Project management mode progress visual display board
By using a project management mode progress visualization dashboard, which employs intuitive elements such as graphics and charts to display project progress, the problem of static information presentation in traditional tools is solved, enabling dynamic display and efficient communication of project progress.
Patent Information
- Application Number
- CN202520191662.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-07
- Publication Date
- 2026-02-03
- Estimated Expiration
- 2035-02-07
AI Technical Summary
Traditional project schedule management tools present static information, making it difficult to reflect dynamic changes in the project in real time. This results in a significant amount of time being spent explaining and updating the information during project meetings or daily communication.
This invention provides a project management progress visualization display board that uses intuitive elements such as graphics, charts, and colors to display project progress. The main frame and sub-frame structure can be flipped to easily adjust the displayed content and adapt to different project management needs.
It provides an intuitive display of project progress, reduces the time spent interpreting complex tables or documents, enables team members to quickly focus on key tasks, provides a unified information platform, and improves communication efficiency.
Smart Images

Figure CN223871203U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model belongs to the project management technical field, concretely relates to a project management mode progress visual display board. BACKGROUND
[0002] In today's economic environment, many industries such as construction, information technology, manufacturing, financial services, etc. are highly dependent on projects to achieve business objectives and innovative development. Projects become the key means for enterprises to achieve strategic planning, launch new products and services, optimize internal processes and expand market share. Project management helps to allocate resources reasonably, including manpower, material resources, financial resources and time, etc. In the project execution process, accurate planning and dynamic allocation of resources can avoid the idle or excessive consumption of resources and improve resource utilization efficiency.
[0003] Traditional project progress management tools such as project plan documents, spreadsheets, etc. are often static in information presentation. They can only provide project plans and progress at a certain time point, and it is difficult to reflect the dynamic changes of the project in the execution process in real time. In project meetings or daily communication, when using these tools to display project progress, a lot of time is often spent on explanation and explanation, and the content to be displayed needs to be constantly updated and supplemented, wasting time. UTILITY MODEL CONTENT
[0004] The utility model aims at providing a project management mode progress visual display board, aiming at solving the problems proposed in the above background technology.
[0005] To achieve the above purpose, the utility model provides the following technical scheme:
[0006] A project management mode progress visual display board, comprising,
[0007] The installation assembly comprises a fixed plate, a support fixedly installed on the side wall of the fixed plate, and a shaft sleeve fixedly connected to the end of the support;
[0008] The display assembly comprises a main frame body rotatably installed on the side wall of the shaft sleeve, a secondary frame body rotatably installed on the side wall of the main frame body, and a panel clamped on the side wall of the main frame body.
[0009] As a preferred scheme of the utility model, the display assembly further comprises a main shaft inserted into the end of the secondary frame body, and a nut threadedly connected to the end of the main shaft, and the main shaft is inserted into the end of the main frame body.
[0010] As a preferred scheme of the utility model, the main frame body and the secondary frame body have the same thickness, and the side wall strips of the main frame body and the secondary frame body are used in cooperation.
[0011] As a preferred scheme of the utility model, the display assembly further includes a connecting piece installed on the side wall of the panel, and the panel is symmetrically installed on both sides of the connecting piece.
[0012] As a preferred scheme of the utility model, the panel end is clamped in the middle of the side wall clamping groove of the main frame body, and the panel is flush with the end face of the main frame body.
[0013] As a preferred scheme of the utility model, the display assembly further includes a positioning hole arranged on the side wall of the panel, and the positioning hole is used in cooperation with the connecting piece.
[0014] As a preferred scheme of the utility model, the display assembly further includes a blocking strip installed on the end of the auxiliary frame body, and the blocking strip is clamped on the side wall of the panel.
[0015] Compared with the prior art, the beneficial effects of the utility model are that the visual display board displays the project progress by using intuitive elements such as graphics, charts and colors, and the user can easily see the sequence, parallel relationship and progress of each task without spending a lot of time on interpreting complex tables or documents. BRIEF DESCRIPTION OF DRAWINGS
[0016] In order to more clearly illustrate the technical scheme of the embodiments of the utility model, the following will briefly introduce the drawings needed to be used in the embodiment description, and obviously, the drawings in the following description are only some embodiments of the utility model, and for those skilled in the art, other drawings can also be obtained according to these drawings without creative labor, wherein:
[0017] Figure 1 It is one of the overall structure schematic diagram of the utility model;
[0018] Figure 2 It is the second overall structure schematic diagram of the utility model;
[0019] Figure 3 It is the front structure schematic diagram of the utility model;
[0020] Figure 4 It is the side structure schematic diagram of the utility model.
