Large-load assembled hanging basket

By using a U-shaped intermediate partition and connecting reinforcement plate in the suspended platform, the problem of insufficient structural strength of traditional suspended platforms under heavy loads is solved, thereby improving stability and safety and extending service life.

CN223634322UActive Publication Date: 2025-12-05WATSON TECH GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202423235173.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-27
Publication Date
2025-12-05
Estimated Expiration
2034-12-27

AI Technical Summary

Technical Problem

Traditional assembled suspended platforms lack structural strength and stability when faced with large-sized and heavy-load tasks, which may lead to the basket panels opening or misaligning, affecting work efficiency and threatening safety.

Method used

The design employs a U-shaped middle partition and connecting reinforcing plates, and uses positioning holes and positioning bolts to achieve accurate installation of the basket frame, enhancing the bottom load-bearing strength, while using aluminum alloy materials to ensure lightweight and corrosion resistance.

Benefits of technology

It effectively prevents the basket panels from opening or shifting position, enhances the structural rigidity of the suspended basket, reduces the risk of cracks caused by subsidence in the middle section, extends service life, and improves safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223634322U_ABST
    Figure CN223634322U_ABST
Patent Text Reader

Abstract

The utility model relates to a large-load assembled hanging basket, and relates to the field of high-altitude operation. Due to the fact that the U-shaped middle partition plate is arranged between every two sets of basket frames, the positioning function is achieved, the accurate installation size between the sets of basket frames is guaranteed, and the situation that the basket pieces stretch towards the two sides or deviate is effectively prevented. In addition, a connecting reinforcing plate is further arranged on the lower portion between every two sets of basket frames, the consistency of the relative installation distance of the first positioning bolts between every two adjacent basket pieces is maintained by accurately controlling the hole distance, and therefore the rigidity and the supporting force of the whole hanging basket bottom structure are enhanced. Particularly, when the hanging basket is in a full-load working state, the risk that the connecting part cracks due to sinking of the middle part can be remarkably reduced through the improvement, then the first positioning bolt is protected against the influence of extra stress, and the service life of the whole hanging basket is prolonged.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to high altitude operation technical field especially relates to a big load assembled basket. BACKGROUND

[0002] In the field of building construction, external wall cleaning and other high altitude operation, the hanging basket as an important auxiliary equipment is widely used. With the change of market demand and the development of technology, the demand for hanging baskets capable of carrying large load and having higher safety and stability is increasing.

[0003] Although the traditional assembled hanging basket has certain flexibility and adaptability, when facing large size and heavy load task, there are often problems of insufficient structural strength and poor stability, especially in the case of long time bearing large load, the basket piece may be opened or misaligned, which not only affects the work efficiency, but also poses a potential threat to the safety of the operator. SUMMARY

[0004] The utility model aims at providing a big load assembled hanging basket to solve the above-mentioned prior art problems.

[0005] To achieve the above-mentioned purpose, the utility model adopts the technical scheme that:

[0006] A big load assembled hanging basket, comprising a steel wire rope connected with the lifting mechanism of a building or structure at the upper end, the lower end of the steel wire rope is connected with a hanging point hanging plate, a plurality of basket frames are assembled between two hanging point hanging plates, the middle partition plate between every two groups of basket frames is connected through a U-shaped middle partition plate, a plurality of first positioning holes are distributed on the middle partition plate, a plurality of first mounting holes corresponding to the plurality of first positioning holes are arranged on the basket frame, and the plurality of first mounting holes and the plurality of first positioning holes are detachably connected through first positioning bolts.

[0007] In a possible implementation manner, the lower part between every two groups of basket frames is further reinforced through a connecting reinforcing plate to enhance the stress intensity of the bottom of the big load assembled hanging basket.

[0008] In a possible implementation manner, two second positioning holes are symmetrically distributed on the connecting reinforcing plate, two second mounting holes corresponding to the two second positioning holes are arranged on the basket frame, and the two second mounting holes and the two second positioning holes are detachably connected through second positioning bolts.

[0009] In a possible implementation manner, each group of basket frames comprises two basket pieces oppositely spaced, and a basket bottom connected to the bottom of the two basket pieces, and the basket piece and the basket bottom are detachably connected through third positioning bolts.

[0010] In a possible implementation, the lower end of the steel wire rope is connected to the hanging point hanging plate through a steel wire rope joint.

[0011] In a possible implementation, the lengths of the plurality of groups of the basket frames are the same or have at least two different lengths.

[0012] In a possible implementation, the plurality of first positioning holes are uniformly distributed on the intermediate partition plate.

[0013] In a possible implementation, the hanging point hanging plate and the basket frame are both made of aluminum alloy.

