Positioning tool used in round pipe end installation process

By designing the positioning tool during the installation of the end of the round tube, using the mattress and the boss to clamp the towel rack parts, and threaded connections are made through automated control components, the problem of difficulty for human hands to hold multiple objects in the towel rack assembly is solved, and an efficient and accurate installation process is achieved.

CN223115152UActive Publication Date: 2025-07-18NBL IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422422644.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-08
Publication Date
2025-07-18
Estimated Expiration
2034-10-08

AI Technical Summary

Technical Problem

During the assembly of towel racks, it is difficult for a person to hold multiple parts at the same time, resulting in inaccurate positioning.

Method used

Design a positioning tool during the installation of the round tube end, including a workbench and a clamping assembly, using the cushion table and the boss to clamp and position the parts, and automatically operate the threaded connection through the control components to reduce human participation.

Benefits of technology

It improves the installation efficiency and accuracy of towel racks, simplifies the operation process, and enhances the adaptability and removal efficiency of parts.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223115152U_ABST
    Figure CN223115152U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of round pipe end installation technologies, in particular to a positioning tool used in the round pipe end installation process. The clamping assemblies are arranged on the workbench, the number of the clamping assemblies is two, the clamping assemblies are arranged on the two sides of the workbench respectively, each clamping assembly comprises a pad placing table, each pad placing table is provided with a first placing groove, each pad placing table is provided with a second placing groove in a leaning mode, each second placing groove penetrates through the side, close to the other clamping assembly, of the corresponding pad placing table, and each pad placing table is provided with a mounting hole; the first placing groove, the mounting hole and the second placing groove are communicated in sequence; the boss is arranged on the workbench, the side, away from the workbench, of the boss is provided with a containing face used for containing a gasket, the boss is partially arranged in the pipe body in a penetrating mode, one side of the gasket abuts against the containing face, and the other side of the gasket abuts against the inner side wall of the pipe body. The towel rack has the advantages that manual participation is not needed, only the corresponding threaded rods need to be in threaded connection with the foot pads from the upper portion of the pad placing table, and the mounting efficiency of the towel rack is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of the installation process of the end of a round tube, and in particular to a positioning tool during the installation process of the end of a round tube. Background Art

[0002] A towel rack is a commonly used item in household life. The towel rack includes two types: a crossbar type and a plate type. Usually, the towel rack in the bathroom is of the crossbar type to facilitate drying the towel.

[0003] In the related art, as Figure 1 shown, a towel rack includes a tube body 1, a support leg 2, a foot pad 3, and a threaded rod 11. One end of the support leg 2 abuts against the end of the tube body 1, the foot pad 3 abuts against the other end of the support leg 2, the threaded rod 11 is disposed through the support leg 2, a nut 12 is threadedly connected to one end of the threaded rod 11, the nut 12 abuts against the end of the foot pad 3 away from the support leg 2, a washer 13 is threadedly connected to the other end of the threaded rod 11, the washer 13 is disposed inside the tube body 1 and abuts against the inner side wall of the tube body 1 on the side close to the support leg 2, and the nut 12 and the washer 13 cooperate with the threaded rod 11 to fix the tube body 1, the support leg 2, and the foot pad 3.

[0004] Regarding the above related art, the inventor believes that although the assembly process of the towel rack is simple, since it is necessary to fix the positions of multiple objects, such as the tube body, the foot pad, the support leg, and the washer, when threading the nut and the washer onto the threaded rod, if one person completes it, one hand needs to hold multiple objects, while the other hand holds the threaded rod, etc., which is relatively difficult and likely to cause inaccurate positions, and there is still room for improvement. Utility Model Content

[0005] In order to improve the situation that when one person completes the assembly process of the towel rack, one hand needs to hold multiple objects, while the other hand holds the threaded rod, etc., which is relatively difficult and likely to cause inaccurate positions, the present application provides a positioning tool during the installation process of the end of a round tube.

[0006] The positioning tool during the installation process of the end of a round tube provided by the present application adopts the following technical solution:[[]]

[0007] A positioning tool during the installation process of the end of a round tube includes:

[0008] A workbench for placing the components of the towel rack; and

[0009] A clamping assembly disposed on the workbench. The number of the clamping assemblies is two and they are respectively disposed on both sides of the workbench to position the components at both ends. The clamping assembly includes:

[0010] A mat placing platform, on one side of the mat placing platform away from the workbench, there is a first placing groove for placing foot pads, on one side of the mat placing platform close to the workbench, there is a second placing groove for placing one end of the pipe body, the second placing groove penetrates through one side of the mat placing platform close to the other clamping component, and there are mounting holes on the mat placing platform for the support feet to pass through, and the first placing groove, the mounting holes and the second placing groove are communicated in sequence; and

[0011] A convex platform is arranged on the workbench, the side of the convex platform away from the workbench has a placing surface for placing a gasket, when one end of the pipe body is placed in the second placing groove, a part of the convex platform penetrates into the pipe body, one side of the gasket abuts against the placing surface, and the other side of the gasket abuts against the inner side wall of the pipe body.

