Supporting device for gas engineering construction
By designing support devices with adjustable positioning components and diversion components, the adaptability and rainwater erosion problems of support devices in gas engineering construction are solved, stable support and rainwater diversion for pipelines of different specifications are achieved, and construction safety is improved.
Patent Information
- Application Number
- CN202423047598.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-11
- Publication Date
- 2025-09-12
- Estimated Expiration
- 2034-12-11
AI Technical Summary
In existing gas engineering construction, the support device is difficult to adapt to the adjustment and positioning of gas pipelines of different specifications, and rainwater easily accumulates and causes pipeline erosion.
A support device including a positioning component and a diversion component is designed. The positioning component fixes pipes of different diameters through adjustable positioning blocks and movable plates, and the diversion component diverts rainwater through an inclined base and a through groove to reduce pipe erosion.
It achieves stable support and positioning of gas pipelines of different diameters, reduces erosion of pipelines by rainwater accumulation, and improves construction safety.
Smart Images

Figure CN223331269U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of gas engineering, in particular to a supporting device for gas engineering construction. Background Art
[0002] Gas engineering construction includes pipeline design, pipeline laying, pipeline docking, etc. When laying underground pipelines, support devices are used to ensure the safety and stability of the gas pipelines.
[0003] The publication number is CN215522253U, which provides a support device for laying gas engineering pipelines, including a frame, an installation clamp and an installation arc groove. A reinforcement ring is installed at the inner center position of the frame, and a reinforcement beam is installed on the inner side of the reinforcement ring.
[0004] The above-mentioned support device can be installed in multiple ways, including vertical installation, side installation and hanging installation. However, when laying the device underneath, it is not convenient to adjust the support and positioning position due to the different diameters of gas pipelines of different specifications. When rainwater enters, it is easy to gather and evaporate, causing erosion of the gas pipeline, and it is not convenient to separate and guide it for discharge. Utility Model Content
[0005] The purpose of the utility model is to provide a support device for gas engineering construction to solve the technical problems in the background technology.
[0006] To achieve the above objectives, the present invention provides the following technical solutions:
[0007] A support device for gas engineering construction, including a support box, wherein several top plates are installed on the top of the support box, a positioning assembly is installed near the top of the interior of the support box, and a guide assembly is installed on the inner walls on both sides of the support box. The positioning assembly includes two fixed plates and two movable plates, and the two fixed plates are respectively fixedly installed at the front and rear ends of the interior of the support box, and screws are fixedly installed at both ends of the top of the fixed plate. The movable plate is sleeved on the outside of the two screws in the corresponding fixed plate, and the outside of the screw is connected to a bolt cap. Several group positioning holes are opened at both ends of the top of the fixed plate, and two positioning blocks are installed on the top of the fixed plate. Two positioning bolts are connected to the outside of the top of the positioning block.
[0008] Preferably, the movable plate is movably sleeved on the outside of the two screw rods, and the bolt cap and the screw rods are threadedly connected.
[0009] Preferably, each group of positioning holes has two positioning holes, and the bottom end of the positioning bolt is threadedly connected to the positioning hole.
[0010] Preferably, the inner surface of the top of the positioning block is arc-shaped, and the two positioning blocks are symmetrically arranged with each other.
[0011] Preferably, the guide assembly includes a base and two partitions, the base is fixedly installed inside the support box near the bottom end, the two partitions are respectively fixedly installed on the top of the base near both sides, a number of through grooves are opened between the bottom of the partition and the base, guide grooves are provided between the two sides of the base and the inner walls of the support box on both sides, and two limit grooves are opened on the top of the partition.
[0012] Preferably, the top surfaces of the base are inclined at both sides, and the partition is vertically installed at the top of the base.
[0013] Preferably, the height of the top of the partition is lower than the height of the support box, and the limiting groove is used for the placement of the movable plate.
[0014] Compared with the prior art, the beneficial effects of the present invention are:
[0015] 1) The support device is provided with a positioning assembly, and the positioning block is fixed to the top of the fixed plate by a positioning bolt. By adjusting the distance between the two positioning blocks, it is convenient to support and position gas pipelines of different diameters. The movable plate is sleeved on the outside of the two screws. The connection of the bolt cap facilitates the adjustment and disassembly of the compression degree of the movable plate, facilitates the placement and adjustment of the gas pipeline, and enhances the fixation of the gas pipeline.
