Disassembling tool for sectional type pipeline dredging spring
By designing quick-release components and a stable connection structure, the problem of difficult disassembly and unstable connection of the unblocking spring in traditional pipe cleaners has been solved, achieving convenient and efficient disassembly and stable connection, improving operational comfort and equipment reliability.
Patent Information
- Application Number
- CN202423291413.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-31
- Publication Date
- 2026-02-17
- Estimated Expiration
- 2034-12-31
AI Technical Summary
Traditional pipe cleaners have complex spring connection methods that are inconvenient to disassemble, resulting in time-consuming and laborious maintenance. In addition, the connection is not stable and is prone to loosening and falling off, affecting the comfort of operation and the life of the equipment.
A disassembly tool for a segmented pipe unclogging spring was designed. It adopts a quick-release component, including a handle with a disassembly tip and a stop bar. Through the cooperation of a T-shaped connecting platform and a cross-shaped groove, combined with a reset elastic body and a snap-fit post, convenient disassembly and stable connection can be achieved.
It improves the ease of disassembly and connection stability of the drain spring, shortens maintenance time, reduces hand fatigue, enhances operational efficiency and equipment reliability, and expands its applicability.
Smart Images

Figure CN223917829U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to pipeline dredging device technical field, specifically speaking, especially, it is a kind of dismounting tool of sectional pipeline dredging spring. BACKGROUND
[0002] In modern architecture and daily life, pipeline system is widely used in drainage, sewage, ventilation and many other key fields, and its normal operation plays a vital role in maintaining people's life quality and the smooth development of various production activities.However, pipelines inevitably encounter various blockage problems in the long-term use process, which is a very common and frequent phenomenon.
[0003] The causes of pipeline blockage are complex, including the accumulation of substances such as food residue, hair and oil in daily life, as well as the indiscriminate accumulation of chemical deposits and production waste in industrial production environment.These sundries gradually accumulate and adhere to the pipe wall inside the pipeline, and with the passage of time, the effective flow cross section of the pipeline is continuously eroded and reduced, eventually leading to serious damage to the conveying capacity of the pipeline and even complete loss, and further causing a series of disturbing adverse consequences such as sewage overflow, odor diffusion and production stagnation, which has a direct and significant negative impact on people's living environment and health, as well as the normal order and economic benefits of industrial production.
[0004] In order to effectively deal with the difficult problem of pipeline blockage, pipeline dredging device emerges as the times require and becomes an indispensable important tool.The traditional pipeline dredging device has many limitations in design and function, especially in the connection of dredging spring.The traditional connection mode usually adopts a simple and fixed mode, such as direct welding, simple threaded connection or simply relying on interference fit, etc.These connection methods have exposed a series of serious problems in actual application.When the dredging spring is worn out or deformed due to long-term use, or unfortunately entangled and stuck by sundries during dredging operation, it needs to be replaced urgently, and the disadvantages of traditional connection mode are exposed.Operators often need to spend a lot of time and effort to find and use various complex and cumbersome tools, such as wrench, screwdriver, pliers, etc., to difficultly disassemble the dredging spring.In this process, due to the complexity of operation and inconvenience of tool use, it is easy to cause accidental scratching, collision, deformation and other damage to the main structure of pipeline dredging device and other related parts, not only further increasing the maintenance cost and difficulty, but also possibly shortening the overall service life of pipeline dredging device.
[0005] Moreover, the traditional connection mode has obvious defects in stability, and it is difficult to maintain a reliable connection state in a long time use process or in the face of complex and poor dredging conditions. Under the high-intensity vibration and frequent force impact of the pipeline dredging operation, the connection part is prone to looseness, which directly leads to a significant reduction in dredging effect, and even may cause more serious consequences, such as accidental shedding of the dredging spring inside the pipeline, thereby forming secondary blockage, making the originally difficult pipeline problem more complex and difficult to solve. Meanwhile, in terms of operation comfort, the traditional pipeline dredging device design almost completely ignores the hand fatigue problem of the operator in the long time use process, lacks ergonomic considerations and design elements, and the operator needs to continuously hold the tool and repeatedly operate during use, which easily leads to hand muscle soreness, fatigue and even injury, which not only reduces the work efficiency of the operator, but also has an adverse effect on his work enthusiasm and work experience.
