Attached type lifting scaffold mounting structure

By using a hollow multi-layer scaffolding frame and through-bar design, combined with an electric hoist and pulley system, the problem of complicated installation of walkway panels for attached lifting scaffolding was solved, enabling rapid installation and convenient disassembly, thus improving construction efficiency.

CN223853802UActive Publication Date: 2026-01-30HUNAN CONSTRUCTION ENGINEERING GROUP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520587017.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-03-31
Publication Date
2026-01-30
Estimated Expiration
2035-03-31

AI Technical Summary

Technical Problem

The installation process of walkway panels for existing attached lifting scaffolding is cumbersome, time-consuming, and inconvenient to dismantle.

Method used

The scaffolding adopts a hollow multi-layer scaffolding frame design, with walkway installation space on the inner side of each layer. The walkway is quickly fixed by using through rods and mounting parts, and the electric hoist and pulley system facilitates the lifting of the frame and the positioning of the wall panels.

Benefits of technology

It enables rapid installation and convenient disassembly of walkway slabs, improving construction efficiency and simplifying the construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223853802U_ABST
    Figure CN223853802U_ABST
Patent Text Reader

Abstract

An attached lifting scaffold mounting structure belongs to the technical field of attached lifting scaffold construction and comprises a hollow multilayer scaffold frame, an integrated top plate is fixedly arranged at the top end of the scaffold frame, and an integrated bottom plate is fixedly arranged at the bottom end of the scaffold frame. A plurality of walkway plate mounting spaces are formed on the inner side of each layer of scaffold frame between the top plate and the bottom plate, walkway plates are mounted on the inner sides of the walkway plate mounting spaces, a plurality of through channels are uniformly formed in the walkway plates, and through openings corresponding to the through channels are formed in the scaffold frames; the scaffold frame is further provided with an auxiliary penetrating opening corresponding to the penetrating channel, penetrating rods are arranged in the penetrating opening, the penetrating channel and the auxiliary penetrating opening in a penetrating mode, and the penetrating rods are provided with installation pieces in a matched mode. The utility model has the advantages of simple installation, more convenient follow-up disassembly and the like.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to the construction technology field of attached lifting scaffold, specifically relates to an attached lifting scaffold mounting structure. BACKGROUND

[0002] The attached lifting scaffold is a new type of scaffold technology developed rapidly in the early 21st century, has an important influence on the progress of construction technology, changes high-altitude operation into low-altitude operation, changes suspended operation into internal operation of the scaffold body, has the characteristics of low carbon, high technology content, economy, safety and convenience, and the attached lifting scaffold refers to the scaffold erected to a certain height and attached to the engineering structure, can climb or descend with the engineering structure layer by layer by relying on the lifting equipment and device, is the external scaffold with anti-overturning and anti-falling devices, and the attached lifting scaffold mainly comprises a scaffold body structure, an attachment support, an anti-overturning device, an anti-falling device, a lifting mechanism and a control device.

[0003] In the attached lifting scaffold, the walkway plate needs to be installed for the walkway use of the construction personnel, the scaffold body structure of the attached lifting scaffold is relatively large and long, a plurality of walkway plates need to be installed on each layer of the scaffold body structure, and the installation of the walkway plates of the entire scaffold body structure needs to be completed, so that the workers need to place each walkway plate at the specified position and fix the walkway plates one by one by using screws repeatedly, so that the installation process of the entire walkway plate is relatively complicated and the time cost is relatively long, and therefore the attached lifting scaffold mounting structure for simply installing the walkway plate is provided. UTILITY MODEL CONTENT

[0004] The utility model provides an attached lifting scaffold mounting structure which is simple to install and convenient to disassemble subsequently.

[0005] The utility model adopts the technical scheme that an attached lifting scaffold mounting structure comprises a hollow multilayer scaffold frame, an integrated top plate is fixed at the top end of the scaffold frame, an integrated bottom plate is fixed at the bottom end of the scaffold frame, a plurality of walkway plate installation spaces are formed in the inner side of each layer of the scaffold frame between the top plate and the bottom plate, a walkway plate is installed in the inner side of the walkway plate installation space, a plurality of through channels are uniformly formed in the walkway plate, a through hole corresponding to the through channel is formed in the scaffold frame, a secondary through hole corresponding to the through channel is also formed in the scaffold frame, a through rod is arranged in the through hole, the through channel and the secondary through hole, and a mounting piece is matched and arranged on the through rod.

