Monorail hanging beam reinforcing structure suitable for roof crushing
By designing a reinforced structure suitable for roof crushing in a single-rail lifting beam, the anchoring depth of the sealing plug and anchor cable is used to change the direction of force, the problem of easy breaking of anchor cables due to roof crushing is solved, and the resistance to pulling and safety is improved.
Patent Information
- Application Number
- CN202420592934.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-26
- Publication Date
- 2025-04-29
- Estimated Expiration
- 2034-03-26
AI Technical Summary
During the use of downhole single-rail lifting beams, the top plate breaks causes the anchor cable to be easily broken, affecting the normal use of the crane. The support form in the original trough cannot be used to fix the single-rail lifting beam body.
A single-rail lifting beam reinforcement structure suitable for roof crushing belts is designed. By setting up a central sealing plug and an end-face sealing plug, the anchor rod of the anchor cable has a long anchoring depth, ensuring anchoring in a stable hard rock layer, changing the direction of the stress, avoiding the anchor cable breakage, and fixing the single-rail lifting beam body through a support frame and an anchor chain.
It effectively guarantees the resistance to pulling force, meets the requirements of lifting brackets, avoids breaking of anchor cables, ensures the normal use of the crane, and reduces the workload of setting up I-shaped steel sheds, improving the safety of transportation.
Smart Images

Figure CN222809146U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of monorail hanging beam reinforcement, in particular to a monorail hanging beam reinforcement structure suitable for a top plate crushing zone. Background Art
[0002] Monorail beam reinforcement is to enhance the load-bearing capacity of the monorail beam body and improve its stability and reliability. With the increase of crane usage time and frequency, the monorail beam body may suffer from fatigue deformation, cracks and other problems, and cause the connected top plate to break, thus affecting the normal use of the crane. In order to solve these problems, it is necessary to use the monorail beam reinforcement with top plate breaking belt;
[0003] When a monorail is used to lift and transport a support in the underground, the work face for withdrawing the support is used. When anchor rods are used for lifting, the anchor rods are subjected to vertical tension, and the entire cross section of the anchor rods is stressed. When anchor cables are used for lifting, the exposed length of the anchor cables affects the operation of the monorail crane. When the anchor cables and the monorail beam body are vertically suspended, only anchor links can be used. Due to uneven force, the anchor cables are easily broken. There are safety risks when transporting hydraulic supports, and the top plate of the withdrawn work face is often relatively broken. When the monorail beam body is used to transport the support, due to the limitations of the support form in the original chute and the broken top plate, it is impossible to use anchor rods or I-beams to fix the monorail beam body. Therefore, the utility model proposes a monorail beam reinforcement structure suitable for a broken top plate zone to solve the problems existing in the prior art. Utility Model Content
[0004] In view of the above problems, the utility model proposes a monorail hanging beam reinforcement structure suitable for a broken roof zone. The monorail hanging beam reinforcement structure suitable for a broken roof zone is provided with a center sealing plug, which passes through the through hole in the I-beam and is inserted into the drilled hole in the roof body. The outer cone surface is pressed against the hole wall of the drilled hole due to extrusion, which plays a role of radial sealing and fastening. An end face sealing plug is provided, which is pressed against the through hole wall in the I-beam, which plays a role of end face sealing and fastening. In the case of broken roof, the anchor rod of the anchor cable has a long anchoring depth, which can ensure the anchoring in a stable hard rock formation, and effectively ensure that the pull-out resistance meets the requirements of the lifting bracket. At the same time, the I-beam is fixed to the bottom of the roof, and the force direction is changed by the anchor cable and the I-beam, which effectively ensures that the anchor cable is not easy to break. Bolts are provided to make the monorail hanging beam body connected to the support frame through the anchor chain and the connecting seat fixedly suspended at the bottom of the anchor cable, so as to avoid affecting the operation of the monorail crane locomotive due to the exposed length of the anchor cable when the anchor cable is lifted.
[0005] To achieve the purpose of the utility model, the utility model is implemented through the following technical solutions: a monorail suspension beam reinforcement structure suitable for a top plate crushing zone, comprising a top plate body, a drilled hole is opened on the inner wall of the top plate body, an I-beam is arranged at the bottom of the top plate body, a through hole is opened on the inner wall of the I-beam, an end face sealing plug is penetrated through the inner wall of the through hole, a second inner hole is opened on the inner wall of the end face sealing plug, a center sealing plug is arranged on the top of the end face sealing plug and one end penetrates the drilled hole, a first inner hole is opened on the inner wall of the center sealing plug, an anchor cable is arranged on the inner wall of the first inner hole and penetrates the second inner hole, a tray is arranged at the bottom of the second inner hole, a lock is arranged on the outer wall of the bottom of the second inner hole, mounting plates are symmetrically arranged on both sides of the I-beam, two bolts are arranged on the inner wall of the mounting plate, and a support frame is installed at the bottom of the mounting plate.
