Temporary pipe material support for construction site

By designing an adjustable temporary pipe material bracket, the difficulty of assembly, disassembly and transfer of pipeline storage devices on the construction site in the prior art, as well as the inability to stably place pipes of different diameters, is solved, and the stable storage and efficient management of pipelines are achieved.

CN222920516UActive Publication Date: 2025-05-30WUHAN YUCHENG QIANLI CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421595056.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-08
Publication Date
2025-05-30
Estimated Expiration
2034-07-08

AI Technical Summary

Technical Problem

The existing pipeline storage devices are difficult to quickly assemble, disassemble and transfer on construction sites, and pipes of different diameters cannot be stably placed.

Method used

A temporary pipe material bracket on the construction site is designed, using an adjustable support mechanism, including angle steel, columns, rubber plates and adjustment bolts, which can be quickly assembled and disassembled to adapt to pipes of different diameters.

Benefits of technology

It realizes stable storage of pipelines, facilitates transfer and assembly, can adapt to pipelines of different diameters, and improves pipeline management efficiency at the construction site.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222920516U_ABST
    Figure CN222920516U_ABST
Patent Text Reader

Abstract

The utility model discloses a construction site temporary pipe material support, which relates to the technical field of pipe material storage and comprises a plurality of supporting mechanisms arranged at intervals, each supporting mechanism comprises angle steel and a stand column, the angle steel is horizontally arranged and is provided with a transverse groove, a transverse adjusting bolt is arranged at the lower part of the stand column, and the transverse adjusting bolt penetrates through the transverse groove. The upright post is fixed with the angle steel; each supporting mechanism further comprises a first rubber plate and a plurality of second rubber plates, and the first rubber plate is fixedly connected to one side of the stand column. The angle steel, the stand column and the supporting plate are fixed through the vertical adjusting bolt and the transverse adjusting bolt, assembling and transferring are convenient, the position of the stand column is changed through the vertical adjusting bolt and the transverse adjusting bolt, then the position of the containing plate is adjusted through the clamping block and the clamping groove, a second rubber plate is made to support pipe materials, and assembling and transferring are convenient. And the side faces of the pipes are supported through the first rubber plates, so that the pipes with different diameters can be conveniently and stably supported.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pipe storage, in particular to a temporary pipe support for construction sites. Background Technique

[0002] Pipes are essential materials for construction projects, and commonly used ones include water supply pipes, drainage pipes, gas pipes, heating pipes, wire conduits, rainwater pipes, etc. Since the pipes are circular, when placed on the ground, they are prone to sliding, posing potential safety hazards. Especially for large cement pipes, which are heavier in mass, if they are not placed stably and slide, they are likely to cause harm to surrounding personnel and items. Currently, special pipe storage devices are generally used to facilitate the storage and management of pipes.

[0003] However, most of the existing pipe storage devices are composed of storage boxes or cabinets. At construction sites, storage boxes and cabinets are not easy to transport and assemble on-site. At the same time, most of the existing pipe storage devices can only store pipes of the same size and cannot stably place pipes of different diameters. Content of the Utility Model

[0004] The purpose of the utility model is to solve the problems in the prior art, and a temporary pipe support for construction sites is proposed, which can be quickly assembled and disassembled, is convenient for transportation, and can adjust the storage for pipes of different diameters.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] A temporary pipe support for construction sites includes a plurality of support mechanisms arranged at intervals. Each support mechanism includes an angle steel and a column. The angle steel is horizontally arranged and provided with a transverse groove. A transverse adjustment bolt is provided at the lower part of the column, and the transverse adjustment bolt penetrates the transverse groove to fix the column to the angle steel;

[0007] Each support mechanism further includes a first rubber plate and a plurality of second rubber plates. The first rubber plate is fixedly connected to one side of the column, and the second rubber plates are arranged at intervals on the top of the angle steel. The first rubber plate and the second rubber plates are used to support the pipe materials;

[0008] A placement plate is provided at the bottom of each second rubber plate. A plurality of blocks are fixedly connected to the bottom of the placement plate at equal intervals, and a plurality of slots are provided at equal intervals on the top of the angle steel. Each block is adapted to one slot.