[0006] Further, the through hole penetrates the scaffold frame, the secondary through hole does not penetrate the scaffold frame, and a supporting piece is fixed on the inner wall of the walkway plate installation space.

[0007] Further, the mounting piece is a mounting long rod, the port of the through rod is provided with an insertion port for the mounting long rod to pass through, threaded mounting holes one are arranged at the ports of the mounting long rod, and threaded mounting holes two corresponding to the threaded mounting holes one are arranged on the scaffold frame.

[0008] Further, a plurality of fixing blocks are fixed to one side of the scaffold frame, the number of the fixing blocks is eight, and every two fixing blocks form a group, two groups of fixing blocks are fixed to the top frame of the scaffold frame, and the other two groups of fixing blocks are fixed to the bottom frame of the scaffold frame, vertical sliding rods are fixed between the fixing blocks, rod sleeves are arranged on the sliding rods, and a connecting cable rod is fixed between the rod sleeves.

[0009] Further, wall connecting plates are fixed to the front surfaces of the rod sleeves, the total number of the wall connecting plates is two, and the number of the rod sleeves is four, and threaded mounting holes three are arranged on the wall connecting plates.

[0010] Further, two electric hoists are fixed to the bottom end of the top plate, a traction sheave is arranged on the top end of the bottom plate, a steel cable is connected to the electric hoist, one end of the steel cable extends downward through the traction sheave, and the upward extending end of the steel cable is fixedly provided with a lock piece matched with the connecting cable rod.

[0011] Further, the steel cable passes through a traction groove of the scaffold frame, and a secondary traction sheave is arranged on the inner side of the traction groove.

[0012] Further, the inner surfaces of each side of the rod sleeve are embedded with rolling balls, and rolling ball grooves corresponding to the rolling balls are arranged on the outer surfaces of the sliding rods.

[0013] Compared with the prior art, the scaffold frame has the following beneficial effects:

[0014] The hollow multi-layer scaffold frame is designed to divide the scaffold frame into multiple layers, multiple walkway plate mounting spaces are arranged on the inner sides of the scaffold frames of each layer, the walkway plates are mounted into the walkway plate mounting spaces, and the hollow design of the multi-layer scaffold frame forms a scaffold frame that can be walked on, thereby facilitating subsequent personnel to perform construction operations.

[0015] The walkway plate is directly placed into the walkway plate mounting space, at this time, the through port, the through channel and the secondary through port are matched with each other, the prepared through rod is inserted into the through port, the through channel and the secondary through port, and therefore the walkway plate is mounted on the inner side of the walkway plate mounting space, and then the through rod is fixed by the mounting piece, that is, the walkway plate is fixedly mounted on the inner side of the walkway plate mounting space, the design and installation are simple, and subsequent disassembly is also convenient. BRIEF DESCRIPTION OF DRAWINGS

[0016] Figure 1The utility model discloses a kind of foot frame schematic diagram of attached lifting scaffold mounting structure.

[0017] Figure 2 The utility model discloses a kind of walkway plate schematic diagram of attached lifting scaffold mounting structure.

[0018] Figure 3 The utility model discloses a kind of wall connecting plate schematic diagram of attached lifting scaffold mounting structure.

[0019] Figure 4 The utility model discloses a kind of slide rod and rod sleeve schematic diagram of attached lifting scaffold mounting structure.

[0020] Figure 5 The utility model discloses a kind of inside schematic diagram of traction groove of attached lifting scaffold mounting structure.

