Temperature and pressure meter connector
By designing the thermometer connector and using multiple sets of sealing rings to control the flow of media, the problem of media outlet during replacement or maintenance in the working state of the equipment is solved, and safe and efficient operation is achieved.
Patent Information
- Application Number
- CN202421932999.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2025-05-30
- Estimated Expiration
- 2034-08-09
AI Technical Summary
When the thermometer is replaced or repaired, the equipment is in a working state and cannot be shut down, resulting in the working medium being easily sprayed out, affecting the working environment or burning the staff.
A thermometer connector is designed, including an outer shell and an inner shell, and a number of sealing rings are arranged inside, including a first sealing ring, a second sealing ring and a third sealing ring. The medium flow passage is controlled through these sealing rings to ensure that the medium is not allowed to flow out during replacement or maintenance.
It realizes the replacement and maintenance of the thermometer in the working state of the heating equipment, avoiding the outflow of medium, and improving work efficiency and operation safety.
Smart Images

Figure CN222925139U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pipeline connectors, and particularly relates to a temperature and pressure gauge connector. Background Art
[0002] The temperature and pressure gauge used in the heating pipeline of a household boiler and the water heater equipment is a device for monitoring the temperature and pressure of a working medium (such as water or other fluids), which can help users monitor and maintain the operation status of the equipment, and ensure the safe and efficient operation of the heating or hot water system.
[0003] After the temperature and pressure gauge is installed and used for a period of time, it needs to be overhauled again or a new temperature and pressure gauge needs to be replaced. However, when the measured pipeline and equipment are in a working state, they cannot be directly shut down or closed. Therefore, when replacing the temperature and pressure gauge, it needs to be replaced or overhauled while on standby. At this time, the working medium in the equipment is likely to spray out, affecting the working environment or scalding the staff. Content of the Utility Model
[0004] The purpose of the utility model is: to solve the above problems, the utility model provides a temperature and pressure gauge connector.
[0005] The utility model specifically adopts the following technical solutions to achieve the above purpose, including:
[0006] A connector, which is installed on one side of the heating pipeline and is used to connect the heating pipeline and the temperature and pressure gauge;
[0007] The connector includes an outer shell and an inner shell. A plurality of groups of sealing rings are arranged inside the connector. The sealing rings include a first sealing ring, a second sealing ring and a third sealing ring, and the sealing rings are used to control the medium flow channel.
[0008] As a further description of the above technical solution, a slope part is arranged at the bottom of the outer shell, and the slope part is used to extrude the first sealing ring.
[0009] As a further description of the above technical solution, a first accommodating part is arranged in the middle of the outer shell, and the accommodating part is used to accommodate a spring.
[0010] As a further description of the above technical solution, a first groove part is arranged at the bottom of the inner shell, and the first sealing ring is arranged in the first groove part.
[0011] As a further description of the above technical solution, a second groove part is arranged in the middle of the inner shell, and the second sealing ring is arranged in the second groove part.
[0012] As a further description of the above technical solution, a second accommodating part is arranged at the top of the inner shell, and the third sealing ring is arranged in the second accommodating part.
[0013] As a further description of the above technical solution, the second sealing ring is arranged between the first sealing ring and the third sealing ring.
[0014] As a further description of the above technical solution, the inner diameter of the second sealing ring is larger than that of the first sealing ring and the third sealing ring.
[0015] As a further description of the above technical solution, the wire diameter of the third sealing ring is larger than that of the first sealing ring and the second sealing ring.
[0016] As a further description of the above technical solution, a spring is arranged between the first sealing ring and the second sealing ring.
[0017] The beneficial effects of the present utility model are as follows:
[0018] In the present utility model, multiple groups of sealing rings are arranged inside the connector. Before installing the temperature and pressure gauge, sealing is carried out through the sealing ring at the bottom. After installing the temperature and pressure gauge, sealing is carried out through the sealing rings in the middle and at the top, preventing the medium from flowing out. When the heating equipment is in the working state, the instrument can also be replaced and repaired without stopping the machine for operation.
[0019] To more clearly elaborate on the structural features and functions of the present utility model, the present utility model will be described in detail below in conjunction with the accompanying drawings and specific embodiments. Description of the Drawings
[0020] Figure 1 is a schematic structural diagram of the temperature and pressure gauge connector of the present utility model;
[0021] Figure 2 is a schematic diagram of the medium flow after installing the connector;
[0022] Figure 3 is a schematic diagram of the medium flow after installing the temperature and pressure gauge.
[0023] Reference Signs:
[0024] 1. Connector; 11. Outer housing; 111. Slope portion; 112. First accommodation portion; 12. Inner housing; 121. First groove portion; 122. Second groove portion; 123. Second accommodation portion; 13. Sealing ring; 131. First sealing ring; 132. Second sealing ring; 133. Third sealing ring; 14. Spring; 2. Heating pipeline; 3. Temperature and pressure gauge. Detailed Embodiments
[0025] To make the objectives, technical solutions, and advantages of the embodiments of the present utility model clearer, the technical solutions in the embodiments of the present utility model will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present utility model.