[0009] Further, two angle steels are provided in each support mechanism, and the two angle steels are arranged in parallel. The column is vertically arranged between the two angle steels.

[0010] Further, a limiting block is fixedly connected to the bottom of the placement plate. The limiting block is located between the two angle steels and is in contact with the two angle steels on both sides.

[0011] Furthermore, an opening is provided on one side of the column. The lower end of the first rubber plate is provided with an insertion portion that can be inserted into the opening. The upper portion of the first rubber plate is provided with fixing bolts for fixing the first rubber plate to the column.

[0012] Furthermore, each support mechanism further includes a support plate. A vertical groove is formed in the upper part of the column. The lower end of the support plate is fixed to the angle steel, and the upper end is provided with a vertical adjustment bolt that penetrates the vertical groove to fix the upper part of the column to the angle steel.

[0013] Furthermore, two support plates are provided in each support mechanism, and the two support plates are respectively located on both sides of the column.

[0014] Furthermore, a cushion plate is provided between the support plate and the column. The vertical adjustment bolt penetrates the cushion plate, and a rubber pad is provided on the side of the cushion plate close to the column.

[0015] Furthermore, the angle steels of each support mechanism are arranged in parallel, and each angle steel is provided with a fixing hole. An expansion bolt is arranged in the fixing hole for fixing each angle steel to the ground.

[0016] Furthermore, the top surfaces of the second rubber plates are inclined, and the height of the top surface on the side close to the first rubber plate is lower than that on the other side.

[0017] Furthermore, the top surfaces of the second rubber plates are concave arc-shaped.

[0018] The beneficial effects of the present utility model are as follows:

[0019] In the present utility model, the temporary pipe and material support at the construction site fixes the angle steel, column and support plate through the vertical adjustment bolt and the horizontal adjustment bolt. The support is convenient to assemble, and is convenient for temporary installation, disassembly and transportation at the construction site. Each second rubber plate supports one pipe material, and cooperates with the first rubber plate to support the side of the pipe material, realizing the stable storage of all pipe materials;

[0020] When it is necessary to store pipe materials with other diameters, loosen the vertical adjustment bolt and the horizontal adjustment bolt, then the position of the column can be changed. Then, insert the block into different card slots, so as to conveniently adjust the position of the placement plate, so that after each second rubber plate supports one pipe material, the pipe materials are mutually attached, and the sides of the pipe materials are supported by the first rubber plate, which is convenient for stably supporting pipe materials with different diameters. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 is a schematic three-dimensional structure diagram of a temporary pipe and material support at the construction site proposed by the present utility model;

[0022] Figure 2Schematic three-dimensional structure diagram of a support mechanism of a temporary pipe and material support at a construction site proposed by the present utility model;

[0023] Figure 3 Schematic sectional structure diagram of a temporary pipe and material support at a construction site proposed by the present utility model;

[0024] Figure 4 Schematic top view sectional view of a vertical adjusting bolt and a backing plate of a temporary pipe and material support at a construction site proposed by the present utility model.

[0025] In the figure: 1 angle steel, 101 card slot, 102 transverse slot, 2 support plate, 201 vertical adjusting bolt, 3 backing plate, 301 rubber pad, 4 column, 401 vertical slot, 5 first rubber plate, 501 insertion part, 6 placing plate, 601 clamping block, 602 limiting block, 7 second rubber plate, 8 transverse adjusting bolt, 9 pipe material. Specific embodiments

[0026] The technical solutions of this patent will be further described in detail below in conjunction with specific embodiments.

[0027] The embodiments of this patent are described in detail below. The examples of the embodiments are shown in the drawings, where the same or similar reference numerals indicate the same or similar elements or elements with the same or similar functions from beginning to end. The embodiments described below by referring to the drawings are exemplary and are only used to explain this patent and should not be construed as a limitation of this patent.