[0021] Mark in drawing: 1. foot frame;2. top plate;3. bottom plate;4. walkway plate;5. walkway plate installation space;6. through passage;7. through port;8. sub through port;9. through rod;10. installation long rod;11. insertion port;12. screw mounting hole one;13. screw mounting hole two;14. fixed block;15. slide rod;16. rod sleeve;17. connecting cable rod;18. wall connecting plate;19. electric hoist;20. traction sheave;21. steel cable;22. traction groove;23. sub traction sheave;24. ball;25. ball groove;26. support sheet. DETAILED DESCRIPTION

[0022] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the utility model.

[0023] Reference Figures 1 to 5 The embodiment provides a kind of attached lifting scaffold mounting structure, including hollow multi-layer foot frame 1, the top of the foot frame 1 is fixed with integrated top plate 2, the bottom of the foot frame 1 is fixed with integrated bottom plate 3, multiple walkway plate installation spaces 5 are formed in the inside of each layer foot frame 1 between top plate 2 and bottom plate 3, walkway plate 4 is installed in the inside of walkway plate installation space 5, multiple through passages 6 are evenly provided on walkway plate 4, through port 7 corresponding to through passage 6 is provided on the foot frame 1, sub through port 8 corresponding to through passage 6 is also provided on the foot frame 1, through rod 9 is arranged in through port 7, through passage 6 and sub through port 8, and installation piece is matched and arranged on through rod 9.

[0024] Referring to Figures 1 to 2 , the through hole 7 penetrates the foot frame 1, the auxiliary through hole 8 does not penetrate the foot frame 1, and a support piece 26 is fixed on the inner wall of the walkway plate mounting space 5. The mounting member is a mounting rod 10, a plug-in hole 11 is formed at the end of the through rod 9 for the mounting rod 10 to penetrate, threaded mounting holes 12 are formed at both ends of the mounting rod 10, and threaded mounting holes 13 corresponding to the threaded mounting holes 12 are formed on the foot frame 1. The walkway plate 4 is directly placed inside the walkway plate mounting space 5, at which time the through hole 7, the through channel 6, and the auxiliary through hole 8 correspond to each other. The prepared through rod 9 is inserted into the through hole 7, the through channel 6, and the auxiliary through hole 8, the tail of the through rod 9 is inserted into the auxiliary through hole 8 that does not penetrate the foot frame 1, the head of the through rod 9 is not located in the through hole 7 but exposed outside the through hole 7, so that the mounting rod 10 can penetrate the through rod 9, and the walkway plate 4 is fixedly installed inside the walkway plate mounting space. After the mounting rod 10 penetrates the through rod 9, the threaded mounting holes 12 at both ends of the mounting rod 10 need to correspond to the threaded mounting holes 13 on the foot frame 1, after the corresponding, another screw rod is screwed into the threaded mounting holes 13 and the threaded mounting holes 12, and finally the mounting rod 10 is fixed, that is, the walkway plate 4 is fixed, and the support piece 26 is arranged to support the walkway plate 4, so that the person does not need to hold the walkway plate 4 during the subsequent installation of the walkway plate 4.

[0025] Referring to Figure 1 , Figures 3 to 5The side of the scaffold frame 1 is fixed with a plurality of fixed blocks 14, the number of the fixed blocks 14 is eight, and every two fixed blocks 14 form a group, two groups of fixed blocks 14 are fixed on the top frame of the scaffold frame 1, and the other two groups of fixed blocks 14 are fixed on the bottom frame of the scaffold frame 1, vertical sliding rods 15 are fixed between the fixed blocks 14, rod sleeves 16 are sleeved on the sliding rods 15, and connecting rod 17 is fixed between the rod sleeves 16. The front surface of the rod sleeve 16 is fixed with a connecting wall plate 18, the total number of the connecting wall plate 18 is two, the number of the rod sleeve 16 is four, and the connecting wall plate 18 has three threaded mounting holes. The bottom end of the top plate 2 is fixed with two electric hoists 19, the top end of the bottom plate 3 is provided with a traction sheave 20, the electric hoist 19 is connected with a steel cable 21, one end of the steel cable 21 extends downward through the traction sheave 20, and the upward extending end of the steel cable 21 is fixed with a lock catch matched with the connecting rod 17. The steel cable 21 penetrates through a traction groove 22 of the scaffold frame 1, and a sub traction sheave 23 is mounted on the inner side of the traction groove 22. The inner surface of each side of the rod sleeve 16 is embedded with a ball 24, and a ball groove 25 corresponding to the ball 24 is formed in the outer surface of the sliding rod 15. The steel cable 21 can be wound by starting the electric hoist 19 to lift the scaffold frame 1 upward, when the scaffold frame 1 is lifted upward, the bolt connecting the connecting wall plate 18 and the wall is disassembled, the connecting wall plate 18 moves along the sliding rod 15, when the connecting wall plate 18 moves upward to adjust the height of the building, the connecting wall plate 18 is fixed on the wall again, the steel cable and the connecting wall plate do not need to be disassembled, the connecting wall plate 18 can be moved upward to adjust, and the connecting wall plate 18 can only move upward along the sliding rod 15, without the need of repeatedly positioning and punching holes in the wall of the previous layer of building to fix the connecting wall plate 18, so that the connecting wall plate 18 and the wall are positioned, the design of the sub traction sheave 23 ensures the stability of the movement of the steel cable 21, the design of the ball 24 and the ball groove 25 ensures the stability of the movement of the rod sleeve 16, and the sliding contact area between them is small, so as to reduce the friction resistance.

