Safety device capable of being quickly disassembled and used for preventing large-angle limiting during hoisting

By designing a fast disassembleable lifting and lifting safety device to prevent large-angle limits, the safety hazards of large-angle displacement of steel wire ropes during lifting operations are solved, and the purpose of reducing labor costs and improving lifting safety is achieved.

CN223032908UActive Publication Date: 2025-06-27SHANGHAI BAOYE GRP CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422509505.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-17
Publication Date
2025-06-27
Estimated Expiration
2034-10-17

AI Technical Summary

Technical Problem

In hoisting operations, when the angle of the wire rope exceeds the safety range, the prior art is difficult to effectively limit large-angle displacement, resulting in safety hazards, and is limited when adjusting the hoisting parameters, affecting the hoisting efficiency.

Method used

A fast disassembleable lifting and lifting safety device to prevent large angle limits is designed, including a shackle device and a connecting device. By setting limit holes and limit bolts on the shackle, the wire rope is fixed, and the maximum angle is adjusted to prevent large angle displacement.

Benefits of technology

It effectively reduces labor costs, improves lifting safety, ensures on-site lifting safety, prevents wire ropes from falling off, and is suitable for heavy-duty large-span material hoisting, improving work efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223032908U_ABST
    Figure CN223032908U_ABST
Patent Text Reader

Abstract

A hoisting safety device capable of being rapidly detached and preventing large-angle limiting during hoisting comprises a shackle device and a connecting device, the shackle device comprises two shackles, namely the first shackle and the second shackle, the first shackle is provided with a first limiting hole, the second shackle is provided with a second limiting hole, and the connecting device is connected with the first shackle and the second shackle. Limiting bolts are mounted in the first limiting hole and the second limiting hole correspondingly, during mounting, the steel wire rope penetrates through the first limiting hole and the second limiting hole correspondingly, and the steel wire rope in the steel wire rope is limited and fixed through the limiting bolts; the two ends of the connecting shaft are connected to the first shackle and the second shackle correspondingly to achieve connection and fixation of the shackles. The utility model provides a hoisting large-angle limiting safety device capable of being quickly disassembled, and the aims of limiting large-angle pulling force, reducing labor cost and improving operation safety are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to hoisting in construction engineering and mechanical engineering, and particularly relates to a safety device for preventing large-angle limit in quick-disassembly hoisting. Background Technique

[0002] In hoisting operations, the included angle of the steel wire rope is an important safety consideration. According to relevant safety regulations, the included angle of steel wire rope hoisting generally should not exceed 120 degrees to prevent the steel wire rope from breaking due to excessive stretching. In addition, the included angle between the sling and the horizontal plane should not be less than 45 degrees. If the included angle is less than 45 degrees, auxiliary supports must be added between the slings to ensure safety. When high-altitude hoisting operations are carried out in various engineering constructions, in order to prevent the large-angle installation of the steel wire rope, the hoisting point of the goods is often adjusted smaller. However, this scheme cannot hoist to the maximum hoisting point of the goods, and is too limited for heavy goods with a large span. Hoisting heavy goods is affected by the hoisting force due to the limited hoisting distance, and a hoisting machine that meets the parameters needs to be readjusted. By restricting the displacement of the steel wire rope through a limit device, the maximum hoisting point can be calculated, which is beneficial to the hoisting work of heavy large-span materials. Content of the Utility Model

[0003] To solve the above technical problems, the utility model provides a safety device for preventing large-angle limit in quick-disassembly hoisting, which realizes the purpose of restricting large-angle tension, reducing labor costs, and improving operation safety.

[0004] To achieve the above purpose, the technical solution adopted by the utility model is as follows:

[0005] A safety device for preventing large-angle limit in quick-disassembly hoisting, characterized in that: it includes a shackle device and a connecting device. The shackle device includes two shackles, namely a first shackle and a second shackle. A first limit hole is opened on the first shackle, and a second limit hole is opened on the second shackle. Limit bolts are respectively installed in the first limit hole and the second limit hole. During installation, the steel wire ropes respectively pass through the first limit hole and the second limit hole, and the steel wire ropes inside are limited and fixed by the limit bolts. The connecting device includes a connecting shaft, and both ends of the connecting shaft are respectively connected to the first shackle and the second shackle to realize the connection and fixation of the shackles.

