Special equipment for movable drilling of guardrail

By designing special equipment for mobile drilling for guardrails, the combination of hanging frames, load-bearing booms, supporting hanging frames, slide rail mechanisms and double-electric drilling sets, the problems of poor hanging basket materials and low construction efficiency in the existing technology are solved, and efficient and safe drilling operations on guardrails are achieved.

CN222790694UActive Publication Date: 2025-04-25CHONGQING JUNENG CONSTR GRP ROAD & BRIDGE ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420434290.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-07
Publication Date
2025-04-25
Estimated Expiration
2034-03-07

AI Technical Summary

Technical Problem

In the prior art, the hanging basket material is not strong and prone to fatigue and damage, poses safety hazards, and is also inefficient in construction because the operators need to frequently move the hanging basket to the next hole for drilling operations.

Method used

A special equipment for mobile drilling of guardrails is designed, including a hanger, a load-bearing boom, a support hanger, a slide rail mechanism and a double electric drilling rig. Through the mutual cooperation of these components, accurate drilling of holes is achieved on the guardrail, and the double electric drilling rig is driven to drill holes on the side of the guardrail through the force transmission rod. After the hole is formed, the operator pushes the equipment to the next hole position.

Benefits of technology

While ensuring construction safety, it saves manpower, improves drilling efficiency, reduces frequent operations of hanging basket movement, and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222790694U_ABST
    Figure CN222790694U_ABST
Patent Text Reader

Abstract

The utility model discloses special equipment for guardrail movable drilling, which relates to the technical field of bridge engineering accessory structures and comprises a guardrail, a hanging bracket is clamped at the top of the guardrail, an electric box is arranged on the rear side of the hanging bracket, a double-roller-group support is fixedly mounted at the top of the hanging bracket, and a bearing hanging rod is fixedly mounted on the front side of the hanging bracket. Through mutual cooperation of the hanging bracket, the bearing hanging rod, the supporting hanging bracket, the sliding rail mechanism and the double-electric-drill unit, special drilling equipment is installed and placed on the guardrail, after the drilling position is accurately positioned, a power source is switched on, and after an operator applies a horizontal force to the dowel bar, the double-electric-drill unit is driven to drill holes in the side face of the guardrail. And after the hole is formed, the operator can easily push the whole special drilling equipment to the next hole position, and the operation is circulated, so that the effects of saving manpower and improving the drilling efficiency while ensuring the construction safety are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of auxiliary structures of bridge engineering, in particular to special equipment for mobile drilling of guardrails. Background Art

[0002] In the conventional (hanging basket + manual drilling) construction method, since the pipeline crossing the bridge is generally located on the outside of the central side guardrail of the left and right sides of the route, and there is only a 50cm gap inside the guardrail, a large movable hanging basket cannot be used for construction. In order to meet the working conditions of the workers outside the guardrail, a small hanging basket that has been processed and modified is often used so that the workers can perform drilling operations on it. The existing technology has the following problems:

[0003] Because the existing construction method requires the hanging basket to be miniaturized and easy to move, the materials used for the hanging basket are often not strong. After a period of use, it is easy to cause fatigue damage, which poses a safety hazard. At the same time, in order to meet the safety of manned operations in a small hanging basket, the hanging basket has not been modified to be able to carry people and move on the guardrail. After completing the drilling construction at one place, the operator needs to return to the bridge deck, move the hanging basket to the next drilling location, and then drill again, and this cycle is repeated, resulting in low construction efficiency. Utility Model Content

[0004] The utility model provides a special device for drilling holes in a guardrail, so as to solve the problems raised in the above-mentioned background technology.

[0005] In order to solve the above technical problems, the technical solution adopted by the utility model is:

[0006] A special equipment for mobile drilling of guardrails comprises a guardrail, a hanger is clamped on the top of the guardrail, an electric box is arranged on the rear side of the hanger, a double roller group bracket is fixedly installed on the top of the hanger, a load-bearing hanger rod is fixedly installed on the front side of the hanger, two supporting hangers are arranged below the load-bearing hanger rod, a slide rail mechanism is arranged on the top of the two supporting hangers, a double electric drill set is arranged on the top of the two slide rail mechanisms, a transverse connecting rod is fixedly connected between the opposite surfaces of the hanger and the top of the load-bearing hanger rod, and an angle steel bracket is arranged on the front side of the guardrail.

