Cement pouring supporting device

CN223837861UActive Publication Date: 2026-01-27GUIZHOU HENGXIN ENGINEERING SERVICES CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520212726.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-02-11
Publication Date
2026-01-27
Estimated Expiration
2035-02-11

AI Technical Summary

Technical Problem

In existing cement pouring support devices, the installation error of the baffle makes it difficult for the reinforcing bars to pass through the round hole, which reduces the cement pouring rate.

Method used

The steel cage is fixed by horizontal elongated holes set on the first and second baffles and by first nuts, second nuts, first washers and second washers. The structural strength is improved by combining reinforcing plates and reinforcing bars, and the steel bars are easy to pass through and fix.

Benefits of technology

This improved the cement pouring rate, ensured that the reinforcing cage was not easily moved during the casting process, and improved the quality of highway construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223837861U_ABST
    Figure CN223837861U_ABST
Patent Text Reader

Abstract

The utility model discloses a cement pouring supporting device, and belongs to the technical field of cement pouring supporting equipment, the cement pouring supporting device comprises a base, a first baffle, a second baffle and a third baffle, the first baffle is provided with a first long round hole, the first baffle is provided with a first piston in the first long round hole, the second baffle is provided with a second long round hole, and the third baffle is provided with a second piston in the second long round hole. The second baffle is provided with a second piston in the second oblong hole, and the first oblong hole and the second oblong hole are both arranged in the horizontal direction. The reinforcing steel bars in the first baffle, the second baffle and the third baffle can pass through a first long round hole and a second long round hole, the reinforcing steel bars can conveniently penetrate through the first baffle and the second baffle, and therefore the cement pouring rate is increased, meanwhile, a first piston is inserted into the first long round hole, and a second piston is inserted into the second long round hole; and cement is not easy to leak from the oblong hole during pouring.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the technical field of cement pouring support equipment, and in particular discloses a cement pouring support device. Background Technology

[0002] During highway construction, cement pouring is required, which inevitably involves the use of support devices. These support devices provide fixation and improve stability during cement pouring, making them an indispensable part of highway construction.

[0003] Existing concrete pouring support devices include a base and a baffle plate set on the upper surface of the base. The base and the baffle plate form a enclosure, and steel bars are fixed inside the enclosure. Highway construction is achieved by pouring cement into the enclosure.

[0004] In response to the aforementioned prior art, the inventors discovered that in the prior art, circular holes are typically provided on the reinforcing bar baffles to ensure their integrity. However, existing baffles along the length direction are often formed by fixing multiple baffles together. Due to installation errors, the circular holes on some baffles may not be able to allow the reinforcing bars to pass through, thereby reducing the cement pouring rate. Utility Model Content

[0005] In order to improve the cement pouring rate, this application provides a cement pouring support device.

[0006] This application provides a cement pouring support device, which adopts the following technical solution:

[0007] A cement pouring support device includes a base, a first baffle, a second baffle, and a third baffle. The first and second baffles are disposed opposite each other on the upper surface of the base. Two third baffles are disposed opposite each other on the upper surface of the base. One side of the third baffle is connected to the first baffle, and the other side of the third baffle is connected to the second baffle. The first baffle has a first elongated hole, and the second baffle has a second elongated hole. Both the first and second elongated holes are arranged horizontally. A reinforcing cage is disposed on the base, and the reinforcing bars on the reinforcing cage pass through the first and second elongated holes.

[0008] By adopting the above technical solution, the reinforcing bars in the first baffle, the second baffle, and the third baffle can pass through the first elongated oval hole and the second elongated oval hole, which facilitates the reinforcing bars to pass through the first baffle and the second baffle, thereby improving the cement pouring rate.

[0009] Optionally, the two ends of the reinforcing bar are respectively threaded with a first nut and a second nut, the reinforcing bar is fitted with a first pad on the outside of the first baffle, the first pad is located between the first baffle and the first nut, and the reinforcing bar is fitted with a second pad on the outside of the second baffle, the second pad is located between the second baffle and the second nut.

[0010] By adopting the above technical solution, the steel cage can be fixed between the first baffle and the second baffle through the first nut, the second nut, the first washer, and the second washer, which facilitates the installation of the steel cage and makes it less likely to move during the casting process.

[0011] Optionally, a first reinforcing plate is fixed to the outer side of the first baffle outside the first elongated hole, and a second reinforcing plate is fixed to the outer side of the second baffle outside the second elongated hole.

[0012] By adopting the above technical solution, the first reinforcing plate can improve the structural strength at the first elongated hole, and the second reinforcing plate can improve the structural strength at the second elongated hole.

[0013] Optionally, a first reinforcing rib is fixed to the outer side of the first baffle, and a second reinforcing rib is fixed to the outer side of the second baffle.

[0014] By adopting the above technical solution, the setting of the first reinforcing rib improves the structural strength of the first baffle, and the setting of the second reinforcing rib improves the structural strength of the second baffle.