[0014] The technical scheme provided by the utility model has at least the following beneficial effects:

[0015] The intermediate partition plate arranged in a U shape between every two groups of basket frames not only plays a positioning role and ensures the accurate installation size between the groups of basket frames, but also effectively prevents the basket sheets from being opened to both sides or from being deviated in position. In addition, the connecting reinforcement plate arranged at the lower part between every two groups of basket frames maintains the consistency of the relative installation distance of the first positioning bolts between two adjacent basket sheets by precisely controlling the hole distance, thereby enhancing the rigidity and support force of the entire hanging basket bottom structure. In particular, when the hanging basket is in a full load working state, this improvement can significantly reduce the risk of cracks at the connecting position caused by the sinking of the middle part, thereby protecting the first positioning bolts from the influence of additional stress and prolonging the service life of the entire hanging basket. BRIEF DESCRIPTION OF DRAWINGS

[0016] The accompanying drawings are used to provide a further understanding of the utility model, and constitute a part of the specification, and are used to explain the utility model together with embodiments of the utility model, and do not constitute a limitation on the utility model.

[0017] Figure 1 A front view of the large-load assembled hanging basket provided by an example embodiment of the utility model is shown.

[0018] Figure 2 A bottom view of the large-load assembled hanging basket provided by an example embodiment of the utility model is shown.

[0019] Figure 3 A front view of the intermediate partition plate of the large-load assembled hanging basket provided by an example embodiment of the utility model is shown.

[0020] In the figure: 1, steel wire rope; 2, hanging point hanging plate; 3, basket frame; 301, basket sheet; 302, basket bottom; 4, intermediate partition plate; 401, first positioning hole; 5, connecting reinforcement plate; 501, second positioning hole; 6, steel wire rope joint. DETAILED DESCRIPTION

[0021] The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments of the present application, all other embodiments obtained by those skilled in the art without creative work fall within the scope of the present application.

[0022] In the description below, the terms "front", "back", "left", "right", "top" and "bottom" refer to the directions in the drawings accompanying the present application, and the terms "bottom surface" and "top surface", "inner" and "outer" refer to the directions towards or away from a specific part. In addition, the terms "first" and "second" are used only for the purpose of description, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features with "first" and "second" can explicitly or implicitly include one or more features. In the description of the present application, the meaning of "multiple" is two or more.

[0023] The present application will be further described below with reference to the drawings and embodiments.

[0024] Figure 1 Fig. 1 shows a front view of a large-load assembled hanging basket provided by an exemplary embodiment of the present application, Figure 2 Fig. 2 shows a bottom view of a large-load assembled hanging basket provided by an exemplary embodiment of the present application, Figure 3 Fig. 3 shows a front view of a middle partition plate of a large-load assembled hanging basket provided by an exemplary embodiment of the present application.

[0025] In detail, the large-load assembled hanging basket comprises a steel wire rope 1 connected to a lifting mechanism of a building or structure at an upper end, a lower end of the steel wire rope 1 is connected to a hanging point hanging plate 2, a plurality of basket frames 3 are assembled between two hanging point hanging plates 2, each two basket frames 3 are connected by a U-shaped middle partition plate 4, the middle partition plate 4 is distributed with a plurality of first positioning holes 401, the basket frame 3 is provided with a plurality of first mounting holes corresponding to the plurality of first positioning holes 401, and the plurality of first mounting holes and the plurality of first positioning holes 401 are detachably connected by first positioning bolts.

[0026] Specifically, each group of basket frames 3 comprises two basket sheets 301 spaced apart and opposite to each other, and a basket bottom 302 connected to the bottom of the two basket sheets 301, and the basket sheet 301 and the basket bottom 302 are detachably connected by third positioning bolts.

[0027] In the embodiments of the present application, the middle partition plate 4 arranged in a U shape between every two groups of basket frames 3 not only plays a positioning role and ensures the accurate installation size between the groups of basket frames 3, but also effectively prevents the basket sheets 301 from being opened to both sides or from being deviated.

[0028] It is worth mentioning that the lower end of the steel wire rope 1 is connected with the hanging point hanging plate 2 through the steel wire rope joint 6.

[0029] In one example, the length sizes of the multiple groups of basket frames 3 are all the same, and the large-load assembled hanging basket is assembled by multiple groups of basket frames 3 with a length of 3 meters.

[0030] In another example, the multiple groups of basket frames 3 have at least two different length sizes, and the large-load assembled hanging basket is assembled by multiple groups of basket frames 3 with a length of 3 meters and basket frames 3 with a length of 2 meters.

[0031] Preferably, the multiple first positioning holes 401 are uniformly and spacedly distributed on the middle partition plate 4.

[0032] Further, the lower part between every two groups of basket frames 3 is also reinforced by the connecting reinforcing plate 5 to enhance the stress intensity of the bottom of the large-load assembled hanging basket. The connecting reinforcing plate 5 is symmetrically provided with two second positioning holes 501, and the basket frame 3 is provided with two second mounting holes corresponding to the two second positioning holes 501, and the two second mounting holes are detachably connected with the two second positioning holes 501 through second positioning bolts.