[0007] A further improvement of the technical solution of the utility model is that the hanger includes two hollow round steel tubes 1, and hollow round steel tubes 2 are fixedly connected to the front and rear sides of the bottom of the two hollow round steel tubes 1, and tightening knobs 1 are provided on the tops of the two hollow round steel tubes 1 for tightening the hollow round steel tubes 2, and rollers are provided at the bottom ends of the two hollow round steel tubes 2.

[0008] A further improvement of the technical solution of the utility model is that the double roller group bracket includes two hollow round steel tubes three, two hollow square steel tubes two are fixedly installed on the opposite surfaces of the two hollow round steel tubes three, two double roller groups are fixedly installed between the opposite surfaces of the two hollow square steel tubes two, and a fastening knob two is provided at the top center of the two hollow round steel tubes three.

[0009] A further improvement of the technical solution of the utility model is that the load-bearing hanger includes two transverse hollow round steel tubes, two vertical hollow round steel tubes are fixedly installed on the front and rear sides of the bottom of the two transverse hollow round steel tubes, the bottom ends of the two vertical hollow round steel tubes on the rear side are provided with detachable rollers, the top rear sides of the two transverse hollow round steel tubes are provided with bolts, and the front sides of the two detachable rollers on the rear side are provided with roller tightening knobs for tightening the detachable rollers.

[0010] A further improvement of the technical solution of the utility model is that the supporting hanger includes four hollow round steel tubes four, a hollow square steel tube three is fixedly connected between the opposite surfaces of the front and rear two hollow round steel tubes four, and a fastening knob three is provided on the upper and lower sides of the front left front hollow round steel tube four.

[0011] A further improvement of the technical solution of the utility model is that the slide rail mechanism includes four slide rails, and drilling rig supports are fixedly installed on the tops of two of the slide rails on the upper and lower sides, a vertical connecting rod is fixedly installed on the top of the lower drilling rig support, and a force transmission rod is fixedly installed on the top of the upper drilling rig support.

[0012] A further improvement of the technical solution of the utility model is that the dual electric drilling rig comprises two motors, and the outer walls of the two motors are fixedly connected with two fixing belts.

[0013] Due to the adoption of the above technical solution, the utility model has achieved the following technical progress compared with the prior art:

[0014] 1. The utility model provides a special equipment for drilling holes on the guardrail. Through the cooperation of a hanger, a load-bearing hanger, a supporting hanger, a slide rail mechanism, and a double electric drill unit, the special equipment for drilling holes is installed and placed on the guardrail. After accurately positioning the drilling position, the power is turned on. After the operator applies a horizontal force to the force transmission rod, the double electric drill unit is driven to drill holes on the side of the guardrail. After the holes are formed, the operator can easily push the entire special equipment for drilling holes to the next hole position, and the cycle is repeated, thereby achieving the effect of saving manpower while ensuring construction safety and improving drilling efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is an overall schematic diagram of the structure of the utility model;

[0016] Figure 2 This is a schematic diagram of the electric drill switch control box hanger of the utility model structure;

[0017] Figure 3 This is a schematic diagram of the electric drill control box of the utility model structure;

[0018] Figure 4 It is a schematic diagram of the double roller bracket on the top of the guardrail of the utility model structure;

[0019] Figure 5 It is a schematic diagram of a drilling rig, a drilling rig support, and a slide rail load-bearing boom of the utility model structure;

[0020] Figure 6 It is a schematic diagram of the support and hanger of the drilling rig and the slide rail of the utility model structure;

[0021] Figure 7 This is a schematic diagram of a drilling rig support and a slide rail of the utility model structure;

[0022] Figure 8 This is a schematic diagram of a dual electric drill unit of the utility model structure;

[0023] Fig. 9 It is a schematic diagram of the transverse connecting rod of the series control box hanger, double roller group, and drilling rig support hanger of the structure of the utility model;

[0024] Fig.10 The utility model is a schematic diagram of the pipeline bridge angle steel bracket of the structure.