[0012] By adopting the above technical solutions, the mat placing platform cooperates with the convex platform to clamp and position the parts of the towel rack, without manual participation. It only needs to thread the corresponding threaded rod onto the foot pad from above the mat placing platform, which improves the installation efficiency of the towel rack.

[0013] Optionally, the clamping component further includes a positioning plate arranged on the workbench, the mat placing platform and the convex platform are both arranged on the positioning plate, there are fixing holes on the positioning plate, and there are positioning blocks arranged on the workbench and passing through the fixing holes, and the number of the positioning blocks is several and arranged along the length direction of the workbench.

[0014] By adopting the above technical solutions, the positioning plate cooperates with the positioning blocks to install the clamping component on the workbench, and the number of the positioning blocks is several and arranged along the length direction, so that when the positioning plate cooperates with different positioning blocks, the distance between the two clamping components is different, thereby adapting to towel racks of different sizes and improving the adaptability of the positioning tooling.

[0015] Optionally, the mat placing platform includes:

[0016] A fixed part arranged on the workbench; and

[0017] A movable part arranged on the workbench and approaching or separating from the fixed part, and the fixed part and the movable part cooperate to form the first placing groove, the mounting holes and the second placing groove.

[0018] By adopting the above technical solutions, the mat placing platform is divided into two parts, so that the assembled towel rack can be taken out from the separation position of the fixed part and the movable part, which improves the taking-out efficiency of the towel rack.

[0019] Optionally, it further includes a control component, the control component includes a first air cylinder arranged on the positioning plate, the piston rod of the first air cylinder faces the fixed part, and the movable part is arranged on the piston rod of the first air cylinder.

[0020] By adopting the above technical solution, the setting of the first cylinder enables the movable part to move without manual operation, improving the moving efficiency of the movable part. On the other hand, after the movable part moves, the piston rod of the first cylinder still abuts against it, so that the movable part is not easily loosened and dropped after moving, improving the moving stability of the movable part.

[0021] Optionally, the control assembly further includes a second cylinder disposed on the positioning plate, the boss is disposed on the piston rod of the second cylinder, and the piston rod of the second cylinder is arranged along the length direction of the pipe body and faces the end of the pipe body.

[0022] By adopting the above technical solution, the setting of the second cylinder enables the gasket to be placed on the boss in an area outside the pad placing table, improving the placing efficiency and comfort of the gasket.

[0023] Optionally, the control assembly further includes a control switch disposed on the positioning plate, the control switch is electrically connected to the first cylinder, and the control switch is electrically connected to the second cylinder to synchronously control the opening and closing of the first cylinder and the second cylinder.

[0024] By adopting the above technical solution, the setting of the control switch enables two actions to be triggered with one key, thereby instantaneously clamping the two, reducing the cumbersome work caused by multiple operations, and improving the clamping efficiency.

[0025] Optionally, a first abutting block is disposed on the boss and abuts against the end face of the pipe body.

[0026] By adopting the above technical solution, the setting of the first abutting block positions the position of the pipe body to prevent the pipe body from shifting, improving the positioning accuracy of the pipe body.

[0027] Optionally, a second abutting block is disposed on the boss and passes through the pipe body and abuts against the end face of the gasket.

[0028] By adopting the above technical solution, on the one hand, during the movement of the gasket, it will be rubbed by the inner side wall of the pipe body and move. The second abutting block abuts against the gasket, thereby preventing the gasket from moving during the movement, so that the gasket finally aligns with the support feet, improving the efficiency of the gasket moving to the aligned state. On the other hand, when the threaded rod is threadedly connected to the gasket, the gasket is not easily rotated due to abutting against the second abutting block, improving the installation stability of the gasket.

[0029] Optionally, an avoidance groove for avoiding the threaded rod passing through the gasket is disposed on the boss, and the avoidance groove penetrates through one side of the boss close to the middle of the pipe body.