[0033] In the embodiments of the present application, the connecting reinforcing plate 5 is further arranged at the lower part between every two groups of basket frames 3, which maintains the consistency of the relative installation distance of the first positioning bolts between two adjacent basket sheets 301 by accurately controlling the hole distance, thereby enhancing the rigidity and support of the bottom structure of the entire hanging basket. In particular, when the hanging basket is in a full-load working state, this improvement can significantly reduce the risk of cracks at the connecting part due to the sinking of the middle part, thereby protecting the first positioning bolts from additional stress and prolonging the service life of the entire hanging basket.

[0034] As a supplementary description, the hanging point hanging plate 2 and the basket frame 3 are both made of aluminum alloy.

[0035] In conclusion, the large load assembling basket is connected with the steel wire 1 at the upper end of the building or structure lifting mechanism, the lower end of the steel wire 1 is connected with the lifting point hanging plate 2 through the steel wire joint 6, a plurality of groups of basket frames 3 are assembled between the two lifting point hanging plates 2, the middle partition plate 4 in the U-shaped form is arranged between every two groups of basket frames 3, a plurality of first positioning holes 401 on the middle partition plate 4 are aligned with the first mounting holes on the basket frame 3 and are detachably fixed through the first positioning bolt, the accurate installation size between the groups of basket frames 3 is ensured and the basket sheet 301 is prevented from being opened to both sides or deviated, meanwhile, every group of basket frames 3 comprises the two basket sheets 301 oppositely spaced and the basket bottom 302 connected at the bottom, the basket sheet 301 and the basket bottom 302 are connected through the third positioning bolt, in order to adapt to different length requirements, the basket frame 3 can be all 3 meters long or be combined with different lengths of 3 meters and 2 meters, in addition, the connecting reinforcing plate 5 is arranged at the lower part between every two groups of basket frames 3 to enhance the stress intensity at the bottom, the second positioning hole 501 on the connecting reinforcing plate 5 is fixed with the second mounting hole on the basket frame 3 through the second positioning bolt, so that the consistency of the relative installation distance of the first positioning bolt between the adjacent basket sheets 301 is accurately controlled, thereby the structural rigidity and the supporting force are increased, the risk of cracks caused by the sinking of the middle part under the full load working state is significantly reduced, the first positioning bolt is protected from the additional stress and the service life is prolonged, and it is worth noting that all the components such as the lifting point hanging plate 2 and the basket frame 3 are made of aluminum alloy to ensure the lightness and the corrosion resistance.

[0036] In the embodiments disclosed in the present application, the terms "mounting", "connecting", "connecting", "fixing" and the like should be understood in a broad sense, for example, "connecting" can be fixed connection, or detachable connection, or integral connection; "connecting" can be direct connection, or indirect connection through an intermediate medium. For ordinary skilled in the art, the specific meaning of the above terms in the embodiments disclosed in the present application can be understood according to the specific circumstances.

[0037] The above is only the preferred embodiment of the present application, and it should be pointed out that for ordinary skilled in the art, without departing from the principle of the present application, a number of improvements and refinements can be made, and these improvements and refinements should also be considered as the protection scope of the present application.

Claims

1. A heavy load assembly hoist basket comprising a steel wire rope (1) connected to a lifting mechanism of a building or structure at its upper end, characterized in that, The lower end of the steel wire rope (1) is connected with a hanging point hanging plate (2), a plurality of groups of basket frames (3) are assembled between two hanging point hanging plates (2), every two groups of basket frames (3) are connected through a U-shaped middle partition plate (4), a plurality of first positioning holes (401) are distributed on the middle partition plate (4), the basket frame (3) has a plurality of first mounting holes corresponding to the plurality of first positioning holes (401), and the plurality of first mounting holes and the plurality of first positioning holes (401) are detachably connected through first positioning bolts.

2. The large load assembly basket of claim 1, wherein, The lower part between every two groups of basket frames (3) is also enhanced through a connecting reinforcing plate (5) to enhance the stress intensity of the bottom of the large load assembled hanging basket.

3. The large load assembly basket of claim 2, wherein, The connecting reinforcing plate (5) is symmetrically distributed with two second positioning holes (501), the basket frame (3) has two second mounting holes corresponding to the two second positioning holes (501), and the two second mounting holes and the two second positioning holes (501) are detachably connected through second positioning bolts.

4. The heavy load assembly hoist basket of claim 1, wherein, Each group of basket frames (3) comprises two basket sheets (301) which are spaced apart and opposed, and a basket bottom (302) connected to the bottom of the two basket sheets (301), and the basket sheet (301) and the basket bottom (302) are detachably connected through third positioning bolts.

5. The heavy load assembly hoist basket of claim 1, wherein, The lower end of the steel wire rope (1) is connected with the hanging point hanging plate (2) through a steel wire rope joint (6).

6. The large load assembly basket of claim 1, wherein, The length dimensions of the plurality of groups of basket frames (3) are the same or have at least two different length dimensions.

7. The large load assembly basket of claim 1, wherein, The plurality of first positioning holes (401) are uniformly and spacedly distributed on the middle partition plate (4).

8. The large load assembly basket of claim 1, wherein, The hanging point hanging plate (2) and the basket frame (3) are both made of aluminum alloy.