[0026] As Figures 1 - 3 shown, in one embodiment, a temperature and pressure gauge connector includes: a connector 1, which is installed on one side of a heating pipeline 2, and the connector 1 is used to connect the heating pipeline 2 and the temperature and pressure gauge 3;
[0027] Please continue to refer to Figures 1 - 3 , in this embodiment, the connector 1 includes an outer housing 11 and an inner housing 12, and the inner housing 12 is arranged inside the outer housing 11. Among them, multiple groups of sealing rings 13 are arranged inside the connector 1. The sealing rings 13 include a first sealing ring 131, a second sealing ring 132, and a third sealing ring 133, which are used to control the medium flow passage.
[0028] Exemplarily, the second sealing ring 132 is arranged between the first sealing ring 131 and the third sealing ring 133, and the inner diameter of the second sealing ring 132 is larger than that of the first sealing ring 131 and the third sealing ring 133, and the wire diameter of the third sealing ring 133 is larger than that of the first sealing ring 131 and the second sealing ring 132. It should be noted in detail that a spring 14 is arranged between the first sealing ring 131 and the second sealing ring 132, which can adjust the relative height of the inner housing 12 and the outer housing 11 before and after the installation of the temperature and pressure gauge 3, and then squeeze and loosen the first sealing ring 131.
[0029] Please continue to refer to Figures 1 - 3 , in this embodiment, a slope portion 111 is arranged at the bottom of the outer housing 11, and the slope portion 111 is used to squeeze the first sealing ring 131; a first accommodation portion 112 is arranged in the middle of the outer housing 11, and the accommodation portion is used to accommodate the spring 14.
[0030] Furthermore, a first groove portion 121 is arranged at the bottom of the inner housing 12, and the first sealing ring 131 is clamped in the first groove portion 121; a second groove portion 122 is arranged in the middle of the inner housing 12, and the second sealing ring 132 is clamped in the second groove portion 122; a second accommodation portion 123 is arranged at the top of the inner housing 12, and the third sealing ring 133 is arranged in the second accommodation portion 123.
[0031] Working principle: Before installing the temperature and pressure gauge 3, first install the connector 1 on the heating pipeline 2. Under the action of the spring 14, the slope portion 111 of the outer housing 11 squeezes the first sealing ring 131 on the first groove portion 121 of the inner housing 12, and seals through the first sealing ring 131 at the bottom to prevent the medium of the heating pipeline 2 from flowing out; subsequently, install the temperature and pressure gauge 3. After the spring 14 is compressed, the channel of the slope portion 111 of the outer housing 11 is opened, and seals through the second sealing ring 132 in the middle and the third sealing ring 133 at the top to prevent the medium from flowing out.
[0032] Through the above technical solution, the present application enables the heating equipment to be in a working state, and the temperature and pressure gauge 3 can also be replaced and repaired without the need to stop the machine for operation, nor will there be any outflow of the heating medium, effectively improving the work efficiency and operation safety.
[0033] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present utility model. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present utility model. Therefore, the present utility model will not be limited to these embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A temperature and pressure gauge connector, characterized in that: include: A connector (1), the connector (1) being installed on one side of the heating pipe (2), the connector (1) being used to connect the heating pipe (2) and the temperature and pressure gauge (3); The connector (1) comprises an outer shell (11) and an inner shell (12); a plurality of sealing rings (13) are arranged inside the connector (1); the sealing rings (13) comprise a first sealing ring (131), a second sealing ring (132) and a third sealing ring (133); the sealing rings (13) are used to control a medium flow channel; The bottom of the outer shell (11) is provided with a slope portion (111), and the slope portion (111) is used to squeeze the first sealing ring (131); A first accommodating portion (112) is provided in the middle of the outer shell (11), and the accommodating portion is used to accommodate the spring (14); The bottom of the inner shell (12) is provided with a first groove portion (121), and the first groove portion (121) is provided with a first sealing ring (131); A second groove portion (122) is provided in the middle of the inner shell (12), and a second sealing ring (132) is provided in the second groove portion (122); A second accommodating portion (123) is provided at the top of the inner shell (12), and a third sealing ring (133) is provided in the second accommodating portion (123).
2. The temperature and pressure gauge connector according to claim 1, characterized in that: The second sealing ring (132) is arranged between the first sealing ring (131) and the third sealing ring (133).
3. The temperature and pressure gauge connector according to claim 1, characterized in that: The inner diameter of the second sealing ring (132) is larger than that of the first sealing ring (131) and the third sealing ring (133).
4. The temperature and pressure gauge connector according to claim 1, characterized in that: The wire diameter of the third sealing ring (133) is larger than that of the first sealing ring (131) and the second sealing ring (132).