[0016] 2) The support device is provided with a diversion component. Rainwater passes through the inclined surface at the top of the base and flows into the diversion groove through the through groove, reducing the accumulation of rainwater under the gas pipeline. The rainwater is discharged through the diversion groove and the water vapor is separated by the partition, reducing the erosion of the gas pipeline. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a schematic diagram of the overall structure of a support device for gas engineering construction according to the present utility model;
[0018] Figure 2 This is a structural diagram of the positioning assembly in an embodiment of the present utility model;
[0019] Figure 3 This is a schematic structural diagram of the flow guide assembly in an embodiment of the present utility model;
[0020] Figure 4 It is a front view of the entire embodiment of the present invention.
[0021] In the figure: 1. Support box; 2. Top plate; 3. Positioning assembly; 4. Guide assembly; 5. Fixed plate; 6. Movable plate; 7. Screw; 8. Bolt cap; 9. Positioning hole; 10. Positioning block; 11. Positioning bolt; 12. Base; 13. Partition; 14. Through groove; 15. Guide groove; 16. Limit groove. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.
[0023] Example 1
[0024] Combine Figure 1-Figure 4 A support device for gas engineering construction includes a support box 1, a plurality of top plates 2 are installed on the top of the support box 1, a positioning component 3 is installed near the top of the support box 1, and a guide component 4 is installed on the inner walls of both sides of the support box 1.
[0025] See Figure 2 , it is further obtained that the positioning assembly 3 includes two fixed plates 5 and two movable plates 6. The two fixed plates 5 are respectively fixedly installed at the front and rear ends of the support box 1. Screws 7 are fixedly installed on the top of the fixed plate 5 at both ends. The movable plate 6 is sleeved on the outside of the two screws 7 in the corresponding fixed plate 5. The outside of the screw 7 is connected with a bolt cap 8. A number of group positioning holes 9 are opened on the top of the fixed plate 5 at both ends. Two positioning blocks 10 are installed on the top of the fixed plate 5. Two positioning bolts 11 are connected to the outside of the top of the positioning block 10.
[0026] The movable plate 6 is movably sleeved on the outside of the two screw rods 7, and the bolt cap 8 and the screw rod 7 are threadedly connected. The connection between the bolt cap 8 and the screw rod 7 facilitates the adjustment of the tightness of the movable plate 6.
[0027] There are two positioning holes 9 in each group. The bottom end of the positioning bolt 11 is threadedly connected to the positioning hole 9 . The positioning hole 9 is used to connect the positioning bolt 11 to facilitate the fixation of the positioning block 10 .
[0028] The inner surface of the top of the positioning block 10 is arc-shaped, and the two positioning blocks 10 are symmetrically arranged with each other. The gas pipeline is supported and fixed by the two positioning blocks 10.
[0029] Specifically, the two positioning blocks 10 are fixed to the designated position on the top of the fixed plate 5 by the positioning bolts 11, and the gas pipeline is placed between the positioning blocks 10 of the two fixed plates 5. By sleeve-fitting the movable plate 6 onto the outside of the two screw rods 7, the movable plate 6 is pressed and fixed on the top of the gas pipeline through the connection of the bolt cap 8.
[0030] Example 2
[0031] See Figure 3, and on the basis of Example 1, it is further obtained that the guide component 4 includes a base 12 and two partitions 13, the base 12 is fixedly installed inside the support box 1 near the bottom end, and the two partitions 13 are respectively fixedly installed on the top of the base 12 near both sides, and a plurality of through grooves 14 are opened between the bottom of the partition 13 and the base 12, and guide grooves 15 are provided between the two sides of the base 12 and the inner walls of the support box 1 on both sides, and two limit grooves 16 are opened on the top of the partition 13.
[0032] The top surfaces of the base 12 on both sides are inclined, and the partition 13 is located on the top of the base 12 and is installed vertically. The partition 13 separates the water vapor in the guide groove 15 to reduce the erosion of the gas pipeline by the water vapor.