[0025] In the figure: 1. guardrail; 2. hanger; 201. hollow round steel pipe 1; 202. hollow round steel pipe 2; 203. hollow square steel pipe 1; 204. tightening knob 1; 205. roller; 3. electric box; 4. double roller bracket; 401. hollow round steel pipe 3; 402. hollow square steel pipe 2; 403. double roller bracket; 404. tightening knob 2; 5. load-bearing hanger; 501. horizontal hollow round steel pipe; 502. vertical hollow round steel Tube; 503, detachable roller; 504, bolt; 505, roller tightening knob; 6, support hanger; 601, hollow round steel pipe four; 602, hollow square steel pipe three; 603, tightening knob three; 7, slide rail mechanism; 701, slide rail; 702, drilling rig bracket; 703, force transmission rod; 704, vertical connecting rod; 8, dual electric drilling rig group; 801, motor; 802, fixing belt; 9, horizontal connecting rod; 10, angle steel bracket. DETAILED DESCRIPTION

[0026] The present invention is further described in detail below in conjunction with the embodiments:

[0027] Example 1

[0028] like Figure 1-10As shown, the utility model provides a special equipment for drilling holes with a guardrail, including a guardrail 1, which is made of reinforced concrete. A hanger 2 is clamped on the top of the guardrail 1 for supporting a control box. An electric box 3 is arranged on the rear side of the hanger 2 for controlling a drilling rig switch. A double roller group bracket 4 is fixedly installed on the top of the hanger 2. A load-bearing hanger rod 5 is fixedly installed on the front side of the hanger 2. Two supporting hangers 6 are arranged below the load-bearing hanger rod 5. A slide rail mechanism 7 is arranged on the top of the two supporting hangers 6. A double electric drilling rig group 8 is arranged on the top of the two slide rail mechanisms 7. A transverse connecting rod 9 is fixedly connected between the opposite surfaces of the tops of the hanger 2 and the load-bearing hanger rod 5 for connecting the motor control box hanger, the drilling rig support hanger and the double roller group in series. An angle steel bracket 10 is arranged on the front side of the guardrail 1 , used for pipelines crossing the bridge outside the guardrail, the hanger 2 includes two hollow round steel pipes 201, the front and rear sides of the bottom of the two hollow round steel pipes 201 are fixedly connected with hollow round steel pipes 202, the tops of the two hollow round steel pipes 201 are provided with fastening knobs 204 for fastening the hollow round steel pipes 202, the bottom ends of the two hollow round steel pipes 202 are provided with rollers 205, the double roller group bracket 4 includes two hollow round steel pipes 3 401, two hollow square steel pipes 2 402 are fixedly installed on the opposite surfaces of the two hollow round steel pipes 3 401, two double roller groups 403 are fixedly installed between the opposite surfaces of the two hollow square steel pipes 2 402, and the top centers of the two hollow round steel pipes 3 401 are provided with fastening knobs 2 404.

[0029] Example 2

[0030] like Figure 1-10 As shown, on the basis of Example 1, the utility model provides a technical solution: preferably, the load-bearing hanger 5 includes two horizontal hollow round steel tubes 501, and two vertical hollow round steel tubes 502 are fixedly installed on the front and rear sides of the bottom of the two horizontal hollow round steel tubes 501, and the bottom ends of the two vertical hollow round steel tubes 502 on the rear side are provided with detachable rollers 503, and the top rear sides of the two horizontal hollow round steel tubes 501 are provided with bolts 504, and the front sides of the two detachable rollers 503 on the rear side are provided with roller tightening knobs 505 for tightening the detachable rollers 503, and the supporting hanger 6 includes four hollow round steel tubes four 601, and the opposite surfaces of the front and rear two hollow round steel tubes four 601 are fixedly connected with hollow square steel tubes three 602, and the front side of the left front hollow round steel tube four 601 is provided with tightening knobs three 603 on the upper and lower sides.

[0031] Example 3

[0032] like Figure 1-10As shown, on the basis of Example 1, the utility model provides a technical solution: preferably, the slide rail mechanism 7 includes four slide rails 701, and the tops of the two slide rails 701 on the upper and lower sides are fixedly installed with drilling rig supports 702, the top of the lower drilling rig support 702 is fixedly installed with a vertical connecting rod 704, and the top of the upper drilling rig support 702 is fixedly installed with a force transmission rod 703, and the dual electric drilling rig group 8 includes two motors 801, and the outer walls of the two motors 801 are fixedly connected with two fixing belts 802.

