By setting up the main keel and the secondary keel in the building, and using the coordination of the clamping joints and the slots, the installation of the hanging point-free mineral wool board is achieved, solving the problems of low space occupation and efficiency in the traditional method, and improving the construction quality and efficiency.

CN222893842UActive Publication Date: 2025-05-23CHINA METALLURGICAL CONSTR ENG GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421851070.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2025-05-23
Estimated Expiration
2034-08-01

AI Technical Summary

Technical Problem

The traditional mineral wool board installation method requires occupancy of a large amount of ceiling space, resulting in low installation efficiency, high single square cost, and safety hazards.

Method used

The installation structure of the mineral wool board is adopted. The main keel and secondary keel are set on the wall, and the combination of the clamping part and the slot is used to fix the mineral wool board to reduce the construction and space occupation of the keel.

Benefits of technology

Save ceiling space, reduce keel construction and single square construction cost, improve the quality and efficiency of construction, and reduce safety hazards.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222893842U_ABST
    Figure CN222893842U_ABST
Patent Text Reader

Abstract

The utility model discloses a hanging-point-free mineral wool board installation structure, which relates to the technical field of building construction, and comprises a main keel fixed on a wall edge and an auxiliary keel used for installing a mineral wool board, the main keel is provided with a clamping part, two ends of the auxiliary keel are provided with clamping grooves used for being clamped on the clamping part, and the main keel and the auxiliary keel are integrally formed. The mineral wool board is fixed at the bottom end of the auxiliary keel; compared with a traditional method, the ceiling space can be saved, keel construction is reduced, the construction cost per square meter is reduced, and the quality and efficiency of building construction are ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to an installation structure for a mineral wool board without hanging points. Background Art

[0002] The traditional installation method of mineral wool board usually requires galvanized steel hangers to fix the main and secondary keels. If there are pipelines, a steel frame transfer layer needs to be set up, which takes up more space for the ceiling base. Therefore, the traditional installation method requires more time, manpower and a higher unit square cost, resulting in low installation efficiency, the ceiling height cannot meet the design requirements, the installation is incorrect or not firm, or the overall ceiling is blown up due to negative pressure, posing a safety hazard. Summary of the invention

[0003] In view of this, the purpose of the utility model is to provide a mineral wool board installation structure without hanging points.

[0004] The utility model provides a structure for installing a mineral wool board without hanging points, which adopts the following technical solutions:

[0005] A mineral wool board installation structure without hanging points comprises a main keel fixed on the wall and a secondary keel for installing the mineral wool board, wherein the main keel is provided with a clamping part, and both ends of the secondary keel are provided with clamping grooves clamped on the clamping part, and the mineral wool board is fixed to the bottom end of the secondary keel.

[0006] Furthermore, the clamping portion includes a support plate arranged on the top of the main keel and extending in the horizontal direction and a baffle plate arranged at the end of the support plate in the vertical direction, and the baffle plate is inserted into the clamping slot.

[0007] Furthermore, a clamping plate is bent at the bottom of the secondary keel, and a clamping groove for inserting the clamping plate is provided on the mineral wool board.

[0008] Furthermore, the middle portion of the secondary keel is curved.

[0009] Furthermore, the bottom of the main keel extends horizontally to form an anti-slip plate, and the anti-slip plate is located below the mineral wool board.

[0010] In summary, the utility model has at least one of the following beneficial effects: compared with the traditional method, it can save ceiling space, reduce keel construction, reduce the cost per square meter, and ensure the quality and efficiency of building construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a schematic diagram of the use of an embodiment of the utility model;

[0012] Figure 2 This is a schematic diagram of the installation of the secondary keel and mineral wool board according to an embodiment of the utility model.

[0013] Description of reference numerals:

[0014] 1. Main keel; 11. Clamping part; 111. Support plate; 112. Baffle; 2. Mineral wool board; 21. Clamping groove; 3. Secondary keel; 31. Clamping groove; 32. Clamping plate. DETAILED DESCRIPTION

[0015] The following is an explanation of the implementation of the present invention through specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific implementations, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention.