[0006] A fixing sleeve is installed at the bottom of the support frame, an anchor chain is arranged at the bottom of the fixing sleeve, a connecting seat is installed at the bottom of the anchor chain, and a monorail hanging beam body is arranged at the bottom of the connecting seat.
[0007] A further improvement is that the central sealing plug is movably connected to the drill hole, and the central sealing plug is tightly fitted to the end face sealing plugs.
[0008] A further improvement is that the end face sealing plug is movably connected to the through hole, and the through hole is threadedly connected to the I-beam.
[0009] A further improvement is that the second inner hole and the first inner hole are connected to the anchor cable by threads, and the anchor cable is tightly fitted to the support tray.
[0010] A further improvement is that the mounting plate and the I-beam are movably connected, and the bolts, the mounting plate and the I-beam are threadedly connected.
[0011] A further improvement is that the anchor chain is fixedly connected to the fixing sleeve and the connecting seat, and the support frame is sleeve-connected to the fixing sleeve.
[0012] The beneficial effects of the utility model are as follows: the utility model provides a center sealing plug, which passes through the through hole in the I-beam and is inserted into the drilled hole in the roof body. The outer cone surface is pressed against the wall of the drilled hole due to extrusion, which plays a role of radial sealing and fastening. An end face sealing plug is provided, which is pressed against the wall of the through hole in the I-beam, which plays a role of end face sealing and fastening. In the case of broken roof, the anchor rod of the anchor cable has a long anchoring depth, which can ensure the anchoring in a stable hard rock formation, effectively ensuring that the pull-out resistance meets the requirements of the lifting bracket, and at the same time, the I-beam is fixed to the bottom of the roof. The force direction is changed by the anchor cable cooperating with the I-beam, which effectively ensures that the anchor cable is not easy to break. Bolts are provided to make the monorail hanging beam body connected to the support frame through the anchor chain and the connecting seat fixedly suspended at the bottom of the anchor cable, so as to avoid the influence of the monorail crane locomotive operation due to the exposed length of the anchor cable when the anchor cable is lifted. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 This is a schematic diagram of the front cross-sectional structure of the utility model;
[0014] Figure 2 This is a schematic diagram of the front view structure of the utility model;
[0015] Figure 3 This is a side view of the structure of the utility model;
[0016] Figure 4 This is a schematic diagram of the three-dimensional structure of the I-beam of the utility model;
[0017] Figure 5 For this utility model Figure 1 Enlarged view of point A in the middle.
[0018] In the figure: 1. top plate body; 2. drilling hole; 3. I-beam; 4. through hole; 5. anchor cable; 6. center sealing plug; 7. first inner hole; 8. end face sealing plug; 9. second inner hole; 10. with the help of pallet; 11. monorail hanging beam body; 12. lock; 13. mounting plate; 14. bolt; 15. support frame; 16. fixing sleeve; 17. anchor chain; 18. connecting seat. DETAILED DESCRIPTION
[0019] In order to deepen the understanding of the present invention, the present invention will be further described in detail below in conjunction with an embodiment. The embodiment is only used to explain the present invention and does not constitute a limitation on the protection scope of the present invention.
[0020] according to Figure 1-5As shown, this embodiment proposes a monorail beam reinforcement structure suitable for a top plate crushing zone, comprising a top plate body 1, a bore hole 2 is opened on the inner wall of the top plate body 1, an I-beam 3 is arranged at the bottom of the top plate body 1, a through hole 4 is opened on the inner wall of the I-beam 3, an end face sealing plug 8 is penetrated through the inner wall of the through hole 4, a second inner hole 9 is opened on the inner wall of the end face sealing plug 8, a center sealing plug 6 is arranged on the top of the end face sealing plug 8 and one end penetrates the bore hole 2, a first inner hole 7 is opened on the inner wall of the center sealing plug 6, an anchor cable 5 is arranged on the inner wall of the first inner hole 7 and penetrates the second inner hole 9, a tray 10 is arranged at the bottom of the second inner hole 9, a lock 12 is sleeved on the outer wall of the bottom of the second inner hole 9, mounting plates 13 are symmetrically arranged on both sides of the I-beam 3, two bolts 14 are arranged on the inner wall of the mounting plate 13, and a support frame 15 is installed at the bottom of the mounting plate 13.