[0021] In the diagram: 100, mounting component; 101, fixing plate; 102, support component; 103, bushing; 200, display component; 201, main frame; 202, secondary frame; 203, panel; 204, spindle; 205, nut; 206, connector; 207, positioning hole; 208, stop bar. Detailed Implementation
[0022] To make the above-mentioned objectives, features and advantages of this utility model more apparent and understandable, the specific embodiments of this utility model will be described in detail below with reference to the accompanying drawings.
[0023] Many specific details are set forth in the following description in order to provide a full understanding of the present invention. However, the present invention may also be implemented in other ways different from those described herein. Those skilled in the art can make similar extensions without departing from the spirit of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0024] Secondly, the term "an embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The phrase "in one embodiment" appearing in different places in this specification does not necessarily refer to the same embodiment, nor is it a single or selective embodiment that excludes other embodiments.
[0025] Example
[0026] Reference Figures 1-4 This is an embodiment of the present invention, which provides a project management mode progress visualization display board, including:
[0027] The mounting assembly 100 includes a fixing plate 101, a support member 102 fixedly mounted on the side wall of the fixing plate 101, and a bushing 103 fixedly connected to the end of the support member 102.
[0028] The display component 200 includes a main frame 201 rotatably mounted on the side wall of the bushing 103, a secondary frame 202 rotatably mounted on the side wall of the main frame 201, and a panel 203 snapped onto the side wall of the main frame 201.
[0029] The mounting component 100 is fixed to the support base and connects with the display component 200. It works in conjunction with the content to be displayed during the project management process, fixing the content materials onto the panel 203. When a display is needed, the sub-frame 202 and the main frame 201 are flipped sequentially. The number of sub-frames 202 and the main frame 201 can be increased according to actual needs, allowing for a complete display of the project progress without the need to change display materials midway. All materials can be displayed at once, or a portion can be displayed selectively. It is easy to adjust and adapt to different project management needs. Furthermore, the sub-frames 202 and the main frame 201 can be flipped and adjusted to easily add different display content at the same time, further improving display efficiency.
[0030] Specifically, the display component 200 also includes a spindle 204 inserted into the end of the sub-frame 202, and a nut 205 threaded into the end of the spindle 204, the spindle 204 being inserted into the end of the main frame 201.
[0031] A main shaft 204 with a nut 205 is added at the connection between the side walls of the main frame 201 and the sub-frame 202. This facilitates the disassembly and assembly of the main frame 201 and the sub-frame 202, and also allows for adjustment of the number of main frames 201 and sub-frames 202 installed as needed to meet different project requirements. The adjustment is convenient, and further tightening the nut 205 makes it easy to fix the main frame 201 and the sub-frame 202 together, maintaining the stability of the angle between the main frame 201 and the sub-frame 202.
[0032] Furthermore, the main frame 201 and the sub-frame 202 have the same thickness, and the sidewall strips of the main frame 201 and the sub-frame 202 are used in conjunction.
[0033] The main frame 201 and the sub-frame 202 have the same thickness, which makes it easier to connect and assemble them. The number of main frames 201 and sub-frames 202 installed can be adjusted according to actual needs.
[0034] Furthermore, the display component 200 also includes a connector 206 mounted on the side wall of the panel 203, with the panel 203 symmetrically mounted on both sides of the connector 206.
[0035] The addition of connector 206 facilitates fixing panel 203 to the side walls of main frame 201 and sub-frame 202, maintaining the stability of panel 203 and preventing panel 203 from detaching from the side walls of main frame 201 and sub-frame 202.
[0036] Preferably, the end of the panel 203 is engaged in the middle of the slot on the side wall of the main frame 201, and the panel 203 is flush with the end face of the main frame 201.
[0037] Among them, the main frame 201 and the sub-frame 202 are provided with groove structures that cooperate with the end of the panel 203, which can help to limit the panel 203 and prevent the panel 203 from slipping off the side wall of the main frame 201 and the sub-frame 202.
[0038] It should be noted that the display component 200 also includes a positioning hole 207 provided on the side wall of the panel 203, which is used in conjunction with the connector 206.
[0039] The addition of positioning holes 207 facilitates the fixing of connectors 206 to the side wall of panel 203, maintaining the docking accuracy of panel 203. It also facilitates the fixing of content to be displayed. Additional fixing components can be added as needed to display and fix materials related to the project progress.
[0040] Preferably, the display component 200 further includes a baffle 208 installed at the end of the sub-frame 202, the baffle 208 being snapped onto the side wall of the panel 203.
[0041] Among them, the baffle 208 is used to limit the panel 203 in conjunction with the side wall of the sub-frame 202, further preventing the panel 203 from loosening and maintaining the stability of the position of the panel 203.