[0006] In summary, in view of the many defects and deficiencies of the traditional pipeline dredging spring connection mode, an innovative disassembly tool is urgently needed to effectively solve the above problems, to improve the efficiency of pipeline dredging operation, reduce cost, ensure the convenience and comfort of operation, and ensure the reliable and stable development of pipeline dredging work. Practical new type content
[0007] The utility model aims at solving the shortcoming of prior art, and provides a disassembly tool for sectional pipeline dredging spring, which comprises a dredging spring, one end of the dredging spring is provided with a connection A end, the connection A end comprises a first cylindrical main body, a T-shaped connection table is arranged at the end of the first cylindrical main body, an installation groove is arranged at the end of the T-shaped connection table away from the first cylindrical main body, a reset elastic body is fixedly installed in the installation groove, and a buckling column is fixedly installed at the end of the reset elastic body.
[0008] Preferably, a hand holding handle is integrally formed at the top of the handle for convenient hand holding.
[0009] Preferably, a connecting rod is arranged between the hand holding handle and the handle, and an arc-shaped block is arranged between the hand holding handle and the connecting rod.
[0010] Preferably, a reinforcing rib plate is arranged between the handle and the connecting rod.
[0011] Preferably, the number of the dismounting prongs is one.
[0012] Preferably, the number of the dismounting prongs is two, and the two dismounting prongs are arranged on both sides of the stop rod.
[0013] Compared with the prior art, the utility model has the beneficial effects that:
[0014] 1. Convenient and quick dismounting function: the design of the quick dismounting assembly greatly improves the dismounting convenience of the dredging spring.
[0015] 2. Stable connection structure: the T-shaped connecting table of the connection A end and the ten-shaped groove of the connection B end are matched with each other, and the reset elastic body in the mounting groove and the buckling column are combined to make the dredging spring stable in the use process.
[0016] 3. Ergonomic design: the handgrip integrally formed at the top of the handle and the arc-shaped block between the handle and the connecting rod meet the hand holding habit of human body, and can effectively reduce the fatigue of the hand during long time use.
[0017] 4. Flexible dismounting prong configuration: the dismounting prong can be set to one or two according to actual demand, and is arranged on both sides of the stop rod. BRIEF DESCRIPTION OF DRAWINGS
[0018] Figure 1 It is an overall structure schematic view of the dismounting tool of the sectional pipe dredging spring (one dismounting prong) provided by the utility model;
[0019] Figure 2 It is an overall structure schematic view of the dismounting tool of the sectional pipe dredging spring (two dismounting prongs) provided by the utility model;
[0020] Figure 3 The utility model provides a whole structure schematic drawing (with hand holds handle) of a dismounting tool of sectional type pipeline dredging spring;
[0021] Figure 4 The utility model provides a whole structure schematic drawing (with hand holds handle) of a dismounting tool of sectional type pipeline dredging spring;
[0022] In the drawing,
[0023] The connection A end 1 is first cylindrical main body 11, has T type connecting table 12, buckling column 13;
[0024] The connection B end 2 is second cylindrical main body 21, ten type recess 22, dismounting hole 23, buckling column groove 24;
[0025] Handle 31, dismounting sharp head 32, stop lever 33, hand holds handle 34, connecting rod 35, arc block 36, reinforcing rib 37. Specific embodiments
[0026] The technical scheme in the embodiments of the utility model will be apparently and completely described below with reference to the drawings in the embodiments of the utility model, and obviously, the described embodiments are only a part of the embodiments of the utility model, not all the embodiments.