[0021] A fixing sleeve 16 is installed at the bottom of the support frame 15, and an anchor chain 17 is arranged at the bottom of the fixing sleeve 16. A connecting seat 18 is installed at the bottom of the anchor chain 17, and a monorail hanging beam body 11 is arranged at the bottom of the connecting seat 18. When the device is in use, the staff puts the center sealing plug 6 connected to the end face sealing plug 8 on the anchor cable 5, and then inserts the center sealing plug 6 into the borehole 2 in the top plate body 1 through the through hole 4 in the I-beam 3. By tightening the lock 12 and using the tray 10, the anchor cable 5 is continuously pushed forward. Under the obstruction of the edge of the borehole 2, the anchor cable 5 will be greatly deformed, so that the first inner hole 7 of the center sealing plug 6 is tightly wrapped around the anchor cable 5, and the outer cone surface of the center sealing plug 6 is pressed and tightly attached to the hole wall of the borehole 2, which plays a role of radial sealing and tightening, and the rear part of the deformed end face sealing plug 8 is tightly attached to the tray 10, so that the second inner hole 9 is tightly wrapped around the anchor cable 5, so that the end The face sealing plug 8 is tightly attached to the wall of the through hole 4 in the I-beam 3, playing the role of end face sealing and tightening. Therefore, when the roof is broken, the anchor rod anchoring depth of the anchor cable 5 is relatively long, which can ensure the anchoring in the stable hard rock layer, effectively ensuring that the pull-out resistance meets the requirements of the lifting bracket, and at the same time, the I-beam 3 is fixed to the bottom of the roof body 1, so that the force direction is changed by cooperating with the I-beam 3 through the anchor cable 5, effectively ensuring that the anchor cable 5 is not easy to break, and then the mounting plate 13 connected to the support frame 15 is manually sleeved on the outer wall of the I-beam 3, and then each bolt 14 is manually inserted through the mounting plate 13 into the I-beam 3, so that the support frame 15 connected to the mounting plate 13 is fixed on the I-beam 3, so that the support frame 15 is fixedly suspended in the air at the bottom of the anchor cable 5 through the monorail hanging beam body 11 connected by the anchor chain 17 and the connecting seat 18, so as to avoid affecting the operation of the monorail crane locomotive due to the exposed length of the anchor cable 5 when the anchor cable 5 is lifted.
[0022] The center sealing plug 6 is movably connected to the borehole 2, and is tightly fitted to the end face sealing plug 8. The outer conical surface of the center sealing plug 6 is pressed tightly against the wall of the borehole 2, thereby playing a role of radial sealing and tightening.
[0023] The end face sealing plug 8 is movably connected to the through hole 4 , and the through hole 4 is threadedly connected to the I-beam 3 , by inserting the center sealing plug 6 through the through hole 4 in the I-beam 3 into the drilled hole 2 in the top plate body 1 .
[0024] The second inner hole 9 and the first inner hole 7 are threadedly connected to the anchor cable 5, and the anchor cable 5 is tightly fitted to the auxiliary tray 10. The rear part of the deformed end face sealing plug 8 is tightly attached to the auxiliary tray 10, so that the second inner hole 9 is tightly wrapped around the anchor cable 5, so that the end face sealing plug 8 is tightly attached to the wall of the through hole 4 in the I-beam 3, thereby playing the role of end face sealing and fastening.
[0025] The mounting plate 13 and the I-beam 3 are movably connected, and the bolts 14 are threadedly connected to the mounting plate 13 and the I-beam 3. The support frame 15 connected to the mounting plate 13 is fixed on the I-beam 3 by manually inserting each bolt 14 through the mounting plate 13 into the I-beam 3.
[0026] The anchor chain 17 is fixedly connected to the fixing sleeve 16 and the connecting seat 18, and the support frame 15 is sleeve-connected to the fixing sleeve 16. The monorail hanging beam body 11 connected to the support frame 15 through the anchor chain 17 and the connecting seat 18 is fixedly suspended at the bottom of the anchor cable 5 to avoid affecting the operation of the monorail crane locomotive due to the exposed length of the anchor cable 5 when the anchor cable 5 is lifted.