[0006] In the above structure: A quick-detachable lifting and hoisting anti-large-angle limit safety device proposed by the present utility model includes a shackle device and a connecting device. The shackle device is connected and fixed through the connecting device. The shackle device includes two shackles, namely a first shackle and a second shackle. A first limit hole and a second limit hole for fixing the steel wire rope are respectively provided on the first shackle and the second shackle. By installing limit bolts in the first limit hole and the second limit hole, the fixing and limiting of the steel wire rope inside can be achieved. During installation, the steel wire ropes respectively pass through the first limit hole and the second limit hole, and the limit bolts are used to limit and fix the steel wire ropes inside, and the maximum angle between the first shackle and the second shackle is adjusted to prevent the large-angle deformation of the steel wire rope under force during hoisting and prevent large-angle displacement. The connecting device includes a connecting shaft, and both ends of the connecting shaft are respectively connected to the shackles to achieve the connection and fixation of the shackles.

[0007] The operation process of this application is as follows:

[0008] 1. Hoisting use application → Hoisting site inspection → Hoisting technical disclosure → Hoisting operation safety supervision;

[0009] 2. Preparation work before hoisting: Check whether the installation reference marks and azimuth line marks of the equipment are correct, and check whether the material stacking, loading into the bucket or lifting lugs, etc. meet the hoisting requirements;

[0010] 3. After installing the hoisting rigging, after connecting and installing the goods to the steel wire rope, install the first shackle and the second shackle on the steel wire rope below the hook, and limit and fix the steel wire ropes inside the first shackle and the second shackle with limit bolts, and adjust the maximum angle to prevent the large-angle deformation of the steel wire rope under force during hoisting;

[0011] 4. Trial hoisting: Check and confirm before trial hoisting. The hoisting general commander conducts hoisting operation technical disclosure, arranges the key points and main contents for each supervision post to conduct supervision. Lift and lower the hoisting for multiple tests to make each part coordinated and safe, and review the changes of each part, etc.;

[0012] 5. Lifting and positioning: The general commander officially orders each deputy commander to check the arrival and standby situation of each post, and check whether the command signal system of each post is normal; each post reports the preparation situation and timely notifies the command platform with signals; officially lift the load, stop when the lifted object leaves the ground by 500 - 800 mm, and conduct further inspection. Each post should report whether the situation is normal; if normal, continue to lift;

[0013] 6. When the component, material or equipment falls and is positioned, it should be slowly lowered strictly according to the instructions of the signalman. If necessary, there should be operating workers to cooperate with the hoisting and observe the overturning angle during the hoisting process.

[0014] Furthermore: Both the first shackle and the second shackle are set to be U-shaped. A first through hole and a second through hole are respectively arranged on the upper end faces of the U-shaped first shackle and second shackle. During installation, the steel wire rope on one side passes through the first limiting hole and the first through hole on the first shackle, and the steel wire rope on the other side passes through the second limiting hole and the second through hole on the second shackle.

[0015] In the above structure: The first shackle and the second shackle being set to U-shaped is convenient for bearing force and also for installation. A first through hole and a second through hole are respectively arranged on the upper end faces of the first shackle and the second shackle. During installation, the steel wire rope on one side passes through the first limiting hole and the first through hole on the first shackle, and the steel wire rope on the other side passes through the second limiting hole and the second through hole on the second shackle, realizing the installation and fixation of the steel wire rope and facilitating the lifting of goods by the steel wire rope.

[0016] Furthermore: The connecting shaft is a steel bar, and both ends of the steel bar are welded to the closed ends of the U-shaped first shackle and second shackle respectively.

[0017] In the above structure: The connecting shaft is made of steel bar, which has high strength to prevent breakage during use. Both ends of the steel bar are welded to the closed ends of the U-shaped first shackle and second shackle respectively to prevent the shackle from separating from the connecting shaft during lifting.