[0028] In the description of this patent, it should be understood that the orientation or positional relationship indicated by the terms "center", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing this patent and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this patent.

[0029] In the description of this patent, it should be noted that unless otherwise clearly specified and defined, the terms "installation", "connection", "connection", "setting" should be understood in a broad sense. For example, it can be fixedly connected and set, or detachably connected and set, or integrally connected and set. For those of ordinary skill in the art, the specific meanings of the above terms in this patent can be understood according to specific situations.

[0030] Refer to Figures 1-4 , a temporary pipe and material support at a construction site, which is applied to the temporary storage of pipe materials at a construction site. For the convenience of installation, disassembly and transportation of the support, and at the same time, it is convenient to stably place pipe materials with different diameters.

[0031] The temporary pipe and material support at the construction site includes multiple support mechanisms, which are arranged at intervals. According to the length of the pipe material 9, multiple support mechanisms can be set to stably support and place the pipe material 9.

[0032] Each of the support mechanisms includes two angle steels 1, two support plates 2, a column 4, a first rubber plate 5, and multiple second rubber plates 7;

[0033] The two angle steels 1 are horizontally and parallelly arranged. Fixed holes are provided on the angle steels 1, and expansion bolts are provided in the fixed holes for fixing each angle steel 1 on the concrete ground. The column 4 is vertically arranged between the two angle steels 1. The angle steel 1 is provided with a transverse groove 102. A transverse adjustment bolt 8 is provided at the lower part of the column 4. The transverse adjustment bolt 8 penetrates through the transverse groove 102. The column 4 can be adjusted horizontally between the two angle steels 1 according to the diameter of the pipe material 9 to be placed. After the position of the column 4 is determined, the transverse adjustment bolt 8 can be screwed to fix the lower part of the column 4 to the angle steel 1. A vertical groove 401 is provided at the upper part of the column 4. The lower end of the support plate 2 is fixed to the angle steel 1, and a vertical adjustment bolt 201 is provided at the upper end. The vertical adjustment bolt 201 penetrates through the vertical groove 401. After the position of the column 4 is determined, the vertical adjustment bolt 201 can be screwed to fix the upper part of the column 4 to the angle steel 1 through the support plate 2 in a hollow manner, thereby completing the reinforcement and fixation of the column 4. After the pipe material 9 is placed on the support mechanism, the bottom is supported by the second rubber plate 7 on the angle steel 1, and the side is supported by the first rubber plate 5 on the column 4. Since the position of the column 4 can be adjusted, it is convenient for the first rubber plate 5 on the column 4 to always stably support the pipe material 9 with different diameters.

[0034] In addition, in order to improve the stability of the fixation of the column 4, a cushion plate 3 is provided between the support plate 2 and the column 4. The vertical adjustment bolt 201 penetrates through the cushion plate 3. A rubber pad 301 is provided on one side of the cushion plate 3 close to the column 4. The cushion plate 3 is padded between the support plate 2 and the column 4, thereby improving the stability of the connection between the support plate 2 and the column 4. At the same time, the rubber pad 301 increases the friction force to prevent the top of the support plate 2 from sliding on the column 4.

[0035] An opening is provided on one side of the column 4. The lower end of the first rubber plate 5 is provided with an insertion part 501. The insertion part 501 can be inserted into the opening. A fixing bolt is provided at the upper part of the first rubber plate 5 for fixing the first rubber plate 5 to the column 4. When installing the first rubber plate 5, the lower part of the first rubber plate 5 can be first inserted into the opening through the insertion part 501 for fixation, and then the upper part of the first rubber plate 5 can be fixed to the column 4 through the fixing bolt, so that the first rubber plate 5 is fixed on one side of the column 4, which is convenient for the first rubber plate 5 to support one side of the pipe material 9 and prevent the pipe material 9 from being knocked and damaged.