[0015] Optionally, multiple first baffles are provided, and the multiple first baffles are fixed together by a first bolt; multiple second baffles are provided, and the multiple second baffles are fixed together by a second bolt.

[0016] By adopting the above technical solution, it is convenient to install or remove multiple first baffles, and at the same time, it is convenient to install or remove multiple second baffles.

[0017] Optionally, the first baffle and the third baffle are fixed together by a third bolt.

[0018] By adopting the above technical solution, it is convenient to install or disassemble the first baffle and the third baffle.

[0019] Optionally, the second baffle and the third baffle are fixed together by a fourth bolt.

[0020] By adopting the above technical solution, it is convenient to install or disassemble the second and third baffles.

[0021] Optionally, the first baffle and the second baffle are fixed to the base by a fifth bolt.

[0022] By adopting the above technical solution, it is convenient to install or disassemble the first baffle and the second baffle.

[0023] In summary, this application includes at least one of the following beneficial technical effects:

[0024] 1. The reinforcing bars in the first baffle, the second baffle, and the third baffle can pass through the first elongated oval hole and the second elongated oval hole, which facilitates the reinforcing bars to pass through the first baffle and the second baffle, thereby improving the cement pouring rate;

[0025] 2. The first nut, the second nut, the first washer, and the second washer can fix the steel cage between the first baffle and the second baffle, which facilitates the installation of the steel cage and makes it less likely to move during the casting process;

[0026] 3. The first reinforcing plate can improve the structural strength at the first elongated hole, and the second reinforcing plate can improve the structural strength at the second elongated hole. Attached Figure Description

[0027] Figure 1 This is a schematic diagram of the overall structure of this application.

[0028] Figure 2 This is a schematic diagram of the structure of the first baffle in this application.

[0029] Figure 3 This is a partial structural schematic diagram illustrating the first elongated hole.

[0030] Figure 4 This is a schematic diagram of the structure of the second baffle in this application.

[0031] Figure 5 This is a partial structural schematic diagram illustrating the second elongated hole.

[0032] Explanation of reference numerals in the attached drawings: 1. Base; 2. First baffle; 21. First elongated hole; 22. First reinforcing plate; 23. First reinforcing rib; 3. Second baffle; 31. Second elongated hole; 32. Second reinforcing plate; 33. Second reinforcing rib; 4. Third baffle; 5. First bolt; 6. Second bolt; 7. Third bolt; 8. Fourth bolt; 9. Fifth bolt; 100. Reinforcing bar; 101. First nut; 102. Second nut; 103. First pad; 104. Second pad. Detailed Implementation

[0033] The following is in conjunction with the appendix Figure 1-5 This application will be described in further detail.

[0034] This application discloses a cement pouring support device. (Refer to...) Figure 1 , Figure 2 as well as Figure 4A cement pouring support device includes a base 1, a first baffle 2, a second baffle 3, and a third baffle 4. Multiple first baffles 2 and 3 are provided, and the number of first baffles 2 and second baffles 3 is the same. The first baffles 2 and 3 are arranged opposite each other and are fixed to the upper surface of the base 1 by fifth bolts 9, facilitating the installation or removal of the first baffles 2 and 3. Two third baffles 4 are provided, arranged opposite each other on the upper surface of the base 1. One side of the third baffle 4 is fixedly connected to the first baffle 2 by a third bolt, and the other side of the third baffle 4 is fixedly connected to the second baffle 3 by a fourth bolt 8, facilitating the installation or removal of the two third baffles 4. A reinforcing cage is placed in the middle of the upper surface of the base 1. The reinforcing bars 100 on the reinforcing cage pass between the first baffles 2 and the second baffles 3.

[0035] Reference Figure 1-3 The outer side of the first baffle 2 is fixed with interlaced first reinforcing ribs 23 to enhance the structural strength of the first baffle 2. The outermost longitudinal first reinforcing ribs 23 of two adjacent first baffles 2 are fixedly connected by first bolts 5, facilitating the installation or disassembly of multiple first baffles 2. Multiple horizontally arranged first elongated holes 21 are evenly provided on the outer side of the first baffle 2. A first reinforcing plate 22 is fixed outside the first elongated holes 21 on the outer side of the first baffle 2. The first reinforcing plate 22 has elongated holes of the same shape as the first elongated holes 21, enhancing the structural strength of the first baffle 2 at the first elongated holes 21. One end of the reinforcing bar 100 passes through the first elongated hole 21 of the first baffle 2, and a first pad 103 is fitted onto the end of the reinforcing bar 100 passing through the first baffle 2. A first nut 101 is threadedly connected to the outside of the first pad 103 of the reinforcing bar 100 passing through the first baffle 2, facilitating the fixing of the reinforcing cage.