[0033] In this embodiment, the entire double electric drilling unit 8 is driven to move left and right by the movement of the force transmission rod 703 , thereby realizing a double-row drilling operation on the guardrail 1 .

[0034] Example 4

[0035] like Figure 1-10 As shown, based on Example 1, the utility model provides a technical solution: the guardrail mobile drilling special equipment includes the following steps:

[0036] Step 1: bury the angle steel bracket 10 of the bridge pipeline in the guardrail 1, and first drill a hole in the guardrail 1; the angle steel bracket 10 is drilled by a special movable drilling device;

[0037] Step 2: Weld the roller 205 to the hanger 2 of the motor control box, and make the roller 205 close to the guardrail 1;

[0038] Step 3: Weld the electric box 3 for controlling the drilling rig switch to the hanger 2, so that the electric box 3 and the hanger 2 form a whole when moving;

[0039] Step 4: Install the double roller set 403 onto the hollow square steel pipe 2 402 of the double roller set bracket 4 through the reserved hole;

[0040] Step 5: Install the detachable roller 503 on the vertical hollow round steel pipe 502, and freely disassemble and assemble it through the roller fastening knob 505; and make the detachable roller 503 close to the outer side of the guardrail 1;

[0041] Step 6: Weld four hollow round steel pipes 601 and eight hollow square steel pipes 602 into an integral support hanger 6 to support the weight of the double electric drill set 8, the drill support 702 and the slide rail 701;

[0042] Step 7: Weld the drilling rig support 702 together through the vertical connecting rod 704 to ensure that the upper and lower motors can move left and right at the same time, weld the force transmission rod 703 to the drilling rig support 702, and then weld the whole to the slidable part of the slide rail 701;

[0043] Step 8: Fix the motor 801 of the dual electric drill set 8 to the drill support 702 via the fixing belt 802;

[0044] Step 9: Use the transverse connecting rod 9 to pass through the hollow round steel pipe 1 201, the hollow round steel pipe 3 401, and the transverse hollow round steel pipe 501, and connect them in series into a whole, and fix them in a suitable connection position by tightening the knob 1 204, the tightening knob 2 404, and the bolt 504, so that this special device can roll along the top surface of the guardrail 1;

[0045] After the above-mentioned special drilling equipment is installed and placed on the guardrail 1 and the drilling position is accurately located, the power is turned on. After the operator applies a horizontal force to the force transmission rod 703, the dual electric drill unit 8 is driven to drill a hole on the side of the guardrail 1. After the hole is formed, the operator can easily push the entire special drilling equipment to the next hole position. In this way, the drilling operation on the outside of the entire bridge guardrail can be completed by repeating the cycle.

[0046] The following is a detailed description of the working principle of the guardrail mobile drilling equipment.

[0047] like Figure 1-10As shown, the angle steel bracket 10 for burying the bridge pipeline in the guardrail 1 should first be drilled in the guardrail 1; the angle steel bracket 10 is drilled by a special movable drilling device, and the roller 205 is welded to the hanger 2 of the motor control box, and the roller 205 can be close to the guardrail 1, and the electric box 3 for controlling the drilling rig switch is welded to the hanger 2. When moving, the electric box 3 and the hanger 2 form a whole, and then the double roller group 403 is installed to the double roller group through the reserved hole. The detachable roller 503 is mounted on the hollow square steel pipe 2 402 of the bracket 4, and then the detachable roller 503 is installed on the vertical hollow round steel pipe 502, and the roller tightening knob 505 can be used to realize free disassembly and assembly; and the detachable roller 503 is close to the outside of the guardrail 1, and then the four hollow round steel pipes 4 601 and the eight hollow square steel pipes 3 602 are welded into an integral support hanger 6; support the weight of the double electric drilling rig group 8 and the drilling rig bracket 702 and the slide rail 701, and the drilling rig bracket 702 is passed through The vertical connecting rods 704 are welded together to ensure that the upper and lower motors can move left and right at the same time. The force transmission rod 703 is also welded to the drilling rig bracket 702, and then the whole is welded to the slidable part of the slide rail 701, and the motor 801 of the dual electric drilling rig group 8 is fixed to the drilling rig bracket 702 through the fixing belt 802, and finally the transverse connecting rod 9 is passed through the hollow round steel pipe 1 201, the hollow round steel pipe 3 401, and the transverse hollow round steel pipe 501, and connected in series to form a whole, and it is fixed in the appropriate connection position by tightening the knob 1 204, the tightening knob 2 404, and the bolt 504, and this special equipment can be rolled along the top surface of the guardrail 1. After the operator applies a horizontal force to the force transmission rod 703, the dual electric drilling rig group 8 is driven to drill a hole in the side of the guardrail 1. After the hole is formed, the operator can easily push the entire drilling special equipment to the next hole position. In this cycle, the drilling operation on the outside of the entire bridge guardrail can be completed.