[0036] A placing plate 6 is provided at the bottom of each second rubber plate 7. A plurality of clamping blocks 601 are fixedly connected to the bottom of the placing plate 6 at equal intervals. A plurality of clamping grooves 101 are provided at equal intervals on the top of the two angle steels 1. Each clamping block 601 is adapted to a clamping groove 101. After the angle steels 1, the support plates 2 and the columns 4 are fixed, the placing plates 6 can be arranged at intervals on the angle steels 1. The clamping blocks 601 are inserted into the clamping grooves 101 for cooperation, so that the placing plates 6 cannot move on the angle steels 1, facilitating the support of the pipe materials 9. At the same time, by inserting the clamping blocks 601 into different internal clamping grooves 101, the positions of the placing plates 6 can be changed, so as to facilitate the stable support of the pipe materials 9 with different diameters. And a limiting block 602 is fixedly connected to the bottom of the placing plate 6. The limiting block 602 is located between the two angle steels 1. After the placing plate 6 is placed on the angle steel 1, both sides of the limiting block 601 are in contact with the two angle steels 1, thus preventing the placing plate 6 from shifting and improving the stability of the placement of the pipe material 9. The top surface of the second rubber plate 7 is inclined or concave arc-shaped. When it is inclined, the top surface height of the second rubber plate 7 on the side close to the first rubber plate 5 is lower than that of the other side. Therefore, when the pipe material 9 is placed on the inclined second rubber plate 7, the pipe material 9 is stressed towards the first rubber plate 5. When it is concave arc-shaped, the pipe material 9 is located within the concave arc, thus preventing the pipe material 9 from rolling and improving the stability of the storage of the pipe material 9.

[0037] The working principle of this temporary pipe material support at the construction site: When assembling and using, first fix the two angle steels 1 on the concrete ground through expansion bolts. Then insert the lower part of the column 4 between the two angle steels 1 and adjust the position of the column 4 according to the diameter of the pipe material 9. After the position adjustment is determined, turn the horizontal adjustment bolt 8 to fix the lower part of the column 4 to the angle steel 1. Then fix the lower part of the support plate 2 on the angle steel 1, and fix the upper part of the support plate 2 to the column 4 through the vertical adjustment bolt 201, so that the upper part of the column 4 and the angle steel 1 are fixed through the support plate 2, completing the reinforcement and fixation of the column 4. Then insert the lower part of the first rubber plate 5 into the opening through the insertion part 501 for fixation, and then fix the upper part of the first rubber plate 5 to the column 4 through the fixing bolt, so that the first rubber plate 5 is fixed on the column 4. Finally, arrange the placing plates 6 at intervals on the angle steels 1 in sequence. The clamping blocks 601 are inserted into the clamping grooves 101 for cooperation, so that the placing plates 6 cannot move on the angle steels 1. Thus, a pipe material 9 can be placed on each second rubber plate 7, and the side of the pipe material 9 is supported and placed in cooperation with the first rubber plate 5, realizing the stable storage of all the pipe materials 9;

[0038] When it is necessary to store the pipe materials 9 with other diameters, first loosen the vertical adjustment bolt 201 and the horizontal adjustment bolt 8, so that the column 4 can adjust its position according to the diameter of the pipe material 9. When the column 4 moves, the vertical adjustment bolt 201 will move vertically inside the vertical groove 401, and the horizontal adjustment bolt 8 will move horizontally inside the horizontal groove 102, thus facilitating the change of the position of the column 4. After the position of the column 4 is determined, tighten the vertical adjustment bolt 201 and the horizontal adjustment bolt 8 again to fix the column 4. Subsequently, adjust the position of each placement plate 6 according to the diameter of the pipe material 9. The position of the placement plate 6 is adjusted by inserting the clamping block 601 into different card slots 101 for cooperation, so that after each pipe material 9 is supported by the second rubber plate 7 on a placement plate 6, the various pipe materials 9 are stored in contact with each other, which is convenient for stably supporting the pipe materials 9 with different diameters.

