033] (2) Shrubs

[0034] ①The height should comply with the design requirements.

[0035] ② All shrubs should be evergreen, root-vine, large, branch-filled broad-leaved shrubs, and have the growth characteristics of the local area.

[0036] (3) Turf, grass seeds, flowers and plants

[0037] Herbs should be drought-resistant, easy to grow, have large vines, well-developed roots, low stems, and be perennials. Flowers and plants should have ornamental value.

[0038] The technical solution may further include the following technical details to better achieve the technical effect: a blind path is provided on the second pedestrian road surface 2 .

[0039] The technical solution may also include the following technical details to better achieve the technical effect: a white marble bench 7 is provided at the junction of the upper side of the recreation area and the green plant area 3 .

[0040] The present technical solution may also include the following technical details to better achieve the technical effect: the thickness of the safety mat 6 is 30 mm, and the safety mat 6 includes at least three colors of EPDM mats, which in this embodiment are white EPDM mats, blue EPDM mats and red EPDM mats.

[0041] The technical solution may further include the following technical details to better achieve the technical effect: the recreation area also includes a climbing mechanism. In the present embodiment, the climbing mechanism 5 is composed of a simulated hillside 51 , a climbing net 52 and a slide 53 .

[0042] Although the implementation scheme of the utility model has been disclosed as above, it is not limited to the applications listed in the specification and implementation scheme. It can be fully applied to various fields suitable for the utility model. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the utility model is not limited to the specific details and the embodiments shown and described herein.

Claims

1. An ecological garden recreational landscape green belt structure, characterized in that: include: An amusement area, a first pedestrian road, a second pedestrian road and a green plant area; the second pedestrian road is provided at the lower side of the amusement area, and the remaining three sides of the amusement area are provided with green plant areas extending outward, wherein the first pedestrian road is extended on the left and right sides of the amusement area, and the first pedestrian road is connected to the second pedestrian road; Among them, the ground of the recreation area is paved with a safety mat, and the recreation area includes a sand pit; the sand pit includes a sand pool and a slope section; the bottom of the sand pool includes a rammed soil layer, a gravel layer, a non-woven geotextile layer, a coarse sand layer, and a fine sand layer from bottom to top; the side walls of the sand pool are composed of a rammed soil layer, a concrete cushion layer and a brick layer at the bottom, and the height of the brick layer is slightly higher than the height of the fine sand layer; the slope section is arranged around the sand pool, and the slope section is a hill-like structure, one end of the slope section is connected to the safety mat, and the other end of the slope section extends into the inner wall of the sand pool and is connected thereto.

2. The ecological garden recreational landscape green belt structure as claimed in claim 1, characterized in that: The slope section includes a rammed earth layer, a crushed stone layer, a concrete shaping layer, a cement mortar slope leveling layer and an EPDM rubber floor cushion layer from bottom to top, wherein the rammed layer and the crushed stone layer are both in a flat state, and the slope section is shaped into a hill-like structure through the C20 concrete shaping layer.

3. The ecological garden recreational landscape green belt structure as claimed in claim 2, characterized in that: The gravel layer of the sand pool is provided with a seepage drainage pipe, the gravel layer of the slope section is provided with a seepage drainage pipe and a plurality of drainage branch pipes, one end of the drainage branch pipe is connected to the seepage drainage pipe of the gravel layer of the slope section, and the other end of the drainage branch pipe passes through the brick layer and is connected to the sand pool, and the non-woven geotextile layer at the bottom of the sand pool extends toward the side wall of the sand pool to the bottom of one end of the slope section.

4. The ecological garden recreational landscape green belt structure as claimed in claim 1, characterized in that: The greening plant area is planted with one or more of trees, shrubs and herbaceous plants.

5. The ecological garden recreational landscape green belt structure as claimed in claim 1, characterized in that: A blind path is arranged on the second pedestrian road surface.

6. The ecological garden recreational landscape green belt structure as claimed in claim 1, characterized in that: White marble benches are set at the junction of the upper side of the recreation area and the green plant area.

7. The ecological garden recreational landscape green belt structure as claimed in claim 1, characterized in that: The safety mat has a thickness of 30 mm and comprises EPDM mats of at least three colors.

8. The ecological garden recreational landscape green belt structure as claimed in claim 1, characterized in that: The play area also includes a climbing mechanism.