[0030] By adopting the above technical solution, due to the provision of the avoidance groove, when the threaded rod moves towards the pipe body, it will not interfere with the boss. When the boss disengages from the pipe body, the threaded rod will not expand with the boss and can leave smoothly, improving the installation efficiency of the threaded rod and the removal efficiency of the towel rack after installation.

[0031] Optionally, a fixing pin penetrating into the foot pad is fixedly connected to the inner side wall of the first placement groove on the side far from the moving part.

[0032] By adopting the above technical solution, due to the provision of the fixing pin, the foot pad will not disengage when the movable part approaches the fixed part, improving the placement stability of the foot pad.

[0033] In summary, the present application includes at least one of the following beneficial technical effects:

[0034] 1. By cooperating the placing platform with the boss to clamp and position the components of the towel rack, there is no need for manual participation. It only needs to thread the corresponding threaded rod onto the foot pad from above the placing platform, improving the installation efficiency of the towel rack;

[0035] 2. The placing platform is divided into two parts, so that the assembled towel rack can be removed from the position where the fixed part and the movable part are separated, improving the removal efficiency of the towel rack. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 is an exploded view of a towel rack in the related art.

[0037] Figure 2 is a schematic structural diagram of a positioning tool during the installation process at the end of a circular pipe in an embodiment of the present application.

[0038] Figure 3 is an exploded view of a clamping assembly in an embodiment of the present application.

[0039] Figure 4 is an exploded view of a convex block and a pipe body in an embodiment of the present application.

[0040] Description of the reference numerals: 1, pipe body; 11, threaded rod; 12, nut; 13, gasket; 2, support leg; 3, foot pad; 4, workbench; 41, positioning block; 5, clamping assembly; 51, positioning plate; 511, fixing hole; 52, placing platform; 521, fixed part; 522, movable part; 523, first placement groove; 524, installation hole; 525, second placement groove; 526, fixing pin; 53, boss; 531, first abutting block; 532, placement surface; 533, avoidance groove; 534, second abutting block; 535, convex edge; 6, control assembly; 61, first cylinder; 62, second cylinder; 63, control switch. DETAILED DESCRIPTION OF THE EMBODIMENTS

[0041] The following is combined with Figures 2 - 4 This application is described in further detail.

[0042] The present application embodiment discloses a positioning tool for the installation process of a round tube end. Figure 2 The positioning tooling during the installation of the round tube end includes a workbench 4, a clamping assembly 5 and a control assembly 6. The clamping assembly 5 is installed on the workbench 4 to clamp and position the corresponding parts of the towel rack. The control assembly 6 is installed on the workbench 4 to control the clamping assembly 5 to clamp or release.

[0043] Reference Figure 2 , there are two clamping assemblies 5, which are respectively located on both sides of the workbench 4 to clamp the spare parts at the two ends of the towel rack. The clamping assembly 5 includes a positioning plate 51, a pad 52 and a boss 53. The positioning plate 51 abuts against the workbench 4, and has a fixing hole 511 on the positioning plate 51. The workbench 4 is fixedly connected with a positioning block 41. The number of the positioning blocks 41 is several and they are arranged along the length direction of the workbench 4. One of the positioning blocks 41 is inserted into the fixing hole 511 to position the positioning plate 51. Here, the positioning block 41 has a T-shaped shape, and the fixing hole 511 and the positioning block 41 are adapted shapes, so that the positioning block 41 will not rotate on the plane of the workbench 4 after being inserted into the fixing hole 511. In other embodiments, the positioning block 41 may also be other shapes that can restrain the rotation of the positioning plate 51. The remaining parts of the clamping assembly 5 except the positioning plate 51 are all mounted on the positioning plate 51 , so that the entire clamping assembly 5 can adapt to pipe bodies 1 of different lengths due to different positioning blocks 41 and different spacings between two clamping assemblies 5 .

[0044] Reference Figure 3 The pad placement platform 52 includes a fixed portion 521 and a movable portion 522. The fixed portion 521 is fixedly connected to the positioning plate 51, and the movable portion 522 is movably connected to the positioning plate 51. The fixed portion 521 and the movable portion 522 cooperate to form a first placement groove 523. The first placement groove 523 is located on a side of the pad placement platform 52 away from the positioning plate 51 for placing the foot pad 3. A fixing pin 526 is fixedly connected to a side of the first placement groove 523 away from the movable portion 522 to fix the placed foot pad 3 to prevent it from being separated from the first placement groove 523 before installation is completed.