[0027] With reference to the drawing, the utility model provides a kind of dismounting tool of sectional type pipeline dredging spring, including dredging spring, the dredging spring one end is provided with connection A end, the connection A end includes first cylindrical main body 11, and the first cylindrical main body 11 end is provided with T type connecting table 12, and the T type connecting table 12 is away from the one end of first cylindrical main body 11 and is provided with mounting groove, and mounting groove is fixedly installed with reset elastic body, and the reset elastic body end is fixedly installed with buckling column 13;The other end of the dredging spring is provided with connection B end 2, and the connection B end 2 includes second cylindrical main body 21, and the second cylindrical main body 21 one end is provided with ten type recess 22 with T type connecting table cooperation is facilitated;Second cylindrical body 21 is provided with dismounting hole 23 in penetration, and the dismounting hole 23 is communicated with the buckling column groove 24 of ten type recess 22 inside;It further includes quick release assembly corresponding with dredging spring use, and the quick release assembly includes handle 31, and the handle bottom is fixedly connected with the dismounting sharp head 32 for inserting inside dismounting hole, and the stop lever 33 for rotating and abutting first cylindrical main body 11.
[0028] Further, the handle 31 top is integrally formed with hand holds handle 34 for hand.
[0029] Further, the hand grip 34 is provided with a connecting rod 35 between the hand grip 34 and the handle 31, and an arc-shaped block 36 is provided between the hand grip 34 and the connecting rod 35.
[0030] Further, a reinforcing rib plate 37 is provided between the handle 31 and the connecting rod 35.
[0031] Further, the number of the dismounting prongs 32 is one.
[0032] Further, the number of the dismounting prongs 32 is two, and the two dismounting prongs 32 are distributed on both sides of the stop rod 33.
[0033] The specific use process of the above embodiment includes the following steps,
[0034] 1. Preparation: First, ensure that the pipe dredger is in a non-working state, and expose the part to be dismounted (the joint of the connection A end and the connection B end) to facilitate the operation of the quick dismounting assembly.
[0035] 2. Insert the dismounting prong: Pick up the quick dismounting assembly, align the corresponding dismounting prong at the bottom of the handle with the dismounting hole on the second cylindrical body of the connection B end, make the dismounting prong deep into the position communicated with the buckling column groove inside the ten-shaped groove, and continue to press down until the dismounting prong pushes the buckling column out of the buckling column groove.
[0036] 3. Rotation operation: Hold the hand grip at the top of the handle, rotate the handle around the dismounting prong, and make the stop rod gradually rotate and abut against the first cylindrical body of the connection A end. During the rotation process, the stop rod will exert an external force on the first cylindrical body, which will cause the displacement of the buckling structure between the connection A end and the connection B end.
[0037] 4. Separate the connection end: As the rotation proceeds, due to the pushing action of the stop rod and the action of the dismounting prong on the internal structure, the reset elastic body in the T-shaped connection table mounting groove of the connection A end is compressed, and the buckling column is withdrawn from the buckling position (the buckling column groove in the ten-shaped groove), that is, at this time, the locking state between the connection A end and the connection B end is released, and under the pushing action of the stop rod, the connection A end and the connection B end can be separated, and the dismounting of the dredging spring connection A end and the connection B end is completed.
[0038] Compared with the existing technology, the structure has the following advantages:
[0039] 1. Convenient and quick disassembly function: the design of the quick disassembly assembly greatly improves the disassembly convenience of the dredging spring. The disassembly sharp at the bottom of the handle can be accurately inserted into the disassembly hole, and the stop lever is rotated to abut against the first cylindrical main body, so that the separation of the connection A end and the connection B end can be easily realized, the problems of difficult replacement, time-consuming and laborious of the dredging spring of the traditional pipeline dredging device are effectively solved, the time for maintenance and replacement of parts is significantly shortened, and the maintenance efficiency of the equipment is improved;
[0040] 2. Stable connection structure: the T-shaped connection table of the connection A end and the ten-shaped groove of the connection B end are matched with each other, the reset elastic body in the mounting groove and the buckling column are combined, the dredging spring is stably connected during use, the buckling column is elastically pressed in the buckling column groove after connection, and the dredging spring is not easy to loosen and fall off, so that the continuity and stability of the pipeline dredging operation are ensured, the dredging interruption or failure caused by loosening of the connection part is reduced, and the working reliability is improved;
[0041] 3. Ergonomic design: the handgrip integrally formed at the top of the handle and the arc-shaped block between the handle and the connecting rod meet the hand holding habit of human body, and can effectively reduce the fatigue feeling of the hand during long time use. Meanwhile, the reinforcing rib plate arranged between the handle and the connecting rod enhances the overall structural strength, so that the operator can more stably and easily operate the quick disassembly tool during use, and the use experience and working efficiency are further improved.