[0027] When the monorail suspension beam reinforcement structure suitable for roof broken zone is in use, the staff puts the center sealing plug 6 connected to the end face sealing plug 8 on the anchor cable 5, and then inserts the center sealing plug 6 into the borehole 2 in the roof body 1 through the through hole 4 in the I-beam 3, and continuously pushes the anchor cable 5 forward by tightening the lock 12 and using the tray 10. Under the obstruction of the edge of the borehole 2, the anchor cable 5 will be greatly deformed, so that the first inner hole 7 of the center sealing plug 6 is tightly wrapped around the anchor cable 5, and the outer cone surface of the center sealing plug 6 is pressed against the hole wall of the borehole 2 due to extrusion, which plays a role of radial sealing and fastening, and the rear part of the deformed end face sealing plug 8 is tightly attached to the tray 10, so that the second inner hole 9 is tightly wrapped around the anchor cable 5, so that the end face sealing plug 8 is tightly attached to the wall of the through hole 4 in the I-beam 3, which plays a role of end face sealing and fastening, so that in the case of roof broken, the anchor rod anchoring depth of the anchor cable 5 is long, which can ensure The anchoring in the stable hard rock formation effectively ensures that the pull-out resistance meets the requirements of the lifting bracket, and at the same time fixes the I-beam 3 to the bottom of the top plate body 1, so that the force direction is changed by the anchor cable 5 and the I-beam 3, which effectively ensures that the anchor cable 5 is not easy to break. Then the mounting plate 13 connected to the support frame 15 is manually sleeved on the outer wall of the I-beam 3, and the bolts 14 are manually inserted through the mounting plate 13 into the I-beam 3, so that the support frame 15 connected to the mounting plate 13 is fixed on the I-beam 3, so that the support frame 15 is fixedly suspended at the bottom of the anchor cable 5 through the monorail hanging beam body 11 connected by the anchor chain 17 and the connecting seat 18, so as to avoid the influence of the monorail crane locomotive operation due to the exposed length of the anchor cable 5 when the anchor cable 5 is lifted. The anchor cable 5 of at least two meters anchored in the hard rock formation is used to cooperate with the I-beam 3 to suspend the monorail hanging beam body 11, which not only reduces the workload of erecting the I-beam shed, but also ensures the safety of transportation.
[0028] The above shows and describes the basic principles, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principles of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.
Claims
1. A monorail beam reinforcement structure suitable for roof crushing zone, characterized by: The invention comprises a top plate body (1), the inner wall of the top plate body (1) is provided with a drill hole (2), the bottom of the top plate body (1) is provided with an I-beam (3), the inner wall of the I-beam (3) is provided with a through hole (4), the inner wall of the through hole (4) is penetrated by an end face sealing plug (8), the inner wall of the end face sealing plug (8) is provided with a second inner hole (9), the top of the end face sealing plug (8) is provided with a center sealing plug (6) and one end of the center sealing plug (6) penetrates the drill hole (2), and the center sealing plug (6) The inner wall of the first inner hole (7) is provided with a first inner hole (7), the inner wall of the first inner hole (7) is provided with an anchor cable (5) and passes through the second inner hole (9), the bottom of the second inner hole (9) is provided with a tray (10), the outer wall of the bottom of the second inner hole (9) is sleeved with a lock (12), the two sides of the I-beam (3) are symmetrically provided with mounting plates (13), the inner wall of the mounting plate (13) is provided with two bolts (14), and the bottom of the mounting plate (13) is installed with a support frame (15); A fixing sleeve (16) is installed at the bottom of the support frame (15), an anchor chain (17) is arranged at the bottom of the fixing sleeve (16), a connecting seat (18) is installed at the bottom of the anchor chain (17), and a monorail hanging beam body (11) is arranged at the bottom of the connecting seat (18).
2. A monorail beam reinforcement structure applicable to a roof crushing zone according to claim 1, characterized in that: The central sealing plug (6) and the borehole (2) are movably connected, and the central sealing plug (6) and the end face sealing plug (8) are tightly fitted.
3. The monorail beam reinforcement structure applicable to the roof crushing zone according to claim 1 is characterized in that: The end face sealing plug (8) and the through hole (4) are movably connected, and the through hole (4) and the I-beam (3) are threadedly connected.
4. The monorail beam reinforcement structure applicable to the roof crushing zone according to claim 1 is characterized in that: The second inner hole (9) and the first inner hole (7) are threadedly connected to the anchor cable (5), and the anchor cable (5) is tightly fitted to the support tray (10).
5. The monorail beam reinforcement structure applicable to the roof crushing zone according to claim 1 is characterized in that: The mounting plate (13) and the I-beam (3) are movably connected, and the bolts (14) and the mounting plate (13) and the I-beam (3) are threadedly connected.
6. The monorail beam reinforcement structure applicable to the roof crushing zone according to claim 1 is characterized in that: The anchor chain (17) is fixedly connected to the fixing sleeve (16) and the connecting seat (18), and the support frame (15) is sleeve-connected to the fixing sleeve (16).