[0045] Reference Figure 3, the fixed part 521 and the movable part 522 cooperate to form a mounting hole 524 for the support leg 2 to pass through. The fixed part 521 and the movable part 522 cooperate to form a second placement groove 525, which is located on the side of the cushion placing table 52 close to the positioning plate 51 and penetrates through the side of the cushion placing table 52 close to the other clamping component 5 for placing the pipe body 1. To facilitate the removal of the overall towel rack after the installation of the pipe body 1, the support leg 2, and the foot pad 3, the second placement groove 525 can extend relatively to the side close to the first placement groove 523 to facilitate the movement of the pipe body 1 along the length direction of the support leg 2 to disengage the foot pad 3 from the side of the opening of the first placement groove 523.

[0046] Refer to Figure 4 , the boss 53 is installed on the positioning plate 51, and a first abutting block 531 is fixedly connected to the boss 53. The first abutting block 531 abuts against the end face of the pipe body 1 to cooperate with the first abutting block 531 of another clamping component 5 to clamp the pipe body 1. The boss 53 has a placement surface 532 for placing the gasket 13. When one end of the pipe body 1 is placed in the second placement groove 525, a part of the boss 53 penetrates into the pipe body 1 to send the gasket 13 into the pipe body 1 and align it with the support leg 2. At this time, one side of the gasket 13 abuts against the placement surface 532, and the other side of the gasket 13 abuts against the inner side wall of the pipe body 1 to prevent the gasket 13 from sliding. The boss 53 has an avoidance groove 533 to avoid the threaded rod 11 passing through the gasket 13. In order to allow the threaded rod 11 to be taken out from the avoidance groove 533 when taken out, the avoidance groove 533 penetrates through the side of the boss 53 close to the middle of the pipe body 1. In order to prevent the gasket 13 from rotating when being threadedly connected to the threaded rod 11 in the pipe body 1, a second abutting block 534 is fixedly connected to the boss 53. The second abutting block 534 abuts against one side of the gasket 13 along the length direction of the pipe body 1, and convex edges 535 are fixedly connected to two opposite sides of the placement surface 532. The convex edges 535 abut against the adjacent surfaces of the surface of the gasket 13 against which the second abutting block 534 abuts to abut against three surfaces of the gasket 13.

[0047] Refer to Figure 3 and Figure 4, the control component 6 includes a first cylinder 61, a second cylinder 62 and a control switch 63. The first cylinder 61 is fixedly connected to the positioning plate 51, and the movable part 522 is fixedly connected to the piston rod of the first cylinder 61. The piston rod of the first cylinder 61 is arranged towards the fixed part 521, so that the movable part 522 is controlled by the piston rod of the first cylinder 61 to approach or move away from the fixed part 521. The second cylinder 62 is fixedly connected to the positioning plate 51, and the boss 53 is fixedly connected to the piston rod of the second cylinder 62. The piston rod of the second cylinder 62 is arranged towards the end of the pipe body 1, and the piston rod of the second cylinder 62 is arranged along the length direction of the pipe body 1 to control the partial insertion of the boss 53 into the pipe body 1 or the detachment from the pipe body 1. The control switch 63 is fixedly connected to the positioning plate 51, and the control switch 63 is electrically connected to the first cylinder 61 and the control switch 63 is electrically connected to the second cylinder 62 to synchronously control the opening and closing of the first cylinder 61 and the second cylinder 62.

[0048] The implementation principle of the positioning tooling during the installation process of the end of the round pipe in the embodiment of the present application is as follows: Place the pipe body 1 in the second placement groove 525, place the support feet 2 in the installation holes 524 and abut against the pipe body 1, place the foot pads 3 in the first placement groove 523, and place the gasket 13 on the boss 53 and abut against the side of the second abutting block 534 away from the second cylinder 62; then turn on the control switch 63, the control switch 63 controls the movement of the piston rod of the first cylinder 61, drives the movable part 522 to approach the fixed part 521 to clamp the side wall of the pipe body 1, the support feet 2 and the foot pads 3. At the same time, the control switch 63 controls the movement of the piston rod of the second cylinder 62, and a part of the boss 53 penetrates into the pipe body 1, and the first abutting block 531 abuts against the end face of the pipe body 1 to clamp the end face of the pipe body 1. At this time, the holes on the gasket 13, the pipe body 1, the support feet 2 and the foot pads 3 are on the same straight line. The threaded rod 11 sequentially passes through the foot pad 3, the support feet 2 and the pipe body 1, and then is threadedly connected to the gasket 13. Then, a nut 12 is threadedly connected to the side of the foot pad 3 away from the support feet 2. After the nut 12 abuts against the side of the foot pad 3 away from the support feet 2, the towel rack is installed. Then turn off the control switch 63, the first cylinder 61 and the second cylinder 62 open, the movable part 522 and the fixed part 521 move away, and the boss 53 detaches from the pipe body 1. At this time, the towel rack is taken out obliquely upward from the side of the fixed part 521 close to the movable part 522.

