Building installation construction hanging bar punching tool controlled by shear type lifter
The construction and construction lifting rib hole drilling tool controlled by the scissor lift control means, using laser positioning and hand-cranking hoist, the problems of low efficiency and safety hazards in traditional lifting rib installation are solved, and fast and accurate hole drilling and safe construction are achieved.
Patent Information
- Application Number
- CN202422240540.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-12
- Publication Date
- 2025-08-01
- Estimated Expiration
- 2034-09-12
AI Technical Summary
During the installation of traditional hanging ribs, the construction efficiency is low and there are safety hazards, making it difficult to achieve rapid and accurate hole drilling.
The construction construction lifting rib drilling tools controlled by scissor lifts are adopted, including hand-cranked scissor lifts, vertical laser emitters, adjustable length support columns and impact drills, and precise positioning and height adjustment are achieved through laser positioning and hand-cranking hoists.
Fast and accurate hole drilling is achieved, construction efficiency is improved, and the safety of workers' operations is ensured.
Smart Images

Figure CN223172915U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to a punching tool for suspender bars in building construction, in particular to a punching tool for suspender bars in building installation construction controlled by a scissor lift. Background Art
[0002] For traditional suspender bar installation, a portal frame scaffold needs to be erected to determine the position of the suspender bars according to the specifications and construction plan. Workers stand on the portal frame scaffold and hold a pneumatic drill in their hands to punch holes at the positioning points. The portal frame scaffold needs to be moved every two or three holes, resulting in extremely low construction efficiency. There is also a relatively convenient construction method, which is to tie a pneumatic drill to the end of a steel pipe and have a worker hold the other end to punch holes at the positioning points. This method has great potential safety hazards and is prone to construction errors, causing difficulties in subsequent construction. Content of the Utility Model
[0003] The purpose of the utility model is to provide a punching tool for suspender bars in building installation construction controlled by a scissor lift, which has a reasonable structure, can not only punch holes quickly and accurately, improve work efficiency, but also ensure the safety of workers during operation.
[0004] The purpose of the utility model is realized as follows: A punching tool for suspender bars in building installation construction controlled by a scissor lift includes a manual scissor lift. Universal wheels are installed at the bottom of the base, and a vertical laser emitter is installed at the center of the base. The manual scissor lift is fixedly installed on the base. The central hole of the lifting seat of the manual scissor lift is concentric with the emission center of the vertical laser emitter. An adjustable-length support column is fixedly connected to the lifting seat of the manual scissor lift, and a pneumatic drill is fixedly installed on the support installed at the upper end of the adjustable-length support column.
[0005] The utility model consists of four major parts, namely the base part, the hoist part, the support column part, and the impact drill part. The base part is a square frame of 1m * 1m welded by four square steel pipes. The two square steel pipes at the bottom are vertically crossed. Universal wheels are installed at both ends of the lower square steel pipes respectively, and a laser emitter is installed at the central position for convenient point finding. The main body of the hoist part is a scissor-type hand-operated hoist. The lower support of the hoist is connected to the square steel pipe of the base part using bolts and nuts, ensuring that the middle position of the hoist and the middle position of the base part are at the same point and firmly fixed. The support column part consists of three sections of steel pipes. One is that one end of the lower steel pipe is welded to the jacking part of the hoist, with the center points corresponding, and another welding sleeve. One end of the middle steel pipe is threaded, and the other end is welded with a sleeve. Steel pipes of different lengths can be selected according to the construction operation height. The lower end of the upper steel pipe is threaded, and the upper end has a notch for connecting the impact drill. The three sections of steel pipes are connected using special sleeves. The impact drill part is mainly composed of an impact drill, which is vertical. The bottom of the impact drill is connected to the notch at the top of the support column. Finally, ensure that the midpoints of the four parts of the base, hoist, support column, and impact drill are on the same line.
[0006] Construction process:
[0007] First, transport each component to the corresponding floor of the construction site. Select steel pipes of different lengths for the support column according to the height of the floor. After assembly, move the tool to the designated point according to the positioning, ensuring that the point emitted by the laser emitter under the base is the same as the drilling point. Then, power on the impact drill, and the worker slowly uses the hand-operated hoist to lift the height of the impact drill. The lifting height is different according to the depth of the hole, and thus the drilling work of one hanger bar is completed. Next, lower the hoist, move the tool to the next point and continue the construction.
[0008] The structure of the utility model is reasonable, achieving fast and accurate drilling, improving work efficiency, and at the same time ensuring the safety of workers during operation. Description of the drawings
[0009] The following will further describe the present utility model in conjunction with the drawings. Figure 1 It is the front view structural schematic diagram of the present utility model. Figure 2 For Figure 1 The top view structural schematic diagram. Specific implementation mode
[0010] A hanger bar drilling tool for building installation construction controlled by a scissor lift, such as Figure 1 、 Figure 2As shown in the figure, it includes a manual scissor lift 1. Universal wheels 3 are installed at the bottom of the base 2. A vertical laser emitter 4 is installed at the center of the base 2. The manual scissor lift 1 is fixedly installed on the base 2. The central hole of the lifting seat 5 of the manual scissor lift 1 is concentric with the emission center of the vertical laser emitter 4. An adjustable-length support column is fixedly connected to the lifting seat 5 of the manual scissor lift 1. An impact drill 7 is fixedly installed on the support 6 provided at the upper end of the adjustable-length support column. The structure of the adjustable-length support column is composed of an upper steel pipe 8, a middle steel pipe 9, and a lower steel pipe 10. Connecting threads are respectively provided at the adjacent ends of these three steel pipes and are connected into one body through a sleeve 11 with internal threads. Among them, the middle steel pipe 9 is set as a steel pipe with a replaceable different length to meet the requirements of different construction operation heights. The structure of the base 2 is a square frame composed of square steel pipes. Crisscross support beams are arranged inside the frame. Universal wheels 3 with braking devices are respectively installed below the base 2. The support 12 below the manual scissor lift 1 is fixedly connected to the base 2 by threaded connection.
Claims
1. A punching tool for construction installation suspension bars controlled by a scissor lift, comprising a hand-operated scissor lift (1), characterized in that: at The bottom of the base (2) is equipped with universal wheels (3). A vertical laser emitter (4) is installed at the center of the base (2). A manual scissor lift (1) is fixedly installed on the base (2). The central hole of the lifting seat (5) of the manual scissor lift (1) is concentric with the emission center of the vertical laser emitter (4). An adjustable-length support column is fixedly connected to the lifting seat (5) of the manual scissor lift (1). An impact drill (7) is fixedly installed on the support (6) provided at the upper end of the adjustable-length support column.
2. The construction installation construction hanger punching tool controlled by a scissor lifter according to claim 1, characterized in that: The structure of the adjustable-length support column is composed of an upper steel pipe (8), a middle steel pipe (9), and a lower steel pipe (10). Connecting threads are respectively provided at the adjacent ends of these three steel pipes and are connected into one body through a sleeve (11) with internal threads. Among them, the middle steel pipe (9) is set as a steel pipe with a replaceable different length to meet the requirements of different construction operation heights.
3. A punching tool for construction installation hanging bars controlled by a scissor lifter according to claim 1, characterized in that: The structure of the base (2) is a square frame composed of square steel pipes. Support beams are arranged vertically and horizontally inside the frame. Universal wheels (3) with braking devices are respectively installed under the base (2).
4. A punching tool for construction installation suspension bars controlled by a scissor lifter according to claim 1, characterized in that: The support (12) below the manual scissor lift (1) is fixedly connected to the base (2) through threaded connection.