[0039] The above is only the preferred specific implementation manner of the present utility model, but the protection scope of the present utility model is not limited thereto. Any person skilled in the art within the technical scope disclosed by the present utility model, according to the technical solution of the present utility model and its inventive concept, makes equivalent substitutions or changes, and should be covered within the protection scope of the present utility model.

Claims

1. A temporary pipe support at a construction site, characterized in that: It comprises a plurality of support mechanisms arranged at intervals, each of the support mechanisms comprises an angle steel (1) and a column (4), the angle steel (1) is arranged horizontally and is provided with a transverse groove (102), a transverse adjustment bolt (8) is provided at the lower part of the column (4), and the transverse adjustment bolt (8) passes through the transverse groove (102) so as to fix the column (4) and the angle steel (1); Each of the supporting mechanisms further comprises a first rubber plate (5) and a plurality of second rubber plates (7), wherein the first rubber plate (5) is fixedly connected to one side of the column (4), and the second rubber plates (7) are arranged at intervals on the top of the angle steel (1), and the first rubber plate (5) and the second rubber plate (7) are used to support the pipe material (9); A placement plate (6) is provided at the bottom of each of the second rubber plates (7), a plurality of clamping blocks (601) are fixedly connected at equal intervals to the bottom of the placement plate (6), a plurality of clamping slots (101) are provided at equal intervals on the top of the angle steel (1), and each clamping block (601) is adapted to fit one of the clamping slots (101).

2. A temporary pipe support for construction sites according to claim 1, characterized in that: The angle steels (1) are arranged in two in each of the supporting mechanisms, and the two angle steels (1) are arranged in parallel, and the column (4) is arranged vertically between the two angle steels (1).

3. A temporary pipe support for construction sites according to claim 2, characterized in that: The bottom of the placement plate (6) is fixedly connected to a limiting block (602), and the limiting block (602) is located between the two angle steels (1), and the two sides thereof are in contact with the two angle steels (1).

4. A temporary pipe support at a construction site according to claim 1, characterized in that: An opening is provided on one side of the column (4); an insertion portion (501) is provided at the lower end of the first rubber sheet (5), and the insertion portion (501) can be inserted into the opening; a fixing bolt is provided on the upper part of the first rubber sheet (5) for fixing the first rubber sheet (5) to the column (4).

5. A temporary pipe support at a construction site according to claim 1, characterized in that: Each of the supporting mechanisms further comprises a supporting plate (2), a vertical groove (401) is provided on the upper part of the column (4), the lower end of the supporting plate (2) is fixed to the angle steel (1), and a vertical adjustment bolt (201) is provided on the upper end, and the vertical adjustment bolt (201) passes through the vertical groove (401) so that the upper part of the column (4) is fixed to the angle steel (1).

6. A temporary pipe support at a construction site according to claim 5, characterized in that: The number of support plates (2) in each support mechanism is two, and the two support plates (2) are respectively located on two sides of the column (4).

7. A temporary pipe support at a construction site according to claim 5, characterized in that: A pad (3) is provided between the support plate (2) and the column (4), the vertical adjustment bolt (201) passes through the pad (3), and a rubber pad (301) is provided on one side of the pad (3) close to the column (4).

8. A temporary pipe support at a construction site according to claim 1, characterized in that: The angle steels (1) of each supporting mechanism are arranged in parallel, and each angle steel (1) is provided with a fixing hole, in which an expansion bolt is provided for fixing each angle steel (1) on the ground.

9. A temporary pipe support at a construction site according to claim 1, characterized in that: The top surface of each second rubber plate (7) is inclined, and the top surface on one side close to the first rubber plate (5) is lower than the top surface on the other side.

10. A temporary pipe support at a construction site according to claim 1, characterized in that: The top surface of each of the second rubber plates (7) is in a concave arc shape.