[0036] Reference Figure 1 , Figure 4 as well as Figure 5The outer side of the second baffle 3 is fixed with interlaced second reinforcing ribs 33 to enhance the structural strength of the second baffle 3. The outermost longitudinal second reinforcing ribs 33 of two adjacent second baffles 3 are fixedly connected by second bolts 6, facilitating the installation or disassembly of multiple second baffles 3. Multiple horizontally arranged second elongated holes 31 are evenly provided on the outer side of the second baffle 3. The number of second elongated holes 31 is the same as the number of second elongated holes 31, and their positions correspond. A second reinforcing plate 32 is fixed to the outer side of the second baffle 3 outside the second elongated holes 31. The second reinforcing plate 32 has elongated holes of the same shape as the second elongated holes 31, enhancing the structural strength of the second baffle 3 at the second elongated holes 31. One end of the reinforcing bar 100 passes through the second elongated hole 31 of the second baffle 3, and a second pad 104 is fitted onto the end of the reinforcing bar 100 passing through the second baffle 3. A second nut 102 is threaded onto the outer side of the second pad 104 of the reinforcing bar 100 passing through the second baffle 3, facilitating the fixing of the reinforcing cage.

[0037] The implementation principle of a cement pouring support device according to an embodiment of this application is as follows: Before cement pouring, the reinforcing cage is placed in the middle of the base 1. The first baffle 2 and the second baffle 3 are moved to the reinforcing bars on the base 1, so that the reinforcing bars 100 pass through the first elongated hole 21 and the second elongated hole 31. The first baffle 2 and the second baffle 3 are fixed to the base 1 by the fifth bolt 9, and adjacent first baffle 2s are fixed by the first bolt 5, and adjacent second baffle 3s are fixed by the second bolt 6. After the first baffle 2 and the second baffle 3 are installed, two third baffles 4 are fixed to both sides of the first baffle 2 and the second baffle 3, so that the first baffle 2, the second baffle 3 and the third baffle 4 form a barrier. After the first baffle 2, the second baffle 3 and the third baffle 4 are installed, the reinforcing cage is fixed between the first baffle 2 and the second baffle 3 by the first pad 103, the second pad 104, the first nut 101 and the second nut 102, so that the reinforcing cage is not easy to move during cement pouring, thus improving the quality of the constructed road.

[0038] The above are all preferred embodiments of this application, and are not intended to limit the scope of protection of this application. Therefore, all equivalent changes made in accordance with the structure, shape and principle of this application should be covered within the scope of protection of this application.

Claims

1. A cement pouring support device, characterized in that: The system includes a base (1), a first baffle (2), a second baffle (3), and a third baffle (4). The first baffle (2) and the second baffle (3) are disposed opposite each other on the upper surface of the base (1). There are two third baffles (4), which are disposed opposite each other on the upper surface of the base (1). One side of the third baffle (4) is connected to the first baffle (2), and the other side of the third baffle (4) is connected to the second baffle (3). The first baffle (2) has a first elongated hole (21), and the second baffle (3) has a second elongated hole (31). Both the first elongated hole (21) and the second elongated hole (31) are arranged in a horizontal direction. A steel cage is provided on the base (1), and the steel bars (100) on the steel cage are inserted between the first elongated hole (21) and the second elongated hole (31).

2. The cement pouring support device according to claim 1, characterized in that: The steel bar (100) is threaded with a first nut (101) and a second nut (102) at both ends. A first pad (103) is fitted on the outside of the first baffle (2) of the steel bar (100). The first pad (103) is located between the first baffle (2) and the first nut (101). A second pad (104) is fitted on the outside of the second baffle (3) of the steel bar (100). The second pad (104) is located between the second baffle (3) and the second nut (102).

3. A cement pouring support device according to claim 2, characterized in that: The outer side of the first baffle (2) is fixed with a first reinforcing plate (22) outside the first elongated hole (21), and the outer side of the second baffle (3) is fixed with a second reinforcing plate (32) outside the second elongated hole (31).

4. A cement pouring support device according to claim 1, characterized in that: The first baffle (2) has a first reinforcing rib (23) fixed on its outer side, and the second baffle (3) has a second reinforcing rib (33) fixed on its outer side.

5. A cement pouring support device according to claim 1, characterized in that: The first baffle (2) is provided in multiple pieces, and the multiple first baffles (2) are fixed by the first bolt (5). The second baffle (3) is provided in multiple pieces, and the multiple second baffles (3) are fixed by the second bolt (6).

6. A cement pouring support device according to claim 1, characterized in that: The first baffle (2) and the third baffle (4) are fixed by the third bolt (7).

7. A cement pouring support device according to claim 1, characterized in that: The second baffle (3) and the third baffle (4) are fixed together by the fourth bolt (8).

8. A cement pouring support device according to claim 1, characterized in that: The first baffle (2) and the second baffle (3) are fixed to the base (1) by the fifth bolt (9).