[0018] Compared with the prior art, the beneficial effects of the present utility model are as follows:

[0019] 1. The present utility model effectively reduces the labor cost and improves the hoisting safety. By setting the quick-disassembly anti-large-angle limit safety device, it can not only ensure the on-site hoisting safety, prevent large-angle displacement, and is easy to disassemble after the hoisting is completed, but also reduce the labor intensity of the staff, improve the work efficiency, and is conducive to the smooth progress of on-site hoisting safety;

[0020] 2. It not only realizes the limitation of large-angle displacement in hoisting but also prevents the steel wire rope from falling off the hook;

[0021] 3. It is conducive to the hoisting work of heavy large-span materials;

[0022] 4. It achieves the purpose of reducing the labor cost and improving the operation safety. Description of the Drawings

[0023] Figure 1 is the structural schematic diagram of the present utility model;

[0024] Figure 2 is the installation schematic diagram of the present utility model;

[0025] List of Reference Numerals:

[0026] 1. Connecting shaft; 2. First shackle; 3. Second shackle; 4. Hook; 5. Steel wire rope; 6. Goods. Detailed implementation manners

[0027] The present utility model will be further described in detail below in conjunction with the accompanying drawings and specific implementation manners:

[0028] As Figure 1-2 shown, the present utility model provides a quick-detachable lifting and hoisting anti-large-angle limit safety device, which includes a shackle device and a connecting device. The shackle device includes two shackles, namely a first shackle 2 and a second shackle 3. A first limit hole is provided on the first shackle 2, and a second limit hole is provided on the second shackle 3. Limit bolts are respectively installed in the first limit hole and the second limit hole. During installation, a steel wire rope 5 passes through the first limit hole and the second limit hole respectively, and the steel wire rope 5 inside is limited and fixed by the limit bolts. The connecting device includes a connecting shaft 1, and both ends of the connecting shaft 1 are respectively connected to the first shackle 2 and the second shackle 3 to realize the connection and fixation of the shackles.

[0029] A quick-detachable lifting and hoisting anti-large-angle limit safety device provided by the present utility model includes a shackle device and a connecting device. The shackle device is connected and fixed through the connecting device. The shackle device includes two shackles, namely a first shackle 2 and a second shackle 3. First limit holes and second limit holes for fixing the steel wire rope 5 are respectively provided on the first shackle 2 and the second shackle 3. By installing limit bolts in the first limit hole and the second limit hole, the fixation and limitation of the steel wire rope 5 inside can be realized. During installation, the steel wire rope 5 passes through the first limit hole and the second limit hole respectively, and the steel wire rope 5 inside is limited and fixed by the limit bolts. The maximum angle between the first shackle 2 and the second shackle 3 is adjusted to prevent the steel wire rope 5 from deforming at a large angle under force during hoisting and prevent large-angle displacement. The connecting device includes a connecting shaft 1, and both ends of the connecting shaft 1 are respectively connected to the shackles to realize the connection and fixation of the shackles.

[0030] The operation process of this application is as follows:

[0031] 1. Hoisting use application → Hoisting site inspection → Hoisting technical disclosure → Hoisting operation safety supervision;

[0032] 2. Preparation work before hoisting: Check whether the installation reference marks and azimuth line marks of the equipment are correct, and check whether the material stacking, loading into the hopper or lifting lugs, etc. meet the hoisting requirements;

[0033] 3. After the hoisting rigging is installed, after connecting and installing the goods 6 and the steel wire rope 5, install the first shackle 2 and the second shackle 3 on the steel wire rope 5 below the hook 4, and limit and fix the steel wire rope 5 inside the first shackle 2 and the second shackle 3 with limit bolts, and adjust the maximum angle to prevent the steel wire rope 5 from deforming at a large angle under force during hoisting;

[0034] 4. Trial lifting: Before trial lifting, check and confirm. The hoisting general commander gives the hoisting operation briefing, arranges the key points and main contents for supervision at each supervision post. Conduct multiple tests of lifting and lowering to make each part coordinated and safe, and recheck the changes of each part, etc.;

[0035] 5. Lifting and positioning: The general commander officially orders each deputy commander to check the arrival and standby status of each post and check whether the command signal system is normal; each post reports the preparation status and promptly notifies the command platform with signals; officially lift the load. When the load leaves the ground by 500 - 800 mm, stop and conduct further inspections. Each post should report whether the situation is normal; if normal, continue to lift;

[0036] 6. When the component, material or equipment descends and is positioned, it should be slowly lowered strictly according to the instructions of the signalman. When necessary, there should be operating workers to cooperate with the hoisting and observe the tipping angle during the hoisting process.