[0033] The height of the top of the partition 13 is lower than that of the support box 1 . The limiting groove 16 is used to place the movable plate 6 . Rainwater dripping through the through groove 14 enters the guide groove 15 and is guided and discharged through the guide groove 15 .
[0034] Specifically, rainwater drops onto the base 12 and enters the guide groove 15 through the inclined surface of the base 12 and the through groove 14 , and is guided and discharged through the guide groove 15 , while the partition 13 reduces the erosion of the gas pipeline by water vapor.
[0035] In actual operation, multiple support boxes 1 are installed in sequence in the pipeline foundation pit, and then the fixing plate 5 is used to support the gas pipeline, and the top plate 2 is used to provide protection for the top of the support box 1;
[0036] When fixing, install the two positioning blocks 10 at the corresponding positions on the top of the fixed plate 5, connect the positioning bolts 11 with the positioning holes 9 for fixing, adjust the positions of the two positioning blocks 10 through the positioning holes 9 to adapt to gas pipelines of different diameters, support and position the outside of the gas pipeline through the positioning blocks 10, then sleeve the movable plate 6 onto the outside of the two screws 7, and connect the bolt caps 8 with the screws 7 so that the movable plate 6 presses the gas pipeline for fixing;
[0037] During diversion, part of the rainwater enters the support box 1 through the gap in the top plate 2, and flows into the two diversion grooves 15 respectively through the inclined surfaces and through grooves 14 on both sides of the top of the base 12, thereby reducing the accumulation of rainwater under the gas pipeline. The rainwater is guided and discharged through the diversion grooves 15, and the water vapor is separated by the partition 13, thereby reducing the erosion of the gas pipeline.
[0038] Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A support device for gas engineering construction, comprising a support box (1), wherein a plurality of top plates (2) are installed on the top of the support box (1), characterized in that: A positioning assembly (3) is installed at the top of the support box (1), and flow guide assemblies (4) are installed on the inner walls of both sides of the support box (1); The positioning assembly (3) comprises two fixed plates (5) and two movable plates (6), the two fixed plates (5) being fixedly mounted on the front and rear ends of the support box (1), the top of the fixed plate (5) being fixedly mounted with screw rods (7) at both ends, the movable plate (6) being sleeved on the outside of the two screw rods (7) in the corresponding fixed plate (5), the outside of the screw rods (7) being connected with bolt caps (8), the top of the fixed plate (5) being provided with a plurality of group positioning holes (9) at both ends, the top of the fixed plate (5) being provided with two positioning blocks (10), and the top of the positioning block (10) being connected with two positioning bolts (11) at the outside thereof.
2. A support device for gas engineering construction according to claim 1, characterized in that: The movable plate (6) is movably sleeved on the outside of the two screw rods (7), and the bolt cap (8) and the screw rods (7) are threadedly connected.
3. A support device for gas engineering construction according to claim 1, characterized in that: The number of each group of positioning holes (9) is two, and the bottom end of the positioning bolt (11) is threadedly connected to the positioning hole (9).
4. A support device for gas engineering construction according to claim 1, characterized in that: The inner surface of the top of the positioning block (10) is arranged in an arc shape, and the two positioning blocks (10) are arranged symmetrically with each other.
5. A support device for gas engineering construction according to claim 1, characterized in that: The guide assembly (4) includes a base (12) and two partitions (13), wherein the base (12) is fixedly mounted inside the support box (1) near the bottom end, and the two partitions (13) are respectively fixedly mounted on the top of the base (12) near both sides, and a plurality of through grooves (14) are provided between the bottom of the partition (13) and the base (12), and guide grooves (15) are provided between both sides of the base (12) and the inner walls of both sides of the support box (1), and two limit grooves (16) are provided on the top of the partition (13).
6. A support device for gas engineering construction according to claim 5, characterized in that: The top of the base (12) is arranged to be inclined on both sides, and the partition (13) is located on the top of the base (12) and is installed vertically.
7. A support device for gas engineering construction according to claim 5, characterized in that: The height of the top of the partition (13) is lower than the height of the support box (1), and the limiting groove (16) is used for arranging the movable plate (6).
Citation Information
Patent Citations
Supporting device for gas engineering pipeline laying
CN215522253U