[0016] The following is combined with Figure 1-2 The utility model is described in further detail.

[0017] The utility model embodiment discloses a mineral wool board installation structure without hanging points. Figure 1-Figure 2 The installation structure of the mineral wool board without hanging points includes a main keel 1 fixed on the wall and a secondary keel 3 for installing the mineral wool board 2. The main keel 1 is provided with a clamping portion 11, and both ends of the secondary keel 3 are provided with clamping grooves 31 clamped on the clamping portion 11. The mineral wool board 2 is fixed to the bottom end of the secondary keel 3. By matching the clamping grooves 31 at both ends of the secondary keel 3 with the clamping portions 11 of the main keels 1 on the walls on both sides, the two ends of the secondary keel 3 are fixed to the walls on both sides. When the mineral wool board 2 is installed on the secondary keel 3, the ceiling space can be saved, the keel construction can be reduced, the unit square cost can be reduced, and the quality and efficiency of the construction can be ensured.

[0018] In this embodiment, the clamping portion 11 includes a support plate 111 arranged on the top of the main keel 1 and extending in the horizontal direction, and a baffle 112 arranged vertically at the end of the support plate 111. The baffle 112 is inserted into the clamping slot 31, and a side groove wall of the clamping slot 31 of the secondary keel 3 abuts against the support plate 111. The baffle 112 is inserted into the clamping slot 31 to limit the secondary keel 3 and install the secondary keel 3 on the main keel 1.

[0019] In this embodiment, a clamping plate 32 is bent at the bottom of the secondary keel 3, and a clamping groove 21 for inserting the clamping plate 32 is provided on the mineral wool board 2. The clamping plate 32 is arranged in a horizontal direction and can be inserted into the clamping groove 21 to install the mineral wool board 2 on the secondary keel 3.

[0020] In this embodiment, the middle portion of the secondary keel 3 is bent, which can increase the overall strength of the secondary keel 3 .

[0021] In this embodiment, the bottom of the main keel 1 extends horizontally to form an anti-drop plate 12, and the anti-drop plate 12 is located below the mineral wool board 2. The anti-drop plate 12 can protect the mineral wool board 2, preventing the mineral wool board 2 from falling off the secondary keel 3 and falling on the anti-drop plate 12, and preventing the mineral wool board 2 from falling directly to the ground after falling off the secondary keel 3.

[0022] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Although the utility model has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the technical solution of the utility model can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the utility model, which should be included in the scope of the claims of the utility model.

Claims

1. A mineral wool board installation structure without hanging points, characterized in that: The invention comprises a main keel (1) fixed on the wall and a secondary keel (3) for installing a mineral wool board (2), wherein the main keel (1) is provided with a clamping portion (11), and both ends of the secondary keel (3) are provided with clamping grooves (31) for clamping on the clamping portion (11), and the mineral wool board (2) is fixed to the bottom end of the secondary keel (3).

2. The installation structure of mineral wool board without hanging points according to claim 1 is characterized in that: The clamping portion (11) comprises a support plate (111) arranged on the top of the main keel (1) and extending in the horizontal direction, and a baffle plate (112) arranged vertically at the end of the support plate (111), and the baffle plate (112) is inserted into the clamping slot (31).

3. The installation structure of mineral wool board without hanging points according to claim 1 is characterized in that: A clamping plate (32) is bent at the bottom of the secondary keel (3), and a clamping groove (21) for inserting the clamping plate (32) is provided on the mineral wool board (2).

4. The installation structure of mineral wool board without hanging points according to claim 3 is characterized in that: The middle part of the secondary keel (3) is arranged in a curved shape.

5. The installation structure of mineral wool board without hanging points according to claim 1 is characterized in that: The bottom of the main keel (1) extends horizontally to form an anti-slip plate (12), and the anti-slip plate (12) is located below the mineral wool board (2).