[0026] In specific work, the design of the hollow multi-layer scaffold frame 1 divides the scaffold frame 1 into multiple layers, a plurality of walkway plate installation spaces 5 are arranged on the inner side of each layer of the scaffold frame 1, the walkway plate 4 is installed into the walkway plate installation space 5, the hollow design of the multi-layer scaffold frame 1 forms a scaffold that can be walked on, and subsequent personnel can conveniently perform construction work, the installation mode of the walkway plate 4 is that the walkway plate 4 is directly placed into the walkway plate installation space 5, at this time, the through hole 7, the through channel 6 and the auxiliary through hole 8 correspond to each other, the prepared through rod 9 is inserted into the through hole 7, the through channel 6 and the auxiliary through hole 8, therefore the walkway plate 4 is installed on the inner side of the walkway plate installation space, and then the through rod 9 is fixed by cooperating with the mounting part, that is, the walkway plate 4 is fixed and installed on the inner side of the walkway plate installation space, the design and installation are simple, and subsequent disassembly is also relatively convenient.

[0027] Although the present specification is described in terms of embodiments, not every embodiment exhibits every characteristic or exhibits the characteristics in the same manner. The description herein of any particular embodiment is merely intended to describe the particular embodiment and is not intended to limit or exclude any other embodiment of the scope of the disclosure. Thus, embodiments should be considered in a mutual arbitrary way : none of the statements herein should be taken as limitations on the embodiments defined by the appended claims directed to that specific embodiment, and absolute values should not be taken into account; individual characteristics should be considered individually and all possible combinations made without substitution effects that can adversely affect the object; the mere fact that different features are recited in mutually different dependent claims does not indicate that a combination of these features cannot be used to advantage.

Claims

1. An attached lifting scaffolding installation structure, characterized in that: The application discloses a hollow multi-layer scaffold frame, which is provided with an integrated top plate at the top end and an integrated bottom plate at the bottom end.

2. The attached lifting scaffold mounting structure according to claim 1, characterized by: The through hole, the through channel and the auxiliary through hole are provided with a through rod.

3. The attached lifting scaffold mounting structure according to claim 2, characterized in that: The installation piece is a long installation rod.

4. The attached lifting scaffold mounting structure according to claim 3, characterized by: The scaffold frame is provided with a plurality of fixed blocks on one side.

5. The attached lifting scaffold mounting structure according to claim 4, characterized in that: The rod sleeve is provided with a connecting wall plate on the front side.

6. The attached lifting scaffold mounting structure according to claim 5, characterized in that: The bottom end of the top plate is provided with two electric hoists.

7. The attached lifting scaffold mounting structure according to claim 6, characterized in that: The bottom plate is provided with a traction sheave at the top end.

8. The attached lifting scaffold mounting structure according to claim 7, characterized by: The steel cable passes through the traction groove of the scaffold frame. The inner side of the traction groove is provided with an auxiliary traction sheave.