[0049] The above are all the preferred embodiments of the present application. Without limiting the protection scope of the present application accordingly, therefore: All equivalent changes made according to the structure, shape and principle of the present application shall be covered within the protection scope of the present application.

Claims

1. A positioning tooling during the installation process of the end of a circular tube, characterized in that: Including: A workbench (4) for placing the components of the towel rack; And A clamping assembly (5) is provided on the workbench (4). The number of the clamping assemblies (5) is two and they are respectively arranged on both sides of the workbench (4) to position the components at both ends. The clamping assembly (5) includes: A cushion placing table (52). On the side of the cushion placing table (52) away from the workbench (4), there is a first placing groove (523) for placing the foot pad (3). On the side of the cushion placing table (52) close to the workbench (4), there is a second placing groove (525) for placing one end of the pipe body (1). The second placing groove (525) penetrates through the side of the cushion placing table (52) close to the other clamping assembly (5). There is a mounting hole (524) on the cushion placing table (52) for the support leg (2) to pass through. The first placing groove (523), the mounting hole (524) and the second placing groove (525) are communicated in sequence; and A convex platform (53) is provided on the workbench (4). On the side of the convex platform (53) away from the workbench (4), there is a placing surface (532) for placing the gasket (13). When one end of the pipe body (1) is placed in the second placing groove (525), a part of the convex platform (53) penetrates into the pipe body (1). One side of the gasket (13) abuts against the placing surface (532), and the other side of the gasket (13) abuts against the inner side wall of the pipe body (1).

2. The positioning tooling during the installation process of the end part of a circular tube according to claim 1, characterized in that: The clamping assembly (5) further includes a positioning plate (51) provided on the workbench (4). The cushion placing table (52) and the convex platform (53) are both provided on the positioning plate (51). There are fixing holes (511) on the positioning plate (51). There are positioning blocks (41) on the workbench (4) that penetrate through the fixing holes (511). The number of the positioning blocks (41) is several and they are arranged along the length direction of the workbench (4).

3. The positioning tooling during the installation process of the end part of a circular tube according to claim 2, wherein: The cushion placing table (52) includes: A fixing part (521) provided on the workbench (4); and A movable part (522) provided on the workbench (4) and approaching or separating from the fixing part (521). The fixing part (521) and the movable part (522) cooperate to form the first placing groove (523), the mounting hole (524) and the second placing groove (525).

4. A positioning tooling during the installation process of the end of a round tube, characterized in that: It further includes a control assembly (6). The control assembly (6) includes a first air cylinder (61) provided on the positioning plate (51). The piston rod of the first air cylinder (61) is arranged towards the fixing part (521). The movable part (522) is arranged on the piston rod of the first air cylinder (61).

5. The positioning tooling during the installation process of the end part of a circular pipe according to claim 4, characterized in that: The control assembly (6) further includes a second air cylinder (62) provided on the positioning plate (51). The convex platform (53) is arranged on the piston rod of the second air cylinder (62). The piston rod of the second air cylinder (62) is arranged along the length direction of the pipe body (1) and towards the end of the pipe body (1).

6. The positioning tooling during the installation process of the end part of a circular tube according to claim 5, characterized in that: The control component (6) further includes a control switch (63) disposed on the positioning plate (51). The control switch (63) is electrically connected to the first cylinder (61) and the control switch (63) is electrically connected to the second cylinder (62) to synchronously control the opening and closing of the first cylinder (61) and the second cylinder (62).

7. A positioning tooling during the installation process of the end part of a circular tube, characterized in that: A first abutting block (531) abutting against the end face of the pipe body (1) is provided on the boss (53).

8. A positioning tooling during the installation process of the end of a circular tube, characterized in that: A second abutting block (534) disposed inside the pipe body (1) and abutting against the end face of the gasket (13) is provided on the boss (53).

9. A positioning tooling during the installation process of the end part of a circular tube, characterized in that: An avoidance groove (533) for avoiding the threaded rod passing through the gasket (13) is provided on the boss (53). The avoidance groove (533) penetrates through one side of the boss (53) close to the middle of the pipe body (1).

10. The positioning tooling during the installation process of the end part of a circular pipe according to claim 3, characterized in that: A fixing pin (526) penetrating into the foot pad (3) is fixedly connected to the inner side wall of the first placement groove (523) on the side away from the moving part.