[0042] In use, the mounting component 100 is fixed to the support base and docks with the display component 200 to display the content required during the project management process. The content materials are fixed on the panel 203. When a display is needed, the sub-frame 202 and the main frame 201 are flipped in sequence. The number of sub-frames 202 and the main frame 201 can be increased according to actual needs, which can display the project process completely without changing the display materials midway. The sub-frames 202 and the main frame 201 can be flipped and adjusted to easily add different display content at the same time. The main shaft 204 with nuts 205 is added to facilitate the disassembly and assembly of the main frame 201 and the sub-frame 202, and also to facilitate the adjustment of the number of main frames 201 and the sub-frame 202 installed as needed. Tightening the nuts 205 makes it easy to fix the main frame 201 and the sub-frame 202 together.
[0043] In summary, visual dashboards use intuitive elements such as graphics, charts, and colors to display project progress. For example, they display the start time, end time, and duration of tasks. The length and position of task bars clearly reflect the arrangement of tasks on the timeline. Users can easily see the sequence, parallel relationships, and progress of each task without spending a lot of time interpreting complex tables or documents. Team members can quickly focus on key tasks and understand their impact on the entire project. Visual dashboards provide a unified information platform, enabling everyone to communicate based on the same visual information. All materials can be displayed at once, or a portion can be selectively displayed, making it easy to adjust and adapt to different project management needs.
[0044] It is important to note that the constructions and arrangements of this application shown in several different exemplary embodiments are merely illustrative. Although only a few embodiments are described in detail in this disclosure, those who consult this disclosure will readily understand that many modifications are possible (e.g., changes in the size, dimensions, structure, shape and proportion of various elements, as well as parameter values (e.g., temperature, pressure, etc.), mounting arrangements, use of materials, color, orientation, etc.) without substantially departing from the novel teachings and advantages of the subject matter described in this application). For example, an element shown as integrally formed may be composed of multiple parts or elements, the position of elements may be inverted or otherwise altered, and the nature or number or position of discrete elements may be changed or altered. Therefore, all such modifications are intended to be included within the scope of this utility model. The order or sequence of any process or method steps may be changed or reordered according to alternative embodiments. In the claims, any "device plus function" clause is intended to cover the structure described herein that performs the function, and not only structural equivalents but also equivalent structures. Without departing from the scope of this invention, other substitutions, modifications, alterations, and omissions may be made in the design, operation, and arrangement of the exemplary embodiments. Therefore, this invention is not limited to the specific embodiments, but extends to various modifications that still fall within the scope of the appended claims.
[0045] Furthermore, in order to provide a concise description of exemplary embodiments, not all features of actual embodiments (i.e., those features that are not relevant to the best mode of carrying out the present invention as currently considered, or those features that are not relevant to implementing the present invention) may be omitted.
[0046] It should be understood that numerous specific implementation decisions can be made during the development of any practical implementation, such as in any engineering or design project. Such development efforts may be complex and time-consuming, but for those skilled in the art who benefit from this disclosure, the development effort will be a routine work of design, manufacturing, and production without requiring much experimentation.
[0047] It should be noted that the above embodiments are only used to illustrate the technical solution of this utility model and are not intended to limit it. Although this utility model has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solution of this utility model without departing from the spirit and scope of the technical solution of this utility model, and all such modifications or substitutions should be covered within the scope of the claims of this utility model.
Claims
1. A project management mode progress visualization display board, characterized in that: include, The mounting assembly (100) includes a fixing plate (101), a support member (102) fixedly mounted on the side wall of the fixing plate (101), and a bushing (103) fixedly connected to the end of the support member (102). The display assembly (200) includes a main frame (201) rotatably mounted on the side wall of the bushing (103), a sub-frame (202) rotatably mounted on the side wall of the main frame (201), and a panel (203) snapped onto the side wall of the main frame (201).
2. The project management mode progress visualization display board according to claim 1, characterized in that: The display component (200) also includes a main shaft (204) inserted into the end of the sub-frame (202) and a nut (205) threaded into the end of the main shaft (204), the main shaft (204) being inserted into the end of the main frame (201).
3. The project management mode progress visualization display board according to claim 2, characterized in that: The main frame (201) and the sub-frame (202) have the same thickness, and the sidewall strips of the main frame (201) and the sub-frame (202) are used together.
4. The project management mode progress visualization display board according to claim 3, characterized in that: The display component (200) also includes a connector (206) installed on the side wall of the panel (203), and the panel (203) is symmetrically installed on both sides of the connector (206).
5. A project management mode progress visualization display board according to claim 4, characterized in that: The end of the panel (203) is engaged in the middle of the slot on the side wall of the main frame (201), and the panel (203) is flush with the end face of the main frame (201).
6. A project management mode progress visualization display board according to claim 5, characterized in that: The display component (200) also includes a positioning hole (207) disposed on the side wall of the panel (203), the positioning hole (207) being used in conjunction with the connector (206).
7. A project management mode progress visualization display board according to claim 6, characterized in that: The display component (200) also includes a stop bar (208) installed at the end of the sub-frame (202), the stop bar (208) being snapped into the side wall of the panel (203).