[0037] In this embodiment: Both the first shackle 2 and the second shackle 3 are set as U - shaped. A first through - hole and a second through - hole are respectively arranged on the upper end surfaces of the U - shaped first shackle 2 and second shackle 3. During installation, the wire rope 5 on one side passes through the first limit hole and the first through - hole on the first shackle 2, and the wire rope 5 on the other side passes through the second limit hole and the second through - hole on the second shackle 3. The first shackle 2 and the second shackle 3 being set as U - shaped is convenient for bearing force and also convenient for installation. The first through - hole and the second through - hole are respectively arranged on the upper end surfaces of the first shackle 2 and the second shackle 3. During installation, the wire rope 5 on one side passes through the first limit hole and the first through - hole on the first shackle 2, and the wire rope 5 on the other side passes through the second limit hole and the second through - hole on the second shackle 3, realizing the installation and fixation of the wire rope 5 and facilitating the hoisting of the goods 6 by the wire rope 5.

[0038] In this embodiment: The connecting shaft 1 is a steel bar, and both ends of the steel bar are welded to the closed ends of the U - shaped first shackle 2 and second shackle 3 respectively. The connecting shaft 1 is made of steel bar, which has high strength and prevents breakage during use. Both ends of the steel bar are welded to the closed ends of the U - shaped first shackle 2 and second shackle 3 respectively to prevent the shackle from detaching from the connecting shaft 1 during hoisting.

[0039] 1. The utility model effectively reduces the labor cost and improves the hoisting safety. By setting the quick - disassembly anti - large - angle limit safety device, it can not only ensure the on - site hoisting safety, prevent large - angle displacement, and is easy to disassemble after hoisting is completed, but also reduce the labor intensity of the staff, improve the work efficiency, and is conducive to the smooth progress of on - site hoisting safety;

[0040] 2. It not only realizes the limitation of large - angle displacement in hoisting but also prevents the wire rope 5 from falling off the hook 4;

[0041] 3. It is conducive to the hoisting work of heavy - duty and large - span materials;

[0042] 4. The purpose of reducing labor costs and improving operation safety.

[0043] As described above, it is only a preferred embodiment of the present utility model, and it is not limited to the present utility model in any other form. Any modification or equivalent change made according to the technical essence of the present utility model still belongs to the scope protected by the present utility model.

Claims

1. A quickly disassembled lifting and hoisting safety device to prevent large angle limit, characterized by: The invention comprises a shackle device and a connecting device, wherein the shackle device comprises two shackles, namely a first shackle (2) and a second shackle (3), wherein the first shackle (2) is provided with a first limiting hole, and the second shackle (3) is provided with a second limiting hole, and limiting bolts are respectively installed in the first limiting hole and the second limiting hole. During installation, a steel wire rope (5) is respectively passed through the first limiting hole and the second limiting hole, and the steel wire rope (5) therein is limitedly fixed by the limiting bolts, and the connecting device comprises a connecting shaft (1), and the two ends of the connecting shaft (1) are respectively connected to the first shackle (2) and the second shackle (3) to realize the connection and fixation of the shackles.

2. According to claim 1, a quickly detachable lifting and hoisting safety device to prevent large-angle limit, characterized in that: The first shackle (2) and the second shackle (3) are both arranged in a U-shape, and a first through hole and a second through hole are respectively arranged on the upper end surfaces of the U-shaped first shackle (2) and the second shackle (3). During installation, the steel wire rope (5) on one side passes through the first limiting hole and the first through hole on the first shackle (2), and the steel wire rope (5) on the other side passes through the second limiting hole and the second through hole on the second shackle (3).

3. A quickly detachable lifting and hoisting safety device to prevent large-angle limit according to claim 1 or 2, characterized in that: The connecting shaft (1) is a steel bar, and both ends of the steel bar are respectively welded to the closed ends of the U-shaped first shackle (2) and the second shackle (3).