[0048] The above generally describes the present invention in detail, but it is obvious to a person skilled in the art that some modifications or improvements can be made to the present invention. Therefore, modifications or improvements that do not depart from the spirit of the present invention are within the scope of protection of the present invention.

Claims

1. A special device for drilling with a guardrail, comprising a guardrail (1), characterized in that: A hanger (2) is clamped on the top of the guardrail (1), an electric box (3) is arranged on the rear side of the hanger (2), a double roller bracket (4) is fixedly installed on the top of the hanger (2), a load-bearing suspension rod (5) is fixedly installed on the front side of the hanger (2), two supporting hangers (6) are arranged below the load-bearing suspension rod (5), a slide rail mechanism (7) is arranged on the top of the two supporting hangers (6), a double electric drill group (8) is arranged on the top of the two slide rail mechanisms (7), a transverse connecting rod (9) is fixedly connected between the opposite surfaces of the top of the hanger (2) and the load-bearing suspension rod (5), and an angle steel bracket (10) is arranged on the front side of the guardrail (1).

2. The special equipment for drilling guardrails according to claim 1, characterized in that: The hanger (2) includes two hollow round steel tubes (201), the front and rear sides of the bottom of the two hollow round steel tubes (201) are fixedly connected with hollow round steel tubes (202), the tops of the two hollow round steel tubes (201) are provided with tightening knobs (204) for tightening the hollow round steel tubes (202), and the bottom ends of the two hollow round steel tubes (202) are provided with rollers (205).

3. The special equipment for drilling guardrails according to claim 1, characterized in that: The double roller group bracket (4) includes two hollow round steel tubes (3) (401), two hollow square steel tubes (2) (402) are fixedly installed on the opposite surfaces of the two hollow round steel tubes (3) (401), two double roller groups (403) are fixedly installed between the opposite surfaces of the two hollow square steel tubes (2) (402), and the top centers of the two hollow round steel tubes (3) (401) are each provided with a tightening knob (404).

4. The special equipment for drilling guardrails according to claim 1, characterized in that: The load-bearing hanger (5) includes two transverse hollow round steel tubes (501), two vertical hollow round steel tubes (502) are fixedly installed on the front and rear sides of the bottom of the two transverse hollow round steel tubes (501), the bottom ends of the two vertical hollow round steel tubes (502) on the rear side are provided with detachable rollers (503), the top rear sides of the two transverse hollow round steel tubes (501) are provided with bolts (504), and the front sides of the two detachable rollers (503) on the rear side are provided with roller tightening knobs (505) for tightening the detachable rollers (503).

5. The special equipment for drilling guardrails according to claim 1 is characterized by: The support hanger (6) includes four hollow round steel tubes (601), and the opposite surfaces of the front and rear two hollow round steel tubes (601) are fixedly connected with a hollow square steel tube (602), and the front sides of the hollow round steel tube (601) on the left front are provided with tightening knobs (603) on the upper and lower sides.

6. The special equipment for drilling guardrails according to claim 1, characterized in that: The slide rail mechanism (7) comprises four slide rails (701), the tops of the two slide rails (701) on the upper and lower sides are fixedly mounted with drilling rig supports (702), the top of the lower drilling rig support (702) is fixedly mounted with a vertical connecting rod (704), and the top of the upper drilling rig support (702) is fixedly mounted with a force transmission rod (703).

7. The special equipment for drilling guardrails according to claim 1, characterized in that: The dual electric drilling machine set (8) comprises two motors (801), and the outer walls of the two motors (801) are fixedly connected with two fixing belts (802).