[0042] 4. Flexible disassembly sharp configuration: the disassembly sharp can be provided with one or two according to actual needs, and is distributed on both sides of the stop lever. Such flexible design can meet the use scene requirements of different spring diameters, further optimize the structure and practical performance of the tool on the basis of ensuring that the disassembly function is effectively realized, and the tool has wider applicability.
[0043] The above specific embodiments further illustrate the purpose, technical scheme and beneficial effects of the utility model, and it should be understood that the above is only a specific embodiment of the utility model, but the protection scope of the utility model is not limited thereto, any person skilled in the art can make equivalent replacement or change according to the technical scheme and utility model concept of the utility model within the technical range disclosed by the utility model, which should be covered in the protection scope of the utility model.
[0044] In addition, in the description of the utility model, it should be understood that the terms indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the utility model and simplifying the description, and do not indicate or imply that the indicated device or element must have a specific orientation, be constructed and operated in a specific orientation, therefore it cannot be understood as a limitation on the utility model.
[0045] Furthermore, in the utility model, unless another definite provision and limitation, the term " install " " link " " connect " " fixed " and so on term should do the broad sense understanding, for example, can be fixed connection, also can be detachable connection, or be integrated; can be mechanical connection, also can be electrical connection; can be directly connected, also can pass through the indirect connection of intermediate medium, can be the communication of two elements or the interaction of two elements. For ordinary skilled person in the art, the specific meaning of the above terms in the utility model can be understood according to the specific circumstances.
Claims
1. A disassembly tool for a segmented pipe unblocking spring, comprising an unblocking spring, one end of which is provided with a connecting end A, the connecting end A comprising a first cylindrical body, the end of the first cylindrical body being provided with a T-shaped connecting platform, the end of the T-shaped connecting platform away from the first cylindrical body being provided with an installation groove, a reset elastic body being fixedly installed in the installation groove, and a fastening post being fixedly installed at the end of the reset elastic body; the other end of the unblocking spring is provided with a connecting end B, the connecting end B comprising a second cylindrical body, one end of the second cylindrical body being provided with a cross-shaped groove for facilitating engagement with the T-shaped connecting platform; a disassembly hole is provided through the second cylindrical body, the disassembly hole communicating with a fastening post groove provided inside the cross-shaped groove; characterized in that... It also includes a quick-release assembly for use with a drain spring, the quick-release assembly including a handle, a disassembly tip fixedly connected to the bottom of the handle for easy insertion into the disassembly hole, and a stop bar for rotating against the first cylindrical body.
2. The disassembly tool for a segmented pipe unclogging spring according to claim 1, characterized in that, The top of the handle is integrally molded with a hand grip for easy hand handling.
3. The disassembly tool for a segmented pipe unclogging spring according to claim 2, characterized in that, A connecting rod is provided between the handle and the grip, and an arc-shaped block is provided between the handle and the connecting rod.
4. The disassembly tool for a segmented pipe unclogging spring according to claim 1, characterized in that, A reinforcing rib is provided between the handle and the connecting rod.
5. The disassembly tool for a segmented pipe unclogging spring according to claim 1, characterized in that, The number of disassembled tips is one.
6. The disassembly tool for a segmented pipe unclogging spring according to claim 1, characterized in that, The number of disassembly tips is two, and the two disassembly tips are distributed on both sides of the stop bar.